Load Plan parallel execution hanged after data warning

We are having 9 scenarios executing in parallel in a Load plan. Whenever we get data quality warning for certain interface, the error data get written to E$ table, and execution of this scenarios get completed with warning yellow sign. But after this scenario next scenario didn't execute and LP remain in the running mode.
But when I break the parallel steps in a group of 2 scenarios, it run fine and completed all the steps even after warnings.
Does this means it depend on Agent setting, as currently we have only one agent setup on weblogic server.
Thanks
Sanjeet Singh
Edited by: 963648 on Oct 7, 2012 2:36 AM

There was Oracle bug "Bug 13324950 : LOAD PLAN EXECUTION REMAINS IN RUNNING STAT WHEN ONE PARALLEL SCEN TRACKS ERRORS"
Patch 14550964: LOAD WHEN USING THE ODI LOAD PLAN, THE LOADING STOPS WHEN THERE IS A WARNING to fix the issue.Pls note when you search this patch in the system, it will return two patches for 11.1.1.5 and 11.1.1.6.3 receptively. Pls choose the right version.

Similar Messages

  • E 7-00 hangs after date change to 1 year past. New...

    Hello boys and girls,
    I bought this sh... and the worst thing in this smartphone is voice conversartions ex. auto relock touch screen at incoming call and many other. My old E70 is best in that case.
    This fu... device hangs up always after date change to 1 year past. I do that to install application which has certificate expired .
    After reset (8 secs. power btn. press) situation is still persist - hangs on pulpit and no reaction for any button but power (8 sec. reset).
    Help please and release update for this next **bleep**in BETA version !!
    Solved!
    Go to Solution.

    @WINFO
    Whereas you would probably get away with installing application compatible with touch screen S60 5th Ed. device, you are trying with application for S60 3rd FP1 which also has expired certificate.
    However many times you keep power button depressed for 8 seconds this is only equivalent to removing battery from device not resetting; you may have to consider a three key depressed power on "hard reset" with all it's consequences to get device working again.
    Happy to have helped forum with a Support Ratio = 42.5

  • Mapping execution hangs after 10.1.0.4 upgrade

    Hi,
    The following has been upgraded :- OWB from 10.1.0.2 to 10.1.0.4, Workflow from 2.6.2 to 2.6.4 and DB from 9.0.2 to 10.2. After all this I had problems executing process flows, I re-registered the location for these and re-deployed the pf;pws and they execute now. I cannot execute mappings directly until I re-deploy them. I have hundreds of mappings, they seem to be okay being run by pflows but I am not sure if some get run by themselves , in which case it looks like they will fail if they are not deployed. Has anyone come across this behaviour after the 10.1..0.4 upgrade, is it normal to have to re-deploy all mappings and pflows after upgrade ??
    Thanks for any assistance !
    Cheers,
    Brandon

    Thanks Borkur, I may do the same here, problem with my repository is that some mappings fail when trying to re-deploy but the current pl/sql in the target is executing fine so I will have to fix the deployment errors before I can deploy these (db links arent being added to the remote objects). Was hoping not to have to re-deploy all the mappings but I agree may be best to be safe.
    Cheers,
    Brandon

  • Parallel Execution and disk affinity on MPP

    Hello,
    In Chapter 25 Using Parallel Execution
    Oracle® Database Data Warehousing Guide
    10g Release 2 (10.2)
    Part Number B14223-02
    There is a very short quote "Additionally, Oracle Database considers the disk affinity of the granules on MPP systems to take advantage of the physical proximity between parallel execution servers and disks."
    I understand the benefits but :
    - I'm wondering what it really means ?
    - How it can work ?
    - How to demonstrate, show this phenomenon ?
    Best Regards,
    Gregory

    Hi Vency,
    Try posting this in the following forum:
    General Database Discussions
    Thanks, Mark

  • Send a Failure Email Notification After Load Plan execution in ODI 11g

    Hi Experts,
    Greetings!
    I am trying to send an email if any of the step fails during Load Plan execution. Irrespective of the failed object, only 1 email should be sent to the Administrator. I unable to do this. Mails are getting sent for the no of times the no of object fails. For eg if 10 out of 100 steps fails, 10 emails are getting sent. I need to send only 1 email.
    I am using ODISendMail.
    I have tried various combinations however, all in Vain.
    For instance:
    root step --> Exeception Step (Send Failure Email) and Execption behaviour (Run Exception and Ignore). Using this because, I dont want to stop the load plan on the step failure.
    Interface1: Exeception Step (Blank) and Execption behaviour (Run Exception and Ignore).
    Interface2: Exeception Step (Blank) and Execption behaviour (Run Exception and Ignore).
    Exception not getting executed.
    Please help.
    Regards,
    Andy

