Material Calculation error

Hi Gurus,
I am using raw material of different concentration like
10%, 20%,30%, 40%.
It is maintained in the classification.I have given formula for the material calculation in the recipe.
When i am creating process order & doing batch determination system picking different batches but quantity is same for 10% concentration which is maintained in recipe.
my requirement is qty should be vary as per batch concentration . i.e. if concentration is high required qty should be less & concentration is low then required qty should be high .
Please reply me
Thanks in advance
Abhi

Hi abhi,
This field will gets active/display only when Batch Management is active for material.
Refer below configue guide for Batch Specific Unit.It will also helpful to you.
[Batch Specific Unit of Measure|http://help.sap.com/bestpractices/BBLibrary/Documentation/Q24_BB_ConfigGuide_EN_US.doc]
Regards,
Dhaval

Similar Messages

  • "Item 10     IPC:TTE:Calculation error: Pricing error: Mandatory condition & is

    Hello Experts,
    I need your help to solve this TTE pricing error.
    In Service Order, I am getting this error message for one particular material only
    "Item 10     IPC:TTE:Calculation error: Pricing error: Mandatory condition & is missing".
    Remaining materils I am not getting this error message.
    Please proivide your suggestions to crack this.
    Thanks

    Hi,
      This message come when you caculate 0TTE when doing cross country transactions . Check if this codition needs to be caculated for your order. If it is not required you should not make call .You can try to eliminate this error bu uisng the BADI BADI_TTE_DOCUMENT

  • Material Determination error during Transaction DP90

    Dear Experts,
    I am configuring the Depot Repair scenario for a Hitech Industry.
    The Process is as follows;
    1. Ceating the  Notification
    2. Creating a repair order using Notificaion. and getting the repaired items in to the plant
    3. Creaing and confirming the service order and delivering the repaired product to the customer.
    4. Creating a Billing Request using service order during transaction DP90.
    I am facing the following error!!! -
    Material Determination error in the service order line item xxxxx/xx!!!!!!
    I have configured the DIP Profile YBR00099 as below.
    The characteristics Activity Number, Activity Type and Cost Elemnt were given the Material Determination Check.
    The source is---- " Actual Costs and Line Items " with 100 Percent, No sets are used for the source characteristics.
    In the Material Determination a Blank Item is used with a Check for the field " Material Direct"
    In the Material Determination Criteria for the Blank Material, it is configured as below;
    Activity Type            No Set Used - No Value used
    Activity NUmber        No Set Used - No Value used
    Cost Element           YBR-Material-01(Set values are 608110 and   * )
    Note : the above configuration was done using the Config guide AS IS.
    The material that was used in the Service order is not maintained in the  ODP1 transaction ---> Material Determination.. instead ,only a blank material is used and configured as above.
    The subsequent Process should continue as follows;
    5. After saving the billing request, two more line items are determined in the repair order.
    6. Debit memo is created using the repair order. where the Actual confirmed hours of service and spare parts confirmed if any are billed for the customer.
    Basically I am very much new to this RRB concept and I was facing the above error and could n't be able to proceed further.
    Please help me in this regard.
    BadariNath .G
    Answerthink India Limited, Hyd
    9989425075

    Material Determination error in the service order line item
    Check note 460415 and 545095
    thanks
    G. Lakshmipathi

  • Material statuses error message should go after entering Trackin No in PO

    Hi All,
    I have created one Material statuses with error message, I have created material with the use of that material statuses..
    Its working fine,At the creation of PR, PO I'm getting that Error message..
    My requirement is if I enter Requirement Tracking Number at item level of PR or PO means that Material statuses Error message should Go out and system has to allow to create PR or PO..
    Is it possible?? how to do it?? plz help me...
    Is it possible in standard SAp???
    thanks and regards
    rames reddy

