Missing part for planned order-reg

Hi,
I want to see missing parts list against planned orders. I checked through MDVP but it shows all components as missing parts eventhough stock is available.
Is there any way to see this.
Regards
Karthik

Dear Karthikeyan,
In general Availability check is done at production order level and rarely in REM scenario's this check is
carried out at planned order level.
Because planned order's are a proposal,which may/may not be converted into a production order.
At planned order level you carry out an ATP check and its based on the checking group,checking
rule,and the scope of check.
So check the config settings in OPJJ particularly for the scope of check.
Here the check box -->check without RLT plays a vital role.
once after carrying out ATP,the system shows the committed quantity,say if the order is for 100 and
suppose if the raw materials are available only for making 20 means then after making ATP check in the
planned order header you can see an additonal field called commited quantity below the order quantity.
Check in MD12 for an individual planned order and it works based on the availability check value
assigned in the material master.
Regards
Mangalraj.S

Similar Messages

  • Missing parts for Process orders

    Hi Experts,
    We are trying to find out the Transaction to faciltate the Missing parts list for the process order even after the order has been completed having the Status TECO, CLSD. This is to understand whether proper enough materials are consumed for the order or not. Based on that Production incharge can ensure the component consumption is made as per the Process order requirement.
    We are trying with CO24, this is showing the missing parts list if order does not contain TECO and CLSD status.
    Also we are checking with COOISPI, COID, but could find the correct feature out of them.
    Do we need to develop any customized report with the help ABAPers.If yes please guide us the method.
    Please help us in acheiving the list of components which are not consumed as per the Process order requirement.
    Also guide us to identify the list of materials which are excess consumed for the Process order.
    Thanks in advance..

    Hi Jiaul,
    Thank you very much for your reply.
    So we need to develop the program to flag the missing parts and its qty even after the Order has the status TECO or CLSD.
    Can you please provide logic to develop the Program.
    I am thinking to take the inputs from process order required qty Vs withdrwan qty. if the Qty difference is positve, which should come under missing parts. if the difference is still negative means excess qty consumed.
    Waiting for suggestions
    Thanks in advance

  • Missing Parts for all Orders

    Is there a single report which gives missing parts list for all orders with due allocation of components as per the order dates?

    Dear,
    Missing parts information we can see in CO24 tcode.
    In COHV or COMAC.
    in mass processing gtab page
    select function = material availability check, execute it.
    In selection tab page
    Plant
    Order type
    System status - MSPT.
    Or,
    COOIS : Production Order Information System
    Under this transaction you need to Select in List option as Components and then go on Selection Tab
    Regards,
    R.Brahmankar

  • How to calculate missing parts for production orders?

    Dear All,
    I have this scenario i'm using collective orders\direct production method in my industry which means that sub assemblies don't enter any warehouses but transferdd directly to its superior order as a component , my problem is i want to know the missing raw material for the finished product , knowing that the FP has a 6 level BOM i want during ATP for production order the sustem checks only for the lowest level of material and takes only the CURRENT STOCK IN WAREHOUSES , what checking group should be used for the FP, Subassemblies and raw materials.
    plz help
    Ahmed Sobhi

    HI,
    If no Av. Check is to be done at all, then specify checking group as KP. But be informed, this will be impactive across all business processes meaning if you plan to sell the SFG & you place a SO for that item, an Av. Check will confirm it immediately as it has av. checking group as KP.
    Now for the checking group maintained for raw mtl, go to OPJJ & check the details of the checking rule to know which receipts/ issues are considered & you may modify the same as per your need.
    I would suggest do a test in your sandbox & if it meets your need, then adopt the same.
    Regards,
    Vivek

  • Standard Report for missing parts at production order operation level?

    Hi PP Gurus,
                We have standard report for missing parts at production orders level.
    For our client, they need a report for missing parts analysis at production order operation level. Do we have any such standard report in the SAP?
    Please help.
    Thanks,
    Reddy.