    Thanks SH.
    I tried your suggestion as per below.
    1. Created global variable "v_cnt" with default value "0"
    2. Created package "pkg_v_cnt" to increment the variable by 1
    3. created package "pkg_sendError_Email" to check if v_cnt > 0 then Send Error Email.
    For Instance, the loan plan looks like this:
    root step --> Exeception Step (pkg_v_cnt) and Execption behaviour (Run Exception and Raise)
    Interface1: Exeception Step (pkg_v_cnt) and Execption behaviour (Run Exception and Ignore).
    Interface2: Exeception Step (pkg_v_cnt) and Execption behaviour (Run Exception and Ignore).
    Send Error Email (pkg_sendError_Email)
    The issue here is that, the variables are not getting the incremented value and hence unable to send email . The variable value remains "0" even after execution of the exception steps when both interfaces fails.
    Pls help.
    Thanks,
    Andy

  • BI Apps ODI Load Plan Execution Error and Question on Rerun

    I am following the technetwork Cookbook: Installing and Configuring Oracle BI Applications 11.1.1.7.1 to install and configure my first BIApps with ODI. Smooth until I execute the Load Plan.
    Following errors were found on first attempt of execution. Without doing any change, I re-executed the load plan, error again but this time the message is difference (2nd attempt)
    Question:
    - How shall I start to diagnostic the ODI error?
    - Apparently there are something left in the failure execution, how I can clean it up for reruning the Load Plan?
    Many thanks.
    ODI errors on first execution
    ODI-1519: Serial step "Start Load Plan (InternalID:1500)" failed because child step "Global Variable Refresh (InternalID:2500)" is in error.
    ODI-1519: Serial step "Global Variable Refresh (InternalID:2500)" failed because child step "1 Domain (InternalID:5500)" is in error.
    ODI-1519: Serial step "1 Domain (InternalID:5500)" failed because child step "2 Domain SDE (InternalID:35500)" is in error.
    ODI-1519: Serial step "2 Domain SDE (InternalID:35500)" failed because child step "Serial (InternalID:36500)" is in error.
    ODI-1519: Serial step "Serial (InternalID:36500)" failed because child step "3 SDE General Domain (InternalID:54500)" is in error.
    ODI-1519: Serial step "3 SDE General Domain (InternalID:54500)" failed because child step "Load Target Table (InternalID:55500)" is in error.
    ODI-1519: Serial step "Load Target Table (InternalID:55500)" failed because child step "EBS_12_1_1 - DSN 1000 (InternalID:56500)" is in error.
    ODI-1519: Serial step "EBS_12_1_1 - DSN 1000 (InternalID:56500)" failed because child step "DOMAIN (InternalID:57500)" is in error.
    ODI-1519: Serial step "DOMAIN (InternalID:57500)" failed because child step "Parallel (InternalID:58500)" is in error.
    ODI-1518: Parallel step "Parallel (InternalID:58500)" failed; 5 child step(s) in error, which is more than the maximum number of allowed errors (0) defined for the parallel step.  Failed child steps: COMMON (InternalID:59500), HUMAN_RES (InternalID:90500), FINANCIALS (InternalID:95500), SUPP_CHAIN (InternalID:122500), PROJECTS (InternalID:98500)
    ODI-1518: Parallel step "COMMON (InternalID:59500)" failed; 11 child step(s) in error, which is more than the maximum number of allowed errors (0) defined for the parallel step.  Failed child steps: SDE_ORA_DOMAINGENERAL_PRODUCT_CLASS (InternalID:69500), SDE_ORA_DOMAINGENERAL_FND_LOOKUPS PAY_GROUP (InternalID:88500), SDE_ORA_DOMAINGENERAL_FND_LOOKUPS MARITAL_STATUS (InternalID:85500), SDE_ORA_DOMAINGENERAL_PRODUCT_MASTERORG (InternalID:73500), SDE_ORA_DOMAINGENERAL_PRODUCT_CATEGORYNAME (InternalID:67500), SDE_ORA_DOMAINGENERAL_STATE (InternalID:61500), SDE_ORA_DOMAINGENERAL_FND_LOOKUPS CUSTOMER_CATEGORY (InternalID:83500), PRODCAT (InternalID:75500), SDE_ORA_DOMAINGENERAL_FLEXFIELD (InternalID:89500), SDE_ORA_DOMAINGENERAL_FND_LOOKUPS ORGANIZATION_SIZE (InternalID:82500), UOM - Serial (InternalID:78500)
    ODI-1217: Session SDE_ORAR1211_ADAPTOR_SDE_ORA_DOMAINGENERAL_PRODUCT_CLASS (38500) fails with return code 8000.
    ODI-1226: Step Run SDE_ORA_DomainGeneral_Product_Class fails after 1 attempt(s).
    ODI-1240: Flow Run SDE_ORA_DomainGeneral_Product_Class fails while performing a Integration operation. This flow loads target table W_DOMAIN_MEMBER_GS.
    ODI-1228: Task SDE_ORA_DomainGeneral_Product_Class (Integration) fails on the target ORACLE connection BIAPPS_DW.
    Caused By: java.sql.SQLException: Listener refused the connection with the following error:
    ORA-12516, TNS:listener could not find available handler with matching protocol stack...
    ODI errors on second execution
    ODI-1519: Serial step "Start Load Plan (InternalID:1500)" failed because child step "Global Variable Refresh (InternalID:2500)" is in error.
    ODI-1519: Serial step "Global Variable Refresh (InternalID:2500)" failed because child step "1 Domain (InternalID:5500)" is in error.
    ODI-1519: Serial step "1 Domain (InternalID:5500)" failed because child step "2 Domain SDE (InternalID:35500)" is in error.
    ODI-1519: Serial step "2 Domain SDE (InternalID:35500)" failed because child step "Serial (InternalID:36500)" is in error.
    ODI-1519: Serial step "Serial (InternalID:36500)" failed because child step "3 SDE General Flexfield (InternalID:37500)" is in error.
    ODI-1519: Serial step "3 SDE General Flexfield (InternalID:37500)" failed because child step "Finalize Flexfield (InternalID:50500)" is in error.
    ODI-1519: Serial step "Finalize Flexfield (InternalID:50500)" failed because child step "EXEC_TABLE_MAINT_PROC (InternalID:51500)" is in error.
    ODI-1217: Session EXEC_TABLE_MAINT_PROC (107500) fails with return code 20000.
    ODI-1226: Step TABLE_MAINT_PROC fails after 1 attempt(s).
    ODI-1232: Procedure TABLE_MAINT_PROC execution fails.
    ODI-1228: Task TABLE_MAINT_PROC (Procedure) fails on the target ORACLE connection BIAPPS_DW.
    Caused By: java.sql.SQLException: ORA-20000: Error creating Index/Constraint : W_FLEX_SQL_G_U1 => ORA-01452: cannot CREATE UNIQUE INDEX; duplicate keys found

