Make to order / Make to Stock / Make to production. Scenarion.
Hello..
Please explain Make to order / Make to Stock / Make to production. Scenarion in details with examples.
David.
Dear David
Make-to-order production is a process in which a product is individually manufactured for a particular customer. In contrast to mass production for an unspecified market where a material is manufactured many times, in make-to-order production a material is created only once though the same or a similar production process might be repeated at a later time.
You can use make-to-order production:
For branches of industry or products where a small quantity of products with a large number of different characteristics are manufactured
When a product has to be assembled particularly for a sales order
Choose a make-to-stock strategy, if:
The materials are not segregated. In other words, they are not assigned to specific sales orders.
Costs need to be tracked at material level, and not at sales order level.
You should always use make-to-stock production if you produce stock independently of orders because you want to provide your customers immediately with goods from that stock later on. You might even want to produce goods without having sales orders, if you expect that there might be customer demand in the future. This means that make-to-stock strategies can support a very close customer-vendor relationship because your objective here is to provide your customers with goods from your stock as quickly as possible. Returns that have passed quality inspection and other unexpected goods receipts can be used for other sales orders.
This does not mean that you have unreasonably high stock levels. You can avoid them by doing one of the following:
Create a production plan in advance (in Demand Management) to plan your stock.
If you make use of this option, you may also want to decide whether sales orders exceeding your plan are to affect production or not.
Receive sales orders relatively early on (using scheduling agreements, for example).
thanks
G. Lakshmipathi
Similar Messages
-
Make to order ,sales from stock
Hi,
What are the important differences between make to order and sales from stock? with respect to availability, scheduling and customer stock
ThanksHi there,
Make to order is when you manufacture or procure the material only upon order. Stocks are not maintained for those items in the storage loc. As & when the order comes, a production run is triggered through MRP. After the production, stock is posted as reserved sales order stock. Stock is then made available to fulfill the delivery.
Other items are make to stock. Usually for fast moving or consumer goods, stocks are always mainatined in the plant storage loc. As & when the order comes, availability check is done. If stock is available to meet the delivery date, delivery is proceesed or a confirmed delievry date is proposed basing on the replenishment lead time in availability check.
Regards,
Sivanand -
Make to order, no safety stock.
Dear All,
I have 1 finish good X, made from materials X and Y. I set safety stock for X and Y.
When I make A to stock, I need safety stock of X, Y; I create demand and run MPS, MPR -> ok.
But when I make A to order, don't need safety stock of X, Y. How to do that ?
ngocvt.Ngoc,
Well, I am confused.
I have 1 finish good X, made from materials X and Y.
Recursive Bill of materials? Or maybe you mean your finished good is 'A'?
When I make A to stock, I need safety stock of X, Y
OK, put safety stock into the Material Masters of x & y.
But when I make A to order, don't need safety stock of X, Y.
First, tell me how are you making A as MTS one day and MTO the next?
Safety stock is not dependent upon the source of the demand, it is generally used to ensure a higher level of availability of components to meet business requirements during unexpected events (such as a demand generated by an unexpectedly large sales order, or a production failure of X or y). Generally, if you need safety stock for X and Y, the need doesn't go away just because you have one parent that is MTO and another that is MTS. You either need safety stock to meet unexpected events, or you don't.
Best Regards,
DB49 -
Subcontracting availibility check on make to order stock
Dear All,
I have a material let's say 'X' which with a BOM/routing which includes a subcontracting step of material "Y" which is a also a make to stock item. When I create a sales order for material X and run a Plannings run I first produce material Y. Because it's a make to order item the stock it will be customer specific stock. The next step is to send material Y away to the subcontrator, in order to complete material X. However when a create a subcontracting PO and wants to delivery it via transaction ME2O I get the error message that there is no stock available. The reason for this is that teh availibilty check doesn't check the Make to order stock quantities.
