Maintenance plant & maintenance planning plant

Hi,Experts,
Logistic plant is created by MM consultant.Why to create again maintenance plant & maintenance planning plant? can anybody please explain the logic behind it.Incase say, there is only one logistic plant created by MM consultant,if maintenance plant & planning plant is not created in this case how will it affect?can anybody pl explain this ?
rgds
mehbub

Hi
   Please read SAP help you get complete deteails
in brief logistic plant created by MM thats fine. As the Plant maintenance you need to have the Maintenance plant and Maintenance planning plant.
If you consider logistic plant as Maintenance plant. for this maintenance plant you need to carryout the planning ie is thorugh maintenance plannig plant.
so you need to assing to each other in the enterprics structure.
bascially maint plant is plant where you perform the maint task and maint plan is the plan aganit the maint plant you plan the maintenance .
regards
krishna

Similar Messages

  • Work Order - Maintenance Planning plant change

    Hi Gurus,
    Is there any way to change the maintenance planning plant in a created work order? We are having an issue on work orders and we need to tranfer our open work orders to another plants to solved the issue. Please me let me know if this is possible to do in SAP. And let me know how to do it in SAP.
    Thanks in advance,

    Hi,
    The start of the plan is not option as this will surely have an impact. Anyway, work around for this issue was provided and this is OK now. We will continue with the old orders untill such time they will finally be closed. No postings will be created against this old orders and if there's a need to do GR new orders will be created in new plants for the postings.
    Thanks for you help,

  • Plant Maintenance - Linkage between Task List and Maintenance Plan

    Sir,
    In Plant Maintenance, I have an equipment for which there are 9 maintenance activities that have to be performed every year. Out of these 4 activities will be carried out every month. 1 activity will be carried out during the months of February, June and October. 5 activities will be carried out only in the month of December.
    I need to create Task List for all these activities and subsequently create Maintenance Plans for all these Task Lists.
    Can I group all the 4 activites which will be carried out every month into one single Task List, with separate operation nos and time against each activity?. I don't know whether it is correct or not.
    If I use the above method I can create 3 Task Lists for this particular equipment with same Group no and 3 Group Counters.
    How to create Maintenance Plan for the above scenario?.
    Eventhough, 4 activites are carried out every month and they have been grouped into a single Task List (Group counter 1) and if these activites are carried out on different dates within a month how can I create Maintenance Plan and subsequently create a Maintenance Order?.
    I need some help in this regard. A detailed reply will be helpful.
    Can anyone throw some light in this regard.
    Regards,
    R. Vijayakumar

    you need to create one task list with a maintenance strategy with packages and hierarchy to outline the work requirements i.e. some tasks to be carried out 3 monthly some 4 monthly etc, and also if common tasks appear in 3 monthly package vs 4 monthly package then to suppress the duplicating task
    you would then define a strategy based maintenance plan and run it to get the respective maintenance orders

  • Copy Planning Plant to Sort field in Maintenance Plan

    Hi All,
    Is there any User Exit User exit is available to Copy Planning Plant to Sort field in Maintenance Plan.
    Regds
    Vinit

    I think it is not possibe as the sort field in maintenance plan is a customizing field. you can not enter any value in the sort field but you in SPRO first you have to maintain the values  for sort field.
    The sort field in order and notification, there you can copy the planning plant or anything else as they are manual input fields

  • Assign Maintenance Planning Plant to Maintenance Plant

    Hi All,
    What is the purpose of the configuration node "Assign Maintenance Planning Plant to Maintenance Plant"?
    What happens if we don't maintain this configuration?
    Regards,
    Devasenapathy.K

    Hi ,
    Maintenance Planning Plant and Planning Plant are different
    In Logistics you define Plant which has to be distinguished as Maintenance Planning Plant . In these Plants you will plan for all your maintenance tasks
    You can plan and created
    1. Task list
    2. Planning and scheduling of Maintenance Plans
    3.creation of  Notifcations
    4. Execution of Maintenacne Orders
    Maintenance Plants are also termed as Plants in which your technical objects are installed
    For example, if an equipment X is installed in the Plant 0001 then Plant 0001 is called as Planning Plant and this plant on its own cannot plan for maintenance activities unless it is created as Maintenance Planning Plant
    if this Plant 0001 is created as Maintenance Planning Plant, then this plant is responsible for Planning and execution of tasks for maintenance
    this is where your assignment is needed, if not Maintenance and execution cannot happen
    hope it is clear
    thanks