    Hi,
    The first error happened is
    ORA-12516, TNS:listener could not find available handler with matching protocol stack...
    The above is due to the listener been disconnected while the LP is executing. This can be solved by restarting the load.
    The second error happened is
    ORA-20000: Error creating Index/Constraint : W_FLEX_SQL_G_U1 => ORA-01452: cannot CREATE UNIQUE INDEX; duplicate keys found
    The above is due to the duplicate records found in the table w_flex_sql_g. You can solve this by deleting the duplicated records in that table like referred in the below link
    OBIEE, Endeca and ODI: BIApps and ODI 11.1.1.7.1 Full Load
    Regards,
    Saro

  • Early execution of scheduled load plan

    Hi All,
    Can anyone help me
    In my Project, production environment they scheduled 2 loadplans ie fulltest & odscopies
    so what happen here is in fulltest scheduled at every sat 1.00am, having 7 scenarios with 3 are parellel, in that 2 scenarios has executed befor the scheduled time and again exectuted scheduled time
    why its runs we are not able to found it and its do this week only never happen previosly ?
    Thansk in advance
    srikanth

    Hi.
    1) I don't know if its possible
    2) I don't know if it's possible to achieve what you want from one load plan to another.
    You may do the following:
    1 - Create a table with the load plan name or ID and the dependency between them (like a parent-child table) and put start and end date times or flag attributes to inform the execution start and finish.
    2 - Create one or more package or procedure to control the finish of one load plan and start of the other. Use the ODITimeWait and a variable to check the value of the flags in a loop.
    3 - Put the call of these packages or procedures in the beginning of each load plan so he may start but will continue only if the parent load plan finished sucessfuly.
    May be a little complicated in the beginning but worth a try and you can attach as many load plans you want.
    OR
    1 - Create a package with a call to the child load plan using OdiStartLoadPlan
    2 - Add the package scenario to the end of the first load plan.
    Any other idea will be greatly appreciated.
    Cheers.

