Material Issue against multiple reservation in one step

Hello everybody,
I want to issue materials against multiple reservation (originating from Service order or PM order) in one step because the number of reservations is quite large (say thousands of reservation in a day). If i go one by one through MB1A it will take a lots of time. Please suggest some solution for the same.
Regards
Amit Gupta

Hi,
You could write a program (new dialog transaction), in which you can select the reservations for which you want to issue, show the summarized list of materials and quantities to be issued, then you decide which materials you actually want to process, and then call BAPI_GOODSMVT_CREATE to post the individual reservations in the background.
This is just a general idea, but you can use it to develop the real thing, which will probably turn out to be quite more complex.
Regards,
Mario

Similar Messages

  • Issue against multiple reservations

    I want to restrict a material issue against reservations.
    System shall allow issue of material in the sequence of reservations created.
    If reservation R1 is created 1st for a material than res R2 then system shall nor allow the issue of material against R2 unless all the items have been issued against R1.
    Thanks,
    Suz

    Suz,
    Not supported by standard SAP.  This will require custom development.
    Rgds,
    DB49

  • Report for Material Issued against Service Orders But not Billed.

    Hi Experts,
    For CRM Service Orders Based on the Reservation number generated in CRM we will make the Goods issue document in ECC.
    My Question In CRM Do we have any standard report to see Material issued against CRM Service orders but not billed. i.e. Work in progress.
    Thanks in Advance,
    Abhinesh

    Hi Vivek,
    What I wanted to say that you won't get information from VAV about billing since as far as I know it doesn't contain any relevant table.
    You should try create a query using LIKP-LIPS-(joint type: left outer)-VBRK. This will connect deliveries to billing document, you can also get SO number. Please try this.
    (Sorrowully I don't know which logical database would be good for you)
    BR
    Csaba

  • PO number and material issued against this PO for subcontracting

    How to know the link in between the PO number and material issued against this PO for subcontracting.
    I have checked that PO history is not getting updated.
    Thanks,

    Hi,
    We have 2 different scenarios where you can post a goods issue to Subcontract Venodrs.
    Scenarios 1: You can post the goods issue against a subcontrac vendor with out referencing the Subcon PO from ME2O, at this stage we will be knowing what is the stock at subcontract vendor but we will not be knowing the issues against which and how much Quantities are posted.
    So when we are post goods receipt, then we will come to know the consuption quantities.
    Scenario: 2, If we use the delivery concept then we can track the goods issues against the subcon POs.
    If you really keen to track the material issued to Subcon vendor against a PO so better use with delivery.
    Thansk,
    Satya.

  • In iPhoto can you label multiple photos in one step or do you have to label them one by one?

    In iPhoto can you label multiple photos in one step or do you have to label them one by one?

    what are you calling a "label"  You can set the title for multiple photos by selecting them and using the batch change command
    LN

  • Excess material issue against RSQ

    Hi Gurus,
    We are using repetitive manufacturing in our organization (Automotive Industry), the material staging is done based on the plan order with pull list as per the BOM, but in case excess components are required how can we stage this excess material?
    Scenario-In BOM we are having steel washers as 4units (staged against pull list printout) and during operation 2 units got scrapped, how can we stage this additional requirements of 2units at production supply area?Against which document this additional requirement can be staged in REM?
    Regards
    cs

    Hi Antony,
    Thanks for your reply..
    Yes I agree it can be done with component scrap during MFBF transaction,requirement here is the printout of required excess material issue,against which the store guy will stage the material.
    The store department want to record against which plan order this excess material has been issued.
    Please advice.
    Regards
    cs

  • Material issue against PR

    hello friends.
    i have a small querry.
    i have stock of raw material in storage location.
    my scenario is make to order.
    i have generated a sales order and then i have done planning of the final material.
    as the planning process is carried out hence all materials from top to bottom are planned.
    but as there is already raw material in stock, the pr that is generated should issue raw material from the stock.
    i do not want to purchase raw materail.
    is it possible to issue stock material against PR.
    thanks for the help .
    warm regards.

