I have created a LTP senairo and took the LTP Run through MS01. The planned order were created for the materials but the dependent requirements were not planned. In MS04 against the planned order I have an exception message 52 (No BOM selected) What can be a cause for this are there any specific settings to plan dependent materials through LTP? My requirement is that LTP should also show dependent requirements for the components.
Thanks!

Hi Özgen,
Thanks for the reply. I had entered the BOM selection ID but still it was not planning it. The problem was with the dates and when I pulled it in the planning Horizan it did plan it.. Even if there is not BOM selection ID maintained it will plan the dependent components which its doing in my case. Thanks for the reply though!
God Bless!
Regards,

Similar Messages

  • UNABLE TO CREATE DEPENDENT REQUIREMENT FOR MIC - MULTIPLE SPECIFICATION REQ

    Dear Gurus,
    We have to create multiple specification for one MIC --> ECC 6.
    We did the following activities.
    1.Inspection Type 89 --> Multiple Specification is activated in customizing - Default Values.
    2. For the material 1259, Inspection Set up - for the Inspection Type 89 carried out in QM View  of Material Master.
        Multiple spec is activated in Material Master also.
    3. Inspection Plan is created.MIC
    4. I HAVE CREATED THE INSP. PLAN --> GROUP 236 AND COUNTER 1 USING QP01.
    5.I HAVE ASSIGNED THE MIC --> TESTQC  TO THE OPERATION.
    6.In customizing,
        QM --> Quality Planning --> Inspection Planning --> General --> Multiple Specification
        For the OBJECT TYPE 01 --> COUNTRY,
       I HAVE ASSIGNED 4 COUNTRIES --> (1) BAHRAIN (2) DENMARK (3) FRANCE AND (4) GERMANY.
    7.Now I want to create the Multiple specification using the Eng. Work Bench --> EWB.
    8.  Multple Spec. check box activated in EWB.
    9 While creating a dependent requirement for the MIC in EWB, if I assign the object type --> Country   
        and the Object -->  Bahrain, I am getting the error as -->
    =====================================================================
    Assignment of material 000000000000001259;1000; is not available
    Message no. QP306
    ================================================================================================================================================
    I could not proceed.
    HOW TO CREATE THE DEPENDENT REQUIREMENT IN EWB
    Please guide.
    With Best Regards,
    Raghu Sharma

    Dear Gajesh,
    I appreciate for your prompt reply.
    I have activated the multiple specification at client level as a first step.
    Will you please check and confirm?
    Expecting your reply,
    With Best Regards,
    Raghu Sharma

  • Depreciation Run not creating a batch in SM35

    Hi All,
    System is not creating a batch in SM35 for month end Depreciation Run.
    I am using the transaction AFAB with test run system is showing the
    line items of depreciation run but without test run system is not
    creating batch in SM35 to complete the process of depreciation run.
    Please advice what to do to solve this problem. its very (URGENT)
    Regards,
    Yasir Khan

    Hi,
    Have you created a BDC or perhaps you have used Direct postings in FI?
    Look in your asset if it is posted in the period and if it is posted in FI.
    You can recreate a BDC with AFBD - Recreate Session.
    Have look in your Job log and spool file perhaps there is more information
    Paul

  • Dependent requirements not displayed for ROP

    In reorder point planning, an entry is only created in the planning file and the net requirements calculation is only carried out if stock levels fall below the reorder point. To avoid overplanning, sales orders, dependent requirements, reservations and so on are not usually included in the net requirements calculation as these future requirements are already planned with the reorder level. However, to guarantee that the MRP controller is informed of current issues, the system displays sales orders, dependent and manual reservations and so on.
    --- The question is in my case system is not displaying dependent requirements though they are only for information sake.
    Can somebody throw a light on this?

    Hello,
    In reorder point planning, dependent requirements are neither displayed nor considered in the net requirements calculation.  There are several helpful notes and a modification note available for this. Please take a look at the following SAP notes:
    - 549752 question 3
    - 550954 question 3
    If you want to display the dependent requirements, please refer to note 37697 which contains a modification for that purpose.
    I hope this helps!
    Siobhan

  • Dependent requirements

    Dear friends,
    For example I am having a Sales order for 20 items. Due to some constrains, at a time I can not produce more than 1 item. So I am creating a production order for 1 item with reference to a sales order (using CO08).
    My problem is while running MRP, system is creating the dependent requirements for all the 20items. So I want to run MRP for the production order (like MD50 for sales order). Otherwise my MRP run should not consider the Sales orders for the dependent requirements calculation.
    Dependent requirements for all the 20 items is creating a big confusion. My scenario is pure MTO. Down the line all the production is for the respective sales order only.
    Please suggest me...
    Regards.