  • Maintenance Item assignment to a Maintenance Plan

    Dear Expert,
    we need some help about the following scenario.
    Currently we are working on preventive maintenance in SAP ECC 6.0 system. We have created several maintenance items without assignment to maintenance plans in order to use them like models: to make quickly the creation of a maintenance plan our users can choose the suitable maintenance item from a range.
    In these items we have inserted only strategy and maintenance task list but we have not insert the technical object.
    We carry out the following steps:
    1. we run transaction IP42;
    2. we insert the maintenance category and the strategy;
    3. in the tab "Item" we press the button "Assign more items";
    4. system runs report RIMPOS00 (Display Maintenance Item: Selection Criteria) in order to select the item to insert in the maintenance plan. In this screen the followin fields are locked (we can not change them):
    - "Maint. plan cat.";
    - "Maintenance strategy";
    - "MaintPlan assignment" and the radio botton is set on "without".
    In this way if a maintenance item has been already assigned to a maintenance plan users can not select it for the current plan.
    In your opinion could we open the radio buttons for the field "MaintPlan assignment" ? Could anyone help us ?
    Thank you very much for your help.
    Kind regards.

    Hi,
    Pl.try following path in SPRO,
    Plant Maintenance and Customer Service..Maintenance Plans, Work Centers, Task Lists and PRTs..
    Maintenance Plans..Set List Editing for Maintenance Items
    After clicking on Execute button u will get a pop up " Customising list editing "Double click on selection do the changes & save.
    It will work i think.
    Pl.try.
    Regards,
    Amit

  • Mass Maintenance of Maintenance Plans

    http://help.sap.com/erp2005_ehp_03/helpdata/EN/a1/5959394ba2cd4ae10000000a114084/frameset.htm
    Procedure
    If you want to change maintenance plans with the mass maintenance function, proceed as follows:
    1. Choose Logistics ®
    2. Plant Maintenance ® Planned Maintenance ® Maintenance Planning ® Maintenance Plans ® Mass Maintenance for Maint. Plans ® Mass Maintenance for Maint. Plans or use the transaction code mch01 and choose Enter. The Mass Changes for Maintenance Plans screen appears.
    3. Enter an appropriate variant name or your selection data in the areas of the screen called Maintenance plan selection, Maintenance item selection, Hierarchy or Work scheduling/task list data.
    Note
    If you want to make similar changes to data often, you can create a variant to ease data entry.
    4. Choose Execute.
    The Mass Maintenance: Table View screen appears.
    (The Mass Maintenance: Field View dialog box appears if you choose Execute field view from the Mass Changes for Maintenance Plans screen).
    5. Choose the appropriate tab page according to whether you want to make changes to the maintenance plans, maintenance cycles or the maintenance items.
    6. Select the objects that you want to change.
    You can select the fields that you want to change using the Select fields function.
    7. You can check your changes by using the Test changes function.
    8. Your changes are saved to the database when you choose Save.
    9. The system displays all the changes you have made and any errors that may have occurred in a log. You can save this log if you wish.
    Result
    Your changes have an immediate effect on all the selected objects.
    I have a need to enable this program which was delivered in one of the enhancement packs.  We have thousands of maintenance plans that need to be modified.
    A couple of questions:
    1) how do I activate as little as possible to allow me to use this program
    2) With this enhancement activated, am I going to be putting myself on a new support pack line.

    hi,
    I just know go to transaction SFW5 to check whether all components required for the operation of system are activated (switched on). But I do not know exactly which component is affected for this function.
    Hope it helps.

