Missing Parts in production Order no committed date and qty

Hello Guru,
May I ask your help to check our issue when we create a Production order, we got an error Order has missing parts. When check the Availability Check view, most of the components do not have committed date and qty even there are available stocks on them.
Can you help check what went wrong and its possible solution already check OPJK and OPJJ seems we have correct set up for this.?
I tried to check in CO09 on one component. from there there is also 0 committed qty and date. While the other component has OrdRes with 0 committed qty and date and there are some with values. Please help thanks.

Hi Ramagari,
OPJK
Plant AAAA
Ord Type: YYY1
Avalability Check: 2 (Check availability during order release)
Material Availability Part
Check mat. availability when saving order (tick)
Checking Rule : YP (PP checking rule - Production Order rel.)
Component Check Type : ATP Check
Release Material: 1 (User decides on release if parts are missing)
PRT Part
Checking Rule : 02 (Status check and inventory audit)
PRT Release : 1 (User decides to release when there's no PRT)
Capacity Part
No check (tick)
OPJJ
Availability Check: 02 (Individ. Reqs)
Checking Rule: 01 (Checking rule 01)
Stocks parts:
Include safety stocks (tick)
Missing parts processing part:
Checking period: GR : 0
In/outward movements part:
Incl. Pur Ord : X
inlc. pur Req (tick)
incl. dep req (tick)
Incl. reserv (tick)
incl. sales req (tick)
incl deliver (tick)
incl. ship notif (tick)
incl rel ord reqs : X
incl pld ord : X
incl prd ord : X

Similar Messages

  • Standard Report for missing parts at production order operation level?

    Hi PP Gurus,
                We have standard report for missing parts at production orders level.
    For our client, they need a report for missing parts analysis at production order operation level. Do we have any such standard report in the SAP?
    Please help.
    Thanks,
    Reddy.

    Hi Arvind,
          Thanks for for your response.
    1. List: Components,  Layout: Standard layout          set the Missing part
           It shows the component requirement/withdrawn  quantity for each operation of production order. It is not showing the commit quantity.
    2. List: Components,  Layout: Pick list          set the Missing part
           It shows the component requirement/withdrawn  quantity for each production order.
    3. List: Components,  Layout: Missing Parts List-Material View          set the Missing part
           It shows the component requirement/commit quantity for each production order. It is not showing the commit quantity at opertion level.
    4. List: Components,  Layout: Missing Parts List-Order View          set the Missing part
           It shows the component requirement/commit quantity for each production order. It is not showing the commit quantity at opertion level.
          We are unable to get the solution from all these 1 to 4 reports from COOIS.
    Do we have any option to change the existing layout (ex: 3 ) to get the commit quantity for operation with missing parts indicator?
    If avilable, what is the procedure to be followed?
    Thanks,
    Reddy.

  • Autmatic upadate of status of missing parts in production order

    Dear Gurus,
    In production order to check missing parts status we have to click on push button for check for material availability. Is there any way available to update the latest material position in production order automatically?
    Regards,
    SAP CONS

    Dear ,
    This can be set at Order Control in OPJK .
    You can goto OPJK-Select order type , plant and indicator 1(Availablity Check ) -Here Do not mark No Check check box  and Mark material availablity check while saving .Keep the Collective Conversion indicator as 1-User decides based on if material is  missing parts .
    Regards
    JH

  • Scope of Check Variation in Missing Part list Production Order

    Hi,
    I have a problem that While creation or conversion from planned order to production order if i get missing part list i found that Scope of check is as Z6 and ZP (Checking rule).But when when i Release the same production order also am getting missing part list here when i check scope of check as Z6 and PP(Checking rule).
    Why this difference is coming,can any body tell the possible causes.
    Cheers,
    Kumar.S

    >
    KUMAR.S. wrote:
    > Hi,
    >
    > I have a problem that While creation or conversion from planned order to production order if i get missing part list i found that Scope of check is as Z6 and ZP (Checking rule).But when when i Release the same production order also am getting missing part list here when i check scope of check as Z6 and PP(Checking rule).
    >
    > Why this difference is coming,can any body tell the possible causes.
    >
    > Cheers,
    > Kumar.S
    Kumar,
    Its simple for creation and release of Production order different checking rule is used(This must be intentional). You check this in OPJK transaction,  check for your order type / Plant combination for Business function 1(Create) the checking rule assigned would be ZP, whereas for the same order type / Plant combination for Business function 2(Release) the checking rule would be PP.
    If you want the same, you can change it here. But I assume there must have been a purpose for this custom checking rule creation. You can find the scope of check difference between these 2 combinations in transaction OPJJ.
    Regards,
    Prasobh

  • How to calculate missing parts for production orders?