    Hi Kodand Nag,
    Please explain your scenario once again, I get confused little bit, 
    What I understood from your last reply, u have created sale order  with order qty is 20 nos for one material. (I assume).
    Then u have created prod order for one Nos (Partially – since is capacity constraint) with reference to sale order.(CO08).
    In MTO, system consider the sale order to create dependent requirements for dependent  material.
      Here u want system to consider production order not sale order requirements  – This is not possible.
    My solution is since u have converted partially qty as Production order, order reservations should have created for dependent material, if u run the MRP for dependent material (Next one below the header material) , sale order requirements is not taken into the account only production order req. I hope i am not mistaken, else please comeback.
    Regards
    Pradeep

  • Dependant requirements

    Hi Gurus,
    One quick question about BOM not generating dependent requirements. e.g If I have a BOM1 and Components of BOM1 are P1 and P2. and If P1 is a BOM as well components are P3 and P4.
    If I create a Planned Independent requirement for BOM1, MRP should create 2 Planned order 1 for BOM1 and 2 for P1 (both materials are In-house, Strategy Group is 40. I am NOT seeing 2 planned order I only see Planned order for BOM1. kindly help is there something wrong which I am doing. Thanks

    Shani,
    To recap, it sounds like you have two BOM structures:
    BOM1 > P1, P2
    P1 > P3, P4
    You create a PIR for BOM1.  You run MRP.  MRP creates a planned order for BOM1, and no other planned orders are created.
    I will assume you did not use MD03 when you ran MRP.  I will assume that your MRP types (all 5 parts) are not a consumption type such as V, but a demand type such as P or M*.
    a.  Look at MD04 against P1 and P2.  Do you see dependent requirements from the planned order for BOM1?  Do these dependent requirements reduce the available quantity of P1 to 'less than zero'?
    b.  Manually create a planned order for P1.  Any errors/warnings?
    If the answers to 'a'  are yes, and the answer to 'b' is no, then you probably have a planning file problem.  Create a planning file entry for all 5 parts. MD20.  Delete your planned orders and try again.
    Best Regards,
    DB49

  • NPROC:Dependent requirement not getting generated

    Hi Experts,
    We have an issue wherein we have Depedent requirement for a HALB material against FERT material requirement.But, the MD04 screen of HALB material doesn't show any Dependent requirement.
    Infact, the MD04 screen of the FERT material shows NROC in the MRP element data for the given period.
    NROC: It means that there are some errorneous components which were created by doing GR before a GI.
    I had tried executing MF47 transaction(which is COGI equivalanet in REM scenario) for clearing the errorneous components.But, i got the error as "Deficit of BA Unrestricted use". So,it means that it shall use my current stock for post processing the error componenets, which ideally shouldn't been the case as the stock was already consumed.
    Then, i found out that the BOM of FERT was not maintained.
    So,just wanna know that coz BOM of FERT is not maintained & the HALB needs to be defined as a component in the BOM of FERT in this case?
    or any other solution is there so that Depedent requirement for the HALB material reflects in MD04 screen.
    What we want: The recurring NPROC requirement which is coming for the year 2009, 2010 should permanently vanish from MD04 screen.
    Thanks,
    Rishi
    Edited by: Rishi. N. Khanduri on Jan 28, 2010 3:08 PM

    Harendra,
    Are you using "NETPL" as processing key for MD02? After 3 or 4 days is the dependent requirment getting created automatically or is it after MRP run again?
    Please provide more details,
    Regards,
    Prasobh

  • Dependents requirement not created

    Hello Gurus,
    I am running MRP through batch MRP run 
    (t.code - wc27),
    Processing key NEUPL 3 3 1 1 1. I want to create dependents requirement future dated so date input I gave is 28/12/2018 last working day form factory calender., but requirement is not created.
    Please help I am new in this module. Need help.

