CATS Time Entry - Charging time to a different cost center

We are looking at using CATS for time entry for our salaried non-exempt employees.  Some of these employees charge their overtime to a different cost center.  For example, normally their overtime is charged to their own cost center but periodically they help another group and need to charge the overtime to the other group's cost center.  In the CATS profile where you select the fields you want to be available for input, display, etc., I see cost center as an option.  However, when I select it as a field for input, it does not appear on the timesheet.  I see there are other cost center fields (receiver cost center, sender cost center) but I thought these had more to do with work orders (not sure of that, though) and work orders are not used for this group of people.  Currently, the time is being charged to an alternate cost center when the time administrator enters the overtime via PA30 and then selects the 'Cost assignment' button to record the appropriate cost center. I would appreciate any information/guidance you can provide.  Thank you.

Hi Kathleen,
We are trying to do the same thing so I understand exactly what you are asking.  We made the sender cost center field an input field via the IMG - Cross-Applications Components> Time Sheet> Time Recording> Choose fields> - select data entry section and look for sender cost centre - field name CATSD-SKOSTL - ensure "input" is selected.
Eventhough we have been able to enter an alternative cost center with an attendance (i.e., different from the employee's cost center saved on IT0001), it is not being transferrred to HR (does not appear on attendance infotype) therefore payroll does not pick-up the cost center with the attendance hours and it is not posted to FI.  Payroll continues to use the employee's home cost center.
Have you been able to get any further with this issue?
You can contact me directly if you like - 1-613-599-8600 - ext 243.
Catherine Maunder
Calian
340 Legget Drive, Suite 101
Ottawa, ON, K2K 1Y6

Similar Messages

  • MSS different cost center by approved time sheet

    Hello,
    In Table CATSDB seen we the results from time entry. The fields Send cost center and receiver cost center. An employee has an standard costcenter as masterdata. When this person works a couple of hours on a cost center that differs from his standard (master data), he giving in the cost center were he works on. Every thing is ok in ESS.
    In MSS in the team viewer this person belongs to a team. Bij the approval of time sheets he displays standard (master data) and the u2018differentu2019 cost center. This situation we want to avoid. The u2018differentu2019 cost center is somebody else his responsilibility.
    I try something with Cost center responsility. Can someone help me?
    Thank you

    Dear Dilek Ersoz 
                    I have the same requirement where i have to default the Sending cost center and Actiivty type from infotype 315  in the CAT2 sending cost center and activity , but in the cats profile defaults section i have kept the Cost Center and acitivyt type checboxes being checked , still iam not getting the values of the 0315, please could you let me know how to default the values in cat2.
    regards
    sai.

  • Overtime assignment to a different cost center

    Hello,
    Scenario:
    Overtime with different cost center
    DWS: 0800 - 1700
    Actual IN: 0800
    Actual OUT: 2300
    Approved OT: 1800 - 2400
    Cost center: 10100 (This cost center is different from the cost center in IT0001) should be charged for the overtime only.
    Given the scenario above, I could not use infotype 2002 (create an attendance type as overtime) since if i input 1800-2400 the system will valuate the whole six hours (6) as overtime (note: the system should only valuate 5 hours- 1800-2300; approved overtime with comparison to actual in/out).
    If I will use infotype 2005, it will have the same behavior as it 2002. 1800-2400 will be paid.
    If I will use infotype 2007 via the GOT function, it will valuate the overtime as 1800-2300 (approved overtime with comparison to actual in/out) correctly BUT i could not charged the corresponding cost center. I already checked the spro and it 2007's cost center could not be activated.
    Do you have any ideas in mind? Any comments are appreciated.
    Thanks.

    Hello,
    Thank you for your answers.
    I am considering using IT2007 since it automatically distinguish which work should be valuated as overtime with regards to comparing the filed overtime (via input in IT2007) with regards to the time entries(clock in/out) of the employee.
    Example:
    if daily workschedule is 0800- 1700
    actual in/out   0800 - 2300
    entry in IT2007 is   1700 - 2400
    The overtime that the system will recognize is 1700-2300.
    Unlike in using IT2005, if i input 1700-2400, it will valuate 1700-2400 without considering the actual in/out of the employee.
    I can manually change the IT2005 but the overtime of the employees which are assigned to another cost center are 1000+records in a day.  If I manually edit the entries in IT2005, it will be very tedious. Same goes if it is via 2010.
    Do you guys have other ideas in mind?
    Btw, I am using positive time eval.
    Thanks in advance.
    Edited by: Maya Fajardo on Feb 10, 2011 12:02 PM