    Dear All,
    I have this scenario i'm using collective orders\direct production method in my industry which means that sub assemblies don't enter any warehouses but transferdd directly to its superior order as a component , my problem is i want to know the missing raw material for the finished product , knowing that the FP has a 6 level BOM i want during ATP for production order the sustem checks only for the lowest level of material and takes only the CURRENT STOCK IN WAREHOUSES , what checking group should be used for the FP, Subassemblies and raw materials.
    plz help
    Ahmed Sobhi

    HI,
    If no Av. Check is to be done at all, then specify checking group as KP. But be informed, this will be impactive across all business processes meaning if you plan to sell the SFG & you place a SO for that item, an Av. Check will confirm it immediately as it has av. checking group as KP.
    Now for the checking group maintained for raw mtl, go to OPJJ & check the details of the checking rule to know which receipts/ issues are considered & you may modify the same as per your need.
    I would suggest do a test in your sandbox & if it meets your need, then adopt the same.
    Regards,
    Vivek

  • Missing parts for Process orders

    Hi Experts,
    We are trying to find out the Transaction to faciltate the Missing parts list for the process order even after the order has been completed having the Status TECO, CLSD. This is to understand whether proper enough materials are consumed for the order or not. Based on that Production incharge can ensure the component consumption is made as per the Process order requirement.
    We are trying with CO24, this is showing the missing parts list if order does not contain TECO and CLSD status.
    Also we are checking with COOISPI, COID, but could find the correct feature out of them.
    Do we need to develop any customized report with the help ABAPers.If yes please guide us the method.
    Please help us in acheiving the list of components which are not consumed as per the Process order requirement.
    Also guide us to identify the list of materials which are excess consumed for the Process order.
    Thanks in advance..

    Hi Jiaul,
    Thank you very much for your reply.
    So we need to develop the program to flag the missing parts and its qty even after the Order has the status TECO or CLSD.
    Can you please provide logic to develop the Program.
    I am thinking to take the inputs from process order required qty Vs withdrwan qty. if the Qty difference is positve, which should come under missing parts. if the difference is still negative means excess qty consumed.
    Waiting for suggestions
    Thanks in advance

  • Reg.Creation of production order in past dates

    Hi all,
      Tell me that is there any possibility to create production order in Past dates.Let me explain my requirement.
    I create Production order mannually in CO01.By creating using this transaction code i need to save the production order on past dates,say
    Today's date - 06/04/2010
    my requirement is i will create production order on 06/04/2010 with the basic start date of production as 04/04/2010(I.e.Past Dates).And the system should schedule the order in past dates only after saving it.
    This is what i need
    To get this what are the configuration aspects i have to taken care.
    Thanks in advance,
    M.Badrinarain.

    hi ,
    for configuration you can go to OPU3 as suggested by by Mr. Kumar.
    also for a particular process order you can do it by :
    process order >settings> scheduling parameters in menu bar of process order.
    there you can give no. of days in past .
    regds
    satish

  • Process Order Basic Finish Date and Scheduled Finish Date

    Folks,
    I have a requirement from the business to be able to update the Process Order Basic Finish Date and Scheduled Finish Date independently from each other.
    In other words, update the Basic Finish Date and the Scheduled Finish Date cannot change or update the Scheduled Finish Date and the Basic Finish Date cannot change.
    I believe the reason for this is to be able to use the Basic Date to maintain the ATP accurately and keep the Scheduled Date to mark when the order was originally due from the shop floor to be able to measure if orders are being completed on time or late.
    I have worked in tnx OPUZ and had some success with other issues with these dates but I can't seem to make them work independently from each other.
    Or does anyone have any ideas how to measure proces order performance to the production schedule?
    Thank you for your help,
    Greg

    Rajesha, thank you for your reply but it doesn't solve my problem.
    Let me restate my scenario:
    I start a process order and both the basic and scheduled finish dates are the same, June 1.
    At some point, shop floor tells me they will be late and cannot deliver until June 15.
    I need to update a date in the system so the ATP and the MRP planning runs have correct information for promising customers, I will update the Basic Finish date with June 15.
    I also need to keep the original June 1 date in order to measure the shop floor performance to the production schedule to measure how early or late the  order was delivered. How can I keep the original finish date or how can I measure if a process order is early or late??
    Thank you for your help,
    Greg

  • Converting part of the string to a date and subtract with sysdate.