    Hi Arvind,
          Thanks for for your response.
    1. List: Components,  Layout: Standard layout          set the Missing part
           It shows the component requirement/withdrawn  quantity for each operation of production order. It is not showing the commit quantity.
    2. List: Components,  Layout: Pick list          set the Missing part
           It shows the component requirement/withdrawn  quantity for each production order.
    3. List: Components,  Layout: Missing Parts List-Material View          set the Missing part
           It shows the component requirement/commit quantity for each production order. It is not showing the commit quantity at opertion level.
    4. List: Components,  Layout: Missing Parts List-Order View          set the Missing part
           It shows the component requirement/commit quantity for each production order. It is not showing the commit quantity at opertion level.
          We are unable to get the solution from all these 1 to 4 reports from COOIS.
    Do we have any option to change the existing layout (ex: 3 ) to get the commit quantity for operation with missing parts indicator?
    If avilable, what is the procedure to be followed?
    Thanks,
    Reddy.

  • How to find Missing Parts for a particular Process Order?

    Hi,
    How to find Missing Parts  for a particular Process Order ?
    Is there any function module or Table ??
    Thnx in Advance.

    Hi prince roy
    you can use the T-code = <b>CO24 - Missing Parts Info System</b>
    if helpful PLEASE REWARD YOUR POINTS
    thanks
    chakri

  • User exit/ badi needed for planned order create/change,collective ATP check

    Dear All,
    I'm looking for a user exit/ badi which can be used for planned orders at the stage of
    mass collective availability check (COMAC tcode) update; or at some other relevant stages of mass update of planned orders.
    I need after collective availability check to perform the following:
    1) to copy date from "total comitment" field on header tab of planned order and paste it (replace old date) to order finish date on header screen
    then
    2) to start a scheduling.
    Very appreciate your help.
    Best Regards,
    Andrey
    Edited by: Andrey Kruglov on Apr 15, 2010 3:06 PM
    Edited by: Andrey Kruglov on Apr 15, 2010 3:07 PM

    Dear,
    Use the BAPI : BAPI_PLANNEDORDER_CHANGE
    Or use the function module MD_SET_ACTION_PLAF for Schedule planned order.
    and the transaction MDAC Execute action for planned order
    This function module includes the following actions:
    Explode BOM
    Explode BOM, check availability
    Check availability, only explode BOM in the case of a requirement
    Check availability, do not explode BOM
    Reset availability
    Change planned order data
    Schedule planned order
    Delete planned order
    Assign the key for the respective action control to the materials in the material master (MRP 4 view).
    Please refer this thread,
    Re: MDVP for collective orders
    Regards,
    R.Brahmankar

  • Creation of Reservation for planned order

    Hi Team,
    Is it possible to create reservation for planned orders after MRP run?
    My opinion was the reservation can only be created with reference to production order after MRP. The reservation can not be created with reference to planne dorders after MRP run because planned orders are intermident document which will not exist in the system always. The planned order details will not be available in the system once it get converted into production order.
    How the reservation will be processed which was created with reference to planned order after converting the planned order to production order?
    Kindly need ur guidance.
    Thanks
    psk

    Dear PSK,
    In a typical discrete manufacturing setup production orders are the promised receipt for which reservations gets generated as
    soon a production order is created.But only if the order is released goods movements can be posted against the reservation
    details through MIGO/MB1A for 261 movement.
    It's not required to create any reservation at the planned order level or which may not help you in any means to your business.
    But however in a REM scenario MF60 is used to create stock transfer reservations for 311 movement where planned orders
    are used for production backflush.To explain in detail even without any planned orders you can do a stock transfer reservation
    for a production quantity.
    Check and revert back.
    Regards
    Mangalraj.S

  • How to connect MAPL and PLPO to derive work center for planned order

    Hi,
    Anybody know how to derive work center using MAPL and PLPO for planned order (PLAF). Is there any connecting table between MAPL and PLPO.
    Please help asap.
    Regards,
    Mitali

