Internal Order Balance

Hi All
i have been settle the (70%) of Internal Order per the period 06 .i .e Last month
wht is the treatment fro the remaing 30%- is there any process for month end closing for IO (like G/L, Vendor Balances Etc..)
in Internal Order Report showing the balances

Hello,
depending on how your CO is set up, IO should be empty and should be cycled/settled to cost centers or wherever it is needed.
if you don't do anything, the balance will remain. Add a second line to your settlement rule for the remaining 30%
kr
Nico

Similar Messages

  • AUC - Internal order values to upload

    Hi,
    We are doing master data upload.
    We have created BDC to upload the Internal order from legacy system to SAP.
    Can any one please help on how to upload the Internal order Balances (with Asset under constructurion)
    Thanks,
    Sudha

    "Can any one please help on how to upload the Internal order Balances (with Asset under constructurion)"
    What is the actual problem?
    Assuming you want historical balances for each period on your Internal Order. One option is to:
    Post a take-on journal for each month of the Internal Order:
    Dr  P&L Exp (Capex P&L Account) with Internal Order
    Cr 999999 Opening Balance takeon GL (Balance Sheet)
    Run settlement for each month:
    Dr AuC
    Cr P&L settlement account with Internal Order
    Assumes you use a separate P&L settlement account otherwise you need to create a report painter report to report on the P&L Capex account if you don't (i.e. report painter separates settlements and actual expenditures ect in columns for the Capex account).
    Above process is painful if you have many years of data. Otherwise you can pick the end of the prior fiscal year to post the bulk of the Internal Order Value then settle it, carry forward the AuC by standard asset module closing, and then post each period as above for the current Fiscal Year.
    You would then need to exclude these figures from the Trial Balance for the remainder of the opening Balance postings at Go-Live.
    Anyone with a better idea?

  • Internal Order Settlement-urgent

    Hi Gurus
    I have an internal order balance of -160$ USD.
    USD is the Controlling Area Curr.
    But when viewed in local Curr (CAD) it has a balance of zero.
    I checked the controlling area settings, and it is set to update local aswell as contr. area curr.
    Please advise as how to get this internal order settled.
    I cant reverse because there are 600 more orders settled after this issue has arised.
    Please advise with TCodes
    thanks  in advance
    Sharath

    These could be orders already settled in the earlier years with some balance is USD currency. It is possible that the old version of SAP allowed the full settlement even with the balance in controlling area currency. In the version 4.7 this is not possible.
    As no new cost will likely be posted on or settled from these orders, so just lock the orders. This does not have any effect in reportings normally.

  • Internal Order Residual Balance carry forward.

    Hello Team,
    I am new dealing with Internal Orders, but I would like some guidance on the following:
    1- We created an internal order las year in Nov. 2007, but when I did the balance carry forward it appeares that the residual balance for I/O did not transferred. I noticed that by running report S_ALR_87013019. At the time of a creation of PO the system wll give me a msg of budget exceeded. So how do I Carry forward the residual budget into the new year? the only way I was able to resolve the issue for now is by deactivating the I/O T-code T-code K032 but then this defeats the purpose of I/O
    2- How do I set-up tolerance leve for each I/O. I would ilke for user to get a warning 10% before teh budget is about to be exceed and a hard stop 10% after it has ben execeed.
    3- How can I configure I/O to send e-mails to managers when budget hits the tolerance level.
    Thank You,
    Frank F.

    Hello and thank you for your reply. But I encoutered the following:
    1- I already have budget profile set-up in OKOB
    When I went to the menu path that you gave me
    (Controlling> Internal Orders> Budgeting and Availability Control-->
    Define Tolerance Limits for Availability Control)
    Under availability control I only show activate- K030 and deactivate K032. I did not see Define Tolerance Limits for Availabilty control.
    So I am still at a stand still. as to how to set-up Tolerance levels and how to assign it to I/O.
    but, you answer the e-mail notification, we do not have workflow set-up so it will not work.
    Any help will be greatly appreciated.
    Regards,
    Frank

