PDC interface - PM/CS confirmation without Activity type

Hi,
We have a problem with PM/CS PDC confirmations in our ECC6 version of SAP.  For PS & PP, the default activity type is populated automatically when doing the confirmation.  But for PM/CS, the activity type is left blank.  All three CONFXX idocs have no activity type specified.
The only thing I found regarding this problem/behavior is a OSS note, dated from 2001. OSS number is 0000381846.  Is this note applicable for our system?
Is there someone who knows about this?
Thanks
Eric

Hi,
what you are willing to implement is not a supported functionality in the current Yard management.
If this is not yet the case, I would encourage you to open a SAP Customer message so that your question gets checked and analysed at development support.
BR
Alain

Similar Messages

  • Setting up the HR-PDC  interface to ext. system without direct RFC

    Hello,
    Setting up the HR-PDC  interface to external system without direct RFC - Uploading time events
    Following note number 647145, I tried to set up connection to external time collection system. As the external system isn't able to work with RFC, I setup a fileport using transaction WE21. When an outbound IDOC is created with transaction PT80, it will be stored at the outbound path. The IDOC then will be transfered to the external system with a unix script triggered by event.
    For inbound IDOCS, the fileport cannot be used as I don't see any way to configure it as the time events that  should come in via RFC port, will be uploaded and processed according the ALE distribution model. The BOR object "PTManagerExtPEvent" of type "BUS7014" with method "Insert" is used to insert the time events into the interface table CC1TEV from an HR-PDC certified subsystem. The message type is "HRCC1UPTEVEN".
    As standard process won't work in our case, I'd need alternative solution. Actually the time events are send via ftp to the SAP directory that points to incoming IDOC path setup on WE21.
    Maybe there should some way to setup RFC connection to own SAP system that points to the SAP directory where the inbound files are stored.
    Maybe using the FM IDOC_INPUT_HRCC1UPTEVEN can be used to trigger the upload manually but first the files have to be uploaded from file similiar to report RSEINB00. Testing this report using the SAP directory and port where the inbound files are located I get error message that IDOC control record is missing, that seems to be understandable as this report is used to upload IDOCS from file but HR-PDC upload file HRCC1UPTEVEN01 has no specific IDOC segments in this moment as it was created according specific HR-PDC interface description. The IDOC in the standard process will be created with the BAPI.
    As I'm new in HR and ALE, I'd be grateful for any help on this matter.
    Best regards
    Andreas

    Hello Andreas,
    thanks for Your contribution. Recently I've got the trial version and made some tests and found out that the bapi-handler works perfectly for managing HR-PDC interface.
    Nevertheless actually there's no compilation for OS/400 and the AS/400 I'm working with has an old OS release without C compiler and furthermore RFC libraries of SAP cannot be installed on this release.
    The Bapi-handler for testing runs on Windows
    and I'd need an intermediate machine to manage the data between AS/400 and SAP. I'd prefer direct connection between timecollection subsystem and SAP for obvios reason.
    Regards
    Andreas

  • Confirmation of activity types in CO11N

    Dear Experts,
    I have a small issue, while confirmation of production order in CO11N the activity type for the actual quantity is confirming but our requirement is that if we are confirming the half quantity means partial quantity, activity should also be confirmed for the half quantity.
    Thanks & Regards,
    Alok Tiwari

    Dear Bhupendra Singh,
    First of all thank you very much for your reply.
    I am trying to do the way you said but it is not happening.
    My requirement is if the production order quantity is 10 each and planned activity is 10 min for labor and if i want to confirm partially 5 each then the activity to confirm for labor should automatically propose me 5 min.
    Regards,
    Alok Tiwari

  • Confirmation of activity type in Process order -Impact in FI.

    Dear All,
    On doing a confirmation of a activity type for a process/ Production order - values get posted to secondary cost element which has been assigned to a acitivity type.  This means only a impact in controlling but not in FI
    How woould the booking happens in FI ?is it not required to book in FI, if yes, why.
    Please suggest.
    Thanks.