    I guess u r trying to view the detail scheduling info (tab in MD13) for a planned order . In that case -
    1. Go to PLAF and enter the planned order number. (PLAF-PLNUM) and get the ID of the capacity requirements record (PLAF-BEDID).
    2. With this PLAF-BEDID go to KBED. pass the value here. KBED-BEDID. The KBED-ARBID values are your work center ID.
    3. To get the work center texts ( the way is appears in the screen) - Pass this value to CRHD . CRHD-OBJTY = 'A' ( i.e Type work center) and CRHD-OBJID = KBED-ARBID.
    Hope it solves ur prob.
    Cheers
    SKC

  • Extractor for Planned order

    Hi Experts,
    I am looking for the stabdard extractor for the Planned order, Basically I need the fields from the table PLAF.
    Please let me know any standard extractor available or any extractor need to enhance.
    Thanks
    sai

    Hi Sai,
    Take a look at 2LIS_04_P_MATNR and see if it is usefull:
    http://help.sap.com/saphelp_nw70/helpdata/en/88/7fc73c0c52085be10000000a114084/frameset.htm
    Else it seems that you should create a generic extractor directly on the table according to this thread:
    Re: Extractors for Planned orders and Proces Orders
    Hope this helps.
    BR
    Stefan

  • Table For Planned Order Details From PP Module

    In our organisation we are taking Plan Vs Acheivement from Production. So, intialy we taken Plan details from "PLAF" Table and Acheivement details from "S225" Table. But After running MRP at month end. Previous month plan get deleted and new order create.
    how to get history data for Planned order.
    Please help us.
    Regards
    Naga

    I don't think that there is any history in regard to planned orders.  PLAF will get rebuilt according to your MRP parameters and I don't believe that the data is stored.
    Regards,
    Rich Heilman

  • Automatic dispatch of Planned Order - Reg.,

    Hi
    Here i'm trying to dispatch a planning order automatically, when a work center capacity got fully loaded. What is the necessary settings has to be done?
    Kindly explain clearly
    Regards,
    Gopi

    Dear ,
    When you are dispatching the operation for Planned Order /Production order in that day , system checks the availble capacity load in that work centre .If required capacity is not avalaible based on the work centre available capacity (Capacity Tab-Available capacity -Check overload CM05 for workcentre in that week) , operation will not be dipatched and Scheduling logg will be created
    .I suggest that you need to check the Available Capacity (can be viewed weekly /monthly -Select the weekly grid -double click -system will dipaly the daily load in a week ) of the work centre and then go back to CM25 with your work centre -select Overall Profile -Enter Work centre -Strategy -Mark "Date Entry while dispatching " which will hel you to dipatch the date based available capacity CM05.Or else try to use CM21-Graphical view (goto -settings-scale-daily split -chek the available capacity date -dispatch.
    In CM01/CM05 , please enter Plant /Work Centre in CM05-Hit DETAIL Capacit list or Varibale View -it will display with weekly bais capcity set up based on the .Select the week where this date fall on or If you want to look the daily baisi load , then goto Planning tab-Profile-Option Profile -select as appropirate to analysis the load daily /weekly
    Setting Required :
    1. Settings for Available Capacity
    2. Setting for Capacity requirements
    3. Settings for Capacity evaluation and leveling
    1.Materials Master define the Production scheduler and production scheduling profile
    2.Work Center - Define the capcity planner group,activate checkbox Relevant for Finite sceduling,on the capacity header define the shift timings,break timings and unit of measure,no of individual capaity, enter formula for scheduling in capacity view.
    3.Routing - enter the values for the standard values. Use control key with scheduling.
    4.In transaction OPU5 and OPU3Z - define the scheduling parameters for planned order and productiion orders and activate the checkbox Capacity requirement and Scheduling. what is the settings in OPPQ and OPPR for the "Start in Past" parameter, you need to keep them consistent with the OPU5 settings.
    Capacity Setup :
    Define time profile in OPD2.
    Define the strategy profile in OPDB
    Define the Overall profiles in OPD0.
    In the order control OPJK I have maintained check capacity with SAPSFCG013 profile.
    Define Scheduling parameters for Production orders-OPKP-Maintain Capacity Checked /Finite Scheduling Cheked /Scheduing Type -BW/FW .
    Hope this will help u in analysis the set up.Revert if u need any help
    Regards
    JH
    Edited by: Jiaul Haque on Apr 28, 2010 2:04 PM