  • Tcode for checking the Maintenance Plan

    Hello,
    I want the transaction code for checking the list of maintenance plan for a particular plant. I went thru tcode IP03, IP16 but could not find the option of plant there..
    Kindly guide..
    Regards,
    Naren

    Naren,
    As stated above, there isn't a plant field in the maintenance plan (only maintenance item, hence the reference ot IP17)
    However, it is quite common to use the maintenance plan Sort field as a plant field by customising the table settings for each plant.
    PeteA

  • Table for maintenance plan and maintenance cycle and Unit

    Hello,
    I need to know the table where the values are stored for maintenance plan, maintenance cycle and Unit.
    I know that we can get the maintenance cycle and unit from MMPT table.
    Question 1
    If the maintenance plan has only a single cycle then the data is stored in above table MMPT, but if a maintenance plan has mutiple cycles like 1 maintenance plan has maintenance cycle as 364 Days and 1092 days then the data is not stored in MMPt table.
    Question 2
    Requirement is I need to develop a report where in I need maintenance order, maintenance plan and the relevant maintenance cycle and unit. Supose an maintenance order is created for the above maintenance plan which has 2 maintenance cycle how can I identify for which maintenance cycle the order is created.
    Regards,
    Narendra

    Hi,
    Please review PM tables
    PM/SM/SD Tables
    MPOS                       Maintenance Items
    AFAB     Network - Relationships
    PLKO     Task list
    PLAS
    AFFH     Operations
    PRT assignment data for the work order
    AFFL     Work order sequence
    AFFT     Order process instructions
    AFFV     Order process instruction values
    AFFW     Goods movements with errors from confirmations
    AFIH     Maintenance order header
    AFKO     Order header data PP orders
    AFPO     Order item
    AFRC     Table of planned changes to conf.: Automatic goods receipt
    AFRD     Default values for collective confirmation
    AFRH     Header information for confirmation pool
    AFRU     Order completion confirmations
    AFRV     Pool of confirmations
    AFVC     Operation within an order
    AFVU     DB structure of the user fields of the operation
    AFVV     DB structure of the quantities/dates/values in the operation
    MPOS     Maintenance ITEM
    AFWI     Subsequently posted goods movements for confirmations
    AUFK     Order master data
    AUFM     Goods movement for order
    MPLA     Maintenance Plans
    BGMK     Master warranty header
    BGMP     Master warranty item
    BGMS     Text item master warranty
    BGMT     Master warranty text
    BGMZ     Warranty counter information
    CRHD     Work Center Header
    CRTX     Text for the Work Center or Production Resource/Tool
    EQKT     Equipment short texts
    EQST     Equipment link to BOM
    EQUI     Equipment master data
    EQUZ     Equipment time segment
    HIKO     Order master data history
    IFLO     Functional Location (View)
    IFLOT     Functional location (TABLE)
    IFLOTX     Functional location: Short texts
    IHGNS     Plant maintenance permit segment
    IHPA     Plant Maintenance: Partners
    IHSG     Object-related permits in Plant Maintenance
    ILOA     PM object location and account assignment
    IMPTT     Measuring point (table)
    IMRG     Measurement document
    KAKO     Capacity Header Segment
    KONP     Conditions (Item)
    KONV     Conditions (Procedure Data)
    OBJK     Plant Maintenance Object List
    QMEL     Quality notification
    QMFE     Quality notification - items
    QMIH     Quality message - maintenance data excerpt
    QMMA     Quality notification - activities
    QMSM     Notification - Tasks
    QMUR     Quality notification - causes
    STPOA     Name is does not have an A at the end; BOM items
    T001     Company Codes
    T001L     Storage Locations
    T001W     Plants
    T077D     Customer account groups
    T003O     Order Types
    T352R     Maintenance revisions
    T353I_T     Maintenance activity type description
    T356     Priorities
    T357G     Permits
    T357G_T     Table 357G texts
    T370A     Activity category for PM lists
    TINCT     Customers: Incoterms: Texts
    TVKO     Organizational Unit: Sales Organizations
    TVKOS     Organizational Unit: Divisions per Sales Organization
    TVKOV     Org. Unit: Distribution Channels per Sales Organization
    TVTA     Organizational Unit: Sales Area(s)
    VIAUFKST     Order selection view
    MMPT Cycle detail
    Regards
    Carlos

  • Performance/Counter Based Maintenance Plan

    Dear All,
    Please guide me the detailed process related with "Performance/Counter Based Maintenance Plan" with step wise(with Tcode) .
    its urgent
    Please help.
    Sushant

    Hi Sushant,
    as it's urgent, I simply refer to a blpg document created by Maheswaran KD:
    Behavior of Performance Based Plan in SAP Plant Maintenance
    Please, all credits to Maheswaran!
    Regards,
    P.

