Plan cost & Actual cost in KKBC_ORD for CO Prdn Order

Dear Experts,
We are not able to findout the why difference is appearing during T code KKBC_ORD order analyse for Raw materials, please suggest wht may be the wrong thing in the order?
Before this i would like to brief you on the process.
Raw matls are created with "V" as price control. & Finished Goods as "S" control.& we create one BOM. Say example
My finished Goods will be 500555 code & Raw matl code will say 1001010 & 1002020.
My BOM will contain these raw matls with qty of 1kg each.
FG code 500555 of 2kg Bag
Items are 1001010 & 1002020 of 1kg each.
Here my mvng price are 2 & 4Rs for raw mtls 1001010 & 1002020 respectively.
In Material master we define overhead key as 10% to a Finished goods (500555) in Costing view.
1) Now i create a Base planning object T code KKE1 & I update the 10% as overhead cost & raw matls qtys as per BOM.At the end you can see the overall manufacture cost of the FGs in this case you will get for
FG 500555 about 6.6Rs. then save it.here it is done for 1bag only.
2) Create a CO PRDOUCTION ORDER T code KKF1 system will generate one number & save it. Now go to KKF4 add the base planning object name & enter the required qty say 10 bags...
You can see the COGM will now 66Rs for 10 bags as per the planning.
3)Goods issued to Order 261 with refc to BOM & Order number entred qty as 10. Sytem will calculates the qtys of raw mtals based on 10bags & save it.
4)Goods  receipt done against CO PRDOUCTION ORDER (Finished  goods 500555).
*5)KKBC_ORD i hav updated the CO PRDOUCTION ORDER & choosen cost trend. Here i am seeing a diffc in actual cost column & variance of 26%.but how it is possible*
Regards
TG

I can think of a couple of areas where there may be differences.
First, your CO order is probably not getting any overhead costs.  Your base planning object had 10% overhead built into it, but that is only for developing the preliminary cost estimate for the order.  The allocation of actual overhead must occur through some other method (i.e. overhead costing sheet, activity allocation, or template allocation).
Second, the actual material costs assigned to the order will be based on the material's inventory valuation at the time they are issued to the order.  Since you said the materials are valuated at weighted average cost, it is possible that their inventory valuation changed between the time the base planning object was created and the time they were issued to the order.
thanks,

Similar Messages

  • Planned vs Actual Cost Report (with variance) for PM Orders

    Hi Experts,
    We are using the project system to collate order costs for annual shut work.  We have a requirement for a report to show 25% variance between planned and actual order costs (maintneance order).
    At this stage, we dont mind whether this is implemented in the the PM system, or the PS system.
    This is a fairly basic / common requirment.  Are there any standard transactions we could use to:
    1.  Select a list of orders using standard selection criteria.
    2.  Select a % for variance, e.g. 25%
    3.  Display a list of orders where the planned vs actual costs were greater than 25% and what the actual variance is for each order?
    Thanks,
    Maikel

    Hi Maikel,
                   I have never seen any such scenario, but the best thing that can come to me is for the shut down activities you muct have created a Revision, then based on that Revision you can take a dump of all the orders with Planned and Actual Cost, in the excel, and there by putting the formulae you can definitely have the Varience report.
    Hope it helps you.
    Regards,
    Yawar Khan

  • Function module for calculating planned and actual cost of production order

    Hi ,
    Do we have any standard function module for calculating planned and actual cost for production order?
    i need to implement this in a Z-report.
    Thanks
    Srini

    Hi,
    try below function module
    CRMCO_GET_PLAN_ACTUAL_COSTS
    CO_IH_GET_PLANNED_COSTS_TOTAL
    Regards,
    Sankaran

  • Cost Analysis: Planned Vs Actual Cost Variance for cost

    Hai
    Which is the standard cube for "Cost Analysis: Planned Vs Actual Cost Variance for cost"?
    Because i need these fields
    Cost Element
    Actual Cost
    Plan cost
    Debit Posting
    Credit Posting
    Controlling Area
    Cost Centre

    Hi nvr,
    Cost Element : Cost Element nothing but a which product your spending
    Actual Cost : How much amount your spend on particular product
    Plan cost : How much amount you need to spend on particular product
    Debit Posting : In Accounting they are doing one positng that is depend on Debit and Credit.
    Credit Posting:
    For Exp: your parchase one product RS.500/-
    In FI they are posted like this.
    Product Name DR.(Debit) 500
    to Cash                                      500 (Credit)
    here product name is debit posting
    cash is credit posting.
    Controlling Area : Which area your spending the money
    For Exp: You have Man.Company your doing some processes which process that cost is spend nothing but a Controlling Area.
    Cost Centre : cost Centre nothing but which process.
    Hope its' helps .
    Thanks and Regards,
    Venkat.