  • VA01 Sales order (line items) and different Cost center assignment

    Hello gurus,
    im searching for solutions how to assign different cost center to sales order line items, but only thing that i found is the substitution (Using Substitution (GGB1) to change Cost Center assigned in (OKB9))
    Trying to do this i was unable to create something that could work, since there was no Logistic.
    Could somebody explain me the Line item in SO assignment to Different cost centers?
    I know alot about OKB9, VKOA and other transactions, but still cant find anything suitable to solve this issue
    Best regards
    Laurynas

    What i mean is that, on the end of every month we are gathering information for Statistical Key Figures (from Controlling) entering as CO document and then distributing the costs using KSV5 TC on Internal Orders according those entered statistical key figures.
    i.e. we got INCOME 1000000 from 10 internal order, which we distribute on even percentage parts like 10 cost center, each getting 10% of the income.
    I tried to create the SO, but the Profit center field, after i entered a number, was changed automatically into another.
    And the posting didnt reach Controlling and the assigned Cost center. I think it is a lack of configuration.
    Regards
    Laurynas

  • Allocation of cost to different cost center

    Hi Techies,
    I have to allocate cost from one cost center to different cost center according to percentage (%). Company wants to show same cost on sender and then breakdown according to % on receiver cost center.
    Example: Company wants to allocate cost from CCenter A to Ccenter B1, B2, B3.... according to % like 74.1% to B1, 14.8% to B2. Now which allocation functionality (Assessment, Distribution) I should use to solve this problem. I would really appreciate if you have method or process step to perform this process.
    Thank You,
    Kenny

    Use transaction KSU2 to call the Assessment Cycle.
    Click on "First Segment" and in the segment header, under Sender Values, select Posted Amounts and key in 100% (since you wish to assess all the costs). Under Receiver Tracing Factor, select Fixed Percentages.
    Click on the "Senders/Receivers" tab. Now under "Senders", do an F4 (dropdown list) in the Cost Centres field and select your Cost Centres (or groups).
    Similarly click on the Cost Elements and dropdown to select your Cost Elements or groups.
    Now under Receivers, in the Cost Centre field, key in the Cost Centres you wish to post costs to.
    Click the next tab Sender Values
    Here, enter Share in % as 100% (default) and under version, enter 0.
    Now click on the Receiver Tracing Factor tab. You should see all the Cost Centres you entered under Receivers in the Sender/Receiver tab. Enter the %s you wish to apportion to each Cost Centre.
    Save this cycle and run this for the period in question. Before you run this, make sure you post some costs to the Sender Cost Centres. Else the system will find nothing to assess and come back with the same error.
    Hope this helps.
    Cheers.

  • Same cost booking for two different cost center

    i am facing a problem.
    the problem is that here same cost is book under two different cost center @ the ratio of 50%.
    how it is possible.

    Hi,
    What i understand from your question is that in one FI document there are 2 cost center against same cost element with 2 different line.
    If it is so then it is correct.
    User has enter same cost element twice and enter different cost center and dividing the cost equally.
    Regards,
    Shayam

  • Material cost charge to Production Order from Cost Center / Work Center.

    In Production Order Environment, is it possible that goods are issued from Storage location to Cost Center / Work Center, and in turn charged to Production Orders.
    Scenario. Transformer Manufacturing.
    Production Order size : 100 Units
    Steel (Kgs) per Transformer : 3 Kgs
    Total Steel required for Production Order: 300 Kgs (100x3)
    In the process of manufacturing of a Transformer Steel or Core winding is the first process step.
    Even though the Steel required for above said Production Order is 300 Kgs, the minimum issuable lot size from stores is 2000 Kgs.
    Is it possible in SAP ECC 6.0 that the Steel of 2000 Kgs is issued to a Cost Center / Work Center, and later charged to production order based on actual Consumption in the said Cost Center / Work Center.
    Regards, Replies and Sugestions shall be appreciated
    Madhu