I have treid several option but i am Not able to let sap to check the make to order stock when creating a subcontracting delivery. What I am missing or is this not supported by standard SAP?
Thanks in advance.Dear All,
Thanks for your replies but it doesn't solve my problem because when creating a delivery SAP still uses the normal availability check (B) and not the client specific availability check (BE).
Just for the clarification the underlying material is a client specific item (with special stock indicator E) that needs to be send to the subcontractor. However the administrative stock of this material is stored as client specific and won't be picked up when we make a subcontracting delivery because the standard process use availability check B instead of BE.
Like I mentioned maybe it is not foreseen in the standard functionality. -
Make to order OR make to stock
Hi
How can I find out a sales order whether particular sales orderu2019s requirement is make to order Or it is make to stock u2026u2026.
Thanks in AdvanceRqTY is KSV
Does it mean that it is MTO ?
Yes this is MTO
thanks
G. Lakshmipathi -
Make to order(MTO) and make to stock(MTS)
Hi friends
Please Send the details about Make to order(MTO) and make to stock(MTS) process and configuration .if u have any documents pls send to my mail ID : [email protected]
Regards
Baludear balu
MAKE TO ORDER AND MAKE TO STOCK notes
Make to order Scenario
1. Make-to-order production is a process in which a product is individually manufactured for a particular customer. In contrast to mass production for an unspecified market where a material is manufactured many times, in make-to-order production a material is created only once though the same or a similar production process might be repeated at a later time.
2. You can use make-to-order production: (a) For branches of industry or products where a small quantity of products with a large number of different characteristics are manufactured (b) When a product has to be assembled particularly for a sales order.
3. Stock keeping is not usually carried out for products that are made to order. In companies using make-to-order production, the demand program only determines the production area, in which various variant types are produced. Depending on how you track the costs associated with make-to-order production, there are two ways to process make-to-order items during sales order processing.
(a) Make to order using sales order
(b) Make to order using project system (not relevant for SD application)
4. for make to order production using the sales order, all costs and revenues involved for an order item are held collectively at that item. A particular rule is used that can be changed manually to transfer costs to profitability analysis.
5. make to order production is largely a production planning configuration. It is also controlled by the requirements type, which is determined by three things
the strategy group (MRP 3) in MMR
the MRP group (MRP1) in MMR
the item category and MRP type (MRP 1)
6. Make-to-order production is controlled by the requirements type. The requirements type is determined on the basis of the MRP group (MRP1) and the strategy group (MRP3) in the material master record. In addition, a plant must be assigned for make-to-order items in the sales order.
MAKE TO ORDER PRODUCTION (PROCESS FLOW)
First Create a material with MM
Basic data1:
Give Material name : Cycle
Material group : 010
Division : MA
Net Weight : 10 Kg's
Gross Weight : 10Kgs.
Sales: Sales org.1 :
Base Unit of Measure : EA
Delivering Plant : RAMA
Output Tax : 1 ( Full tax)
Sales: General/Plant :
Availability Check : 01 ( Daily Requirements)
Trans.,group : 001
Loading Group : 0003
MRP 1:
MRP Group : 020 ( Make to Order Production)
MRP type : PD (MRP)
MRP controller : 000
Lot size : EX ( Lot-for-Lot order quantity)
MRP 2:
In-house Production : 1
Schedule Margin Key : 000
Forecasting:
Forecast Model : D (Constant Model)
Accounting 1:
Price control : V ( Variable Price)
Variable Price : 4000
Price Unit : 1
Then enter & Save.
Material 769 created.
Create a Sales order with VA;
Order type : OR
Sales Organization : RAMA
Distribution Channel : RA
Division : MA
Sales Office : RAMA
Sales Group : RAM, .............. Enter
Sold to Party: 6000000000
PO number : 55 , PO Date : 04.06.2007.
Item Overview Tab:
Material 769, Quantity : 100
Enter & Save the Document.
