Operating time error in work center

while creating production order, i am getting the below error
"No working/operating time maintained in work center for scheduling"

Hi,
Check following thing,
1.Check whether you have maintained time in capacity tab.
2.Check scheduling tab formulas.
3.Check in control key whether scheduling has been activated.
The error shows below message
C7014 - No working/operating time maintained in work center for scheduling - C7 014
Vendor Master (General Section)   General Material Data  
This documentation is copyright by SAP AG.
Diagnosis
No operating time has been defined for the work center specified in the operation.
System Response
Scheduling is carried out on the basis of an operating time from 00:00 hours to 24:00 hours.
Procedure
Maintain the operating time in the work center.
So maintain correct time in capacity tab
Regards / US
Edited by: Umashankarpmgl on Jan 20, 2012 2:58 PM

Similar Messages

  • Error " No working/operating time maintained in work center for scheduling"

    Hello Friends,
    When i am scheduling the planned order than in scheduling log, system throwing the error "No working/operating time maintained in work center for scheduling".
    Message no. C7014
    But in workcenter, i have attached the grouping and in interval and shift for the available capacity 1, i have maintained the shifts.
    According i can see the capacity on that workcenter in CM01.
    Same error i am getting when i am scheduling the routing and check the scheduling log.
    Regards,
    Jitendra.

    Hi
    Have u checked , to maintain the time required to perform the activity in the work-center?
    please check, i think, we have to maintain for each activity type.
    regards,
    rasika

  • Estimated Start time in notification based on Time defined in Work center

    Hi,
    Following Satish post- I am trying to find solution to the same  problem so i will appreciate any advise.
    When the notification is created ,the estimated start time should be based on priority .This in iteslf is pretty straight & simple. However if the reported time is after work hours or towards the end of work hours or weekends , the estimated start time should be reflected accordingly based on factory calender & work center time schedule.
    In other words the estimated start time should fall within the window of work hours available.
    Example:
    Presume the the working hours for the Organization are 8:00AM to 5:00 PM & a call comes for service at 4:00 PM. Also say , for high priority the defined response time is 5 hours. In such a instance the estimated start date should be set to next day at 11:00 AM.
    Appreciate your help for the configuration that need to be done
    Shirly

    Hi,
          I think ur talking about notification malfunction start time .. currently it just takes the system date and time by default .. and if you need work center timings i believe first u need the eqpt /F.loc to get the work center data in notificaiton ...
    I think u can get these dates can be modified while saving by using user exit  : QQMA0014 QM/PM/SM: Checks before saving a notification or BADI   IF_EX_NOTIF_EVENT_SAVE , but at the same time the eqpt or F.loc have work center details in master record ...or work center needs to be entered manually in notification ..., pls check up ..
    regrds
    pushpa

  • Bapi for getting work center using receiving order and operation.

    Hi Abapers,
    could you tell me the name of bapi which takes receiving order , operation
    and giving back work center
    Thanks in Advance.

    Hi,
      Try this one Data_Sales upload
    Bye

  • System Error Message CR082-Work center with ID 10000005 was not found

    Hi SAP Gurus,
    We are getting the error message 'Work center with ID 10000005 was not found' while our finance guys trying to do costing run for our two plants together. But when they run the costing for two plants seperately then it is working fine. Because of the business needs they have to do the costing run for both plants together.
    "The description of the error is as follows:
    System error: Work center with ID 10000005 was not found
    Message no. CR082
    Diagnosis
    Internal error.
    Procedure
    Repeat the transaction.
    If the error occurs and you have a CRM System connected to your ERP System, the document may have been archived in the CRM System.
    If the error occurs again, inform your system administrator. If the error cannot be corrected, call the SAP Hotline directly. Describe which steps preceeded the error"
    Any idea how to solve this issue.
    Thanks.
    Sachin

    Hi,
    Kindly check with following SAP note for Message No. CR082 :
    [Note 157682 - Message CR082: Work center not found|https://websmp130.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=157682]
    Try with implementing this note which may resolve your problem.
    Hope this helps.
    Regards,
    Tejas

