Material to be provided to subcontractor' site/

Hi
I have requirement that the finished material is sent for subcontracting to the Vendor.One of the raw materials is procured from another Vendor and sent directly to the subcontractor.
The scenario can be mapped partially by creatingf the PO for that Vendor   setting the Indictor "Subcontracting Vendor" and you provide the Subcontractor Vendor no in the "Delivery Address " tab of the Purchase Order.
When we do the GR for the raw material the stock for the Stock Material is updated at Subcontractor'e end directly but my problem is how do I consume that stock.
I mean when we do the Goods Receipt of the finished product from the Subcontractor the stock of the raw material which was supplied by the Vendor directly to the Suncontractor should also get consumed similar to our normal subcontracting.
Does anybody know how to map this scenario?
Regards
V

Hi
There is small problem in process. Lets assume that "X" your finished product. You are buying "Y" from vendor and delivering at subcontractor's place.
GR of subcontracting should be for the material Z (X+Y). I mean to say You should have subcontracting PO(assume 451111) for "Z"which have  components as "X" and "Y" in PO material tab.
You should make GR for PO 451111. So that you get stock of Z in your plant and the material you sent X and you delivered directly Y will be consumed.
You cannnot say I will send X and I will receive also X from subcontractor.Then it will become illogocal and illegal process. Because at any point of time the valuation price of "X" not equal to "X+Y".
Hope you are clear
regards
Antony

Similar Messages

  • Sending material outside the plant to subcontractor for refurbishment

    Hello experts,
                         i have created a normal Miintenance order(PM01)and via that order i want to send my material outside for refurbishment to subcontractor,i have alread assigned the Control key as PM02for external services, now my problem is that when i go to components and put in my material with item category as "N"(NON-stock mtrl, though the mtrl is a stock mtrl). i m able to generat the PReq, but when i go to the PReq, i m getting the account assignment as "F", but item category is blank and in grey mode that i can not change.
    further when i go to making a PO for the PReq, i m still not able to change the item category.
    where r the settings that i m loosing.
    Please help
    Regards,
    yk

    yk,
      The subcontract indicator on the operation "External tab" is only available if you have DIMP (Discrete Industries and Mill Products solution active) in SAP.
    If this is active..this would be the process to follow..
    1) assign Control key with "external processing" to operation
    2) Select the "Subcontract" check box on the external tab of the operation
    3) Assign Components to the operation with item category "L" , when you are providing the materials to the vendor
    4) Assign Proper values to the Material provision indicator for the material
    5) When you save or release the order, the Subcontract PR is then created automatically.
    Regards
    Narasimhan