    Hello Ameya
    I don't see the point of running MRP with date 28/12/2018.
    Dependent requirements will be created on future date according to the parent planned order date, not to the MRP date.
    Please try to run MRP again it with today date.
    If you want to have dependent requirements in the future, please make sure that there are planned orders with date in the future for the parent materials.
    BR
    Caetano

  • MRP Run can not create Planned order to Sales order

    Hi,
    I have a problem with planning run to sales order. We have a configurable material which have make to order strategy. MRP Run does not create planned order to some of our sales order. I think it has relation with schedule lines but i can not understand the problem.
    If schedule line has 1 as confirmed quantity MRP run can not plan but 0 as confirmed quantity MRP Run creates planned order.  How can i solve this problem?
    Regards,
    techmastere

    Hi,
    Order for which qty is confirming, check which schedule line is determined and which requirement type system is determining.
    then in VOV6 for schedule line tick mark availability check & Transfer of requirement
    for requirement class OVZG tick mark availability check & Transfer of requirement
    Note: if schedule line is not relevent for availability check & ToR then system always defaul confirm quantity.
    kapil

  • OOTB approval worfklow not creating task when require checkout is set as Yes on the document library

    HI,
    I set the document library versioning to "require check-out" to yes.
    I set the workflow settings to create an approval workflow and "start the workflow when the item is created".
    I create a new document from the document template, save and check-in. The workflow task is not getting created, however the workflow is started.
    when i change the require check-out to "No" and create a new document as above, the workflow tasks are getting created.
    Can someone advise on what is the problem when versioning is enabled?? can anyone provide solution. thanks.

    Hi,
    According to your description, my understanding is that the task was not created after the approval workflow was running when setting the require check out to be yes.
    I tested the scenario in my environment, if I used the Office client application to create documents, then the task would not be created even when the workflow was running.
    There may be some reason that the creating task action is missed when the document is created using Office client application and the require check out is set to be yes.
    As a workaround, I recommend to install Office Web Apps and use Office Web Apps to create the documents when setting the require check out to be yes.
    The workflow will be starting before the documents is checked in, and it will create the task after the document is checked in.
    Thanks,
    Victoria
    Forum Support
    Please remember to mark the replies as answers if they help and unmark them if they provide no help. If you have feedback for TechNet Subscriber Support, contact
    [email protected]
    Victoria Xia
    TechNet Community Support

  • Run-time error '429':Active X component can not create an object

    Hi Folks,
    I am using some VBA code to run logic in BPC for Excel. When i try to click on VBA button, It's giving the below error.However when i am trying to execute same from server it is working fine. Accessing from BPC client only we are facing this problem.
    Code have no issues. Is there any specific thing need to mentioned in client when we use VBA programming? Basically we used the VBA program to create the id's in BPC for Excel. So that it will automatically created on fly. Testing was fine interms of working in Server.
    " Run-time error '429':Active X component can not create an object ."

    Hi,
    Are you trying to add a member into the dimension from excel? As you said that this has been already tested in the server and is working fine, I believe, you have taken care of everything.
    Now, coming to the point, when you are adding a member in the membersheet, you need to process the dimension. This requires the admin rights. So, please check the task profile of the user ID, with which you are trying from your system. This user ID should be the primary admin.
    Hope this helps.
    Additionally, can you please elaborate on the steps on what you followed for adding a member from the excel directly?

  • Rounding of Decimal for dependent requirement During MRP Run

    Hello Experts,
    I have the following scenario:
    We are currently enabling Characteristic Based Planning in our system.
    Our one component is selected when two characteristic values are met through object dependencies.
    Ex: Component A = Char A= '002' and Char B ='002'
    Now we have given the following Usage Probability for the two characteristic:
    Char A = 20%
    Char B = 15%
    And the total PIR quantity is 25 Pcs for Configurable Header.
    With the above usage probability and PIR Qty, We have a dependent requirement of 0.75 Ea
    ((20% X 15%) of 25 Pcs) = 3% of 25 Pcs = 0.75 Ea of the component
    Now during MRP Run I want to round the dependent Requiremnet to 1 Ea instead of 0.75 Ea.
    Any suggestion towards the solution will be appreciated.
    Regards,
    Vinod