  • Service products for Maintenance Plan

    Hi All,
    Is it possible to Create maintenance plan from a a Service product  - Contract Line item(VA41)? I have come across the Tcode OISF but do not know how to make use of it?
    Would appreciate if you could throw some light on this?
    Pranav

    Hello
    You have maintained the following data for the service product that you subsequently entered in the outline agreement under Logistics --> Customer Service >Service Agreements>Environment -->Sales and Distribution -->Service Products:
    ·        Plant for maintenance planning
    ·        Work center
    ·        Order type
    ·        Plant of maintenance work center
    ·        Business area
    ·        General maintenance task list (you cannot assign equipment task lists or functional location task lists)
    ·        Task list type
    Then-you have created an outline agreement that fulfils the following conditions:
    1)The contract category is Contract.
    2)The contract type is Service and Maintenance.
    3) On the tabstrip Sales, you have specified
                  I)the start and end dates of the contract
                  II)service product as outline agreement item
    4)You have specified the start and end dates for billing in the billing plan under Goto> Item>Billing plan.
    When Creating the Maintenance Plan for Above Contracts
    1)When creating a maintenance plan, you choose an appropriate maintenance plan category.
       Maintenance plan category with reference to an outline agreement, maintenance call object u201Cservice orderu201D
    Enter the following data:
    1)Valid outline agreement
    Regards,
    Rakesh

  • How do I create Notifications automatically from Maintenance plans

    Hi folks
    I have a new requirement from a client.
    They would like some of their Maintenance plans to automatically create Notifications which can later be converted to maintenance orders.
    Please let me know what configuration chnages i need to carry out.
    Thanks, Felix

    HI
    goto SPRO>Plant Maintenance and Customer Service>Maintenance Plans, Work Centers, Task Lists and PRTs>Maintenance Plans>Set Maintenance Plan Categories-->
    new entries , enter PM notification slect call object as 2 notification and ref obj100 or copy existing from NC.
    tehn at the time of creating plan IP42, slect this and yu get option to enter the notification tyrpa nd other deatisl
    -ashok

  • Issue in displaying Maintenance Plan Category.....

    Hello,
    I have created a maintenance plan category ZQ , copying PM category in the golden client, and transported it to test client. This customized plan category is not populated in the transaction IP41 in both servers, golden client and test client. whereas this value is populated in list edit(IP15) maintenance plan category. I have checked in SPRO setting also and is available.
    Path of config:
    spro>plant maintenance and customer service>set maintenance paln category & assign number range.
    Is there anything missing?

    In the configuration have you set the call object correctly. Call object must be a PM object for it to appear in IP41, but can be anything to appear in IP15.
    I have replicated this and cannot find any issues - ZQ is available in both IP41 and IP15 transactions, call object used - Maintenance and Service orders

  • How to compute Maintenance Plan's Plan Date

    Dear Gurus,
    I would like to request help from you.  I have a problem wherein I would like to know how is the Maintenance Plan's Plan Date is computed.
    Below is the parameters of the Maintenance Plan:
    cycle = 1500
    offset = 1478
    annual estimate = 5070
    first meas reading = 22.5
    Start of cycle is = Jun 16, 2011
    The plan date computed is = Sept 7, 2011
    Please let me know if there are other information needed.
    I hope you can share your knowledge on my problem.  Thank you.