    HINT! In order solve this you must know how the pnr is assembled. Study this:
    650323-5510, we only need the first six characters. They inform us about when the person (car owner) was born. In this case it is 23 Mars 1965. You have to use several oracle built-in-functions to solve this. Hint! Begin by converting part of the string to a date and subtract with sysdate.
    select to_char(to_date(cast(pnr,'YYMMDDMM'))) from car_owner;
    please what am i doing wrong. i need the result to be something like this
    Hans, Rosenboll, 59,6 years.

    Hi.
    The main problem here is you have only last two digits of year. That could be the problem in a couple of years from now, when somebody born after 2k would get in to your database. For now if we ignore this problem the right solution would be :
    <code>
    SELECT months_between(trunc(SYSDATE),
    to_date('19' || substr('650323-5510',
    1,
    6),
    'YYYYMMDD')) / 12 years_old
    FROM dual
    </code>
    Suppose you are expecting the age of the car owner as a result above code will give you that. One again notice the '19' I appended.
    Best regards.

  • Credit release ignores Fixed date and qty and re-schedules the line

    Hi,
    If I create an order with the following schedule:
    date                 conf qty
    24.10.2008     110
    25.11.2008     89,889
    25.12.2008     10,000
    Fixed date and qty is checked
    Save the order (its credit blocked)
    Then look back and the confirmed qty shows 0 (as expected)
    Then credit release the order in VKM1 or VKM3 and look at the schedule lines they have changed!
    24.10.2008   110
    25.11.2008   99,889
    The system realised it could deliver some earlier than my schedule.
    However the reason I checked "Fixed date and qty" is because the customer wanted the goods delivered as per the original schedule.
    When you set this indicator it protects the lines from automatic re-scheduling (trans V_V2) but it seems the credit release screen ignores the indicator
    How do we fix this?
    We confirmed the dates to our customer as per the original schedule so if we deliver them before this date the goods will be refused.
    Many thanks
    Rob

    Hi Tom,
    One down effect is that the order will not enter into the rescheduling, the system considers it irrelevant. So if you are using the rescheduling functionality and want the order to be part of it, then you should consider this.
    Michael

  • Schedule Lines - fixed Date and Qty checkbox

    Hi Experts,
    When an order is placed, on the schedule line tab there is a check box for a fixed date and qty. Can this only be set manually or can it be set by customer number.
    Thanks in advance.
    Mike

    Hi,
    When the availability check will happen in that screen you can see fixed date and quantity If you check that it will automatically copied in schedule line .
    If you leave the field blank, the delivery date and confirmed quantity are not fixed. If you are able to expedite either the manufacture or purchase of goods, you may be able to deliver the goods closer to the customer's original request (and sooner than the date the system confirmed).
    Regards,
    Krishna O

  • Missing part for planned order-reg

    Hi,
    I want to see missing parts list against planned orders. I checked through MDVP but it shows all components as missing parts eventhough stock is available.
    Is there any way to see this.
    Regards
    Karthik

    Dear Karthikeyan,
    In general Availability check is done at production order level and rarely in REM scenario's this check is
    carried out at planned order level.
    Because planned order's are a proposal,which may/may not be converted into a production order.
    At planned order level you carry out an ATP check and its based on the checking group,checking
    rule,and the scope of check.
    So check the config settings in OPJJ particularly for the scope of check.
    Here the check box -->check without RLT plays a vital role.
    once after carrying out ATP,the system shows the committed quantity,say if the order is for 100 and
    suppose if the raw materials are available only for making 20 means then after making ATP check in the
    planned order header you can see an additonal field called commited quantity below the order quantity.
    Check in MD12 for an individual planned order and it works based on the availability check value
    assigned in the material master.
    Regards
    Mangalraj.S

  • Missing Parts for all Orders

    Is there a single report which gives missing parts list for all orders with due allocation of components as per the order dates?