  • UNABLE TO ACCESS THE INTERNET FROM LOCAL PROVIDER ON A SITE-TO-SITE VPN CONNECTION

    Dear All,
    I have a site-to-site connection  from point A to point B. From point B i am unable to access the internet from local internet provider.
    I am trying to ping from 192.168.20.1 the dns 8.8.8.8   but i receive the  message "destination net unreachable".
    When i run "show ip nat translation" i receive nothing.
    The vpn connection is working properly, i can ping the other side 192.168.10/24
    Below is the configuration of the cisco router on point B.
    dot11 syslog
    ip source-route
    no ip dhcp use vrf connected
    ip dhcp excluded-address 192.168.21.254
    ip dhcp pool voice
     network 192.168.21.0 255.255.255.0
     default-router 192.168.21.254 
     option 150 ip 192.168.5.10 
    ip cef
    ip domain name neocleous.ru
    ip inspect name IOS_FIREWALL tcp
    ip inspect name IOS_FIREWALL udp
    ip inspect name IOS_FIREWALL icmp
    ip inspect name IOS_FIREWALL h323
    ip inspect name IOS_FIREWALL http
    ip inspect name IOS_FIREWALL https
    ip inspect name IOS_FIREWALL skinny
    ip inspect name IOS_FIREWALL sip
    no ipv6 cef
    multilink bundle-name authenticated
    vty-async
    isdn switch-type primary-net5
    redundancy
    crypto isakmp policy 5
     hash md5
     authentication pre-share
     group 2
    crypto isakmp policy 10
     encr aes
     authentication pre-share
     group 2
     lifetime 28800
    crypto isakmp policy 50
     encr 3des
     hash md5
     authentication pre-share
     group 2
    crypto isakmp key Pb85heuvMde9Wdac5Qohha7lziIf142u address [ip address]
    crypto isakmp invalid-spi-recovery
    crypto isakmp keepalive 10
    crypto ipsec transform-set TRANSET esp-aes esp-sha-hmac 
    crypto ipsec transform-set TRANSET2 esp-des esp-md5-hmac 
    crypto ipsec df-bit clear
    crypto map CryptoMAP1 ipsec-isakmp 
     set peer [ip address]
     set transform-set TRANSET 
     match address CryptoACL
    interface FastEthernet0/0
     description Primary Provider
     ip address [PUBLIC IP MAIN PROVIDER] 255.255.255.252
     ip access-group outside_acl in
     ip mtu 1390
     ip nat outside
     ip virtual-reassembly in
     load-interval 30
     duplex auto
     speed auto
     crypto map CryptoCY
     crypto ipsec df-bit clear
    interface FastEthernet0/1
     description TO LAN
     no ip address
     load-interval 30
     speed 100
     full-duplex
    interface FastEthernet0/1.1
     description DATA VLAN
     encapsulation dot1Q 20
     ip address 192.168.20.254 255.255.255.0
     ip access-group inside_acl in
     ip nat inside
     ip inspect IOS_FIREWALL in
     ip virtual-reassembly in
     ip tcp adjust-mss 1379
    interface FastEthernet0/1.2
     description VOICE VLAN
     encapsulation dot1Q 21
     ip address 192.168.21.254 255.255.255.0
    interface Serial0/2/0:15
     no ip address
     encapsulation hdlc
     isdn switch-type primary-net5
     isdn incoming-voice voice
     no cdp enable
    interface FastEthernet0/3/0
     no ip address
     ip access-group outside_acl in
     ip nat outside
     ip virtual-reassembly in
     shutdown
     duplex auto
     speed auto
     crypto map CryptoCY
    ip local pool VPNPool 192.168.23.2 192.168.23.10
    ip forward-protocol nd
    ip http server
    no ip http secure-server
    ip nat inside source list nat_list interface FastEthernet0/3/0 overload
    ip route 0.0.0.0 0.0.0.0 [default gateway ip]
    ip access-list standard VTY
      permit 192.168.20.0 0.0.0.255
    ip access-list extended CryptoACL
     permit ip 192.168.20.0 0.0.0.255 192.168.3.0 0.0.0.255
     permit ip 192.168.21.0 0.0.0.255 192.168.5.0 0.0.0.255
     permit ip 192.168.21.0 0.0.0.255 192.168.6.0 0.0.0.255
     permit ip 192.168.21.0 0.0.0.255 192.168.12.0 0.0.0.255
     permit ip 192.168.21.0 0.0.0.255 192.168.2.0 0.0.0.255
     permit ip 192.168.20.0 0.0.0.255 192.168.10.0 0.0.0.255
     permit ip host 192.168.22.1 192.168.5.0 0.0.0.255
     permit ip host 192.168.20.1 192.168.5.0 0.0.0.255
     permit ip host 192.168.22.1 192.168.6.0 0.0.0.255
    ip access-list extended DFBIT_acl
     permit tcp any any
    ip access-list extended inside_acl
     permit ip 192.168.20.0 0.0.0.255 host 192.168.3.35
     permit ip 192.168.20.0 0.0.0.255 host 192.168.3.39
     permit ip 192.168.20.0 0.0.0.255 host 192.168.3.23
     permit ip 192.168.20.0 0.0.0.255 host 192.168.3.18
     permit ip 192.168.20.0 0.0.0.255 host 192.168.3.55
     permit ip 192.168.20.0 0.0.0.255 host 192.168.10.144
     permit ip 192.168.20.0 0.0.0.255 host 192.168.10.146
     permit ip 192.168.20.0 0.0.0.255 host 192.168.10.141
     permit ip host 192.168.20.253 host 192.168.3.21
     permit ip host 192.168.20.254 host 192.168.3.21
     permit ip 192.168.20.0 0.0.0.255 host 192.168.3.10
     permit ip 192.168.20.0 0.0.0.255 host 192.168.20.254
    ip access-list extended nat_list
     deny   ip host 192.168.20.254 192.168.10.0 0.0.0.255
     deny   ip host 192.168.20.254 192.168.3.0 0.0.0.255
     deny   ip host 192.168.20.1 192.168.3.0 0.0.0.255
     deny   ip host 192.168.20.1 192.168.10.0 0.0.0.255
     deny   ip host 192.168.20.2 192.168.3.0 0.0.0.255
     deny   ip host 192.168.20.2 192.168.10.0 0.0.0.255
     permit ip host 192.168.20.1 any
     permit ip host 192.168.20.2 any
     permit ip host 192.168.20.254 any
    ip access-list extended outside_acl
     permit gre any host [ip address]
     permit esp any host [ip address]
     deny   ip any any
    ip sla 2
     icmp-echo 192.168.10.254 source-interface FastEthernet0/1.1
     frequency 180
     timeout 500
    ip sla schedule 2 life forever start-time now
    logging 192.168.3.21
    route-map DFBIT_routemap permit 10
     match ip address DFBIT_acl
     set ip df 0
    route-map ISP2 permit 10
     match ip address nat_list
     match interface FastEthernet0/3/0
    route-map nonat permit 10
     match ip address nonat_acl
    route-map ISP1 permit 10
     match ip address nat_list
     match interface FastEthernet0/0

