Material and BOM

hi,experts,
   here is my problem , sometimes ,the standard BOM has been changed ,for example ,add a new material to the BOM,but the BOM of some production order hasn't  been changed ,so ,how to find out the production orders which include the new material ?
thanks
Jarod

Dear,
If you use the ECM- Engineering change management then it is possible to track the changes in BOm and Production order with OCM will given the component history.
Other wise you have to check in Production order Component over view you will get details of component.
Or you can check in USE table RESB with RSNUM of AUFK-AUFNR
or From CAUFV table u can get the material Number and the Plant for the coresponding PO number. and u can pass these Mat.no, Plant and BOM usage as '1'.
or go to these FMs:
1. CO_DB_HEADER_READ
2. CO_SF_AFPO_READ
Hope this will helpful.
Regards,
R.Brahmankar

Similar Messages

  • Q4_How to manage software material and BOM in SAP_High-tech Industry PLM Implementation Issues

    Hello,
    We are implementing SAP PLM for a high-tech company which designs and manufactures mobile phones (ODM). Since we are new in PLM consulting and we are facing with some implementation difficulties, we are looking for some solutions here.
    Question 4: How to manage software material and BOM in SAP?
    Currently, software are not managed as material in the BOM.  How to manage software material in PLM, can anyone help us with some suggestions.
    Question 5: PADS integration with PLM.
    Currently, customer is using Pro/E and PADS to design their product. SAP has already provided standard interface for Pro/E integration. But for PADS, there is no such interface. Because of the specialization of electrical components managed in PADS, different from structural parts in Pro/E, how to transfer them between PLM system and manage them in the PLM system has become an difficulty. We will appreciate a lot if anyone can share us with some successful solutions.

    Hi,
    software, typically a released version of software, is typically managed as a normal material master, and a related document with the code as a package (e.g. ZIP), if really needed.
    Software in development is managed typically with a dedicated Software Configuration Management tool like Rational ClearCase, Subversion, MKS Integrity, ....
    Regards, Ulf

  • Plz help me ,Difference between BOM and BOM

    i am confused  with these two terms BOM - Bill of material and BOM - Bill of manufacturing, Is there any  difference in between these to terms or both are some. Plz let me know as early as possible.
    Thanks for your time.
    suresh arya

    Bill of Material is nothing but list of Raw materials used for to get a finished Material.
    Bill of Manufacturing is nothing but the cost of the Manufacturing include all overheads.
    i think u got  answer
    If it is clear for u assign points
    thanks
    subbu

  • Production Order for a material without BOM and Routing

    Is it possible to create a production order for a given material without routing and BOM, I know we can
    create a production order for a material without a BOM (with a default routing) just wanted to check with
    the above criteria
    Thanks in Advance!!

    Members:
    Thank you for your valuable replies and time
    Santosh:
    Tried what you have mentioned, but system still picks up a default routing
    Kaushik:
    Maintained Default values in OPJG for the given order type, but system still picks up
    default routing
    Mangalraj:
    have no issue in creating a production order without a BOM, but I am trying to see
    is there a way where I can create a production order without a BOM and routing (not
    even default operation )
    Any suggestions on how to create a production order for a material without a BOM
    and routing (not even default one )

  • LSMW to upload Material Characteritics and BOM info

    Hi,
    I am using LSMW to upload Material Characteristic and BOM info for the first time. It would be of great help if someone can provide me with an example with screenshots. Thanx in advance for your help.
    Sachin

    Hi Sachin,
    1) BOM and Classification Datacan not be uploaded together.
    We have Standard Programs available to these uplaods.
    BOM upload
    Object - 0030
    method -0001
    Program - RCSBI010(AUTOMATIC)
    Classification uplaod
    Object -0130
    Method- 0002
    Program-RCCLBI03
    http://www.megaupload.com/?d=578KUG4X
    please follow the link and download  the file.
    It has all the critical steps, screen shots, sample load file.
    let me know if it helps.
    Have fun,
    Satheesh.