  • Balance sheet account postings to Internal order

    Hi All,
    I have a situation in which I have to make a prepaid expense from a BS account but want to assign it to an internal order so that when this expense actually occur, I can use this internal order report for all the prepayment made against that expense. I can create a cost element for this BS account but this is not a good practice. Do you guys have any other idea that I can implement here which is good practice and also solve the problem.
    Thanks
    MKR

    Hi
    SAP Best practises is not to assign Internal Order to a Balance Sheet GL Account.
    In the Standard SAP, you might get an error if you assign an order to a Balance sheet account, but you have an option to change the error message from error to warning.
    You might have to change the field status group assign to the balance sheet gl account to make the Order as Optional Entry.
    Regards,
    Suraj

  • Internal Orders Residual balance forward

    Dear All,
    I am kind of new with internal orders, how do I bring residual balances from last year to this year? I am running into a problem that when we create a PO and reference a I/O #  systems tells me amoutn execeed because there is no dolalr value in the I/O. When I did the balance forward did I missed anything?

    Thank you So much Kalpik, this T-code FIXED the problem. Is there a transaction code to reverse any balance carry forward fro I/O? I just want to be prepare.
    people in purchasing can enter PO now.
    Once Again thank you so much,
    Regards,
    Frank

  • Segment derivation when posting invoice on internal order

    Dear colleagues,
    I have configured the New General Ledger in SAP ECC 5.0, with profit center and segment as splitting characteristics. Document splitting and segment derivation are working fine for almost all scenarios, but not for all scenarios.
    When a post a vendor invoice with FB60 to only a cost center document splitting and segment derivation are working correctly: the segment is derived from the profit center (which is assigned to the cost center in the master data of the cost center) and I can post the invoice.
    However, when I post the vendor invoice to both a cost center and an internal order segment derivation does not work: I get the error message GLT2201 "The field Segment marked as balancing is not filled with any value in line item 001, even after document splitting."                         
    The reason for this is that the posting on the cost center becomes statistical and the posting on the internal order is the actual posting. In the master data of the internal order I have not defined a profit center. Because of this the DUMMY profit center is assigned to the line item.
    I have assigned all profit centers to a segment (in the profit center master data), except for the DUMMY profit center. I guess this is correct?? I can easily solve this issue by assigning the dummy profit center to some kind of dummy segment, but I don't think this is the correct solution.
    A solution might be to enter a profit center in the master data of the internal order (segment can then be derived from this profit center). However, I prefer not to put a profit center in the master data of the internal order.
    Does any of you have experience the same kind of problem? Can anybody give me some advice how to derive the segment correctly in the aboven mentioned posting? Did I do something wrong in the customizing?
    Thanks for your help in advance!
    Regards,
    Koert

    I have already found the solution myself. In the customizing you can define a default segment that will be used in case no segment can be derived in the posting.
    IMG: Financial Accounting (New) --> General Ledger Accounting (New) --> Business Transactions --> Document Splitting --> Edit constants for nonassigned processes
    Regards,
    Koert

  • Interest calculation on Capital expenditure Internal Order

    Hello,
    We have an requirement that if capital internal Order is more that $ 250,000 and project runs more than 90 days, then interest should calculate on balance amount. I know that SAP does calculate interest on PS system. But I am quite doubt on capital internal order which ultimately settle to AUC. Is there any way to calculate interest against internal order in SAP? Your guidance will be highly appreciated.
    Regards,
    Nabin

    Yes it works the same as PS.  Once you create the Interest profile you can assign it to a model Internal Order on the Period End Closing Tab.  For existing Internal Orders you can assign it to the order on the Period End Closing Tab. The Interest Profile field must not be suppressed. The Field selection is in the Order Type if it not turned on
    Creating a model Order is SPRO / Controlling / Internal Orders / Order Master Data / Screen Layout / Define Model Orders
    Changing the fileld selection on IO is SPRO / Controlling / Internal Orders / Order Master Data / Screen Layout / Select Fields look at the bottom left corner.