  • Load Plan Execution Control

    Hello,
    I have following requirement for execution of Load Plan:
    1. Do not allow execution of the Load Plan if it is already running?
    2. Do not allow execution of the Load Plan 1 if Load Plan 2 is executing?
    Can I achieve the requirement through some ODI API's that give me information about Load Plan run which can be embedded as a check in ON CONNECT? or some better way?
    Thanks
    AJ

    Hi.
    1) I don't know if its possible
    2) I don't know if it's possible to achieve what you want from one load plan to another.
    You may do the following:
    1 - Create a table with the load plan name or ID and the dependency between them (like a parent-child table) and put start and end date times or flag attributes to inform the execution start and finish.
    2 - Create one or more package or procedure to control the finish of one load plan and start of the other. Use the ODITimeWait and a variable to check the value of the flags in a loop.
    3 - Put the call of these packages or procedures in the beginning of each load plan so he may start but will continue only if the parent load plan finished sucessfuly.
    May be a little complicated in the beginning but worth a try and you can attach as many load plans you want.
    OR
    1 - Create a package with a call to the child load plan using OdiStartLoadPlan
    2 - Add the package scenario to the end of the first load plan.
    Any other idea will be greatly appreciated.
    Cheers.

  • W_gl_balance_a duplicating/growing data with incremental load plan

    Hi, all!
    I'm executing incremental load plan for Financial Analytics Offering and I'm facing the data doubling/aggregating in every execution.
    Any one faced this problem?
    Solutions Versions:
    - OBIA 11.1.1.7.1
    - OBIEE 11.1.1.7.131017
    - ODI 11.1.1.7.0

    Hi, Sher Ullah Baig!
    I was openned a SR to Oracle, but I still waiting response about 2 weeks.
    Thanks and Regards!
    Fernando Gonçalves
    E-Novasys Business Intelligence Team

  • Win XP Hangs after Splash Screen (PointSec Loaded)

    I have a lenovo t400 laptop, that has Pointsec encryption (6.1.3) ,and WinXP loaded on it.
    I ran the Think Vantage Lenovo update tool which downloaded and installed a number of updates - as I hadn't run it for ages.
    Now when I try to start the computer it hangs after the XP splash screen is displayed. The screen simply goes black.
    I have tried the various Safe Mode options (include VGA Mode, and start with last successful configuration) without luck. They also fail to boot.
    The flow is:
    Power On, PointSec Authentication Screen, Win XP Splash screen, then a black screen
    I have successfully got into the system using UBCD4Win with the pointsec plugin loaded, this loads a WinPE type environment via a USB stick and allows me to access the C: drive unencrypted (as I have authenticated with Pointsec).
    I'm really stuck for ideas as to which of the update is causing the problem, and would love to hear some suggestions on how to fix this situation.
    Additional Info:
    The last few lines in ntbtlog.txt is:
    Did not load driver Direct Parallel
    Did not load driver SM bios service
    Did not load driver SM bus service
    Loaded driver \SystemRoot\System32\Drivers\Cdfs.SYS
    Looking in:
    c:\Windows\$NtServicePackUninstall$
    it looks like Service Pack 3 has been installed:
    The file: spuninst\spuninst,inf shows:
    NtServicePackVersionText = "Service Pack 3"
    NtServicePackPreviousVersionText = "Service Pack 2"
    Solved!
    Go to Solution.

    Fixed!!!
    The problem was the lenovo updates (most likely culprit being the video driver I presume).
    Using UBCD4Win with the pointsec plugin I was able to
    * get  access to the decrypted c: drive
    * Manually rolled back the updates to c:\windows\system32 and c:\windows\system32\drivers
    Original files were found in places like: c:\windows\system32\reinstallbackups\008\DriverFiles
    * Finally I had to roll back the registry updates that the updates did. UBCD4Win provides a tool to do this:  Registry Restore Wizard. It basically just looks in the System Restore Directory c:\System Volume Information and lists all the available Restore Points (thankfully the Lenovo updates mark a restore point before they run). You can also do this manually using the following instructions:
    http://hypography.com/forums/tutorials-and-how-tos/17193-xp-recovery-instructions-for-ubcd4win.html
    This done the system booted successfully.
    I most definitely will be staying clear of pressing the big blue button from now on. That was a real nightmare to fix.