Sales Order 8212 Created
Create Production Order with CO:
Enter Sales order number: 8212, Item No. 10
Order type: PP, Enter
Click on FLAG,
Select Generate Operation and enter NO,
save the Document.
Production Order Created: 60002725
Confirm the Production Order with CO15.
Enter Production Order No. 600075 and save the Document.
Now the confirmation Order will be saved.
Create Goods Receipts with MB31.
Movement type: 101
Order: 6002725
Plant: RAMA
Storage Location: RAMA
Enter and Save, you will get Document Posted: 50000068931posted.
Check the Stock Position with MMBE
Material: 769
Plant: RAMA
Storage Location: RAMA
Execute (F8), here we can see the stock at Sales Order Stock.
Create Delivery with VL01N, Billing with VF01 and Post to Accounts.
Make-To-Stock Production:
Purpose
we describe the planning of a product for make-to-stock production. After requirements planning, you analyze the stock situation and convert a planned order into a production order. You also enter a sales order that is not relevant to the planning. The production order is then released and saved. After the material withdrawals and confirmation of the operations, you analyze the production variances. The sales order is delivered and settled.
Process Flow
1. Planning a Product
T.code: MD61
Logistics Create Production  Production Planning Demand ManagementPlanned Independent Requirements
2. Creating a Sales Order
T.code: VA01
Logistics Sales and Distribution  Sales  Order  Create
3. Executing Multi-Level Requirements Planning
T.code: MD02
From the MRP node, choose PlanningSingle Item - Multi-Level
4. Converting the Planned Order into a Production Order
Tcode: MD04
From the MRP node, choose
EvaluationsStock/Reqmts list
5. Withdrawing the Material for the Production Order
T.code: MB1A
Logistics GoodsMaterials Management Inventory Management  Goods Movement Issue
6. Confirming the Production Order
T.code: CO11N
Logistics Time Ticket Production  Production Control Confirmation  Enter For Operation
7. Creating a Delivery
T.code: VL01N
SingleLogistics  Sales and Distribution  Shipping and Transportation With Outbound Delivery  Create Document Reference to Sales Order
8. Creating a Billing Document
T.code: VF01
 Logistics Create Sales  Billing Billing document
rewards if it helps
siva -
Buy/make to order /stock
hi,
may i know buy to order, buy to stock, make to order and make to stock all these processes,
1 where is the setting to capture value in copa?
2 what kind of information will go to copa from these 4 processes?
thanksCheck
COPA Document not generating from MM postings -
Hi all,
<b>I am trying make to order scenario</b> but i am not getting the desired result. I created a sales order, run the MRP and when in MD04, i want to convert the planned order into production order then at that time the system in the <b>"additional Data for MRP element"</b> screen - in the field <b>besides planned order no. shows me "make to stock"</b>. I am working for <b>MTO</b> scenario. <b>The following are the settings i have maintained:</b>
1. In MMR item category group is "0001"
2. In MRP3 screen the strategy group is "20"
3. VOV4 item category determination i have used item category as "TAN" only.
4. In IMG - sales & distribution - basic functions - AVC & TOR - Transfer of requirements - define requirments class. Here I have selected "040"
5. In define requiremen type i have used "KE -
040"
6. Determination Of Requirement Types Using Transaction - here for item category "TAN" & MRP type "PD" i have selected as 0 - i.e strategy group will come into picture.
<b>I want clarification on the following issues:</b>
1. Which requirements class to be used and what are the settings in the "requirements class". I want field wise entry.
2. Which is the requirement type to be used and where else this requirement type is to be assigned. I want for both SD & PP assignments.
3. Is there any setting to be done in AVC?
4. Is the item category determination correct? i.e i have used TAN for item category group "0001". Is it correct or do i have to assign any other item category.
5. Is the strategy group correct.
6. What are the settings to be done from the PP point of view.
7. In MTO say sales order is created for 20 pc and while generating the production order is it possible to create for 25 pc keeping in mind that 5 may be scrapped.