    Thank you for the reply,
    However, the scenario that i had in mind was a bit different from what you had conceptualized.
    Scenario - These transformers are basically for loading on to Inverters & UPS, The max weight of the transformer range from 15-30 Kgs. and they dont have an external casing of steel as seen on Indian Electricity Board transformers. Multiple production orders are processed at a single time in the Plant as per Customer specifications.
    The general process followed for manufacture is as follows:
    1. Core Winding u2013 This process takes place in the core winding department. Steel reels are loaded on to Winders and individual cores of approx 5 u2013 30 Cm Diameter are produced. (Multiple reels of Steel are stacked one on top of the other onto a pallet.) Usually issue of steel from stores happens pallet wise. The pallets of steel generally weigh in excess of 2 tons.
    In the present situation (Non SAP Environment) the entire pallet of Steel is issued to the Core winding department and later the Output is charged to multiple Production Orders, based on the records of the Core winding dept. Since in general the steel content in the FG ranges from 3- 25 Kgs multiple Production Orders can be catered to from one Pallet of Steel.
    2. Core Laithing. The wound cores are laithed so as to make the sides smooth.
    3. Core Annealing u2013 Heat treatment process.
    4. Core Insulation. u2013 Insulation of the annealed cores with insulating material.
    5. Primary Winding. u2013 Copper is wound as per the BOM Specification. The issue like that of Steel also arises in the Copper winding process. Here also the Cooper comes in Spools which far exceed the requirement for any Production Order. The minimum issueable lot for Copper from Stores is one Spool. The current practice followed is that the Cooper is taken in the name of the Copper winding department and later charged to individual Production Orders.
    6. Primary Soldering.
    7. Mid Insulation.
    8. Secondary Winding
    9. Secondary Soldering
    10. Shielding
    11. Final Insulation u2013 Same issue with insulation too, since the insulating material comes in rolls.
    12. Testing.
    13. Potting & Drilling - Process of pouring a chemical compound in the center of the transformer, which helps the transformer to later be loaded on an Inverter. The same issue with like of Steel, Copper & Insulation arises here too, since the chemical compound comes in big containers capable of meeting production requirement for a week.
    14. Packing
    15. Transfer to FG Inventory.
    One of the suggestions was to issue the entire 2000 Kgs to the Production Order and then return 1700 kgs after completion of the Production Order based on actual usage. However, in my opinion this option might not be practicable because, assuming that I get another / multiple Production orders in between the issue of 2000 Kgs and return of 1700 Kgs, issue to the new Production order will not be possible if the stock in stores was only 2000 Kgs initially. In case assuming that the material is available in stores for the next production order, the situation could worsen in case of receipt of multiple production orders.
    Hope, I have explained the scenario & issue being faced.
    Regards
    Madhu

  • Charging Porposnate dep to the cost centes based on the Interval Assigned

    Hi,
    I have scenario were asste is being transferred from one cost center to another and depreciation needs to be charged on proposnate basis between the old and new cost center.
    I have changed the interval in the aaset master (T-Code AS02) for transfer, but when I am posting depreciation system is chaging 100% dep. to new cost center irrespective of the date of changes.
    Regads,
    AB

    Hi,
    I tested it, made some research and found note 29947:
    When posting depreciation with RABUCH00, with account assignment to cost
    center, depreciation is always posted to the cost center assigned at the
    end of the posting period in which depreciation is being posted.        
    Depreciation is not distributed for a proportionate period of time (by  
    date) to the time-dependent cost centers assigned in table ANLZ.        
    This note speaks about RABUCH00 but is is release independend and still valid.
    Have you made another experience?
    ( Time independent organization unit is not relevant in that case)
    regards
    Bernhard
    Edited by: Bernhard Kirchner on Nov 16, 2010 12:31 PM

  • Manually post to a different cost center during APP

    Hi,
    When the proposal is created, we manually go and edit the proposal and enter 2% cash discount. I have done the settign in OKB9 to pick up the cost center for the Discount Received account.
    Now, is there anyway that I can enter the cost center manually after running APP (will delete the OKBP settings). If i run APP it gives me error that in proposal log that discoun received account requires CO object.
    thanks,
    JR

    NO.
    If you have set up an account assignment rule in OKB9 you wont be able to stop the payment run as it creates the accounting documents.
    If it is always a certain Cost Center you could look at a substution looking at the document type of the payment run to make it different.

  • Activity Costing from same resource to different cost center

    Hi everyone,
    We  need to use a manufacturing resource where it has to cost for activities for product "X" to one cost center and for activities for product "Y" to another cost center. One resource can be assigned to only one cost center
    is it possible to do in SAP or any work around ?. Any suggestion highly appreciated
    thanks !!
    Ganeshan Kalembeth

    Hi,
    u are right we can not assign .one resource to two cost centre ....i think its not possible at all..we need to create different resource for that ...product..that only i can suggest
    regards

  • Can i settle one order to different cost center

    Hi experts
    pls solve my problem
    i posted some expenditure to one order
    one order expenditure : salaries 2500, rent 1500 , Travelling exp 3500
    here i need post salaries to cost center admin-1001
    and i need to post rent , travelling to cost center Markeing-2001
    is it possible or not
    if , how tell me the process
    Regards
    Rams

    Hello Rams
    What ever the settlement u r going to do in IO are dependent on the settlement rule u have defined in SETTLEMENT PROFILE in KOA1
    whereu  have to
    <b>activate the check box %</b>
    <b>activate the amount settlement - activate,.</b>
    <b>the radio button  to be settled in full to be activated.</b>
    U can settle the costs of the orders partly to diffrent cost centers as required. ( as u have explained)
    again u check it out in KOT2 ( creation of order type) wheather u have activated
    <b>CO PARTNER ACTIVATED  X  ( active)</b>
    Hope u would be able to solve the problem
    Expecting some valuable points if it is useful
    Thanks