    Hi Daya
    1. You can calculate activity price for plan in KSPI and for actual KSII for respective CCtr and activity type...but some times people manually update price at KP26 directly which in my opinion is not right way because price is either more or less than the real calculation in KSPI and KSII...
    2. However in your case price is directly updated in KP26 against activity type..when confirmation is done in order this rate * activity qty is your value posted in order level and at the same time respective CCtr is also credited by this amount which you can see in CCtr report
       Example:  CCtr  XXXX01
                       Activity type 999999
                       Sec cost Element for activity type 999999 (43 cat)
        Suppose you have booked FI entries for some expenses like Salary in F-02/FB50...against CCtr XXXX01   So your CCtr XXXX01 is debited by Salary amount and this amount will be absorbed in product through activity for which you need  activity price and confirmation.
        FI entry is booked your expense in GL a/c Salary and same time debited your CCtr through CE salary....Now when you charging this expense in product through prod order you are doing it through confirmation of activity qty which in turn calculating value by taking price from KP26 and qty from confirmation.
    Kamal

  • Confirmation CO11N - Activity Type

    Hi Gurus
    Is it possible to modify CO11N (Time Ticket)  screen to include Activity Type while entering confirmation for the operation.
    The reason I’am asking this is because I have a situation at my clients place that the same operation can be performed by Operator as well as Engineer. Since Operator and Engineer have different activity rates, is it possible that they can enter Activity Type while confirming the Operation.
    Any solutions for this would be deeply Appreciated.
    PS: I know this can be done if we have HR Module implemented where in we can link personnel number to capture cost, but right now client is not going for HR Module.
    Regards,
    Aravind

    Hi Pradeep,
    Thanks for the advise.I thought of this too and suggested client about this.
    They were apprehensive that what if they didn't select the right activity type while confirmation, meaning to say that if Operator selects Engineers activity, it could have lot of repercussions from costing point of view.
    One more point to clarify is that the Operation will be done either by Operator or Engineer but not by both at the same time.
    So i was working on this line whether they can select activity type directly at CO11N rather than entering time in respective activity.
    SAP has this kind of option for network confirmation(CN25 , Project System Module) where in they can select the activity type in the confirmation screen. I was looking for the same kind of option in CO11N.
    Not sure why SAP has not given this option in CO11N, i don't see any contradiction of logic here.
    Regards,
    Aravind

  • Process order confirmation without 101mvt type

    our client is  a process industry.client need during process order confirmation Background 101 not happen.
    Step : 1 Process order create
    Step : 2 Goods issue The material -261
    Step:  3 Process order confirmation   (No 101)
    Step:  4 Goods Receive (MIGO) 101 happen 
    Following Steps Process only,
    cork-only activity confirmation only,after Activity  confirm GR will Happen , how to configure in the system,any user exit or sap note there in the sense tell me?
    Thanks For Advance

    Hi Thiyaharaajan,
    For Goods issue i believe you are using MB1A/MIGO. You also use backflush to automatically issue the material during confirmation.. For this maintain Backflush - 1 in material master MRP 2 view.
    Also during confirmation for doing Auto GR (101 movement type) you need to assign the control key ticked with Auto Goods Receipt for Last operation/phase of Master Recipe.
    Thanks & Regards,
    Ramagiri

  • Restrict work order confirmation without activity price in KP26.