8. When the planned order is converted to production order and if there is shortage of raw material then does the system ask for the sales order no. while creating the <b>"PR"</b> and the <b>"PO"</b>?
<b>I want the following results out of MTO:</b>
1. when i convert the planned order into a production order the system should show the sales order no. so that the production order can be traced back to the sales order.
2. Suppose today I create sales order for item "A" 10 pc. 5 are anyhow in stock, so i confirm those 5 pc for that sales order and production order will be created for 5 only. Say after 10 days when the remaining 5 pc come to stcok then the system shoud automatically confirm those 5 pc for the original sales order only against which the production order was created.
3. I want to evaluate the fin. goods stock as per the sales order. Is it possible.
Efective answers will be highly appreciated.
Regards,
Allabaqsh G. Patil
Message was edited by:
allabaqsh patildear patil
please gothrough this
Make to order Scenario
1. Make-to-order production is a process in which a product is individually manufactured for a particular customer. In contrast to mass production for an unspecified market where a material is manufactured many times, in make-to-order production a material is created only once though the same or a similar production process might be repeated at a later time.
2. You can use make-to-order production: (a) For branches of industry or products where a small quantity of products with a large number of different characteristics are manufactured (b) When a product has to be assembled particularly for a sales order.
3. Stock keeping is not usually carried out for products that are made to order. In companies using make-to-order production, the demand program only determines the production area, in which various variant types are produced. Depending on how you track the costs associated with make-to-order production, there are two ways to process make-to-order items during sales order processing.
(a) Make to order using sales order
(b) Make to order using project system (not relevant for SD application)
4. for make to order production using the sales order, all costs and revenues involved for an order item are held collectively at that item. A particular rule is used that can be changed manually to transfer costs to profitability analysis.
5. make to order production is largely a production planning configuration. It is also controlled by the requirements type, which is determined by three things
the strategy group (MRP 3) in MMR
the MRP group (MRP1) in MMR
the item category and MRP type (MRP 1)
6. Make-to-order production is controlled by the requirements type. The requirements type is determined on the basis of the MRP group (MRP1) and the strategy group (MRP3) in the material master record. In addition, a plant must be assigned for make-to-order items in the sales order.
MAKE TO ORDER PRODUCTION (PROCESS FLOW )
First Create a material with MM
Basic data1:
Give Material name : Cycle
Material group : 010
Division : MA
Net Weight : 10 Kg's
Gross Weight : 10Kgs.
Sales: Sales org.1 :
Base Unit of Measure : EA
Delivering Plant : RAMA
Output Tax : 1 ( Full tax)
Sales: General/Plant :
Availability Check : 01 ( Daily Requirements)
Trans.,group : 001
Loading Group : 0003
MRP 1:
Mrp Group : 020 ( Make to Order Production)
Mrp type : PD (MRP)
Mrp controller : 000
Lot size : EX ( Lot-for-Lot order quantity)
MRP 2:
Inhouse Production : 1
Schedule Margin Key : 000
Forecasting:
Forecast Model : D (Constant Model)
Accounting 1:
Price control : V ( Variable Price)
Variable Price : 4000
Price Unit : 1
Then enter & Save.
Material 769 created.
Create a Sales order with VA;
Order type : OR
Sales Organization : RAMA
Distribution Channel : RA
Division : MA
Sales Office : RAMA
Sales Group : RAM, .............. Enter
Sold to Party : 6000000000
PO number : 55 , PO Date : 04.06.2007.
Item Overview Tab:
Material 769, Quantity : 100
Enter & Save the Document.
Sales Order 8212 Created
Create Production Order with CO:
Enter Sales order number: 8212, Item No. 10
Order type : PP, Enter
Click on FLAG,
Select Generate Operation and enter NO,
save the Document.
Production Order Created : 60002725
Confirm the Production Order with CO15.
Enter Production Order No. 600075 and save the Document.