  • Changing MRP controller for planned order

    Hello experts,
    Is there any way the planner could change the MRP controller of a planned order within MD12 ? We are using ver 4.7 and this field is not enabled. Currently the planners are creating prod orders much in advance and are looking to move to a process where they firm planned order. We are using project stock planning structure so more that one planner may create orders for the same material. So when one planner review the material planning for one project he would firm the planned order and assign it to him for leater conversion.
    Note: I the config I didn't saw any field selection control for planned orders.
    Thank you in advance for sharing your wisdom.
    Francois Paquet BPA
    aeronautive industrie

    Francois,
    Very interesting question. However I never had to change those fields in either planned or prodcution orders.
    Both orders master data fileds are disabled.
    However since your are working with project orders ( or netwrok orders ) system would be giving you specific planner order hard tied to the project order ( similar to Made to order scenario).
    Planner could use MD51 ( project planning ) & MD4C ( option for Netwrok or WBS element ) for monitoring progress of his /her order.
    This way planners do not have to go by MRP controller data.
    Hope this provides some new thoughts.
    Thanks,
    Ram

  • Release status for planned order

    Hi All
          I am running MRP weekly,system is generating the Planned order  once MRP is completed.Here my requirement is i want release status for planned order, at the same time once planned order is released i dont want user to change any data in planned order.
           Somebody explain me about the settings of action control of planned order.
    Regards
    Srinivasan.P

    Hi,
    Sorry to say but there is nothing like system status for Planned orders.
    Check below thread,
    [Release of Plan orders|Planned Order Release]
    Regards,
    Dhaval

  • Scheduling for planned order

    When I choose leadtime scheduling in MRP RUN then system does forward scheduling always.
    Then in planned order change mode when i do manually do scheduling then it does backward scheduling as  per settings in OPU5.
    How to get backward scheduling in MRP.??

    Dear,
    MRP do the backwordscheduling but The system always determines the basic dates for planned orders using backward scheduling.
    The system automatically switches to forward scheduling if the determined start date lies in the past.For this you have to maintain 2 settings.
    1)In OPPQ - Plant parameters maintain the indicator for start date in the past allow. 2) In OPU3 for your plant & order type , maintain the no. of days for start date in the past.
    Hope clear to you.
    Regards,
    R.Brahmankar

Maybe you are looking for

  • Mini Bridge "Waiting for Bridge" error Macintosh

    We'd been having this error on a couple of our computers and none of the steps in the KB article http://helpx.adobe.com/photoshop/kb/error-waiting-for-bridge-cs5.html are working. We initally set up one computer to be used as our master image. Once w

  • Images not displaying in CFDOCUMENT PDF

    Hi there, Has anyone notice any problems with images in dynamic PDF using CFDOCUMENT? I have a site where I create several dynamic PDF document (with images) and all of a sudden, they stop displaying. The only new addition was a SSL for the site. Any

  • I can't download the programme for SSPS 9.01 that I have used for 10 years on Windows XP on my new Windows7.

    These are different problems. I want to know how to install SPSS 9.01 on Windows 7

  • IPhone battery usage stats misleading ?

    Hi All, Something I've just noticed with recent firmware versions (I believe since 3.0) is that the meaning of the "Standby" figure in the time usage stats, has changed and become misleading. It states "Time since lasat full charge", and has a Usage

  • Acrobat 9 re-installs when launched

    Sometimes when I launch Acrobat 9 it goes through the install process as if it was a new install which takes several minutes even though I have had it installed on my computer for years.  Oddly, I can open a file and get the program to launch by clic