Parallel routing / sequence
Hi Experts,
I have issue in routing as follows:
I have five operation in a routing as A,B,C,D,E. In every operation I have some component allocation.
Now operation B,C,D is a common operation but components to be allocated is different as per left side and right side of the product.
So How should I map these oerations B,C,D with different components allocation in a single routing.
Should I use parallel sequence or is there anything like parallel routing also. Please tell me the steps to create the routing with parallel sequences and parallel routing with effects of that after MRP run also.
Waiting for the valuable guidance.
Regards
Deepak Sharma
Hi,
In this case, for the operations B,C,D allocating components differently is not possible in the same routing. Because if the components are aligned to left or right as mentioned, there may be change in the product which in case has to be maintaned in different routings with different material numbers.
If not create routing for the same material with group counter 1 and 2, and create production versions and pick the desired ones after Production order creation.
Hope this gives you an idea...
-Thaila Shree
Similar Messages
-
How to create parallel routing sequence
how to create parallel routing sequence?
we have routings 3010 ,3020 ,3030 and 3040.
but 3010,3020 and 3030 operationwise shop list to be released at one time becuse they all are parallel operations.
after 3010,3020 and 3030 operations 3040 is a sequencial operation.
please do explain the process how to create parallel routing sequence in this case
and confirmation of operations
thanking you
srinivasSrinivas,
i think you are looking at an option were in you can confirm or do goods Issue for the order. If that was the requirement, then the control is in customizing transaction "OPK4".
Here in this transaction you need to define "operation sequence is not checked" for the plant/order type combination.
Hope this helps....Please let me know if your need is something else,
Regards,
Prasobh -
Parallel & alternative sequence-Routing
Dear all,
Can any one please send the document for how to process parallel & alternative sequence.
I tried but during confirmation its not showing the operation which i created in sequence.
Kindly let me know.
Regards
RajasekaranSee the help file
http://help.sap.com/saphelp_47x200/helpdata/en/7e/d42611455911d189400000e8323c4f/frameset.htm
it is very clear in thsi web page -
Parallel Routing in Production
Hi all,
I am using parallel routing. When we creder production order, routing gets coppied in production order.I am able to see only standard sequence but not able to see parallel sequence. How can we see it in production order? and how it works?
Its urgent.
MayurHi Mayur Phalak ,
Pls follow as pradeep's reply to view the paralle sequence
You will not be able to view standard & parallel sequence together in the same screen
Coming to your second question-How it works?
Alignment key controls the scheduling part
As u know the operation with longest lead time will come in the standard sequence
If you set alignement key as "1" then all the operations(both std & parallel) will be scheduled to start at the same time but will end at different time as the lead time vaires for each operation
If you set as "2" then all the operations(both std & parallel) will end at same time ,floats will be at the beginning ie starting will vary for each opearation depending on the lead time
Hope this is helpful,Revert if you have further query
Regards,
SVP -
Parallel Routing - Quantity split in operations
Hi all,
I need help regarding the parallel routing,
operation description
Sequence 0 1
10
20 20
30
40
I have parallel routing with sequence no's 0 and 1
if I have a production order for 10 Nos
1) operation 10 is confirmed for 10 Nos
2) operation 20 in sequence 0 system proposes for 10 Nos
for confirmation
3) Operation 20 of sequence 1 system proposes for 10 Nos for
confirmation which is not so
There should be a split in the quantity for parallel operation like 5,5(Nos) for both opeation 20,20
how do i obtain the slipt in quanty flow to subsequent opeation
also after confirmation of both operation 20,20 system should propose cumulative quantity(10 Nos) in operation 30 for confirmation.
Thanks in advance
RaghavendraHi Raghvendra,
If more than one operation has to be carried out simultaneously then one has to go for parallel sequence
Like taking your example if second & thrid operation takes place at the same time then it is caaled as parallel sequence
any way for your requirement you have to go for operation split
you dont need to maintain two seperate sequences for operation splitting
you want to split between m/c in the same work center(like one work center with 2-3 machines-Machine category) then its possible to do the splitting-you need to maintain each machine as "indvidual capacities" in the work center under capacity header
Then in the operation overview select the required operation(2nd in your case) operation details-->Cap reqmnt assigment here you split the qty & assign to different machines
Basically you have to do capacity levelling,it can be done in CM27,CM25
Hope the above is clear
Revert if you have doubts
Regards,
SVP
Hope the above is clear
Revert if you have further doubts
Regards,
SVP -
MFBF and Alternative Routing Sequence
Hi;
We are using REM in PP.We confirm via MFBF. And we create routings via ca01. I want to use alternative routing sequence during confirmation.
What should I do? or Is it possible for REM?
Thanks.Hi;
Thanks for your answers. I dont want to create new production versions. But routing informations are change.