    Hi,
    Material cant be issued against PR. You can issue material against reservation and close the PR. It seems you are not using MRP.
    Regards

  • Download multiple files in one step

    Hi,
    my first try with acrobat.com with uploading some pictures which I like to share with friends led me to the question, how they can download my 18 pictures in one step. I put them in a workspace and gave them access. You can mark all files, but there is no menu point which offers you to download all files in one step.
    Is there a way to do this in one step?
    Greetings
    Mario

    Hello Mario,
    Thank you for posting. Unfortunately, there is currently no way to download multiple files at once; this functionality is high on our list of planned enhancements, so I encourage you to stay tuned for future releases.
    Best regards,
    Rebecca

  • Attaching Multiple Attachments in One Step to a Complaint

    Hi,
    Standard SAP CRM does not allow multiple attachments to be attached to a complaint in one step. Is there a work around to accomplish this? If so any tips/tricks?
    Thanks in advance

    rbarc wrote:
    > Is it possible to select multiple documents to attach to a new emailin
    > GW 7.03 Web Access ? I can select multiple items one at a time, but when
    > I have 20 or so items to attach that's pretty tedious. Normally one can
    > CTRL + Click or Shift + Click to select multiple items, but this doesn't
    > work in Firefox or IE. Nothing obvious in the suer manual, any
    > suggestions, is this possible ?
    >
    >
    Nope no such way.

  • Import multiple folders in one step

    I'm new to PSE and have just installed version 10: is there a way to import multiple folders from my hard disk into Organizer in one step? Selecting each folder and then selecting all the pictures in it is tedious (I have about 50 folders to import into PSE).

    Hi,
    You can import photos from multiple folders.
    Just click File >> Get Photos and Videos >> From Files and Folders
    Now select the folders you want to import photos from (they should be at same level in the directory, say all folders in My Pictures) using Ctrl+Click, tick the checkbox for 'Get Photos from subfolders' if not already checked and then click 'Get Media'.
    Hope that will help
    Thanks
    andaleeb

  • Transitions to multiple clips in one step

    I have about 100 hundreds still images and I have to apply same transitions about them. Is there a way to do it in one step? I tried to select them all and apply, i.e., cross-dissolve, but FCE put it only one at the point where I click..

    In case it jogs your memory, the auto select buttons look like this: !http://farm4.static.flickr.com/3656/34609963720f9084a4e1m.jpg!
    Whereas the patch panel looks like this: !http://farm4.static.flickr.com/3654/3460180481d57b9a7e63m.jpg!
    In that screenshot of the patch panel, the video patch is set to track V1 (this is indicated by the v1 to the left of V1). To set the patch to another track, click next to the patch panel in that track. If I wanted to set the patch to track V2, I would click next to the V2 patch panel so that v1 moves to V2.
    I hope this makes sense, I can see how it might get a little confusing.

  • Insert multiple rows in one step

    please i need to create an input form where i can insert more than one row at one step using jsp/struts/bc4j,i noticed that this is a repeated question on the form but no one answer

    If you are using JSF then you can use an ADF Faces multi row edit table.
    In 10.1.2 with JSP and Struts there was this how-to that might help:
    http://www.oracle.com/technology/products/jdev/tips/mills/JSP_Multi_Row_Edits.html

  • Text issues merging multiple pdfs into one pdf

    Hello, when I merge multiple pdfs into one pdf document my text is missing or garbled.  I spent hours yesterday trying to figure this out, from insuring the text was embedded and print setting were correct.  Please help!!
    Using Adobe Pro 9.0
    Thanks,
    Faith

    Acrobat Pro is the application you use for working with PDFs, making minor edits, combining multiple PDFs into a single file, extracting or replacing pages, doing fancier form work than ID has the ability to produce, and even creating PDF from a number of other file formats. I'm not sure your question about maintaining the quality of your photos is really applicable -- it would depend on how youare getting from the photo to PDF to begin with. The use of Acrobat in and of itself won't be the determiner.
    That said, I couldn't live without Acrobat Pro in my workflow. Since you are on CS5.5 you have a couple of options. You could purchase a subscription to Creative Cloud (at a discount for the first year), which would give you access not only to Acrobat, but all of the other programs and tools included in the suite, but you pay a monthly or yearly fee, or you can buy a standalone perpetual license to either Acrobat Pro or Acrobat Standard (I didn't realize Standard was still an option, and you might not need all the features of Pro -- you can compare at http://www.adobe.com/products/acrobatpro/buying-guide.html).