    Hi,
    You can keep Requirement Tracking Number as Required Entry in field selection key (NBF or a copy of NBF as ZNBF) of PO document type in u201CReference data, itemu201D segment in following path:
    SPRO > Materials Management > Purchasing > Purchase Order > Define Screen Layout at Document Level
    And then assign field selection key to PO Document type and save.
    SPRO > Materials Management > Purchasing > Purchase Order > Define Document Types
    Now create PO with PO document type, system will ask you to enter Requirement Tracking Number in u201CItem Overviewu201D unless then you can save Purchase Order.
    The same you can do for PR document type by having a field selection key for PR document type.
    Regards,
    Biju K

  • How to ignore the material with error in costing run ck40n

    Hi
    Pls, advice how to ignore parent material form costing run if the components of that material have errors. I need to run the costing run excluding erroneous parent item. Is any configuration on this..
    Pls help..
    K

    Hi Kesharika Goona... 
    If you want to exclude any material from Costing Run, there are two ways...
    1. Go to Material Master, Costing1 view, take the check box "Do Not Cost". If you opt for this check box, the system will not consider this material for costing.
    2. Where you run the standard cost estimate in CK40N, once you save you costing run with the parameters like Costing Variant etc, When you select the "Parameters" agains the Flow step of "Selection", you will be asked to give the inputs like Material Number, Plant etc.
    There, against the Material Number, on the extrem right side, you will see a arrow, press that arrow, and there you can see a tab "Exclude Single Values". There you have to give the material number which you want to exclude from the costing run press "Execute" icon on the botoom-left corner of that pop-up window..
    If you still face problem, pls revert back
    Srikanth Munnaluri

  • Internal Charges Calculation Error status 03 & Charges disaapearing after FO creation

    Hi Experts,
    I have done following Config & data set up for Internal Settlement (Forwarding Order) while I intent to do Inter Company settlement. (I am using TM9.0 SP01 version)
    In Movement Type Stage sequence set to “No Rule” for internal Settlement.
    Created forwarding order by putting different Planning & Execution Forwarding House on Stage Level.
    Agreement set is done & internal Charges are appearing correctly but with Calculation Error “03”
    I rechecked Internal Agreement, Rate Tables, Calculation Sheet, Everything is fine.
    There are two issues I need your experts advise to resolve following issues:
    Charges are calculated correctly but Why Charge Cal. Status is 03? (No error on Charge Item level & Log analysis is fine)
    Charges are disappearing when I create Freight Order against stages it. (with error shown below)
      (attached Screenshots showing errors)
    Regards,
    Vinod Vikhe

    Hello Vinod,
    Still nothing for me...
    Anyway, have you checked if the assigned of BP to the organization unit? Sometimes this is the reason the internal calculation does not work.
    Best Regards, Marcelo

  • Refresh Order Management Materialized Views errors out in R12.1.3

    Hi All -
    Refresh Order Management Materialized Views errors out in R12.1.3 when submitted with blank parameters. Please find below error details ..
    OEXITORDMV module: Refresh Order Management Materialized Views
    Current system time is 15-OCT-2012 11:30:29
    **Starts**15-OCT-2012 11:30:29
    ORACLE error 12008 in FDPSTP
    Cause: FDPSTP failed due to ORA-12008: error in materialized view refresh path
    ORA-01555: snapshot too old: rollback segment number 4 with name "_SYSSMU4_3768336236$" too small
    ORA-06512: at "SYS.DBMS_SNAPSHOT", line 2566
    ORA
    Start of log messages from FND_FILE
    End of log messages from FND_FILE
    Thanks,

    Cause: FDPSTP failed due to ORA-12008: error in materialized view refresh path
    ORA-01555: snapshot too old: rollback segment number 4 with name "_SYSSMU4_3768336236$" too small
    ORA-06512: at "SYS.DBMS_SNAPSHOT", line 2566Please see old threads for the ORA-015555 docs you need to refer to.
    https://forums.oracle.com/forums/search.jspa?threadID=&q=ORA-01555&objID=c3&dateRange=all&userID=&numResults=15&rankBy=10001
    https://forums.oracle.com/forums/search.jspa?threadID=&q=ORA-01555+AND+Materialized+AND+View&objID=c3&dateRange=all&userID=&numResults=15&rankBy=10001
    Thanks,
    Hussein