    HI Guys,
    we are maintaining the activity price in KP26 for mandays activity and confirming it in IW41. Now if activity price is not maintained in KP26, and confirming the mandays in IW41, system should through an error message. please let me know how can i do this.
    Anil Kumar. V

    Hi
    you can check the SPRO in Define Control Parameters for Completion Confirmations where you can mark the Actual cost , and Termination for incorrect act cost. where in it will through an error which confirming the same.
    If the above conditions don't met your requirement you can check the same using user exit
    Regards
    Thyagarajan

  • How we calculate product cost  without taken activity type

    Respected sir,
    pls tell me without taking activity type costing can we calculate product cost? is it possible through Overhead costing to  calculate product cost?
    or if we taken quantity base costing how we calculate each product cost?
    please help me.......
    Than'x
    Dhananjay

    Hi
    Without Activity type you cannot calculate Operation cost. It is not good practice. Why you want to do like this. Please explain.
    I think Over head cost can be calculated without operation cost.
    Regards
    J. Saravan

  • Activity type in time sheet

    Hi all,
    In PS we donu2019t capture any cost. In such case, While entering timesheet, the system through an error message, to enter sender Activity type and it is not allowing to enter timesheet.
    Now, what should be done to skip entering activity type and enter timesheet without entering activity type?
    I guess it is controlled through work center, by not maintaining costing tab, but the system does not allow to save the work center without entering the cost center under costing tab.
    Please suggest, in entering time sheet without activity type
    Thanks,
    Chandru

    Hi,
    Go to --> SPRO --> Cross Application Components --> Time Sheet --> Settings for all User Interfaces --> Time Recording --> Choose Fields -->Data Entry section --> Activity types
    Double click and in reference to data entry profiles we can restrict the entry for the activity type whether it is required / Display / Hide / Input.
    Check and confirm whether the problem is solved
    Regards,
    Selva

  • Eliminating the use of Activity Types -- what are the impacts and risks?

    Our primary FI stakeholder wants to eliminate the use of Activity Types in our ERP 6.0 system.  He would prefer the use of cost elements and cost centers.  I know that the elimination of using Activity Types will impact our planning processes plus our ability to segregate costs within a cost center.  What else am I missing?

    Hi,
    I can't understand the idea of "eliminating the use of activity types"...
    What about direct activity allocation (based on time confirmation using activity types)? Is there no need to do so? Don't you use production orders?
    best regards, Christian
    Edited by: Christian Ortner on Mar 29, 2010 8:19 PM

  • CRC3 shows six activity type

    I want to confirm eight activity type in order confirmation, do i need to use 2 orders? because CRC3 only allow six activity types.
    any better solution? thanks
    I was given eighty process order which are already confirmed, is there any report which can show activity confirmation hours for these orders and then download to excel?

    In Process Industries you need to add setup as standard value, in order to calculate costs for this activity.
    The activities you can confirm in a phase are related to the standard value key of the resource of the phase / operation.
    So, if there are 8 or 9 different activities, you should need to define two different standard value keys
    first , for activities 1 to 6
    second for the 7th and 8th activity.
    Crete two resources, the main wiht the first SVK and the sceondary with the second.
    Use both in the master recipe / order , in the same phase, the second as secondary resource. You will confirm up to 12 activities.
    Hope this helps.

  • PM Order Confirmation using Personnel's Cost Center and Activity Type

    Hi All,
    Is it possible to have PM Order confirmation (IW41) using Cost Center and Activity type from Personnel instead of default from Work Center?  If it is, can it be done with some configuration or user exit?  Please advise.  Thank you.
    Dai

    Hi friend,
    Order confirmation will be done for order operations.While doing confirmation we post the actual work done by the repective work center and respective activity type assigned to the same workcenter.
    But these activity types are assigned to cost center for cost calculation.confirming the respective operation in maintenance order through workcenters gives the report of planned work and actual work done by the respective workcenter.
    We cannot confirm the operation using costcenter and activity type directly through transaction IW41.
    If you want to develop new confirmation screen and making confirmation of the respective order operation with only costcenter and activity type fields, you can do it .
    Regards,
    Pardhreddyc
    Edited by: Pardhreddyc on May 17, 2011 12:45 PM

  • In PP PDC Interface IDOC Message 53 , But Not Confirmed

    In PP / PDC Interface is to update confirmation to the SAP system that were entered in the subsystem by IDOC.
    In the incomming message status "53 Application document posted".
    But the confirmation has not came.
    Kind Advice .
    Prasanna

    Hi,
       As you are saying that, status is 53 and conformation is not coming. Actually, there will be some table , which will be updating the conformation to SAP. First check that table. status doesnot depend whether your conformation is there are not. it purely, related , how you have written your code and updating the status.
    thanks
    manju.