  • Sales order BOm with Both Header material and line item delivery

    Hi,
           We have one requirment   we have two products  Products  A  and B, when we are salling only product B we have some amount for that e.g 1000  rupees   but when we are salling product A  along with this product B is free of cost   so as in SO it is not accepting the 0 amount  thats why while making SO for product A  we reduce 1 rupee from product A   and that 1 rupee we are adding for the Free item B   but now every time we have to add both material in SO
      So is there any way  when we make the So for product A  automatically product B should come in So and price of product A is from VK11  but price of B should always be 1 and while creating delivery with VL01 both material we want to delivery and do the PGi  in the same way we required billing doucment for both the material and in case we are salling only product B price  should be from VK11.
      How to customize the system for above requirement.
    regards,
      zafar

    Hi Zafar,
    Free goods determination is not supported in SAP for structured material like BOM.
    For your requirement, you need not have to create a BOM materiall, simple free goods determination is suitable.
    You can create an Exclusive free goods condition record where material A will be the main item and material B will be the sub item (free of charge).
    So create the Condition record for Exclusive free goods in VBN1.
    When you will create the Sales order for material A, system will take the above materials "A" as Main item (Item category TAN) and "B" Sub-item (Item category TANN) respectively.
    When you will create DELIVERY , both the items will be delivered and you can do PGI.
    As and when required you can also sell material B separately.
    Regards
    Pradyumna

  • Configurable Material and Super BOM

    Hi All !
    Can anybody help me out to construct a Super BOM (starting from pre-requisites) to be done from Material master for the same.
    Regards,
    Srinivasan

    Use Material Type KMAT only for the Configurable material and not for all the comps.
    Following are the steps for creating varient configuration.
    1 Create a material master
    Material type: KMAT (or) check the indicator material is configurable in Basic Data 2
    2 Create Characteristic (CT04)
    3 Create Class (CL02) class type 300 (variant) & assign the characteristic to the class
    4 Assign this class in the Classification view of the material master & save the material.
    5 Create a configurable profile (CU41) for the material
    6.Basic data 1: Gen Itm cat grp (0002) configuration
    7Now while creating the super BOM, use the same Tcode CS01, in the item categary enter 200 and the item details assign it to the KMAT.
    If you can send yr mail ID I can send you the file on CAMSHOW.
    Regds,
    Umesh

  • Multi level follow up material in BOM

    Dear All,
    Our client have a requirement for multi lvel follow up material in BOM.
    for example
    BOM for Finish Good made of A.
    if material A is depleted then used material B
    if material B is depleted then used material C
    if A and B have stock used A(higher priority)
    I tried to used follow up material in MRP4 and BOM but it can not be used for multi level like this case.
    Is there any solution for this?
    Best regards,
    Fred

    Hi anyway I tested the BOM master data like this
    F/G 1 Master Box
    |--- A 10 PCS  Alt Group Z1  Priority 1 Usage 100% Strategy 2 (100% Check)
    |--- B 10 PCS  Alt Group Z1  Priority 2 Usage 100% Strategy 2 (100% Check)
    |--- C 10 PCS  Alt Group Z1  Priority 3 Usage 100% Strategy 2 (100% Check)
    Stock A is depleted
    Stock B enough
    stock C enough
    Expected result F/G only used B 10 PCS
    Actual result is
    F/G 1 Master Box
    |-- A 10 PCS
    |-- B 10 PCS
    |-- C 10 PCS
    Do ou have ides how should the percentage in BOm is maintain?
    Best regards,
    Fred

  • Subcontracing charges and BOM structure.