  • Material replication errors - SRM 5.0

    Hi all,
    Iam getting error when i replicate material master from r3 to srm.
    i successfully done service replication in to srm system, but material not.
    error is :
    Allocation of the tax for country IN, sequence 1, value 0 not possible
    Message no. SRM_PRODUCT_SALES038
    followed steps:
    1. maintained all middleware parameters
    2. R3AS , Load object as material , source site and destination site, selected source system and executed.
    3.smq1 - no q's in the line
    4. smq2 -  the following q's re there.
    R3AD_ATTRIBUTE
    R3AD_CLASS
    R3AI_MATERIAL
    SRMD_ATTRIBUTE
    SRMD_BUPA_MAIN
    SRMD_CLASS
    SRMD_MATERIACONTAINER
    SRMD_MATERIAFINISHED G
    SRMD_MATERIAHOS-A1
    SRMD_MATERIAHOS-D21B
    SRMD_MATERIAJEPLLEAS
    SRMD_MATERIAM1
    SRMD_MATERIAPAC01
    SRMD_MATERIAPMTEST_MAT
    SRMD_MATERIATEST_MATER
    5. selected R3AI_MATERIAL and executed  - status shown as SYSFAIL. due to error mapping.
    6. SMW01 - checked the logs  - error appeared like this.
    Allocation of the tax for country IN, sequence 1, value 0 not possible
    Message no. SRM_PRODUCT_SALES038
    7. Went to R/3 material master - checked any material is having SALES VIEW with a tax code,
    No where i found any thing in that....
    Friends....need help...i stuck up...with the error....
    any clues ...
    regards
    sai

    Reason for the above problem is :
    we need to maintain filter settings in R3AC1.
    TABLE STRUCTURE: MARA
    Field: PSTAT
    OP:EQ
    Incl/Excl : I Inclusive defined
    I run the R3AS again after these settings,material replicated successfully.
    thankyou so much muthu.
    Very useful tips.....
    regards
    sai

  • Installment cannot be calculated; error in repayment plan Infotype  0045

    Hello Experts.
    I am  getting error in IT0045
    "Installment cannot be calculated; error in repayment plan"
    Please give solution
    Regards
    Ramu

    Hi Ramu
    When you are getting this error? While processing salary.
    Thanks
    Yogesh

  • While uploading material give error

    hi friends !!!!!
    while uploading material give error
    item categary is not assign to g/l a/c and chart of a/c
    thanks in advance

    Dear hanumant
    Go to OMS2, select the material type and double click on "Quantity/Value Update" button on your left screen.
    Here for the combination of valuation area and material type, choose the two boxes "Qty.updating" and "Value updating".
    Thanks
    G. Lakshmipathi

  • Mm01 create material  copy from a material save error.

    Hi all,
          when i create a material copy from a material, valuation class  is a must enter field, but a user id is not enter valuation class and save the material. the material is save and valuation class is null. so the material has error.  and other user id  if not enter valuation class then the material can't save. 
         valuation class  is a must enter field, if it is null so the mateial can't save. but now a user id  can save it.  i check t_code:omt3u,
    the value is same. if anyone met the same case please help me. thanks!
    james

    this bbs is not any help.

  • Simple calculation errors

    Does Numbers always make calculation errors?
    I have a sheet with 80.9 entered in one cell and 81.1 in another cell
    When I do a calculation of 81.1 - 80.9, the result I get is 0.199999999999989
    81.1
    80.9
    0.199999999999989
    Why is there a rounding error on numbers with 1 decimal place?
    This makes me not trust anything that Numbers does if it can't even do that!