Ex: I have two machines in a production line, lets say it A and B. This line has a work center code in SAP ( lets says Line1)
When I use only machine A I produce 100 pieces in 5 minutes with 2 worker. But when I use A & B at the same time I produce 100 pieces in 3 minutes with 3 worker.
Machine A and B are connected to the same conveyor belt, so I put the pieces in the same palette. And during confirmation I use Line1 as workcenter.
What should I do to post the exact activities ?
Thanks for your information. -
Can I run a parallel router to apple TV to watch the Amazon product?
Can I run a parallel router to apple TV to watch the Amazon product?
You can't watch Amazon content natively, if you have an IOS deivce you can use airplay.
-
Foreach -parallel in sequence.
Is there a way to run foreach –parallel in sequence? I tried this but it won’t run in sequence.
workflow
test
$servers
= "servers.txt"
foreach -parallel ($server
in $servers)
sequence {
Test-Connection
-ComputerName $server
test
99upgradeWhen I run this code, part of $server and part of
Test-Connection
-ComputerName $server
executes randomly. For the output to make sense, I have to remove the –parallel switch and re-run.
What I was hoping to see in the output was the servername and its IP below it,
without compromising on the total time taken to complete the script.
workflow
test
$servers
= "servers.txt"
foreach -parallel ($server
in get-content
$servers)
sequence {
$server
Test-Connection -ComputerName
$server
test
99upgrade -
Dear all,
I have a routing with an alternative sequence created.
I would like to be able to select the sequence of the operation while confirming (CO11n) and not while creating the production order.
Kindly let me know what's the possibility of that.
in Co11n, when I write operation 0010 and sequence 1 instead of 0 it says "Sequence 1 not defined in order xxxxx, check entry"Maybe you can tell me what's the best practise for this case
I have 2 work centers
FUR11
FUR33
each has different capacity, during the production order, we can work on FUR11 for sometime then shift to FUR33, and it's not a must that this happens. However, I want to be able to confirm the ACTUAL time occuring on any of them. I thought about alternative but in this case I have to know from the begining which alternative I'll be using during the creation of the production order and this is not valid in our case.
What do you suggest?
I was thinking of making them parallel sequences.
Edited by: Rafik Wassef on Apr 13, 2009 1:59 PM -
WIP or scrap calculation for parallel operation sequences not possible
hi,
i want to calculate wip and scrap along with parallel sequence
system prompts following mesage any suggetions plz send in higher priority
Message no. KV161
Diagnosis
If the routing specifies a sequence of operations that are defined as a parallel sequence, this will have the following effects:
The system cannot interpret the confirmed scrap quantities in cumulative and periodic settlement when it calculates the scrap.
The system cannot calculate work in process at target costs for this order because it does not recognize the relevant operations.
Procedure
If you want to calculate scrap or WIP, do not define parallel sequences.
vishnuHi Robert
Though I am seeing this msg for the 1st time - I can give you a some insight into this
It seems you are in product cost by period (PCP) scenario ... In this scenario, WIP is calculated at target cost.... The mechanism of calculating WIP is Confirmed Qty at preceeding operation - Confirmed Qty of next operation..
In your case, since you have parallel operations in your routing, system wont be able to calculate WIP... I am not sure how parallel ops are defined... You need to get in touch with your PP guy....
But, one thing for sure , with parallel ops you wont be able to calculate WIP in PCP scenario
Regards
Ajay M -
Routing-Sequences Error in co11n
Dear all,
Can any one please share the screen shots how to process the sequences in routing
I have tried by using help portal but i dint get any differences on that.
While confirming in co11n,that particular sequences also not get displayed in sequence column.
Regards
RajasekaranDear Raja Sekaran,
Check this link to understand more about alternative and parallel sequences.
Why Rate Routing is (recommended) used in Repetitive Manufacturing?
Alternative sequence of operation can be created only through routing and when it comes to production
order you can copy either the standard sequence or the alternative sequence of operation.
During production order confirmation in CO11N,in the F4 option you can see the entire list of operation
along with the sequence.
First ensure you have parallel sequence of operation exists in the routing level and then the same gets
copied to the production order and at the time of confirmation you can see the list display.
Check and come back.
Regards
Mangalraj.S -
Routing sequences; what's the maximum?
Using the N type routing and Parallel sequences in SAP (Thru CA01), I see from the data element that we have 6 digit number for sequence (PLNFOLGE) ... Meaning that we can technically have a maximum of 9999999 sequence number in a routing.
Have someone experienced a limit below this? (Is this the real limit???)
It's kinnda hard to test unless creating a lot of sequences...
Best regards!
LucHello, I've got a 250Gig hard drive waiting to go in my G4 Dual 867.
I'd like to sit it next to the original 60Gig drive that came with the Mac.
Can anyone point me to a diagram showing how to access the bay? It looks a bit fiddly.
Thanks.