    Dear All,
    In the subcontracting scenaro , Subcontracting charges does't depends neither on  UOM of the material nor conversion factor is fixed of Material Base UOM with Pricing unit .
    for example , price depends upon the operation performd on sheet. If sheet is to be cutted into many peices , so on this sheet 5 operations has to be performed and price is fixed operation wise.
    Now confusion is
    1.)how to give  price in the subcontracting PO.
    2.) and what should be BOM structure in this scenario.
    Please suggest.
    Thanks & Regards
    Nitin Chhabra

    I assume from your question that you do not know the subcontractor price when you place the purchase order.  Based on this your subcontractor info record and BOM should reflect "typical values".  On placing the order you will need to find out the exact amount of material to be issued and manually adjust the purchase order BOM, then allow enough tolerance to except the variance in quantity received and invoice value.

  • Difference between Free goods and BOM (ERLA)

    Hi,
    Could any body throw some light on the Difference between Free goods and BOM(ERLA) to clarify my weired thought.
    AS of what i know is Free goods is 1:1 ratio.
    The main item will be prices and sub item will be free .
    Than same thing is also With BOM (ERLA)
    Regards,
    Venksys

    Hi Venksys
    Please note as given below :
    Free Goods : This function allows you to offer your customers a product free of charge in the form of free goods when a certain quantity of products is ordered. Free goods is a kind of quantity discount, and is granted in the form of a goods delivery that is free of charge when a certain quantity is purchased. There are Two types of free goods :
    1.Inclusive : The customer only pays for part of the goods ordered. The rest of the products are provided at no extra cost. For example, a customer orders  for 3 bottels but pays for 2 bottels  and 1 is supplied free .
    2.Exclusive - The customer pays for the goods ordered, and also receives additional products for free. The materials delivered as free goods will not be the same as that of ordered onces. For examples customer orders 5 bottels , but will receive 1 Bottle opener free.
    BOM : It consists  of 2 or more items combined and sold as an package : Example : Combination of 1 Tooth paste  + 1 tooth brush  packed as BOM.
    The Higher level Material ( BOM) is  not relevant for pricing but relevant for picking : The tooth paste and brush is relevant for pricing  and also can be sold independently : The Item cat group of the Header BOM material will be ERLA  and for Tooth paste and brush material the Item category group will have TAN.
    For more details , please refer to the  link below:
    http://www.sap-img.com/sap-sd/what-is-bom-referring-to-sap-sd.htm
    Thanks and regards
    Veera
    Edited by: veera PV on Jan 24, 2011 9:06 AM

  • MRP run for header material with bom usage-3

    Dear All,
    We have header material with bom usage-3.We maintain the stock at child components only ,not at header
    I have created the planned independent requirement for header material.I have created a sales order but sales order is not shown in md04.
    What can be the further setting  I am missing for mrp run of above scenario.
    with regards,
    pradeep

    Dear ,
    Couple of checks points for you :
    1.Check the material master Sales Org Veie-Item Categoery .As you have mentioned Item Categoery -TAQ which is not relevent for requirement planning throgh schedule line category -CT ( CT means there will not be any inventory or good movement and requirement will not be passed for MRP ) .Only CP -line item categoery does requirement passing through MRP and it will show u in MD04. So the summery is if you want to generate an MTO order for the same FG material , you should matian the Sales Line item categoery as MTO in sales Org View and it will pop up in VA01 whiel logging Sales Order .
    Generally , TAQ item categoery are used in Project Billing or Delivery .ok  and they will not be having any availabilit check so it KP ( no check ) .
    But for MTO order , you should have availablty chek 02/01 in MRP3 view and also MTO Sales Item categoery .
    Based on the above information logg an sales order , release credit chek in VKM3, SAVE and check in MD04.
    Create PIR in MD61 and Run MRP on the both cases .I have tested its working .but noit with TAQ item categoery ok
    2.Why do you need to create Sales Order for dependent Item-Y because it will be in X-BOM item  ? Make sure that Y- should have Sales Item categoery in material master -MM02-Sales Org View as NORM item .If you really want to create sale sorder for this item , it should TAN or NORM .
    3.Other PIR detail is fine .
    Try and revert back
    Regards
    JH