  • Capacity planning for Work Center

    I programmed time for a Work Center on internal activity, for 40 hr using 100% of one resource, the work center it has  a capacity of 8 hr each day, the activity gets a duration of 5 days and I indicated that it has to begin the first day of the next month.
    When I executed transaction CM01, I notice that the 40 hours are planned for the actual day and don´t respect the dates of the internal activity, I think it is a problem with the work center but do not find the error.
    Any suggestion where to look for?
    The data used for creating the Work Center on Capacities:
    - Capacity Category : 002 Person
    - Other formula: SAP008
    The data used for capacity:
    - Base unit of meas.:H
    - Start: 08:00:00
    - Finish: 17:00:00
    - Capacity utilization: 100
    - No. of indiv. cap.:1
    - Unit: H
    - Relevant to finite scheduling: active
    - Can be used by several operations: active
    - Long-term planning: active
    The data used for creating the Work Center on  Scheduling:
    - Capacity Category: 002 Person
    - Other formula: SAP004
    - Work dimension: Time
    - Work unit: H
    Best Regards...

    Hi,
    Please activate the capacity requirement in Capacity tab in CNR2.
    Thanks..

  • Automatic Retry run-time error step in TestStand

    Hi, I am using an instrument at many places in my sequence (let's say 5 times). I am using the Labview instrument driver. Sometimes (every 50 calls), the instrument driver call gives me a run-time error because the instrument is somehow busy. But usually by doing a retry on the step that caused the run-time error, it works. However, in few cases, the instrument is really defective. In order to make my sequence more robust, I want all that handled in TestStand (I want the operator to stay away from the big grey popup. Many of them freaks out when they see this…). I was thinking adding 2 callbacks to my sequence: 1)        Post run-time error: a.        If local “index” == 1, run cleanupb.        If “index” == 0, retry the current step (by manipulating the current step id)c.        Incrementing “index” to 12)        Post step:a.        If step.Result.Status != “Èrror”, ”index” = 0 Index is a local variable in my sequence This algo might work, but is there another way of doing this? You can loop on the failures, but not on the errors.    
    Thanks
    Alexandre

    Alexandre,
    there are many ways to accomplish your task.
    Here's a small list:
    - Disable default error handling and "do error handling in your sequence" (using gotos with precondition) 
    - Use the SequenceFilePostStepRuntimeError Callback
    - Handle the retry-functionality within your codemodule
    I'd suggest you to choose either the second or third option. As Juergen already stated, you can alter the behaviour of TS in regard to runtime errors. The default behaviour displays a dialog asking the operator on how to react. On automated systems, this setting is nonsense, therefore it is suggested to switch to "Run Cleanup". I wouldn't choose any other setting here.
    Using the Callback Sequence is nice since it can be used in a very general way and you can call certain alternativ test strategies if the instrument fails to work.
    Implementing the error handling within the codemodule nevertheless optimizes execution times and could be better in other aspects as well. But on the other side, you have to deside what should happen if the error cannot be solved by the module itself.....
    hope this helps,
    Norbert 
    CEO: What exactly is stopping us from doing this?
    Expert: Geometry
    Marketing Manager: Just ignore it.

  • No work center data on 01.01.2013

    Dear Time Experts,
    During Time eval for one employee I got an error "No work center data on $01.01.2013".
    The person's DOJ is 28.01.2013
    Earlier faced similar issue and resolved by deleting B2 cluster and again running Time Eval fresh from DOJ.  But now same procedure not working.
    Refered below link but not able to delete B2 cluster as it shows person already accounted.
    Re: getting error in PT60
    "No Work Center Data on $01.01.2008"
    Cheers,
    Nayak

    Hi,
    I am also facing same error. Your issue resolved ? I deleted the B2 cluster but having same error. Can you please tell me the solution for this problem.
    Thanks
    Dev

  • Regarding work center configuration.