Now the confirmation Order will be saved.
Create Goods Receipts with MB31.
Movement type : 101
Order : 6002725
Plant : RAMA
Storage Location : RAMA
Enter and Save, you will get Document Posted : 50000068931posted.
Check the Stock Position with MMBE
Material : 769
Plant : RAMA
Storage Location : RAMA
Execute (F8), Here we can see the stock at Sales Order Stock.
Create Delivery with VL01N, Billing with VF01 and Post to Accounts
rewards if it helps
siva -
Make-to-Order Strategy (20) - Accounting Document not created
Hi,
In Make-to-order Strategy (20) after confirmation of production order with automatic goods receipt. The Accounting Document is not created. Can anyone help me out to solve this issue...for raw material after goods receipt against the purchase order with Movement type 101E the doc. is getting generated.
regards
rameshHi, Ran
I have your same problem.
I checked in Check Account Assignment Categories (path: Controlling->Product Cost Controlling->Cost Object Controlling->Product Cost by Sales Order->Control of Sales-Order-Related Production/Product Cost by Sales Order->Check Requirements Classes) and this is my configuration in Accounting assignment view:
Acct Assignment Cat. E
Valuation "blank"
I tried to put "M" in valuation field, but i cannot create a production order, after run MD02.
I receive this error message "You cannot make an assignment to make-to-order stock"
Could anyone help me, please?
Thanks
Daniele -
Make to Order Inventory migration
Hi MM gurus,
Would request for some suggestions on cutover migration of inventory involved from one SAP system to other SAP system.
Particularly for a Make to Order scenario where stock after production is linked to a specific Sales Order. What should be preferable hierarchy of migration? Are sales Orders required before migrating SO linked sales stocks. Is their some better way of doing it.
Request for some helpful inks to inventory migration best practices.
- AshishThe approach in Cutover Strategy always Includes creation of Open Orders be it Purchase orders, Sales Orders, Project, Production Order etc.
Since the Inventory is Sales Order Stock, hence you should first get the open sales orders created in the new system then you can use 561E for initial entry of Sales Order Stock -
Make to order availability check scenario with production order
We have a make-to order scenario where we build custom products for our customers.
In SAP, we specify a strategy group so a production order is automatically generated when an sales order item is entered. However, we sometimes create a small amount of stock, in anticipation of an order. I would like the system to first check available stock in the system, beofre proposing a production order.
Is something like thi spossible thru configuration of the strategy group, or perhaps another method?
Regards
KenHi,
In SPRO->Sales and Distribution->Basic Functions->Availability Check and Transfer of Requirements->Availability Check->Availability Check with ATP Logic or Against Planning->Carry Out Control For Availability Check
Select the Availability check and the Checking rule combination of intrest and if you select the details,here you define that stocks that are to be considered during availability check. -
Make to Order - Reservations and Mov Type
Reservations for Make to Order:
We are using Make to Order strategy for job work scenario, i.e. strategy 20. Here we will receive customer material without reference, after quality checking will be posted to Un-res stock.
1. Now when we run a MRP for finished product the reservations or happening for movement type 261+E, but the stock available is not a sales order stock. How to issue the same without transfer posting, Or can we restrict the reservations for 261 only?.
2. As soon as we book a sales order, is it possible to transfer post the Materials referencing a material document to sales order stock.
Thanks
RamananPVHi,
1. Material is going in unrest stock as there is no reference. Either post stock with reference to SO or you will have to do transfer posting. Take suitable decision as per your business requirement.
2. You mave have to go for development. Discuss with your ABAPer.
Regards -
Make to order Scenario...any client level settings
Hi
please guide me as there any settings which are at Client level or company code level.....
shaileshHi harshad,
If you are asking about MTO please go through below notes:
The Made TO Order Cycle:
The sale department passes on the Made to order-Sales Order to the Material department so that material requirement is analyzed. This is done in SAP by carrying on an MRP Run for all the levels of the product BOM. This MRP Run would create Planned Orders for the shortages. Here the planned orders for fert sub assemblies, Components etc, are created. This planned orders for materials produced in house are converted in to Production order and planned orders for materials
procured from outside are converted in to Purchase order. The creation of Production order through the planned orders will convert all the dependant requirements in to dependant reservations.