    Dear,
    Missing parts information we can see in CO24 tcode.
    In COHV or COMAC.
    in mass processing gtab page
    select function = material availability check, execute it.
    In selection tab page
    Plant
    Order type
    System status - MSPT.
    Or,
    COOIS : Production Order Information System
    Under this transaction you need to Select in List option as Components and then go on Selection Tab
    Regards,
    R.Brahmankar

  • Message for Missing Parts  While Creating Order

    Dear Friends,
    While Creating & Saving The Production Order System Is Not Supporting In Giving A Warning Massage On Missing Parts In spite Of Deficit In Storage Location For Materials.
    The Clint Requires A Warning Massage In Case Of Materials Shortage In SL
    I Tried To Get This From the Following Method
    Checked For Define checking control In OPJK.
    Selected  plant, Order type & selected the business function 1 for create or 2 for release. And Maintained These Settings
    a)     Removed tick mark in No Availability check.
    b)     Type of component check Given as - ATP check.
    c)      Material release - 1. User decides on release if parts are missing.
    d)     PP  Checking rule (Which Is same As with plant parameter OPPQ)
    e)     In Define scope of check (OPJJ) made a tick mark in check w/o RLT.
    Then Assigned the availability checking group at Mrp View of Header material.
    In spite Of All These Settings Still At The Time Of Order Release/Save  A  Warning Massage Or A Informative Massage Is Not Appearing
    Please Suggestu2026u2026u2026u2026
    Hari

    Dear Friends,
    I Did The Following Settings
    A) Define Checking control       02               Individual Req
                        Total Sales          Single Record
                        Total Div Rec               Single Record
    B)Define Checking Rule     PP  Check Rule
    C)Define Scope Of Check     Availability Check          02 Ind Req
                        Checking Rule               PP Check Rule
              Stock
                   Include Safety stock
                   Stock In Transfer
                   Incl Quanty Insp Stock
    And When No tick Mark Is Applied  In NO Stor Loc Inspectn
    Not Used Checking Group "KP" In components material master.
    After  Making All This Settings Also Before  Order ReleaseWhen Pressed u201CMaterial Availability Checku201D
    The System Is Showing  All Materials Available  In Spite Of Deficit In Storage Location
    Suggestu2026u2026

  • Production order Basic start date calculation

    Hello PP Sapperu2019s,
    I have an production order for total qty - 865,00.This production order created on 11.08.2011 and I could able to see the Basic start date as 26.06.2011.Please let me know how this basic start date gets calculated. I mean what are all the parameters included for calculating this basic start date.
    My Observation:
    I have checked in OPU3 for the respective plant and order type the scheduling type mentioned as Backward.
    SMK u2013 903 (ie, opening period for planned order u2013 3 days)
    In Routing we have two operations.
    Requesting from forum people to give me the detailed calculation part on how this basic start date gets calculated / arrived.
    Please let me know if you need any more inputs.
    Cheers,
    Kumar.S

    Hi Kumar,
                     As per my understanding this is all decided/maintained through scheduling parameters which are defined in Customizing per order type, plant and production scheduler (from the material master) (Customizing for Shop Floor Control, by choosing Operations > Scheduling > Define Scheduling Parameters). In what follows the parameters are described that affect the scheduling of a production order. Further control parameters are described in the course of this section.
    According to your query I suggests ,In Customizing you can specify that an order is rescheduled as soon as it is a certain number of days late (Start in the past indicator). The system then automatically carries out today scheduling when the basic start date of the order is more than the given number of days in the past. This scheduling is a type of forward scheduling starting from todayu2019s date and where the necessary reduction measures are applied .
    Else you can also specify  that a production order is to be rescheduled automatically whenever it is saved (indicator Automatic scheduling). If changes relevant to scheduling are made in the order and this indicator is not set then the order is given the status NTER (dates not current).
    Hope this would be useful for you at some extent.
    Please revert if required .
    Regards
    Chandra

Maybe you are looking for

  • Why photos look warmer in Safari??

    Hi everyone, I am using CS3 on my 2006 white iMac to edit my photos. I adjust the colour temperature of my photos so that they look natural in CS3. However, after posting them on Flickr, they looks much warmer on Safari. If I use FireFox (instead of

  • SSL from EJB using Verisign API

    I'm trying to make a call from a session bean in WL6.1 SP1 to Verisign's PFProAPI class. I have successfully used the API in other setups (in servlets, etc.), but cannot seem to get it to work from within an EJB. The verisign test server just keeps r

  • Dynamic Effects in FCE 4.0

    Is it at all possible to make dynamic themes in FCE as in the new iMovie '09? Thanks!

  • Where did my games go?

    After updating to the latest iTunes version, the games on my iPod disappeared. Note: I do NOT have my ipod set to auto-sync, it's always on "manually sync." I can't find the previously-purchased games in my iTunes, or on my iPod... they're completely

  • Enhancements to Quizzes - 5.0 to 5.5

    Is there a list anywhere that details the enhancements to the quiz tools in Captivate from 5 to 5.5? I'm hoping there where a lot... Thanks in advance. Best, Steve