    You cannot access internet, because all traffic is tunneled for VPN !!!!
    Please see cisco tech documentation and bypass traffic for internet.
    eg.  if lan traffic is going from site a to site b  then through vpn
          else
           lan traffic to internet (any) should be out thorugh the vpn .

  • Withdraw material from blocked stock at subcontractor

    Hi
    We have Third Party Order process where in materials are directly received to subcontracting vendor stock, when Goods receipt is posted in receving plant.
    Due to some error, few stocks have been posted to Blocked stock at Subcontractor.
    We would like to transfer the stock to unrestricted stock / scrap the stock from Subcontractor blocked stock.
    Kindly let me know your opinion to make transfer posting.
    Thanks and Regards
    Rajkumar

    Dear Yadav,
    1.
    Firste you wrote:
    Due to some error, few stocks have been posted to Blocked stock at Subcontractor.
    After that you stated this
    It is about restricted stock at subcontractor.
    2.
    And materials are not subjected to batch management. So we cannot use MSC2N.
    So, your first statement was that the material is in "blocked" stock, after that you stated that it is in restricted-use stock. But you also stated that the material is not batch managed.
    "Restricted-use" is the status of the batch, so your material should be batch managed if its status is restricted-use.
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/a5/63396b43a211d189410000e829fbbd/frameset.htm
    As I wrote you can use MB1A +553O if your material is in QI stock, if it is in restricted use you can't. If it is in restricted-use, please use MSC2N to change its status to unrestricted and after that comes MB1A + 551O.
    What is the real stock type the stock you are speaking? Who "posted" it to that stock type and how?
    Please give EXACT information.
    Thanks,
    Csaba
    Edited by: Csaba Szommer on Feb 10, 2009 10:50 AM

  • Modifying standard material type configuration provided by SAP

    I was recently involved in a discussion regarding whether or not to modify sap provided material types (e.g. FERT)
    My position was that SAP provided material type configuration should not be modified, instead a z-version of the standard material type should be copied over to a z-version or a y-version (FERT copied as ZFRT), configurations changes made the z-version. My position was based on the following considerations:-
    Reference to the original
    Possible implication at the time of future releases or upgrades - In Some of my previous projects this was a reason why the standard material type configurations were never touched
    Hence I am curious to know if there a more current or correct position on this topic.

    Hi Jose,
    You are absolutely correct that standard material type should not be changed as you can always reference to the original if you want to create a new material type by copying the old ones. I too have seen ZFRT and FERT.
    I go by creating a Z one, as I have always the option to reference the original Material Type. As the above members have already replied the same.
    It is very easy to check the material type like FERT, ROH etc. However, say you have changed the settings for standard material type like FHMI, LEIH, VERP etc and you want to create a new material type by referencing any of the above, you will need to check client 000 (as referred by Jurgen) to check what Pricing control it have S or V. What Item Category is in original. What selection of views are there in original etc. you always have a better edge to check from the originals if you do not change them.

