Multiple Cost Center Change Batch Upload

Hi,
  I need to update the data of multiple cost centers. I have tried using BDC/ transaction KS02 and BAPI_COSTCENTER_CHANGEMULTIPLE. However, I encounter problems with cost centers with different validity periods when changing the heirarchy of cost centers. Your input will be highly appreciated.

Hi Christian,
Updating cost centers with single validity period say, 10/25/05-12/31/9999, isn't a problem. However, when changing the heirarchy area, CSKS-KHINR, of cost centers with multiple validity periods, meaning with intervals, i.e. 08/01/2005-09/30/2005 and 11/01/2005 - 12/31/9999, neither BDC nor BAPI works. With BAPI, even the gap where the cost center does not exist is updated while in the BDC of tcode KS02, it gets stuck.
I hope I made the problem clear to you. Hoping you could help.

Similar Messages

  • How to change purchase order's cost center in batch

    Dear all :
    how to change purchase order's cost center in batch?

    Dear Manish :
    thanks so much for you reply.
    the filed which i wanted to change it's content is cost center (KOSTL) in table EKKN.
    i couldn't find it in this t-code when i select fields.

  • Cost center change

    we want to change cost center right now, I'm concerned about the PO and fixed asset with those old cost center, may I know the table for PO, fixed asset assignment?
    for the open PO(done goods receipt, but not invoice verification), PO(done both GR and IR) and fixed assets which are already posted acquisition, fixed assets already done depreciation, how  can we change the cost center assignment? if changed, any serious impact to the month and year end closing for system(for example, auto-payment can not run, depreciation can not run)?
    Thanks

    Hi,
    In KS02, we can't shorten cost center life, we can only change analysis period, only in OKEON, we can change the validity period.
    our business user propose following for accrual posting if cost center change (use new cost center to replace old cost center)
    -Cost center need to be deactivated.
    -And then accrue need to reclass to new cost center.
    -After that block the cost center
    but i check the system, we can only change validity period in OKEON.
    in KS02, we can block posting by locking primary cost posting.
    so my understanding is follows: (1).okeon, (3) KS02. but I 'm not sure the t-code to use for the second step,accrue need to reclass to new cost center, can anyone advise?
    also if we change validity period to end this month, after this month, user can't post to that cost center, why we need block cost center(step3), is it redundant?

  • Creation of multiple cost center for one emplyee

    HI All,
    I have requirement . one emplyee is working two projects so need create two cost centers for one employee.
    please tell me how create multiple cost center for one employee.
    Thanks&Regards
    ramesh

    hai.
    if he works half the time... u can give 50%.. or just get it confirmed from core team member..
    manu

  • Cost center change in the Asset master record

    Hi
    When ever cost center changed in the Asset master record, can it possible what ever the dep that is posted to previous cost center,that will automatically transfers to the new cost center,is there any programme for this,i can use repost functionality in controlling,some time many copst centers changes will happen in
    our system,so can any tell me how to automate this.
    Thanks
    Lily

    Hi,
    Automatic transfer to new cost center is not possible.
    You need to use Distribution or assessment to re allocate the expenses to new cost center.
    Regards,
    Murali
    If it is useful, award points

  • SAP HR vs 4.7 Cost center change question

    Question 1: If you make a cost center change to PP01 will the data automatically update on pa20 or do you have to to an action on following the cost center change.

    Yes Kawana,
    You would need to run the Cost Center Change Action to make the Org. Assignment Change.
    With this action,it will reflect the new Cost Center for the Employee.
    Thanks,
    Vijay

  • Cost center changes affecting cycle?

    Hi Experts,
    In my project, already we did entire cycle from Project System to MM. Now my client wants do some changes or merges of u201CCost Centeru201D.
    If I did this changes as per client request, the entire cycle which was done already will gets affected of this changes ..Please confirm me whether entire cycle will gets affected of this Cost Center change.
    Thanks,
    Thomas
    Edited by: Karl Helm on Mar 27, 2009 2:50 PM

    Hi Kelvin,
    next time please be so kind an come up with a more meaningful thread title...otherwise you run the risk of the thread being removed....see "Rules of engagement". For this time I have corrected it.
    Regards
    Karl

  • Profit center and cost center master data upload errors

    Hi Sapiens,
    Could you please guide me to resolve the below errors in profit center and cost cost center master data upload through LSMW. i am usinng recording method for upload and  getting below error while uploading the data from txt file.
    1. Valid from and to dates are not converting in DDMMYYYY format, which field type we have to use in field mapping?
    2. some of the fields data are overlapping when uploading the data.
    3. How to create validation for empty cells data.
    thank in advance.
    regards,
    jagadeesh.

    Hi
    when you are using LSMW for uploading PC & CC, simple way to correct the Error's WHILE RECORDING The First record, while Creating LSMW, B very care full while entering the details ,bez wht ever Fields your updating ..the same Fields get updated While LSMW Processed.
    As mentioned above update the vaild from and to date in wht ever format you want While recording, in the same format all the remaining records gets updated.. 
    Hope the suggections will Help you in solving your Issues.
    Thanks
    Goutam
    Edited by: Goutam78 on Apr 29, 2011 8:59 PM