  • GR/IR -Internal Order

    I have done the following process:
    a) Created purchase requisition with account assignment catedory A and assigned AUC # and Internal Order #.
    Committments are getting booked at internal order. Looks fine.
    b) Created purchase order with reference of PR. Committment is transfered from PR to PO at internal order. Looks
    fine.
    c) When I am doing a GR for that AUC with ref to PO, AUC number and internal order # is assigned in GR document. In
    the accounting doc, AUC is getting debit and GR/IR account is getting credit.But neither internal order is showing
    up in the accounting document nor its updating committments at internal order.
    What's missing? How can i get the GR updated to internal order.
    Thanks

    Hi,
    Please check all these are in sink or not?
    The acquisition transaction types in Asset Accounting have to be designated as relevant to the budget.
    The APC asset balance sheet accounts have to be defined as statistical cost elements.
    The APC asset balance sheet accounts have to have a field status group that should allow additional account assignment to orders
    Regards,
    Murali

  • Report on Internal orders not settled

    HI All,
    I need a report on the open internal orders which are yet to be settled.
    Thanks
    Z

    Hi,
    You can check the following standard report;
    S_ALR_87012995 - List: Orders
    If any Order shows a balance in the Actual column that means either it is not settled or there are still balances which can be settled. A zero in Actual means that the order is fully settled for the reporting period.
    Thanks,

  • Internal Order for AUC Asset not getting created Automatically

    As per SAP Standard , when I create an  AUC Internal Order (KO01), and save , AUC asset is gets created automatically ted via AS01 and stores the AUC Asset in Internal Order settlement rule. 
    However when tried with the client Im not able to create, AUC is not getting automatically created and stored in Int Order Settlement rule.
    In config I have added investment profile to Ord Type  and in OAOA ( AUC Asset class setting , Investment profile is also checked)
    Kindly let me have your inputs to fix the issue
    Advance Thanks
    Sanjai

    Hi,
    In order to create AUC asset automatically by the system, you need to create an investment profile in OITA.
    Then assign this investment profile in the Internal order master data created through KO01 in the Investments tab.
    There is no option of assigning the Investment profile in the Order type.
    And in OAOA that is Asset class, select the radio button investment measure.
    You can default the Asset class of AUC in the investment profile or leave it blank so that same can be filled when system prompts for AUC creation.
    You cant see the AUC asset in the settlement rule once Investment order is created, but only after settlement of the balances to the AUC u can see.
    Thanks & Regards,
    Ravi Kumar

  • How to change settlement receivers in internal order

    Hi
    Internal order holds costs date back to previous year. I would like to perform settlement to the Cost Center and will perform Manual reposting from Cost center to the order in current fiscal year.
    To perform this in order master data under settlement rule receivers are assets. I would like to add cost center as settlement receiver.
    Any one help me on this how to change settlement receivers.
    Useful aswers will be rewarded with points
    Regards
    Prasad

    My problem is solved in the other way,,,,,,,i have settled costs date back to 2006 to the cost center and from cost center manually posted the to the order
    and performed order settlement in 2007.
    so previous year balance has been carried to the present year

  • Issue in closing an Internal Order

    Hi SAP Gurus,
    I need assistance for closing a very old IO in SAP.
    The IO was setup with a certain profit center and cost center. The cost center is now closed.
    I tried to change the cost center to another active cost center.Now when i used t-co KO88 for settlement run = message " There is nothing to settle ".
    Using t-co KO02 for closing the IO and i get the error message  " Balance of ORD xxxxxxx is not zero ".
    So I setup the system status in SAP to TECO GMPS SETC. But i want to close this IO. What could be the issue behind this?
    Regards,
    Priyank

    Hi,
    First check whether the Line items are there or not - KOB1
    If yes, settle them first and set the status
    If no, you can directly set the status in KO02.
    KOB1 - Internal order - set maximum date and execute
    See the line items
    or
    KO02 - Menu bar -> Extras - Cost analysis
    You can ind the status
    Find the value which hasn't been settled in the below report
    S_ALR_87013015 - List: Actual Debit/Credit
    Thanks