  • Stttlement to different cost center

    Dear All
    In my current project ,the management  wants the Inter Labour cost  to settle to XXXXXX cost center , and rest of the cost to the YYYYY cost center.
    As the Maintenance team is not responsible for the Salary of the Maintenance Engineers. The YYYY cost centre doesn't have the budget for their Salaries.
    Pl tell me what changes in the settlement profile will trigger the required settlement?
    At present ,I am getting  only one cost centre YYYYYYY   in the settlement rule, which is coming from the Tech object Master.
    Thanks in advance.
    Manish

    Hi thyagarajan
    Is it not possible to allow every Engineering supervisor , to manually enter the settlement rule. As it will only confuse them.
    Is it possible somewhere is Settltement profile that , we can mention this.
    Regards
    Manish

  • Authorization for Time Entry on Cost Center Level

    Hi Experts,
    Would like to know, if we can do authorisation for time entry on the base of cost center. For example, an employee worked for 8 hrs and out of that 2 hrs worked for different cost center. That 2 hrs should be approve by Manager of that cost center and 6 hrs from his current cost center.
    I thought of Structural Authorisation but not sure how it will work. I would appreciate prompt response on the same.
    Thanks,
    Aashish

    I was pointing out [the rules|https://www.sdn.sap.com/irj/sdn/wiki?path=/display/home/rulesofEngagement] about requesting "promptness" from what is a voluntary effort here to help each other and help those who first try to help themselves (keyword: "search").
    Actually, I noticed that you had cross-posted this thread to the HCM forum. Normally, we move threads to other forums which are more appropriate, and often lock cross-posting. This is one of those grey areas between technical and functional, so I turned a blind eye on it.
    I am hoping that there will be a functionality to mirror good questions to other related forums without having to cross-post. This would be very usefull for sure but the question would have to be good and the person who asked it would have to have a good track record of respecting [the rules|https://www.sdn.sap.com/irj/sdn/wiki?path=/display/home/rulesofEngagement]. Most likely moderators would be the only ones to "mirror" good questions, unless they contain words such as "urgent" or "ASAP" or "prompt" or "points will be rewarded", etc...
    Cheers,
    Julius

  • Service entry - Change cost center

    Dear Experts,
    When we create a service PO, say 100 qty distributed to 1 cost center A100, but at the time of creating service entry sheet, i want to distribute to different cost center, say 20 qty to A200, 20qty to A300, 60qt to A400
    I tried the systems allows me to create service entry sheet.
    Do this have any effected on positing issues, or still the PO considered is Open PO?
    Please advice..
    Thanks
    Saravanan

    Hi
    When you Distribute the Cost To different cost center sbased on the Qty the amount is posted to all the Cots centers Proprtionally.
    The PO is still open Only . It will be Closed only after Competing the Invoicing Process.
    Thanks & Regards
    Kishore

  • Cost center valorization for free of charge item

    During sales order entry I need to have some
    - standard item that have to be invoiced to the customer
    - free of charge items; these items have not to be invoiced and for them I need to value a specific cost center ( for the standard price stored in material master data).
    I know there is a customizig setting I can use to manage the relationship between the order reason and the cost center but this value is valid at header level (VBAK-KOSTL) while I don't know how I can set different cost center at item level (VBAP-KOSTL).
    Thank you in advance,
    Alessandro

    Hi,
    in NewGL I am sure that its not possible as there is no accounting document created (which contains the PRCTR information as well) if the revenue is zero.
    And I am pretty sure that its not possible too in old PCA (Ledger 8A).
    CO-PA docs. can be created for free of charge items (otherwise the cost of these items are missing in costing-based CO-PA).
    BR Christian

Maybe you are looking for

  • Searching in sxmb_moni for business data

    Hello, it is possible searching for business data in sxmb_moni for example a order-No. The reason is that a customer want know the time the order is executing or this happened without an error or trying to send the order again. Normally only with the

  • Information on APO or 3'rd Party Planning Software

    Dear Experts, We are into discrete manufacturing with MTO scenario & want to map the planning process in SAP PP. As we experienced in standard SAP PP has the ability to run MRP and perform unconstrained planning. Capacity Leveling is also very diffic

  • Extend BASIC Type HRMD_ABA (HRM Module) - Custom Extention

    Hi I have extended IDOC Message type HRMD_ABA to include custom Infortype. We are planning to use Change Pointer. How can BD21(generate idoc from change pointers) populate custom infotype data into the IDOC? Thanks,

  • Problem to run free trial of After Effects CS6

    Hi, I would like to Download a free trial of After Effects CS6 but it wants me to install AdobeDownloadAssistant to do it. I installed it but it won't run because it says that it doesn't find Adobe Air when I do have it. I tried uninstalling and rein

  • Error in DHCP log

    anyone know what this means: "missing option dhcp slp service scope" or "missing option dhcp proxy auto discovery url Any ideas?