  • PR( purchase requ) for Alternative material in BOM

    Hi PP expert,
    I am using alternative material in BOM. As for example my Header BOM material is u2018Yu2019 and his alternative components  are  X1 and X2
    I have done setting in BOM
    For -
    X1,------
    Priority  ---1
    Strategy  -  2 ,100%
    Usage prob     100
    For -
    X2----
    Priority  -
    2
    Strategy  - -
    2 ,100%
    Usage prob    -
    0
    My client want when  run the MRP , PR should be  generate  of material u201CX2u201D ,because there is no X2 stock and Material  u201CX1u201D  have more stock and want to consume X1 material 1st  then X2.
    X1 has been blocked for procurement.
    Kindly suggest me how will generate PR of X2 when the run MRP. X2 is alternative material..
    Regards,
    Aqueel

    Hi Aqueel!
          As I know, standard SAP cannot solve your problem. Howerver, you can try with these way:
              1/ Try to estimate how long your company will consump all X1(Ex 3 days). Use Alternative BOM 1 for X1, Alternative BOM 2 for X2. And allocate Alt 1 to Production version 1 with valid to 8/10/2010, Alt 2 to production 2 valid from 9/10/2010.
              2/ Change:
              For -
    X1,------
              Priority ---2
              Strategy - 2 ,100%
              Usage prob 0
              For -
    X2----
              Priority -
    1
              Strategy - -
    2 ,100%
              Usage prob -
    100
    And Run MRP, system will take X2 into accout. If you want to savage X1. Need to calculate it and manually change in comonent list of Production order (Now, X2 will consider) with X1 until X1 stock finish.
    Hope it can solve you problem(not perfect).
    Regards
    Tony

  • How to attach a drawing for a material to BOM? Is it possible?

    hi, all SAP experts,
          for creating document i went in cv01n but i don't found any tab or space where i will attach a drawing.So please tell me how to attach a drawing for a material to BOM?
    thanks in advance
    regards
    Nitin Nerkar

    Yes, it is.
    Please check this link:
    how i will attach drawing in bom and how i will see the drawing in screen.
    (please use the search function of the forum)

  • Posting a material with BOM together?

    Dear SAPIENTS
    When I am doing MIGO Posting for a material and this material has BOM with some quantity then I want BOM component should also be posted together with that material.
    Regards,
    Kaushal Rai

    hi,
    Co- product is cost relevant (cost relevancy indicator is ticked)..
    If you look at a petro chemical refining industry their main input material will be "Crude oil" during refining they get "Petrol", "Diesel", "Kerosene", "Naptha" & "Water" etc...
    So the whole of the production cost should not go to "Petrol" alone, as Diesel, Kerosene and "Naptha" are also sellable. Water is not sold out, but is being used internal for the operation.
    In this scenario "Petrol". "Diesel", "Kerosene" and "Naptha" are defined as co-products in the material master. And the cost which needs to be distributed among them are in the ratio 30:30:20:20, so in the joint production details we select the apportionment structure, and here we define the equivalence number by entering the materials and numbers as required by us as 30:30:20:20.
    Now BOM is defined for the main product "Petrol" and Diesel", "Kerosene", "Naptha" and Water are defined in -ve quantity. Here the definition of water goes as "BiProduct". Crude oil is defined as component in +ve quantity. Now during order costing/product costing/settlement considers the entire cost of production based on the crude oil cost and infrastructure cost and it splits into the ratio defined in the equivalence number.

  • To make material and quantity grid out in process order

    Hi ,
    is there any user exit  so that material and quanitiy column in process order can be made grid out................as the material and quantity will flow from BOM ........

    Hi
    Open this link and press Ctrl+F and write component. You will get all possible userexits and Badis relatred to component tab in service or maintenance order. Ask your ABAPER to try those which will be found in this link.
    PM-CS User Exits - ERP Operations - SCN Wiki
    Thank$

Maybe you are looking for