  • Down payment against the Internal Order - for Capital Expenditure

    Dear friends
    I am getting an error while making down payment against the purchase order.
    The order of my entries or steps are as follows:
    Created one internal order for Capital WIP with budget and availability control activation.
    Created one purchase order against a vendor with reference to the above Internal Order.
    When I am making the down payment to the vendor through tcode:F-48, the system throwing an error
    "Define Cost Elements for Down Payments".
    Can any one please explain why this error is coming. When I checked in Internal orders, there is a TCode: OKEP for Define Default Cost Elements for Down Payments.
    System is asking for cost element, but where as what ever the down payment we are making is nothing but advance which is current asset. Why system is asking for cost element?
    Can any one give me the guidance how to handle the issue.
    Thanks in Advance
    Kiran Kumar A

    The reason is when you want the down payment for AUC to be capitalised, then you would need to create cost element for Downpayments.
    Normally as per design of SAP, down payment being a Balance Sheet Account (Current Asset as you rightly mentioned) doesnot need / accept an Cost object, as a special case since down payments for AUC needs to be capitalised and hence need to be carried to Controlling (Internal Order) by creating Cost Element for Downpayments.
    Go ahead and create the cost element. That would resolve your issue.

  • Asset under Construction through Internal order- Functional deficit?

    Hi Experts,
    I have created an internal order and all the expenses incurred for the asst under construction are being booked at this internal order.
    While settling the internal order the system always picks up the month end date as the settlement date and hence the balance of internal Order is getting transferred to AUC on month end date (say31.07.2007).
    So,
    The date of transfer of balance from internal order to AUC is month end date that is 31.07.2007.
    But in Actuality the AUC got complited before month end (say 15..07.2007) and the Asset was put to use on 15.07.2007.
    Now the system is not allowing to settle the AUC to Main Asset as on 15.07.2007 as the AUC was not existence on that date. <b>Error:</b> Posting not possible (Value date earlier than capitalization date).
    I am able to transfer the balance in AUC to Main Assets as on 31.07.2007 but in this case my client is loosing the depreciation element on this asset from 15.07.2007 to 30.07.2007. Is this the functional deficit in SAP? Is there any way through which depreciation can be availed from 15.07.2007?
    Thanks & Regards,
    Bijay kumar Deo

    You can settle the AUC value in one period and posting can be made in another period. in the same you can give the different asset value date in KO88 screen. The only limitation is this possible only if the fiscal year is same.
    Give the asset value date as 15.07.2007 in KO88
    Hope this will work
    Radha

Maybe you are looking for

  • File download/upload howto

    Regarding the Fil upload/download at http://www.oracle.com/technology/products/database/htmldb/howtos/howto_file_upload.html How can I add a 'Delete' button next to each file in the Download report region to delete that file from the wwv_flow_files t

  • 10.6.8, Safari 5.1, Yahoo Mail, Hopeless?

    I am just about fed up with how dysfunctional Yahoo Mail is on my Mac.  I'm using the latest version of Safari that can be used on 10.6.8 and Yahoo mail is just abysmal.  Slow, slow, and slow, even when it works.  Often, it just doesnt.  Buttons fail

  • Proxy Error in CS5.5

    Hey Not sure if anyone else has come across this. When I set a proxy for a comp, I get an error which says, "After Effects error: zero denominator in ratio multiply. ( 17 :: 17 )". I've looked up the error code in Mylenium's database, but to no avail

  • TOP COMMAND FOR MEMORY AVALABILITY

    Hi My database is 10g. BANNER Oracle Database 10g Enterprise Edition Release 10.2.0.4.0 - 64bi PL/SQL Release 10.2.0.4.0 - Production CORE     10.2.0.4.0     Production TNS for Solaris: Version 10.2.0.4.0 - Production NLSRTL Version 10.2.0.4.0 - Prod

  • Direct Material Desciption not Replicated over to SRM

    Hi, I am using SRM Server 5.5,Classic Scenario.When we replicated materials the material Descriptions are not transferred.Can't see in Commpr01.Any clues please? Thanks & Regards, Sudhakar