  • Provider hosted app - Site Provisioning activities

    Hi ,
    I am creating a Provider hosted app which does site provisioning activities like create site , create site columns, content types etc. I have almost 50 or more fields to be added. I am using the Provider hosted app - Process Event, and used SPRemoteEventType
    - App Installed.
    When the app is installed the above functionalities are done, as I need to code to do these activities synchronously.
    I am facing an issue in App Installed event that,during the code execution (consider the field creation method), since it takes some time to add all the fields, after some time limit,  the runtime comes to the start point of code execution , which is
    creation of token helper, and the methods already executed is also called again.
    I have executed the code in Release mode, the logs show the above behavior.
    I am not sure how I am getting this weird behavoir.
    Please advise.

    msdn (Handling events in apps for SharePoint):
    Your implementation of the App Installed event must complete and return an SPRemoteEventResult object
    within 30 seconds or the SharePoint installation infrastructure will think it has failed. The infrastructure will rerun the event, and repeat your code from the beginning, up to four times. After four timeouts,
    SharePoint will roll back the entire app installation. We recommend the following practices:
    If there is any code in your handler that should not be repeated after a timeout, put it in a conditional block that tests to see if it has already run. You must test the actual installed component. Simply setting
    a variable to true when a block of code completes does not work as a test because all variables are reinitialized when the event times out and restarts.
    Move installation code that takes more than 30 seconds into the app itself. You can add it to "first run" logic that executes the first time the app is launched. Alternatively, the app can prompt the
    user to run the installation code.
    If the preceding bullet item is not feasible for your app, another option is to have your event handler start a remote asynchronous process and then immediately return a SPRemoteEventResultobject.
    A weakness of this strategy is that if the remote process fails, it has no way to tell SharePoint to roll back the app installation.
    [custom.development]

  • Damage Material at Subcontractor

    Hi,
    There is scenario in case of Subcontracting PO.
    I have created subcontracting PO having parent material with 1 Qty.
    Child parts issued to vendor in a bulk it can be 1000 qty or more.
    Subcontractor Process the materials he required 100 child parts to create the 1 parent material.
    now while subcontracting he damages the 10 qty out of 100 and he is responsible for these 10 damage items.
    how the damage materials can be treated in the system.

    Initially I have issued 100 Qty to vendor he damages the 10 and then more 10 Qty issued to him, now total Qty has been provided to subcontractor is 110.
    Goods Receipt will be posted with 100 Qty.
    and for 10 (Damage Qty) credit memo will be posted.
    but 10 qty (which was issued later) still have status "Stock provided to Vendor" because GR is posted only for 100 Qty so how it will be adjusted in the system. either physical inventory or any other way ?

  • Question on materialized view unregistered on master site

    Hi
    not sure how it is known, on master site, about the existence of an materialized view on another site referring some table of a master site. it seems registering is not necessary.
    on master site orcl1 : I have a table A, and a materialized view log defined on table A.
    on another site orcl2 : have a db link to orcl1 and a fast refreshable materialized view SCOTT.A_MVW (create materialized view A_MVW refresh fast as select * from A@orcl1)
    on orcl1 I perform : exec DBMS_MVIEW.UNREGISTER_MVIEW (mviewowner => 'SCOTT' ,mviewname => 'A_MVW' ,mviewsite => 'ORCL2');
    as a result the materialized view seems to be successfully unregistered (as it doesn't appear anymore in : select * from DBA_REGISTERED_MVIEWS; )
    But, to my surprise, I can still perform fast refreshes on A_MVW, which also remove lines from the materialized view log . so how is site orcl1 still aware about the existence of the materialized view ?
    it seems that, registered or not at master site, a materialized view behaves the same...or it doesn't ? where is it stored , on master site, information about materialized views (especially those fast refreshable) that reffer local tables ?
    Thank you

    The view allows the Administrator at the Master (Source) site to see information about MVs in remote databases that are querying his/her database.
    A database in Singapore may be administered by DBA "Hemant" . This database may have built (with appropriate permissions !!!) an MV that queries table(s) in a database in London managed by "Alex". Alex can query DBA_REGISTERED_MVIEWS in his (London) database to see that a remote MV is referencing tables locally.
    Why would "Alex" UNREGISTER the MV ? There's no real need to. Unless the information needs to be "hidden" from, say, an Outsource DBA who will be taking "Alex"'s place ! (just kidding !)
    Hemant K Chitale

  • Inspection at vendor site while loading the material?

