Lead Time Demand on REORDER POINT REPORT ??

Hi ALL,
Hope you all doing greate , I am very new in Re order point Inventory Planning Method. I have done all the configuration as;
i - Creates an Item and assign it to the specific IO where I am selection the Planning method as Reorder point and enter the other paramters under the lead time tab I am seleting the total lead time as 5.
I have define safty stock as 100  quantity.
I have configure the Forecast Set and forcast under it which contain an Item with Current Quantity is 1000 now I have call the Report to run so I am getting the rest of the thing except value Lead Time Demand ??
kindly help me in this regards, I would be so kind of you.
Thanks
Mohammad Younus

Hi,
There is a standard report that shows the actual average LT compared to the master data definitions. You can also see the details, and even update master data automatically if you want; WPDTC.
Regards,
Mario

Similar Messages

  • Lead Time - Customizatiou0131n steps: Shipping point, route, and loading group

    It says about delivery scheduling that "The lead time considers the shipping point, route, and loading group". Can anybody explain me briefly the customization menu steps about this sentence?
    Thanks in advance.

    Please go through this document it will help you
    1) Maintain transportation planning point through Menu as follows:
    IMG Maintain Logistic Execution  Definition Enterprise Structure  transportation planning point.
    Create your own like BP01 enter the general data¡¯s required
    2) Defining modes of transport:
    IMG RoutesBasic Transportation Functions  Transportation Logistic Execution Define modes of transportDefine routes
    Use the standard like:
    Shipping type: 01
    Description: Road
    3) Define shipping types :
    Basic Transportation Transportation Logistic ExecutionIMG Define shipping types Route Functions
    Or through T-code: SM30
    PT: 01
    Description: Truck
    Mdtr: 01
    STPG: 0001
    4) Define transportation connecting point :
    LogisticIMG DefineRoutes  Basic Transportation Functions  Transportation Execution Define transportation connection pointsroutes
    Copy the std point and make it FB01 as departure zone and FB02 as destination zone
    5) Define routes and stages.
     Logistic Execution IMG Define Define routes Routes  Basic Transportation Functions Transportation routes and stages
    Use the standard route and copy it as FB0001 and enter the departure zone and destination as what we created.
    6) Defining Transportation Zone:
    Basic Transportation Logistic Execution IMG Define transportation Router determination  Route Transportation Functions zones
    Use the standard transportation zone depending on the route so as for the example use 0000000003 - Southern Region
    7) Maintain country or transportation zone for shipping points
     Logistic Execution IMG  Route determination  Route  Basic Transportation Functions Transportation Maintain country and transportation zone for shipping point
    Shipping point be ASH1 and route as 0000000003 which is assigned to country India
    8) Maintain route determination:
    Logistic ExecutionIMG Route determination Route  Basic Transportation Functions  Transportation  Maintain route determination
    Country of departure: India
    Departure Zone: 0000000003
    Country of destination: India
    Destination Zone: 0000000003
    And enter the data’s needed like shipping condition 01, etc.
    Maintain Transportation relevance for shipping point, sales document type and delivery types.
    9) Now create shipping types
    IMG Define shipment Shipments  Transportation Logistic Execution types
    Copy the standard 0001 and make it to AFIL
    10) Define and assign traffic zones through T-Code: T_76 (or) thru menu as follows
    IMG Define Basic functions  Shipments cost  Transportation Logistic Execution and assign tariff zones
    Copy the standard and make it to FABTARIFF and assign our transportation planning point as ATP1, ATP2 assign tariff zone to every particular transportation planning point
    11) Define and assign pricing procedures
    Shipments Transportation  Logistic Execution IMG define and assign pricing Price control  Pricing cost procedures
    Copy the standard shipping cost pricing procedure SDFC00 to FBSC01
    12) Assign purchasing data:
     Logistic Execution IMG Assign purchasing data Settlement  Shipments cost Transportation
    13) Assign transportation planning point to shipping condition, purchase organization, purchasing group and to plants.
    14) Define Automatic G/L account determination:
     Transportation  Logistics Execution IMG Automatic G/L Account Determination Settlement Shipment Costs
    Or through T-code: OMWB
    Use G/L account 614000 as used in standard
    15) Automatic determination of CO assignments:
    IMG Automatic Settlement  Shipment Costs  Transportation Logistics Execution Determination of CO Assignments
    Or T-code: OKB9
    16) Maintain shipping point address.
     Logistics Execution  Definition Enterprise Structure Define, copy, delete, check shipping point
    17) Creating G/L account centrally.
    Financial AccountingAccounting  Master Records  General Ledger 
    Individual Processing Centrally
    Or through T-Code: FS00
    18) Enter the G/L account 614000 to the company code AFIL
    19) Create transportation condition records:
     Shipment cost  Transportation  Master data Logistic Execution createPrices
    Or thru T-code: TK11
    Enter condition type FB00 that is freight condition type, which is used as standard in the shipping cost pricing procedure.
    Enter the price and save it
    Process:
    1. The system determines the pricing procedure for the shipment cost item-using transportation planning point, service agent and shipment cost item category