    Mason,
    this topic has been addressed in many other threads and is a result of the way numbers are stored on a computer.  the difference between the value displayed and the correct value is 0.2 - 0.199999999999989 which is 0.000000000000011 
    all computer programs use integer of floating point representations of a number-- see this link for details:
    http://en.wikipedia.org/wiki/Single-precision_floating-point_format
    you can format the number with two digits using the cell formatter and you will see the "correct" answer:

  • Get "Error in Net Price Calculation" error while creating a Purchase Order

    I am getting a error when i try to create a PO. Says "Error in Net Price Calculation item 00010(Please correct)"
    I have defined conditon records with the price for the material  and have also created info record.However the price in the info record (including currency i.e USDN is different than the one defined in the conditon records currency is USD).
    However the price is different from the one defined in info record and in material master.
    Where is it picking the price from also is there any way to edit the price in material master or info record ?
    Also when i view the condition records by using Tcode MEK1 i get the following error
    "Access Pricing Purchasing Z00q 20 contains no fields"
    I know Z001 is the access sequence
    Can any one tell me wht is this error message about ?
    Edited by: Dspsac on Jan 29, 2008 4:31 AM

    how can u maintain the condition record as well as info record for a vendor -material in the same time frame
    it is not possibe
    as info record is also 1 of the condition table
    if u have maintained the info record then system is going to fetch the data from there but point top notice is it depends on the validity of record
    system fetch the price from info record
    and the currency used is fom vendor master

  • Production order Target cost Zero - Varience calculation error KV151

    Hi Experts,
    I am having an issue on KKS2 variance calculation, system throwing error KV151 Target cost is 'Zero'
    All pre-requisites are ok including BOM, Rates, Routings etc..
    Process:
    Production order with FERT - valuated material,
    All BOM components in production order are Non valuated stock items, Non-stock items
    Note: Cost Estimat e is for Labor and Overhead only.
    After production order confirmation CO11N, production order Cost analysis displays - Target value ("Zero") and actual value.
    Due to above reason in KSS2 we are unable to calculate variance, system displayed error KV151.
    I cannot settle the production order, guide if I am missing some thing in config. ?
    I appreciate you quick response.
    Thanks,
    RK

    Thanks for your reply Swapvik & Takashi, I have no issues on configuration side very thing looks good.
    Cost estimate - Good
    Variance key - Good
    Production order - FERT (Valuated) - good
    BOM components - UNBW, NLGS only - Good
    Labor rates - good
    Periods - good
    Production order confirmation - Good
    Actual cost - Good
    My Issue is Target cost is zero on cost analysis in CO03 but if I can see target cost in KKBC_ORD report.
    I am unable to calculate variance and settlement.
    I appreciate your response.
    Thanks,
    Raj

  • No price determination for Material/Plant error CK465

    While calculating the cost for a material through process order ,  no price could be determined for  input material despite the standard price of the same is being released , error message CK465.Apart from that the valuation variant and costing varaiant has also been checked and found correct. Still the error persist.
    How to correct the cost calculation while creating process order ? Plz suggest

    HI,
    Please check the Plan Costing variant (usually 'PPP1') assigned to Order ('Control' Tab) and make sure you maintained the prices as per this Valuation strategy maintained in transaction OPL1.
    Hope this helps.

Maybe you are looking for

  • Cannot open pages while connected with AEBS ?

    I only have a dialup connection through AOL. Finally bought old style AEBS with modem so i could connect with my iBook at home. Seem to have it configured to network with my G5 ok. Got it to connect to AOL, i'm online. My problem is i can't open any

  • Sender JMS Adapter - NOT Working

    Hello Everybody - We are on SP13, also installed JMS Driver files on the system. We are running, Central Adapter Engine. We configured the Sender JMS Adapter for WBI MQ->XI->SAP scenario. We need to JMS Adapter to be configured to connect to WBI from

  • Message no. F5053 Down Payment for Vendors

    Please can you tell me the solution. I have a same problem with the following Message no. F5053 The specified special G/L indicator is not classified as "down payment" or not listed in the list of the target special G/L indicators for indicator "F".

  • How to get Message ID of a Post within a thread?

    I think I might be overlooking something obvious. For example, a thread with 20 replies and you want, let's say, the message ID of the 14th (i.e. the 14th as it's currently appearing in the thread, although this sequence of posts may be subject to ch

  • Re:Picture in Matrix column

    Hi, I have Created a Matrix.I want to set a button like picture in one of the column in the matrix.How to achieve this. Thanx in advance Mohana