    Hi All,
    How we can enable the inspection while loading the material i.e at vendor's site, how we can enable the inspection while unloading the material at customer site.
    That is I exactly require an inspection set up to record the values after PO & before GR  and after PGI in sales. How do i enable the same/
    regards,
    Sanjana

    after PO & before GR
    1. make qm procurement active
    2. set a control key with delivery release, 01 inspection type active
    3. create q info record qi01 for that material , plant , vendor- in inspection control tab enter01 insp. type
    4. when po is created , go to qi07 select chedule line and click on inspection lot save
    5. qa32 check for source inspection lot, this will be non stock relevent u can record results and defects
    after PGI in sales
    1. activate insp. type 10
    2. create q info record for sales qv51- click on new info record.enter material and select after delivery
    3. when pgi is done it will create inspection lot for recording purpose

  • Material provided by customer

    Hi Gurus,
    My client is processing the raw material which is provided by customer and also the same raw material is been procured by client.Now he wants to differentiate between customer & self procured material due to price diff. He does not want two diff. no. for the same material. I have gone through various links in SDN but no suitable solution have been found. And also how to generate requirement for customer provided material.
    Regards,
    Deven

    Hi! Devendra,
    You should receive customer supplied material against the sales order with movement 501(if you don't want to valuate the material in your inventory). System will show that material separately as customer stock. If you want to show that material in your inventory but want to valuate it separately then you will have to use split valuation as was suggested earlier.
    I suppose this will help you in resolving the issue.
    Regards,
    Uday

  • Customer provide material

    hi,
    raw material A is provide by customer, which mean the cost is "0", this material A including in BOM. The finished goods cost is roll up from its sequence raw material. However, raw material A cost is "0" becuase it provide by customer. Then how can i roll up the cost for finished product? pls advice. thanks

    Two options:
    1. Create it as a non-valuated material. The system will not ask you for the cost of the material.
    2. This is almost similar to a subcontracted scenario. The only expense you incur is the conversion cost... so set up a Costing variant that reads subcontracting rates. Setup the rate as an info record.
    Cheers.

  • Providing Site Index Link

    Hi,
    Can any one help me, how to provide link for Site Index. For example a Link for Site Index as shown in SDN's Tool Area
    Regards,
    Ravi.

    Find out the URL for your Site Index iView. If its part of any role then you can open the role -> open the iView from the Role - copy the pcd location property and change the pcd: to ROLES:// to get the complete URL. Or you can just preview the iView to get the complete URL.
    If you have the link as "ROLES://.../iView" then you can put a EPCM.doNavigate(your url) inside the masthead par file. Inside the masthead par file open the HeaderView.jsp and put this link there beside the Help / Log Off links. If you open the JSP you can find these links existing there... just create another table cell and put your own link. It should work.
    Regards,
    Shubhadip

  • MM: Packing Material Supplied to Subcontractor for packaging.

    Dear MMers,
    I have a scenario here that we re purchasing a RAW material from a vendor, but to purchase this raw material we are providing the vendors with the packing material, say bags. when PO is issued to this vendor, the bags are also provided to the vendor so that he can pack the material the way we want it.
    When we finally receive the RAW material it is actually the receipt of RAW+Packing material. How can i handle this issance and then receiving of packing material in SAP?
    If i use the subocntracting procedure, the packing material when attached as a component to the raw material is consumed when the raw material is received in stock. This should not happen, i want to receive the packing material also back in stock.
    Any help is appreciated.
    Warm regards.
    OSss

    hi
    try following
    create BOm for the packing material as +100 and -100 (100 is quantity
    two line items with +and - quantity
    so +quantity will be for sending material and -will be when u return
    regards
    kunal

  • Moving average price in material master

    Dear All,
    M client is in  manufacturing process(variant configuration) having make to order scenario (Non-Valuated).
    We are having steel and ring business, For Steel business we are producing in house/subcontracting and  For Ring we are sending Raw material/Semi-finished goods to Sub-contractor for which he is charging processing charges. Raw material/SFG(semi-finished goods) provided to subcontractor is SFG for steel business.
    We are doing movement type 912 E for sending goods for subcontracting (sales order is attached) and while doing G/R through MIGO processing charges are debited and credit goes to gr/ir account,Upto this point I am ok with costing as visible from sales order analysis(KKAC).
    Now In our scenario if out of 6000 rings (as defined in sales order)customer is rejecting 1000 rings we have to detach that sales order through movement type 411 E and bring to our own stock or by movement type 412 E attach to another sales order .Also We are using 413 E movement type for transferring unsold goods to another sales order.
    In 411 E and 412 E movement types system takes moving average price (maintained originally ) and by using movement type 413 E no value is transferred only quantity is transferred (because of non-valuated scenario).
    Now if system picks original price maintained say at re.1 my costing for detached and attached sales order are incorrect .
    Example
    Material master(A) accounting view
    Map     1
    Stock     100               total value     100
    Sales order 1(10 tonnes)A (finished product)                    
    Cost     1000                              
    Revenue     800(5 tonnes)                         
    sales order 2
    cost b/f          5
    Revenue        800(5 tonnes)
    Now if 5 tonnes are detached from sales order it picks price from
    Master i.e Re.1 so Rs.5 is taken to own stock through mtype 411 E
    Or it takes Rs.5 to another sales order 2 as cost of 5 tonnes .
    Now my sales order 1 will show loss of Rs.195(995-800) and sales order2 shows profit of Rs.795.
    I want to know whether system is behaving correctly or some customization is to be done.
    Thanks and Regards
    Vijay
    Edited by: VIJAY MATLANI on Oct 13, 2008 5:28 AM
    Edited by: VIJAY MATLANI on Oct 13, 2008 5:30 AM