    2. Calculation Basis
    3. Condition Record
    4. Access sequence.
    For the sales order, create a delivery using VL01N and pick the goods. Now create a shipment using VT01N and assign the delivery to the shipment document. Make sure to enter the carrier and other details before performing the transportation planning and execution. Save the shipment document and PGI for the delivery would be done automatically.
    A shipment represents a physical goods movement between two or more locations.
    For the system to create a shipment, shipping-relevant deliveries must exist.
    You use Transportation Planning to group pending deliveries into shipments and then to perform the shipments.
    The outbound delivery documents contain routes that the system calculates in route determination, and a transportation planning date for the delivery.
    Dynamic transportation planning is responsible for grouping together outbound deliveries into shipments that have at least the same route, visit plan type and the same transportation planning date.
    The following restrictions can be taken into account for a shipment in Dynamic Transportation Planning:
    • Weight
    • Volume
    • Variable capacity
    • Number of stops
    • Maximum duration
    • Loading units
    Create Shipment Document
    Use
    After the status of the delivery is open for transportation planning, it is possible to create a shipment document to schedule the transportation.
    Transportation Create Single document Logistics Logistic Execution  TransportationPlanning
    T.code: VT01n
    Enter your transportation planning point and shipment type. Press enter.
    Creating the shipment cost document
    Use
    After the deliveries are scheduled by shipment and the shipment is executed, now it is time to maintain and close the shipment document in order to record all relative information and ready for the shipment cost settlement.
    Single document Logistics Logistic Execution  Transportation Shipment cost Create
    T.code: VI01.
    After creation of shipment cost doc. You settle the Shipment cost.
    Go to VI02, enter shipment cost no.and press enter.
    Then go to Overview -- Fright cost items, Select the line item and double click it.
    Go as main menu: Item --> Acc. assignment, you enter G/L acc. and cost center to which the transportation cost will be posted.
    On the Standard change, details – Freight cost items screen, then check the check box “Transfer”, which means you will transfer the relative transportation cost to FI/CO, in this case, the system should determined which Purchase Order will used to settle the cost, so after you check the “Transfer” check box.
    Press save button on the current screen.
    Shipment cost settlement and documents:
    Use
    After the shipment cost settled in shipment cost document, it has the following affects:
    It creates a service entry sheet that refers to the purchase order determined.
    It posts acceptance of services performed.
    It creates an accounting document for the accruals.
    Further subsequent documents are created in FI.
    Create Delivery:
    T.code: Vl01n
    Create TO:
    T.code: LT03
    Create Shipment Document
    Use
    After the status of the delivery is open for transportation planning, it is possible to create a shipment document to schedule the transportation.
     Transportation Planning  Create Single document Logistics Logistic Execution Transportation
    T.code: VT01n
    Enter your transportation planning point and shipment type. Press enter.
    Creating the shipment cost document
    Use
    After the deliveries are scheduled by shipment and the shipment is executed, now it is time to maintain and close the shipment document in order to record all relative information and ready for the shipment cost settlement.
    Single document Logistics Logistic Execution  Transportation Shipment cost Create
    T.code: VI01.
    After creation of shipment cost doc. You settle the Shipment cost.
    Go to VI02, enter shipment cost no.and press enter.
    Then go to Overview -- Fright cost items, Select the line item and double click it.
    Go as main menu: Item --> Acc. assignment, you enter G/L acc. and cost center to which the transportation cost will be posted.
    On the Standard change, details – Freight cost items screen, then check the check box “Transfer”, which means you will transfer the relative transportation cost to FI/CO, in this case, the system should determined which Purchase Order will used to settle the cost, so after you check the “Transfer” check box.
    Press save button on the current screen.
    Shipment cost settlement and documents:
    Use
    After the shipment cost settled in shipment cost document, it has the following affects:
    It creates a service entry sheet that refers to the purchase order determined.
    It posts acceptance of services performed.
    It creates an accounting document for the accruals.
    Further subsequent documents are created in FI.
    Generally process is-
    1) VL01N
    2) VT01
    3) VL02N - PGI
    4) VI01
    5) ML81N – Service Entry Sheet
    6) MIRO – Invoice Verification
    Shipping docs (VT01) are created before PGI...
    You cannot carry out transportation planning or creation of shipment after the goods issue has been executed. Once goods issue is done it means that the material has left your premises so there is no need for a transportation planning after it.
    In case you need carry out the shipment documents at the end of the day you could just create the delivery documents during the day and at end of the day create the shipment documents and the goods issue
    This link is also usseful:
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LETRA/SDTRA.pdf
    Hope this helps you.
    Regards
    nitin