    Hi,
        Please note that for Plant date calculate in Counter Based Plans system takes the below into preference for calculation :-
    1. Start of Counter reading value
    2. Date of Last counter reading udpate ..
    If you maintain offset then system first plans the offset then starts the cycle
    If ur annual estimate is  5070  , if scheduling is done by time then daily activity is 5070/365 = 13.89  round to 14
    Now if your start of counter reading value is 0KM
    And if your date of last counter reading is :- 2/3/2012
    Then your first planned date would be based on the offset :- 1478 -22.5 = 1455.5 /daily activity =1455.5/14 =104days
    So counting 104days from 2/3/2012 you would getting your First Plan date ..
    If u put call horizon as 100% then it will be in HOLD status
    regards
    giri

  • PRT- Maintenance Plan

    Hi Experts,
    Here is my Issue ,
    We have Created Maintenance plan for PRT Equipment - for that Measuring point in counter over readg 500 pieces and Annual Estimate also 500 pieces .our Maintenance Package is every 200 cycle.BY confirming the production order exceeds the 200 pieces, the maintenance order also created by measuring document, in this juncture my doubt is , how to maintain the tool life and we wants the tool life is max of 500 pieces only , after exceeding the production order qty 500 pieces , the system will not allow to make production order confermation for that PRT Equipment, what is the settings for that,?
    For Example a Planner m/c is Created by M- categary ( plant maintenance) , but the tool in which is used in planner m/c can be created  P- categary ( PRT) .       is it Right?
    Tool -life only for 500 pieces , in that how to set for Mainetanacec package? instead of 200 pieces,can we assign 500 pieces?
    ok If we set 500 in M.package  , mainetance plan will be created and say tool  is to be replaced, based on the plan we replace the tool and we instal new tool for the planner m/c. now can we create new PRT equipmnet- tool , for the planner m/c ? , For the new TOOL -PRT equipment , can we create new plan for that ? is it Right means what about old plan?
    With  Regards
    SM.Charles Edwin

    HI
    sam,
    As per ur requirment My understadnding is wirtten here-
    1. First off, Creat all Tools as PRT Equipment... because in this way only u can generate maintenance plan for them and can perform maintenance.
    2. For track of PRT Usage or Life u have to define a Measuring Point in PRT (Equipment). Whenever production order get confirm a measuring doucment will be posted...
    in the Measuring point u can see last entered measurement reading that will reflect usage of PRT.
    3. U have to assign a Maintenance Plan in PRT ( Equipment)
        When PRT Usage exeeds certain level..(after confirmation of production order) Maintenace call object would be generated and subsequent maintenance can be carried out.
    4. Besides all these we can not block usage of PRT in Production order.
    5. PRT Must be assigned in Routing ..other wise it won;t work.
    6. so prequesties for PRT Usage and Maintenance is
    create Measuring point and a Performance Based Maintenance Plan. and assign it in PRT(Equipment).
    7. in this case don't create PRT as a Material.
    If Still in Doubt please ask.
    Regards,
    Amit kushwaha

Maybe you are looking for

  • My 16:9 video is displayed as 4:3!

    Alright.. i'm extremely new at this as today is the first time i ever opened DVD Studio Pro, but i learn quick.. So pretty much i had a 2 minute clip that i edited in Final Cut Pro (a hdv 1080i) that i want to burn to SD DVD.. the footage is in wides

  • BP longtext update via LSWM

    Hi, we are using in LSMW CRMXIF_PARTNER_SAVE for updating long texts on business partner (bp). it works, but alreadyexistent_ long texts on bp will be overwritten by LSMW (so we lost them!). Have anybody a hint how to avoid this? We need an update(=a

  • Hide the row structure in Bex query

    Hi Experts, i have a query regarding display of report in Bex Analyzer.  I have two structures in report one in Row & other in Column. In row  have only one field against which there are two columns having figures my query is as follows: Is this poss

  • Using Crystal Reports with Visual Studio 2008

    I have bin using visual studio 2008 for a while. I have just started using Crystal Report (which came with Visual studio) . I have an Access database connected with 3 tables, the first two table has two test fields and one index field, the third tabl

  • Swatch reset when quitting CP

    1) I customized my swatch in CP8 - added about 20 colors that are specific to a client's branding. 2) I exit out of CP8 3) I open CP8 ==> The swatch no longer has my custom colors. I understand that I can Save my custom colors out to a .ase file and