    Hey
    Check have you made any purchasing documents, with reference to material.
    And anybody played MR21 for the particular material?
    Thanks
    Raman

  • Creation of a simple web site --- how to get started?

    First, I have recently purchased CS5, which is a very nice bundle of fantastic software. However, the thought of mastering all of these packages is mind-boggling. I started by jumping around between different packages, looking at tutorial material, examples, etc. which was quite helpful for getting an overview of how some of them worked and how I might use them. Presently, I have two main objectives --- 1) use Photoshop for doing some painting of images, and 2) use Dreamweaver to build a web site for a friend who offers a place of refuge for homeless cats. I initially thought it might be good to start with the painting project, however, I have changed my plan, and would like to pursue the design of a web page that can be used to help people to find a cat that they can adopt. Note, this is a non-profit application, but one that I believe to be quite important. Here are some of my initial thoughts on this site:
    Site purpose:
    To provide a web site for anyone to look at information on cats at this home, and how they
    can adopt one of them.
    Some features of the site:
    1. A cat database that I as the designer would create. This database would contain
        an entry for each cat available for adoption. It would include such things as
        the name, sex, age, paths to image(s) and/or video(s) of the cat, health status, etc.
        Anyone accessing this site should be able to easily navigate around it and to examine
        entries in this database. The client (designated person at the home offering cats
        for adoption) would be given privledges to modify the database (add, delete, and modify
        entries). The user interface for the client to update the database should be very easy
        to use.
    2. A simple form that could be used for information on someone that would like to adopt
        one of the cats in the database or to make an appointment to go to the location where
        the cat is being kept (for actual contact with the cat).
    3. Track number of visitors to the site
    Preliminary notes on the database
    Fields:
    - ID code (key) % Default: yymmddhrmnName (year-month-day-hr-min-Name)
    - Name
    - Sex (M / F)
    - Neutered / Not neutered
    - Age (estimated)
    - Type (breed)
    - Tagged (chip or ear marking)/ Not tagged
    - Checked In date (yy/mm/dd)
    - Checked Out date (yy/mm/dd)
    - Status (needs home / has home)
    - Social state (1,2,3,4,5)
    - Health state (1,2,3,4,5)
    - Companion state (1,2,3,4,5)
    - Image (file name) % multiple files allowed
    - Video (file name) % multiple files allowed
    - Medical/vet data (e.g. vaccinations, etc.)
    - General information (text on cat that includes comments, observations, etc.)
    Notes:
      * state = 1, Best
                    5, Worst
      Examples:
              Social state = 5, very unfriendly, afraid, etc.
                                   3, can touch if careful
                                   1, very friendly, unafraid
              Health state = 5, not in good health (e.g. infection)
                                   3, only minor health problems
                                   1, in very good health
       Companion state = 5, must have another cat or cats as company
                                   3, could be with other cat(s) company
                                   1, does not need the company of another cat
    Now, with this initial information (granted this is very rough), my question:
    How, armed with CS5, should I attack the problem of getting this web site up and running?
    Keeping in mind that I really would like to learn how to use CS5, and that this would be my first web site project.
    Any suggestions, study plan, references, etc. would be welcomed.
    Message was edited by: Birdy40 because of some small errors and changes.

    In keeping with bregent's admonition - it will invariably turn out more complicated than you imagined, if only because the more you do with this the more you will think of to do. In addition to the excellent suggestions of David Power's books and w3schools, I would offer one other bit of advice: Simplify. Make  your initial project the simplest possible, and then gradually adding more and more features. That will make it easier for you - and this forum - to help along the way.
    Perhaps as a first step, create a database with a few entries and then write code to retrieve the data.Even there you may find fields will need to be adjusted, added or removed or even redefined. Try all sorts of queries. Eventually you can create pages that will allow the input to be done with a form.
    Good luck with the project./
    Barry