  • MM Report for Reorder and lead time

    Hi,
    Can anyone suggest me a report that can show information by materail such as min./max. quantity, re-order or safety stock, and replensihment lead time.
    Thanks
    Atif

    you can create the query using MARC or just go se16 adn enter the MARC table and pull the data.\
    Displayed Fields:   8 of   8  Fixed Columns:                2  List Width 0900                                                                               
    Material             Plant  Reorder Point     Safety stock      Min. lot size     Max. lot size     Total RL time Min SafetyStock                                                                               
    MATERIAL            Z001               0.000             0.000         5,000.000       350,000.000   0                       0.000

  • Report for Reorder point, safety stock, current stock and fixed lot size

    Hi,
    Purchasing Dept. is looking for a report which can give list of materials falling below the reorder point, so that they can go ahead and create procurement proposals for those materials.
    They also want to see the Reorder Point, Safety Stock, current stock and fixed lot size in the same report.
    Let me know if there ia any standard report availbale which displays the same or any approach to get the same.
    Thanks in Advance.
    Regards,
    Shankar Goud.

    Hi,
    There is no standard report because this is meant to be managed by the MRP run.
    The MRP lists show all materials that have a problem (such as stock below reorderpoint) but MRP generates requirements for these anyway and so all you need to do is to look for the MRP generated requirements (requisitions?) and you have your list?
    Are you using MRP?
    If so then please use the standard functions in MRP to get this.
    If not, then WHY NOT?
    Steve B

  • Lead time values are not appearing in the report for current year.

    Hi friends,
    Iam checking a report in production.  where lead time values are displayed as 0 for 1 key figure lead time3 (w/0 dim) . i found there is a formula for this it shows like NODIM ( 'Lead Time 3' ).and there is a value for cal.lead time
    how can i get values in the report.
    Thanks ,
    VRV.

    Hi,
    Although your question is not clear, I understood that the formula built on that KF is NODIM. Basically it means, units of measurement is not considered when calculating.
    Eg: 5 Minutes + 5 Kilograms = 10
    You please try to analyze your KF by the above logic. Then you would be able to figure out why the data is not appearing in the report..
    Assign if helps...
    Regards,
    Suman

  • PO lead time report

    Hi Gurus
    What report can be run to provide the average time taken from PO creation to Goods reciept? IE how do we measure actual delivery lead time
    Thanks in advance
    BR

    Hello
    Thanks for reply.
    IF this is not , could you pl let me know the correct procedure and any standard report for measuring the Delivery time for Purcsase Order based on materials.
    As per your exnample , why a person should enter the delivery date manually , it should should come by system based on PDLT maintained ..
    for tht reason only we are looking to review our materials to update correct PDLT.
    thanks..