The dates of production or purchase are decided through the total replenishment time mentioned in the material master, If it is, in-house production, then the Route times precede over the total replenishment time entered in the material master. And the availability of all the components is ruled by the availability checking rules and by availability checking scopes. Thus whenever the system declares a product to be ready or available by a date it implies that the system has checked the availability of the material with respect to the Ware house stock, in coming stock (Receipts) and all other planned orders already existing for the product or material.
In the Made to order production, sales order produced for Fert and Sub assemblies are converted in to production order during MRP run. The production orders created have a specific quantity, specific Basic start date and a specific Basic Finish Date, a set of operations and a set of component attached from the BOM. In course of production the quantities produced in the operation for an order should be confirmed so that the current status of work is available in real time situation. The components required for production are issued to the production order through goods issue by a movement type 261 and the issue is always made to the reservations or to the order, thereby clearing the reservations. Issues of unplanned components are made as new items issue and not as order issue. The quantities, for an order which are produced completely are the put in to stock i.e. a Goods Receipt is done.
Thus the made to order cycle starts with the sales orders and converting them to Production Orders through MRP Run and there off confirming produced quantities for an order and finally putting the order in to stock.
The Cycle of Made to order: Steps: MTO Scenario
1. Material Creation (Made To order Material with major changes of: Item Category: 0004-make to order/assem.,or 0001-make to order)
2. Route Creation
3. Creation of BOM
4. Sales order
5. Production order Scheduling, Costing, Release and Save
6. Production order Quantity confirmations for operations, Parallel task of material issue to order or to reservations (261)
7. Fully Produced Production Quantities will be put into stock (GR)
8. Delivery against sales order
9. Invoicing.
You have to configure following;
1. OVZG - Defining Requirements Classes SD
Requirements
Availability X
Requirement Transfer X
Allocation ind. 2
Assembly
Special Stock E
Account assignment
Acct Assgt Cat. M
Changeable 0
2. Maintain Account Assignment/Costing Basic Functions Sales and Distribution Requirement Classes For Costing/Account Assignment
Assembly/Requirements
Assembly type 0
Account assignment
Acct Assgt Cat. M
Valuation M
Without Val. Strategy X
3. OVZH - Defining Requirements Types
4. VOV8 - Defining Sales Document Types
5. Sales and Distribution Assign sales Area to Sales Sales Document Header Sales Documents Sales Document Types
6. VOV7 - Maintaining Item Categories
Sales Documents Sales 7. Sales and Distribution Assign Item CategoriesSales Document Item
8. VTFA / VTAA - Copy Control: For Billing document and Sales document
9. KE4I - Assigning SD Conditions to CO-PA Value Fields
10. VOK0 - Pricing Procedure Setup for MTO Sales
Thanks and Regards,
Sateesh.Kandula -
Planning run for make to order strategy
Hi,
I am trying to run the complete planning cycle for strategy group 20. But i am unable to do so. Can u please give me a detailed description on the same.
P.S. I did the planning run for strategy group 10, that is , making a plan and converting to active plan etc.
But unable to run for strategy group 20.
Please look into the same.
Br,
GeetuHi Geetu
Make to Order Means :
Produce/ Procure the material for this Sales Order (----
Strategy Means :
Effe. procedure/plan to execute Requ.