Tom -
How do you route sequencer material to different ports in Audition 3?
"Durin" from Adobe wrote:-
"This first implementation is limited to one global MIDI port. Each channel is broadcast on all ports enabled in the hardware preference manager. This was not our preferred behavior, and is one we intend to address in the next release.
The short explanation comes down to time and choosing which features were prioritized over others. As our goal with this release was not to create a full-featured MIDI editor but a VSTi-based sequencer with basic MIDI support for controllers and keyboards, some of the more advanced features MIDI offers had to be deferred in favor of ensuring our VSTi support was solid and robust.
I've already written up feature designs to implement multiple ports, sophisticated hardware routing and assignments, and full SYSEX and Patch support, and it's my hope that our next release can continue to beef this sequencer up and make it as valuable as the rest of the application. If you have suggestions or a wishlist of features you'd like to see, please share them either in the forums or privately to [email protected] "Hi Kevin
Not sure about the Source selected VRF feature, But still you can try if it work then ok or else you can go with the below solution for traffic coming from data center to VRF.
You need to add two routes.
@ You need to add static router fro VRF network to Data center network
i.e. ip route vrf (voice- VRF ) 0.0.0.0 0.0.0.0 (Gateway) global
@ You need to add static route for VRF network in the global routing table pointing to the interface connected to VRF.
i.e ip route (VRF network ) (VRF subnet mask ) (Gateway Address that’s connect all VRF)
So when traffic is coming from Data Center till will be pointed towards the interface were all VRF is connected & they will communicate & when reverse traffic will come from VRF they will reach to Data Center router & use VRF global route to reach data Center network.
(You can refer the configuration of PE-2 of document that shared earlier)
Regards
Chetan Kumar -
Passing information between parallel Teststand sequences.
The ExecutingCodeModulesInParallel example that came with Teststand 3.0 almost does exactly what I want. The example uses steps that run CVI. I am trying to create a LabVIEW equivalent of this example. Basically, I want a LabVIEW Display panel 1 to write to FileGlobals.Counter1 and a LabVIEW Display panel 2 to read from it during parallel execution.
Right now, I can’t seem to get the information to pass between the two displays.
Once I figure out how do this, I believe I will be able to apply it my specific task.
I’m a newbie when it comes to Teststand and LabVIEW. Any help would be greatly appreciatedHi,
The problems is your VI loops dont actual set the FileGlobals.Finish1 boolean and Counter1 until the stop buttons are press by which time you probably have missed them and like wise your other VI only reads the TestStand variables when the VI is launched.
You need to call the PropertyObject.SetValBoolean method either by using the appropiate VI from the Teststand palette or via the Invoke node. In the other VI you will have to call the PropertyObject.GetValBoolean method and GetValNumber method. This also means you will need to pass the SequenceContext to both VI's.
Have a look at the original example again and you will spot the relavant calls in the two C functions.
I will post you your modified VIs later today.
Hope this helps
Regards
Ray Farmer
Regards
Ray Farmer -
Parallel or sequential routing rule and recovery
I'm trying to implement fault handling via fault policies for a composite, to get faults into the error hospital so recovery is possible.
The fault I'm trying to catch is a service call from a mediator component, but for that to work I have to change the routing rule from sequential to parallel.
So far no problem, it's working.
There are a few synchronous services I want to be able to recover as well, but this is not supported:
"parallel routing rules are not supported for Oracle Mediators with synchronous operations".
Is there another way to get instances of synchronous services into the error hospital for recovery?Hi ,
Check the below blog to set your conditions using condition and expression editor in your receiver determination
/people/shabarish.vijayakumar/blog/2006/06/07/customise-your-xpath-expressions-in-receiver-determination
Let me know if you need any further clarifications on this.
Thanks,
Sekhar D
Maybe you are looking for
-
How does one print just one page of a long PDF file?
My mac wants to print all of the pages. Don't see a way to print just one page. Since the pages are numbered 6-19 and so on, I can't enter the specific page numbers to be printed.
-
Changing video links in Acrobat 9.0
I have several pdfs that contain links to video files on my server. However, I have now changed my hosting company, so the links no longer work. Is there any way of editing the links in my pdfs to direct them to the Flash files on the new server? Or
-
Has anyone set up a G3 powermac with 8.6 to Sympatico?
I am trying to switch over from a 56K modem dialup to the Bell Sympatico High Speed. I have a Speedstream router and have successfully set up my PC computer. However, I am running into brick walls when it comes to my Mac. The software they sent me do
-
E-business Suite RMAN cloning without connecting source
Hi, I've RMAN backup with catalog and nocatalog. I want to use my nocatalog RMAN backup to clone e-business suite R12/11i Application without connecting source. Please advice/sugegst any doc. thanks
-
What does the "Show file status badges" in Slideshow mean ?
Does anyone know what the "Show file status badges" in Slideshow mean ?