  • Activity Type Mandatory in Repetitive Confirmation

    Dear guru ,
    When I run confirmation (MFBF/MF42N) i can post actual activities for a specific operation.
    I have one of this activity not relevant for controlling , itu2019s only used as statistical object for PP.
    Why the system consider the activity type as mandatory for every standard value parameters ?
    Can I have a chance to avoid that all the activities are relevant for controlling ?
    Thanks.

    Dear ,
    For the same operation i have one standard value relevant for CO and one standard value not relevant for CO.
    For the not relevant in view costing of work centre if I set no activity , in MFBF the standard value isnu2019t displayed and I cannot enter any value.
    If I set an activity in view costing of work centre the system required an activity type in MFBF.
    How can avoid in MFBF (posting actual activities view)  to enter an activity type but to confirm a quantity for a value not relevant for CO ?
    Thanks

  • Confirmation of PM activity types in Plant Maintenance or Controlling

    Hi,
    Can anyone tell me if there is a possibility to Confirm activity types of PM workers on PM orders? Which transaction is used for this?
    I would like to settle indirect costs of PM Cost center to PM orders. The tracing factor in this case would be the PM activity types confirmed by the PM workers.
    However, I don't know the PM module and I don't know whether it's possible to confirm activity types using some PM T-code?
    Should I use for this purpose KB21N (enter direct activity allocation) in Controlling, or is confirmation done somewhere in PM module?
    Best wishes,
    Karol

    Hi,
    You are right...
    Confirmation of the activites are always done thorugh PM module transaction only... if i am not worng T.code IW41.. any how check the t.code otherwise consult to your PM consultant
    Only very rarely KB21N is used to rectify or to add some xtra cost
    In day to day lifr the confirmation is done by PM department not by costing department.
    As suraj written for planning activity you use KP26.
    Yah..for allocating the indirect cost to PM order where the basis of allocatio is on confirmed activity cost...this is a simple case of using costing sheet in PM order... where in Base put the activity allocation cost element which you have used in activity type master data and in over head key put % and in credit put cost center which incurrs the indirect expenditure and
    the costing sheet assign in the valuation variant of the order type of the PM order..
    Hope i am clear to you...
    IF helpful assign the points..
    Cheers
    PK

Maybe you are looking for

  • ADFBindingFilter error while deploying a war to WLS server using jdev 12c

    I've a OSB Server setup using XBUS_MAIN_GENERIC_120131.1402.S which is using JDEVADF_MAIN_GENERIC_120102.0032.6211. Launched the 12c Jdev and created a simple adfc web application with a test.jspx page and deployed in the OSB Server. The web app depl

  • Hooking up my guitar to my mac

    ok, maybe its me maybe its not, but i dont get it. is there a way to hook up my guitar to my mac via the mic jack? so far, the only thing ive tried (can try for the moment) was to connect my guitar to my amp and had another cable running from the hea

  • Business Process Performance Tuning

    Hi Pals, I would like to request your help and inputs regarding tuning performance of Business process for my scenario. I have created a synchronous Process with 3 message mapping transformation steps. ( inbetween Sync Receive and Sync Send steps). S

  • Crash when viewing

    When viewing phots in slide show on MBA iPhoto shuts down. I have not used iPhoto previously for viewing, but instead mostly for organizing photos. Transfered a few large sets of photos to view on TV using MBA. Worked fine for about 50 photos but now

  • How to calling 1 800 numbers and then input confer...

    I know that I can call 1-800 numbers in the USA but I need to be on a conference call via  1-800 number on Monday.  Once the 1 800 number is answered, a voice asks me to enter the code to join the conference call.  how do I do that as there is no key