    Hi Vivek,
    As mentioned we are using Characteristic Based Planning.
    The component is selected based on a Selection comdition which is as follows:
    Component 721290201000 = $PARENT.BCS_RL_LINE_LOADER = '002' and $PARENT.BCS_RL_WAFER_VENDOR ='002'
    When the above two conditions are met the component is selected.
    In Characteristic Based Planning we give percentages (Usage Probabality) to the characteristic values like:
    $PARENT.BCS_RL_LINE_LOADER/'002' =20%
    $PARENT.BCS_RL_WAFER_VENDOR/'002'= 30%
    For the Parent which is a KMAT Material we maintain the PIR say 40 Qty.
    Now the component qty is calculated as follows:
    721290201000 =(20% X 30%) of 40 Qty of parent
    721290201000 =(6%) of 40 Qty of parent
    721290201000 = 2.4 Qty of component is the dependent req.
    Now my requirent is to round the dependent requirenment to 3 during MRP Run. Please note that the purchase requisition got from the above dependent requirement is rounded to 3 qty.
    Now I want to round the dependent requirement.
    Regards,
    Vinod

  • Dependent requirements not clearing up

    Hi gurus,
    I was wondering if someone could throw some light on this strange behavior. I tried to check all settings and it did not make any sense to me. we have a material A and material B. material A is the component in the BOM of Material B. We get sales orders for material B. I see in the document flow of sales order of material B that it was PGI'ed yesterday and we have MRP job NETCH that runs everynight. I do not understand why the MRP element with CUS ORD still shows up in MD04 for material B and as a result the dependent requirements also shows up for material A in MD04. what could be the problem. Oh and by the way we use strategy group of 52 on the material master for B.
    Any ideas?
    Thanks
    Ravi

    Hello Ravi
    Take a look on the following documents that I wrote about the most frequent issues on MD04:
    MD04: Problems with sales orders
    Frequent issues on MD04
    If the sales order itself is still displayed on MD04, you should try to run report SDRQCR21 to check for inconsistencies.
    If the sales order itself is not displayed on MD04, but the sales order special stock is displayed on MD04, you should take a look on note 1723507.
    If you still cannot solve the issue, please provide a screenshot of MD04.
    BR
    Caetano

  • Open Purchase Orders not considered as requirement for MRP Run

    Hi ,
    We are facing a issue of Open Purchase orders not appeared in Stock requirements list and also it is not considered as requirement for MRP Run against reservation.
    As aresult for a reservation demand of 10 units we are ending with Open POs 10 units and a additional planned order 10 units.
    Material Type : ERSA
    MRP Type : PD (or VB)
    Lot size : EX (  HB if MRP Type is VB)
    Could you please throw some light to correct our settings to MRP to consider Open POs?
    Saravanan

    Can you check to see if there is a re-order point set up for this materia? That could be causing the problem too.

  • Automatic Transfer requirement not created

    Hi Fiends,
    We have created a returns Sales order and against that we are doing return goods receipts. Whne we did POst goods receipts system post the material docuemnt but it was not creating any transfre requirements.
    How we do the automatic tr while creating material docuemnts, and where can we maintain the settings.
    Regards
    Palani

    Thanks for your immediate respones.
    I am talking about the TR creation not TO. When we posted the Delivery Material docuemnt was create and in that materail docuemnt i cannot See the TR number.
    As you said We verified the LB10 etc and did not find any TR docuemnts .  We have maintain the setting for wharehouse, IM mvt , WH movement  type and TR creation indicator X  etc but system is not creating TR along with the Material docuemnt

Maybe you are looking for

  • Wireless Repeaters

    Hello, I have a few coverage deadspots that I want to elimate with my WRV200.  I see in the configuration that I can use a second WRV200 as a wireless signal repeater.  Does this meanthe second box just needs to be within wireless range of the primar

  • /TD is appearing in the HTM document when downloaded from Report painter

    Hi, We are facing the below issue when we are downloading the report painter report in HTM format. When I am downloading a report in HTM format (Web page or Excel) I see some special characters u201C/TD>u201D in the HTM download document. I am able t

  • Passing Error message to BAPI Structure in RFC

    Hi Experts, I would like to know how we pass error message to BAPI structurre in RFC? Plz some one give the details about how we handle the errors. Thanks in advance.

  • Mongrel_rails_persist - where are my balancer members?

    I'm setting up a Ruby on Rails application on my new Snow Leopard Server. I'm following an Apple tutorial on how to do it: http://developer.apple.com/tools/deployonrailsleopard.html It's going quite well, except the end part of the deployment. In the

  • Iphone data recovery from backup file

    Hi, My iphone 5 is damaged, I am forced to switch to Nokia N8 as the stop gap arrangement till iPone is repaired/replaced by the service centre. I have iPhone backup file on my computer. How do I recover data from backup file to restore it to Nokia N