  • Report Supplier Lead Time - Days

    Hi All,
    Can anybody give me the characters, key figures, CKF's, RKF's and other fields that are usually used in Supplier Lead Time - Days Report in general irrespective of the requirement.....come up what ever you remember from your side.
    Thanks All,

    Nevermind

  • Production lead time report

    Hi,
    Given below mateiral with their lead time activity
    Material A- Finish (in house prodn)
    100 qty = 10 days
    Low level in BOM
    X- Halb (2 days)
    Y-Roh (10 days)
    Z-Traded goods (2 days)
    Is there any report available which provide the information, if i want to plan mateiral (finish) with what period it is possible to fulfill the customer requirement. Considering all procurement and production activity.
    Regards,
    Rajesh

    Hi Rajesh,
    There is no standard report available for the leading time of FG with BOM multi levels. You can go for a Z report.
    thanks and regards
    Murugesan

  • Lead time Report

    Hi,
    Would like to have a report on Lead time between PO Date & GR date.
    Ideally the report should show the PO Number, Date,Material, Mat. Doc Number & GR Date.
    Though ME80FN shows by clicking the PO history, But our user would like to have in a single line item.
    Is there any other Standard Report  to get the above data?
    Regards,
    Vengat

    Hi,
    There is a standard report that shows the actual average LT compared to the master data definitions. You can also see the details, and even update master data automatically if you want; WPDTC.
    Regards,
    Mario

  • PO Lead Time Standard report

    Hi Experts,
    Do we have Standard report to monitor PO Lead time. (Time taken by Vendor to fulfill the Order)
    Regards,
    Jackie

    Hi,
    You can use the report MC$K to check the delivery date vairance for the vendor with respect to material delivery.
    The delivery date variance is calculated with respect to PO Delivery Date and GR Posting Date.
    To execute the report, the delivery date variance  needs to be defined in transaction code MCFC at Purchasing Org. level.
    Regards,
    Bijoy Kumar

  • Material report showing lead time & min order quantity?

    Hi,
    Is there a report which I can download which shows by material, the lead time and minimum order quantity?
    Thanks
    Keeley

    We don't have access to any query writing so if it's not possible to get both fields on one table, can I run two reports?
    OR...
    is it possible to change the ME1M report to display/export horizontally in a table type format rather than wrapped?
    Edited by: Keeley B on Sep 23, 2009 7:58 AM

  • Shipping point - Lead time

    Based on shipping point and route can we set the lead time for pick/pack time and load time.
    In our case we have shipping point 1000. For this shipping point - 1000 based on the ship to party destination zone 5 routes can be determine.
    Letu2019s say R1, R2, R3, R4 and R5
    I need to maintain 2 days additional lead time for pick/pack time and load time only fot the route R1. If I maintained the lead time for pick/pack and load time as 2 days under shipping point 1000 this lead time will be applicable to all the 5 routes.
    In my case this lead time 2 days will be taken into account for only when the route R1 determined for the shipping point 1000.
    PS: This R1 is determined based on the shipping conditions maintained for the customers in customer master.
    Please suggest how to achieve this functionality.
    Thanks

    Thanks for the response.
    The reason why I canu2019t maintain the extra lead time for R1 is for this route customer is arranging the carrier on his own. Since company is not arranging the carrier we cannot maintain the transit time at route level.
    The idea behind the whole process is for some customers carrier is taking care by themselves. Customer raises sales order through EDI there only requested delivery date is being maintained by the customer. Based on the req. delivery date material available date and load time will be determined (for this process we had not maintained any lead time for mat. Availability and load time) so system is taking the delivery date as the mat availability date and load time. The confusion lies here. If the req delivery date given by the customer is 05/20/2009 mat avil date and load time is also the same 05/20/2009. But the customer wants the goods in his warehouse on 05/20/2009 so our customer service reps are manually back date the req delivery date in the order to 05/17/2009 ( the difference 3 days consider the customer to arrange the carrier and the goods to be available on his choice). As we back date in the order from 05/20/2009 to 05/17/2009 so the material ava date and loading time would also be 05/17/2009. By doing this planning can be done and makesure material will reach customer on 05/20/2009/
    Pls let me know if you have any questions
    Thanks.