  • BI-IP To track the planning changes after Data Locking

    Hi All,
    Need your help to design solution for one critical user requirement in IP.
    We all know that in CC Planning, every month after certain date we lock the planning tool and freeze the data. But on exceptional basis, we might require to unlock planning tool to allow users to do some changes in planning data.
    User wants to track these changes and report it out. Is there any standard functionality that SAP-IP has provided to track these kind of changes? If not what is the best way to achieve this?
    Appreciate any input regarding this ! Thanks a lot!
    Som

    Hi,
    You need to have additional characteristics for User & Date in your RTP to record who changed when and what plan record.
    Then you can create a characteristic relationship of type 'Exit Class' to derive User Id(last changed by) and the date(last modified).
    Itu2019s not necessary to include User-ID and Date in any of the aggregation levels, but the Source Characteristic(Company code may be in your case) based on which the values are derived for User-ID & Date, must be present in each aggregation level.
    Then create a custom class say ZCL_LOC_CR_LINE_ITEM by taking class CL_RSPLS_CR_EXIT_BASE  as super class and then redefine the method DERIVE of interface IF_RSPLS_CR_METHODS in your class.
    You can write following code in your method DERIVE:
    CLEAR e_t_mesg.
    FIELD-SYMBOLS: <l_chavl> TYPE ANY.
    ASSIGN COMPONENT '/BIC/ZUSERID' OF STRUCTURE c_s_chas TO <l_chavl>.
      <l_chavl> = sy-uname.
    ASSIGN COMPONENT '0DATE' OF STRUCTURE c_s_chas TO <l_chavl>.
      <l_chavl> = sy-datlo.
    This will solve your purpose.
    Regards,
    Deepti

  • Problem in reading data from serial port continuously- application hangs after sometimes

    I need to read data from two COM port and order of data appearance from COM port is not fixed. 
    I have used small timeout and reading data in while loop continously . If my application is steady for sometime it gets hangs and afterwards it doesnt receive any data again. 
    Then I need to restart my application again to make it work.
    I am attaching VI. Let me know any issue.
    Kudos are always welcome if you got solution to some extent.
    I need my difficulties because they are necessary to enjoy my success.
    --Ranjeet
    Attachments:
    Scanning.vi ‏39 KB

    billko wrote:
    Ranjeet_Singh wrote:
    I need to read data from two COM port and order of data appearance from COM port is not fixed. 
    I have used small timeout and reading data in while loop continously . If my application is steady for sometime it gets hangs and afterwards it doesnt receive any data again. 
    Then I need to restart my application again to make it work.
    I am attaching VI. Let me know any issue.
    What do you mean, "not fixed?"  If there is no termination character, no start/stop character(s) or even a consistent data length, then how can you really be sure when the data starts and stops?
    I probably misunderstood you though.  Assuming the last case is not ture - there is a certain length to the data - then you should use the bytes at port, like in the otherwise disastrous serial port read example.  In this case, it's NOT disastrous.  You have to make sure that you read all the data that came through.  Right now you have no idea how much data you just read.  Also, if this is streaming data, you might want to break it out into a producer/consumer design pattern.
    Not fixed means order is not fixed, data from any com port can come anytime. lenght is fixed, one com port have 14 byte and other 8 byte fixed..
    Reading data is not an issue for me as it works nice but I have a query that why my application hangs after sometime and stops reading data from COM PORT.
    Kudos are always welcome if you got solution to some extent.
    I need my difficulties because they are necessary to enjoy my success.
    --Ranjeet

  • After Successfull Load ETL for General Ledger No data showing in Warehouse

    After Successfull Load ETL for General Ledger No data showing in Warehouse Tables
    DB Version # 11.2.0.1.0 and OS of Warehouse Microsoft Windows Server
    2003 R2 Enterprise Edition Service Pack 2, v.4922
    1. BI Apps version
    Release 7.9.6.3
    2. BI Apps module
    Financials
    3. Source system and version
    EBS R12.1.2
    Please help me out .......

    Hope you have done finance config as per the link
    http://docs.oracle.com/cd/E20490_01/bia.7963/e19039/toc.htm
    List out the tables with row count=0, get the sql override query and execute in source to see # records for tables ending DS or FS where row count=0
    do the same for tables ending with _D using warehouse db.
    If fact tables are getting 0 records check the w_day_d table.
    let me know updates.
    If helps pls mark.