    Hi PP Gurus,
    We need to take an account to Rated Line Speed (Bottles per minute)  (i.e. It should be the current capacity of the bottling line operating at the full rated speed, irrespective of the bottling format).
    We're using Discrete Manufacturing scenario and work center (CR01). How could it be taken into account.
    Is there any alternte way to put an additional fiueld in work center create (CR01)/work center change (CR02) transaction code?
    Thanks & Regards,
    Abu Arbab
    Edited by: abu arbaba on Jan 30, 2009 9:46 AM

    hi,
    What I mentioned is ,  create a reference operation set of one operation with that particular work center  and maintain operation times as the speed of that line  ( 100 bottles for minute should be entered as base qty as 100 and time as 1 min).   Call this reference operation set in any routings that uses this line.
    If you do this,  you don't need additional field in work center and so don't get confused  with it.
    cheers
    Rav

  • How to manage work center in Production order

    Hi,
    I am producing a material having one operation (suppose cutting), which I have mentioned in the routing. I have also mentioned the work center in routing on which cutting operation will be performed. When I make the Production order of 1000 pcs there comes only one work center. But practically, they are producing these 1000 pcs on two different work centers ( 500 on one and 500 on second). How to manage this in SAP.
    Kindly help me.
    Thanks and Regards,
    Yogesh Singla

    Dear ,
    What is the individual capacacity of the Work Centre -CR02-Header -No of Individual Capacity ?
    I think you must be using similar kind of work centre of 2 no 1000 pc .Now , when you are creating routing for this , you should hit Required Spilliting in Routing Operation -Select Operation line item  and then Double click -Select Spilitting and enter splitting No 2.
    At the same time in CR02-Work Center -Capacity Tab -Hit the Header -In the Bottom of the Detail Capacity Header -Avaialabile Capacity -Include 2 as Number of Inidvidaul Capacity  and SAVE.
    Now based on thr required spilittinga and invidual caapcity , it will consider the Work Centre Load .
    Other wise , you can enter one more operation line in routing with similar Labor hrs , work center and control key in routung for production of 1000 pc  .
    Hope it clarifies
    Regards
    JH

  • How to create New Work Center

    Dear Experts
                      How to create New Work Center?, what are all the inforamtions  need while creating workcenter.
    Regards
    Rajakarthik

    Hi,
    In addition to the above post, you need to identify that:
    1. Whether you need separate activity types and cost center for the newly created work center. These details are entered in the Costing View of the Work Center.
    If these are required then use KL01 to create new activity, KP26 to define the activity price.
    If required create cost element using T Code KA01 and Cost Center using KS01.
    Take help from the CO guy on this.
    2. Also  you need to ask the concerned about the operating times for the wor center. That is Start time and End time of WC. It is used for capacity evaluation and scheduling of the orders. It is maintained in the capacity view (Bottom left Button in the view).
    this view will also contain the details regarding the calendar, to be assigned to the work center, if needed. Collect details for this requirement. Also you can assign a different calendar to WC apart from factory calendar.
    3. Find out whether this WC will be operating in shifts or not. Accordingly maintain the details.
    Hope it is useful for you.
    Revert for clarifications
    Regards,
    Rohit.

  • Could not found any usage key in the work center WC001(Use T-CODE CR02)?

    my question:
    (1) I have created one Work Center WC001 and one Plant HJW1.
    (2) I have created one Routing with T-CODE CA01.
    (3) Then I use T-CODE CA02 to change this Routing.
    (4) When I enter the Head details screen,I click the Operations button to enter the Operations Overview screen.
    (5) In the Operations Overview screen list,I input the Work Center WC001 and the Plant HJW1 at the first line and press enter.Then the sap raise error message like below.
    (6) The question was: I could not found any usage key in the work center WC001(Use T-CODE CR02)! Could any one tell me the answer or give me some advice to resolve the problem?Thank you so much.
    error message:
    Work center WC001 plant HJW1 does not exist for task list type N
    Message no. CR084
    Diagnosis
    You want to allocate the work center WC001 to a task list of the type N . However this work center is not intended to be used in a task list of the type N.
    Procedure
    The usage of a work center in task lists is restricted via the usage key. You define this key in work center customizing and allocate to it those task list types in which a work center with this usage key can be used.
    Proceed as follows:
    Check the usage key for the work center WC001 in work center maintenance.
    If necessary change the usage key in the work center or change the allocation of task list types to the usage key in customizing or
    allocate to the task list a work center which is valid for use in a task list of the type N.