Advantages of Make to Order :
Reduce the Inventory
Reduce the Cost
Flexible to Customer Requirements
MAKE to ORDER STRATEGY 20
(Pure make to Order)
===============================================================================
u2022 Production & purchase are triggered by Sales order receipt
u2022 System will not perform net requirement calculation between individual sales orders
u2022 Produced quantities canu2019t be switched between one sales order to other
u2022 System creates individual planned orders against each sales order recd. With ref
u2022 Individual & collective requirement indicator controls the level up to which MTO is applicable
u2022 Goods Issue against the sales order reduces the requirement
u2022 System manages the production & procurement costs specifically for each sales order in settlement order
u2022 Lot for lot order qty, is the default lot size followed in MTO, irrespective of the settings in MRP1
==================================================================================
Create a material(MM01) with Strategy Group :20 ( MRP3)
You can check & confirm all those properties by creating a Sales Order (VA01)
See the effect of it after running the MRP ( MD02),
Check the Results in Stock Requirement List ( MD04)
Also, check the stock level of the same material before the Sales Order &
after the Sales Order
If possible, Create One more Sales Order &
see how the quantities of the individual sales Orders are managed.
You can verify all the prosperities of Make to Order (Strategy :20) by yourself
Hope this may Help
BRSR -
Accounting problem in Make to order cofiguration
Dear friends
we have implemented make-to-order scenario on one of our product. We have successfully gone through the following steps....
sales order -> converting to planed order [md50] -> converting planed order to process order -> confirmation of process order -> transfer cost from process order to sales order[KO88] > delivery> PGI. But *we did not found any accounting document generated after PGI, and all the pricing conditions are yellow except EK01 and DIFF in sales order and billing document.* Is there any thing missing in the above steps or any other problem ?
regrads
KaushikDear Friend
Inventory accnt problem is solved as per ur guide line. But I am getting problem with the Pricing procedure. I have used KOFk as accnt cond type, and EK02 as cost cond type. At the time of creation of sales order all cond type is green and EK02 is 0 with red color. But after saving the order when i open the order find all cond type is yellow and EK02 is green with calculated value and NET VaLUE of the order is equal to EK02 value. Kindly gide me where is the problem
Regards
Kaushik -
VL10E report should show only sales order with complete stock
Hello Friends,
I have to make-to-order scenario. While creating a sales order the system proposes a delivery date based on the inhouse production day maintained in the material master.
In VL10E the system gives list of Sales Order for which delivery is due on that particular date. It does not check whether actually the material is really available on that date for the concerned sales order.
Is there any scope ( any config change or user_exit) which will show only the sales order with complete stock confirmed through production order in the VL10E report.
Regards
DebeshHi,
Check userexit LV50R_VIEWG02. If CF_SUBRC = 1 you will not see it in the list. For this purpose in the interfase you have the information in IS_VBEP. Set a break-point and check the conditions.
For more info check the Note 198137 - VL10: Customer-specific enhancements / user exits
I hope this helps you
Regards
Eduardo
Maybe you are looking for
-
Hi, I have music, both purchased and copied from CD .. on 2 different itunes accounts (as I needed to create a new itunes account when I lost my iphone ??). The new itunes in the cloud account only has music on it from when I replaced my dead iphone
-
Dear Friends i need a report that shows me when an item reaches 0 in stock not an alarm , i need a report that show us in a period of time how many times some items reaches 0 in stock can you help me Martin
-
Hi, I have a new Query proplem: Following named Query doesn't work. <?xml version="1.0"?> <jdoquery> <query name="findByArticleId"> select from salt.domain.orderservice.entity.TestOrder where testOrderPositions.contains(testOrderPosition) && testOrde
-
Add monitoring wizard gives error 'page could not be loaded'
Dear forum members, I use the Cisco USC management pack and i get this error. In the opsmgr eventviewer i don't see nothing at all.Does anybody have an idea to solve this? Kind regards, André
-
Problem on starting weblogic integration 2.1
I would like to ask you for advise/information on the start-up of the weblogic integration 2.1. I have tried to setup the weblogic integration 2.1 (sp1) at home, but without any success yet. There was nothing helpful that I can found in the BEA knowl