  • [BIACM0085] Error executing load plan after reverting from LDAP to original security mechanism in BIA 11.1.1.7.1

    We have tried to change authenticaion of BI Apps 11.1.1.7.1 to LDAP, but reverted this due to some other issues. Now we are back with standard authentication, and all functionality seems to work fine, except execution of a load plan.
    When we select (any) plan that was executed earlier, we get an error:
    [BIACM0085] Error executing load plan. Action: Correct the properties selected or entered and retry.
    [BIACM0080] Cause: Application error: MustUnderstand headers:[{http://docs.oasis-open.org/wss/2004/01/oasis-200401-wss-wssecurity-secext-1.0.xsd}Security] are not understood Action: Contact your help desk or system administrator.
    According to one of our WLS gurus there is a mismatch between consumer and provider of a web service with a security policy, but we cannot find any difference between a working and this failing environment.
    We already started a trace in WLS, but this does not help us further.
    Any hints on troubleshooting steps or even better resolution are more than welcome, as this is blocking a new full load and further tests.
    Tx,
    Luc

    We have tried to change authenticaion of BI Apps 11.1.1.7.1 to LDAP, but reverted this due to some other issues. Now we are back with standard authentication, and all functionality seems to work fine, except execution of a load plan.
    When we select (any) plan that was executed earlier, we get an error:
    [BIACM0085] Error executing load plan. Action: Correct the properties selected or entered and retry.
    [BIACM0080] Cause: Application error: MustUnderstand headers:[{http://docs.oasis-open.org/wss/2004/01/oasis-200401-wss-wssecurity-secext-1.0.xsd}Security] are not understood Action: Contact your help desk or system administrator.
    According to one of our WLS gurus there is a mismatch between consumer and provider of a web service with a security policy, but we cannot find any difference between a working and this failing environment.
    We already started a trace in WLS, but this does not help us further.
    Any hints on troubleshooting steps or even better resolution are more than welcome, as this is blocking a new full load and further tests.
    Tx,
    Luc

  • My ipod cclassic 80gb is hang after trying dat press and hold method then also its not working please tell me solution

    My ipod cclassic 80gb is hang after trying dat press and hold method then also its not working please tell me solution

    Thanks for your response and good luck wishes, I suspect I will need them!
    In principle, I agree re: the manufacturer's warranty. However, I am pretty upset that this is now my second iPod to develop a critical fault within weeks of the warranty expiring, and frankly, it is not unreasonable to expect a state-of-the-art $500 electronic device to last well beyond one year of life.
    I agree talking to Apple is not likely to do me any good (the clue is in how impossible they make it to talk to them in the first place) - but that is not necessarily OK. I expect I will have to pay money to get the battery replaced - again, not OK (full stop - but especially given the cost of the device and the money I have spent with Apple). Yes, the batteries have a limited lifespan, but it should last longer than this (and surely, I should notice a gradual decline in its functionality, not an instant stop).
    I will try Deggie's suggestion (see my reply post), but probably won't hold my breath (think I have already done this). I probably will have to get the new battery - and probably under my own steam. It is a principle at stake and I feel I should be able to let Apple know how I'm feeling - and am frustrated that they make this virtually impossible. It sends the very clear message that they are not interested in listening to their customers.

Maybe you are looking for

  • How to configure Free goods

    Dear Experts, We have a scenario here,Our client raise PO for 25 pcs of material,he receive 28 PC with the same value,client has to pay for 25pcs only.how to configure the process,please suggest me. Regards, Varun

  • Oracle instance terminated by DBW0

    My one of the instance was terminated with following errors in alert log: Thu Mar 9 20:16:42 2006 DBW0: terminating instance due to error 481 Thu Mar 9 20:16:42 2006 System state dump is made for local instance Thu Mar 9 20:16:43 2006 Dump system sta

  • How do I get started using Essbase?

    Hi all, I'm a newbie to Essbase, and Business Intelligence. I went to a training/demo in March but have just done my first install to try it out for myself. (I'm a Java developer by training.) So, I've installed Hyperion EPM 11.1.1.1 on my Windows XP

  • Error code 1962: on Lenovo ideacentre b-series--​-NEED HELP---

    I recently purchased, (when I mean recently it  is 1 1/2 month ago) and I get frustrated b/c of this error (1962). I just don't understand why brand new comp. is doing this.  When I purchased the desktop it was pre-loaded with OS Windows7 and I was t

  • Import and Method Execution Error (8)

    Hi, I having problem in BI 7. when I transport all objects in one transport number such as DOSTransformationDTPDSInfoPackage and transport in QA works fine but when I move in PRD no efect in there and get this messages: Method Execution with error (8