  • Alternate material issue against production order if stock is zero

    Hi,
      I have one requirement  we have 3 material codes
    X, Y and Z.  Material X is present in the Bom of ABC  material Y and Z are not in any BOM  but both those codes are use for procurement of material and can be use insted of X  but due to some requirement as material of different make  we dont want to combine the stock of all.
         Now as per BOM when material for ABC is issue as per BOM  the 'X'  will get issue   but in case  the X stock is zero  system should check stock of Y   and if it is avalibale  then it should issue from Y  insted of X and if Y stock is zero  system should check for Z  if stock is there system should issue from Z.
    can this map in system.
    regards,
    zafar

    Hi,
    While maintaining BOM for FG, maintain all materials X, Y & Z with same qty.
    For material line items Y & Z, maintain "AltItemGroup" at Item Detail level.
    Here enter any key for e.g. "AL" and Press enter then it will ask for following;
    Priority
    Strategy - (1 - Manual maintenance/by usage probability OR 2 - 100% check)
    Usage prob.
    After maintaining all these just check the effect in transaction production order, reservation, confirmation.

  • Issue syncing multiple iPhones on one computer.

    Hello all,
    I don't get any errors or anything like that.
    My issue is that iTunes keeps putting the wrong contact and email information on the wrong phone. Well, it keeps trying to put ALL contacts and email accounts on both phones.
    I have one phone set up to only sync with Outlook Express and the Windows Address Book. That phone also is only set to sync the one and only email account in Outlook Express.
    The other phone is set to sync with Outlook and the Outlook Calendar and contacts. It is also set to only sync with the two email accounts for Outlook.
    I have verified that the settings show correctly for both phones in iTunes, yet when I sync a phone it puts all contacts and all email accounts onto that phone. This is rather annoying as I don't want or need the info from my wife's phone and she doesn't want or need the info from mine...lol.
    The phones are 3 days old now, and I installed the latest version of iTunes the day I bought the phones. All available updates were applied to both phones before any information was set up in iTunes as far as syncing goes.
    Any help would be greatly appreciated.

    click here for information.
    it talks about iPods but the same applies to iPhones. most users employ *method two*.
    JGG

Maybe you are looking for

  • Using alternative xorg config script?

    Hello, I've installed Starcraft Broodwar and it works just fine, but I can only run it in windowed mode which can get a little bit annoying after a while. I've read that you can get it to run in fullscreen if you change your resolution to 640x480. Th

  • Roles appearing in User managment but not in Users Form

    I have used the WF_LOCAL_SYNCH.propagateUserRole API to add roles to new and existing users in our production instance. That seemed to go well. When I view that user through the user management screen I see that he has the role assigned to them. Yet

  • How do you tilt the writing in your text box or tilt a picture for Pages08?

    Some of the templates that are provided for Pages 08' have tilted/slanted text and pictures, but I can't seem to figure out how to do it myself. Is it possible?

  • Having trouble opening FCPX file in Xto7

    Hi all, I am trying to import a file to Xto7 so that I can edit the file on FCP7. However, I am unable to click/open the files. Does anyone know what could be going wrong? Thank you!

  • Creating and Updating POs through API instead of PDOI in 11.5.10

    Hi All, We are doing a 11.5.10 implementation where we need to interface POs from an external system on a daily basis and have a few questions. Basically the client wants to have all the processing done using APIs (private/public) rather than using c