  • COST CENTER CHANGES FOR OPEN PO REQUIRE BEST APPROACH HOW TO DO IT

    Dear All,
    we are changing the cost center for open PO's kindly tell us the best approach how to do it for all open PO's line items for open PO's are 4000.
    we will totally block the old PO's and change the PO's with NO GR and IR immediately, but what and how to do for if there are GR, IR, or one of them their. and also what if IR and GR differences are thier, kindly provide all the best possible approaches.
    below are the scenarios.
    Open PO without GR/IR
    Open PO only with GR
    Open PO only with IR
    Open PO with IR/GR without difference
    Open PO with IR/GR with differences
    Service entry sheet
    kindly provide me all the best approaches to achieve this task. keep in mind beside reversal of GR or IR any other approach.
    qsm sap
    Edited by: qsm sap on Feb 15, 2010 12:08 PM

    Hi,
    Open PO without GR/IR
    Open PO only with GR
    Make Acct assigment as changeable at time of IR in SPRO for Acct Assigmet 'K' ...so that u can change the cost Center while doing MIRO. if u do not want to go with mass change.
    Service entry sheet
    You can change Cost center while Doing SES. No issue
    for others... reverse the IR as one option.
    Regards,
    Pardeep Malik

  • Multiple cost center for one cogs account

    Hi Gurus,
    We have created cogs account as cost element so that system picks relevant cost center at PGI.
    Appreciate if you can tell how can system know which cost center should be entered in cogs line if there are multiple cost centers?????
    Thank you

    Hi  Mohit,
    You can specify in OKB9 on what basis different cost centers need to be picked.
    Regards
    Ajith

  • Report for Cost Center Changes Collectively

    Hi,
    I need a report to see the cost centers changes. For individual cost center, I can see in KS05 - Display Changes
    I tried to search the SAP reports, but could not find any
    Regards,
    Bhavesh

    Hi,
    I donu2019t think there is any standard repot available for it.
    You can develop your own report or query based on the Tables CDHDR and CDPOS, OBJECTCLAS = 'KOSTL' for cost center
    Regards,
    Gaurav

  • Cost center change makes the Org Assignment infotype go blank

    Hi Experts.
    Am trying to change the cost center of an org unit. What happens is, the Infotype 0001 records of all the employees in that Org Unit are delimited and go blank. Can you please suggest a solution for this. Org Re-assignment action helps, but this is a tedious task.
    kindly help.
    Regards,
    Shweta Thakkar

    I don't see any other solution . Anyway why u want to do org-reaasignmmet.
    Yogesh

  • Cost Center Change in Asset master

    Hi Gurus
    I have one problem of Asset master change
    If I change cost center in asset master after depriciation run (same period for which dep. posting has been done) now make rerun of depreciation posting.
    at that time has new depreciation posting done for new cost center or remain as it is ???
    Exact scenario is like this
    1) Depreciation posting was complated for period 1/2007
    2) now change cost center which effective date is 1/1/2007 in asset master
    3) now rerun of depreciation posting
    The depreciation posting with new cost center does not created
    Please reply me as soon as possible
    Thanks in advance
    Paresh Jivani

    Hi Jivani,
    The when you have already executed depreciation run for the assets, system will not allow the re-run that as it affect FI posting.
    In your case, you case distreibute your depreciation cost to new cost center and next month run will take care if you have changed the cost center.
    Regards,
    Vinod
    PS: If useful, assign the points.

  • Cost center change of Profit Center

    Hi,
    We wish to change the profit center of a cost center.  I know that all postings going forward will use the new profit center and any historical postings to the cost center will remain on the old profit center.
    However is there a way to move all the historical postings to that cost center to the new profit center.
    I have looked into 9KEO for this and wondering if there is a program already written that does this automatically without working out what values posted to individual account numbers and years etc.
    Regards,

    Hi,
    There is no such a program; you will have to your analysis and make manual internal PCA document.
    Regards,
    Eli

  • MDG-F 7.0 Single Cost Center Change, Single GL Change, Single Profit Center Change

    Hi all,
    I am in an MDG-F 7.0 shop. In this version, there is a mass change function. But I haven't yet seen any menu selection for single change. such as making changes to just one GL account or making changes to just one cost center code. does that mean that single change has to be done through mass change selection as well?
    Thanks,
    LUO

    Hi Luo
    It is available on Financial Contolling Goverance cost center under Search sub area.
    Here you have to select respective object and after searching result you can find there is link with aready existing master data objects.
    You can click on the link to open respective object. Here you can edit and change as per your wish

Maybe you are looking for

  • Data recovery for Iphone 4s that was wiped

    Hello forum. Thank you for taking the  time to review my question.  I have an Iphone 4s that  a client wiped (reset)  The phone is currently in set up mode.  My client had data (photos, notes, contacts) that were NOT backed up and were on the phone,

  • The FInal Step, i have created a program to all my specifications and i am now ready to connect the hardware

    I have created a program to all my specifications and i am now ready to connect the hardware. My program was created to automate the cleaning process of an atmostpheric chamber. It controls two valves based on the pressure readings and time intervals

  • Start up problems/grey screen/question mark

    Reset the NVRAM and remove all power for 5-10min. http://docs.info.apple.com/article.html?artnum=14449

  • Help on MultiProviders

    Hi All, Here is scenario where I have 2 cubes say I1 and I2 and a MultiProvider in it, if I1 has characteristics say A B and C with Keyfigure KF1 and cube I2 has characteristics A and B with Keyfigure KF2. in the query built on this multiprovider, we

  • Invalid query tree[300-33] the sql error 8180????????

    hi  alll when i click on  my  own creating form the  above  error is  showing......????? Private Sub drawform()         Dim oitem As SAPbouiCOM.Item         Dim oCombopptype As SAPbouiCOM.ComboBox         Try             LoadFromXML("PayPeriodMaster.