  • Re: report for lead time of material

    Dear Gurus,
    I just want to know is there report to see the lead time of material. Kindly suggest me which is the t-code available
    Regards,
    Rajashekar

    Hi,
    You can see the lead time in Report- MCE7 (T Code) for material analysis, here yo will get lead time delivery time of material as per Material group, Vendor,purchase Org. If you want to get material number ,after results displayed choose from menu settings > characteristic display > key & description (or just key) , then
    choose from menu settings > column width and extend the length to e.g. 59 (18 material number + space + 40 description)An alternative way is building query  taking into consideration Table MARC. Thanking you.

  • Target and Actual Lead time in MCP1 report

    Dear Experts,
    In MCP1 report, what is Target Lead Time and Actual Lead Time. How it is calculated?
    Thanks in advance for your valuable replies.
    Regards,
    Jejesh

    Hi,
                                                                                    Target lead time                                                                               
    On the operation level, it is the time period between the scheduled      
        input date at the work center (target input) and the latest scheduled    
        finish of the operation.                                                                               
    The target input date is calculated through the scheduled execution      
        finish of the previous operation.                                                                               
    On the order level it is the time period between the scheduled start and 
        the scheduled finish.                                                    
    and
                                                                                    Actual lead time                                                                               
    At operation level, the time between the input date at the work center   
         and the completion confirmation date (the total from queue time,         
         execution time and move time).                                                                               
    When calculating, the input date is determined via the completion        
         confirmation date of the preceding operation.  The process-dependent     
         wait time of the preceeding operation is subtracted.                                                                               
    At order level, the time between the reported start date and the finish  
         date (the total from execution times and transit times of the operations 
         as well as the order floats before and after production).                
    Regards,
    Rajesh

  • Drop below reorder point - list or report?

    Hi there,
    I would like to create a list of all materials that dropped below the reorder point. Is there a report or transaction to squeeze that information out of the system or do I have to code my oun report?
    If I have to code my oun report I would appreciate a little hint what tables are best to check and maybe even some criteria to check with.
    Thank you in advance!

    Hi!
    I tried both but I am stuck with exception group 96. I dont have one of those...
    MD04: I cant find any Exception groups at all. What frame, Tabstrip?
    MD06: I got a frame calles Restrict selection and a tab strip with Exception groups. In that tab I got exception 1 "New, opening date in the past", 2 "New, start date in the past", ...8 "Terminations"... but no 96 at all.
    Sorry for my incompetence... I am more into abap then user transactions..
    Regards
    Manfred

Maybe you are looking for

  • Trying to pass string OUPATH in my javscript file during OSD MDT deployment. How to do I do this correctly?

    I have an hta and javascript file that requests different pieces of AD info and passes them along to our server during deployment. I have been trying to get the string OU path to pass but am not able to. Each time I get an error that tells me its not

  • How can i make my mobile me account email my primary email?

    I have an apple id and a mobile me account. I want all of my apple mail such as purchase receipts from the itunes store to be sent to my mobile me account address instead of the primary email adress for my apple i.d. Ever time i go into account setti

  • Importing a list into a combo box.

    I need to import several large lists into combo boxes in a form I am creating in AcrobatPro XI. I found the comboPopulateTest.pdf in another discussion; however, this only populates the items in the list. I need to import the Export Values associated

  • Switch to Mac ?

    Hi, Sorry, I don't know any other discussion group I can post besides this one. I hope it is not an off topic here. I want to get a new laptop for my Java work(java servlet(Resin), jsp, JavaBean.., basically webapp stuff). I didn't think about it unt

  • P&L after Distribution

    Dear Consultants, We will be using distribution cycle in allocating some of the expenses from one cost center to another cost centers. Example: Cost Center A had a posting to GL Account / Cost Element 600001 amounting to $ 10,000.00 This will be allo