    Hi
    1) Check what task list usage key you entered for the work center in the basic data . If it is 009 then the work center can be used in all task list type.
    2) If you have defined and used any other usage key , ensure that  for this key , the routing type N is allowed in OP45.
    Regards,
    Ramasamy

  • Cost Center assignment to Work Center(CRCO)

    Hi Experts,
    I was updating Costing data to Work center. I used standard LSMW 0260, 0000, RCRAPDX2, D., but i am getting error as 'Work Center already exists' since i am updating Costing seperately after loading Work Center.
    Please help me in updating this data with any standard program available. Otherthan prefering recording method of LSMW or BDC.
    Thanks,
    Maruthi Prasad

    Hi all,
        Iam really waiting for someone to see and  get the logic right  for this code.Iam completely stuck up.  i need ur help
    Thanks

  • Dummy work center.

    While creating master recipe curling, edge forming, trimming and painting are assign to a single operation and a resource (work center)is assign to this operation in master recipe. Now my problem is that when I enter the scrap quantity during confirmation in COR6N painting material is consume for scrap quantity also.
    I decided to create a dummy work center  for painting and painting material to be assigned to next operation  40.frist advice me am I right and explain me how to create a dummy work center ,what about the cost center and activity types in costing view of work center .pl. give me detailed steps with T codes.

    Hi,
    You can create a dummy work center and assign to the same operation. This is the only way i think you can do it, Suppose it will be like this,
    Operation 0030 Workcenter1
    Operation 0030 Woekcenter2
    then you can use same cost center, If you want to do costing then use the activity that you want to cost.
    Pls refer this also,
    [Example|http://help.sap.com/saphelp_nw04/helpdata/en/50/13a8946d7611d2a5a80060087a7a74/frameset.htm]
    Regards,
    R.Brahmankar

  • Production output releated to work center

    Hi Sap Guru,
    I am working in steel industry there coil manufacture for different workcenter they get different output of Finshed production.I want my production order output depend upon workcenter such as 100% input if using for any work center then in confermetion it output of Finished product should be fix 90% if i want to use other work center it wil gives output 80% because scrap is generated depend upon work center.
    Please guide me whre this scenarion we map.
    Thanks in advance

    Hi ,
    Just my 2 cent advise , you should use production version with different Alternative Bom with different operation scarp rate.
    Because based on what i know , Operation scrap Is defined in the BOM item. But you will need different operation based on different work center. by using operation scarp It shows the percentage of the component that is lost as scrap in a specific operation.
    Example :
    Production version A --- Work Center A ---Alt BOM 1 with Scrap rate 0%
    Production version B --- Work Center B ---Alt BOM 2 with Scrap rate 10%
    Production version C --- Work Center C ---Alt BOM 3 with Scrap rate 20%
    Of course all need based on business requirement need , so there's some others configuration need as well.
    TQ.

Maybe you are looking for

  • Movie Problems with multiple devices

    I have an IPad 2, Itouch(4th Gen) and IPhone. I have downloaded all of my movies exclusively from Itunes but only the latest movie will sync to my IPad and Iphone. The Itouch will sync all of the movies but the other devices will only sync the latest

  • Option to Hide from Strangers

    My purpose with this post today, to ask for the option to privatize everything that is currently showing publicly in skype (an option that is not yet available, but I hope someday will be added to a future update to skype). I have read numerous posts

  • Referencing a "locally installed" Java applet from a server-based HTML page

    How does one reference a "locally installed" Java applet from a server-based HTML page (i.e. via the applet, object, or embed tags)? I have seen references in documentation that this is possible, but I have not seen any examples. I have tried a few t

  • Satellite U920T - display, touchscreen and camera has stopped working

    My U920 has been goten worst every day, first it was the thouchscreen, then the cameras and finnally today the screen has stoped working. The ribon attachment has problems, don't know if I'm the only one or if is a design problem, but the main proble

  • Chart from CSV datasource not appearing

    Hi, I'm using CRXI in VS.NET 2005 on Vista32. I get the feeling that maybe I've misunderstood something fundamental about how Crystal Reports can be used to bind to a report datasource at runtime. I know that I can set the datasource using the OLE Te