  • Table for Production order planned and Actual cost

    Hi Experts,
    Can anybody please tell me the name of table where Production order planned and Actual cost gets saved ?
    Thanks in advance.
    Regards,
    Bijay

    Table COEP
    don't forget the points

  • Planned cost & actual cost are same in process order.

    hi,
    I have created new order type for process order.
    when i made process order & i  going for  confirmation in cor6n , on screen fixed & variable overheads values are coming which system had taken from receipe.
    when i did changes in that values which are in hrs & confirm & settle the order, in cost analysis plan cost & Actual cost was seem to be same.
    I dont get why this is happen ? is there any config in order type.
    thanks in advance.
    regard
    sanjay.

    Check in cost analysis, IN plan VS actual Is activity is available?
    I feel U haven't maintain activity type in costing view of workcenter

  • Table of planned cost & actual cost

    Dear PP experts,
    I want to create Zreport. for that I want the table & field of planned cost & actual cost. Please tell me.
    Thanks
    Jayesh
    SAP PP

    Dear.
    Planned and actual costs of prod order from COEP, COSS, COSP S027 tables
    production order shows the planned cost based on the quantity structure.
    Please refer my reply in this thread for details,
    Re: Actual Halb Material Cost
    Regards,
    R.Brahmankar

  • Planned and Actual costs at the Activity level

    Hi all,
          Can you tell me if there is a R/3 report which lists out the planned and actual costs for a project and displays it for each network and activity? I want these values at the activity level.
          I found a report which lists out these values for each network, but I cannot drilldown to the activity level. Please help.
    Thanks,
    Satyajit.

    Hi,
    There is setting in network type. Please go through transaction OPUV  i.e.
    Change view- Network type paramaeters : overview " Overview.
    Uner Network type parameters there is one radio button in front of ActvtyAcctAssgn. Just activate it.
    Hope this helps.
    Regards
    Tushar

  • Marketing Planning Planning and Actual Cost

    Hi
    We have a clinet requirement, where they want Marketing Planning functionality to be implemented. They want to use Budget Planning and Actual cost tracking functionality. Now as per my understanding we use SEM/BI for planning (Key Figure) and PS or COPA integration for Actual Cost Tracking.
    Is my understanding correct and what are the steps required for the two. Client has currently implemented SEM/BI and ECC, but PS is not in scope. So we will have to capture Actual Cost using COPA.
    Thanks & Regards
    Hits

    Hi Hitesh,
    The below link could answer your questions
    http://help.sap.com/saphelp_crm70/helpdata/EN/46/606830234f0db7e10000000a1553f6/frameset.htm
    Hope this helps,
    Regards,
    Naveen

  • Target cost = Actual cost

    hello,
    in our MTO, the target costs vs actual cost story runs smoothly
    in our make to stock process however, the target cost = actual costs.
    Where is the steering for this? can it be changed?
    kr
    Nico

    In our deployment we use this feature (Target cost) and it does not represent actual costs.  Our OKV6 screen shows the control costs are actual, but target is from Current Std Cost Estimate.  It is my understanding that this approach makes the Target costs show the received parts in make-to-stock at standard costs.  This is useful when your order is set to make more or less than what was actually received.  The Plan will show the planned quantities at standard.  Imagine you create a job to make 100 units, but only receive 70 units and TECO the order short.  The Target would show the plan quantities times 70% rather than the entire planned values to make 100 units.  Each view (Plan, Target and Actual) have their own use and benefit.

  • PS (plan vs actual costs) Report

    Hi,
    I have to generate the above report. How can I diffrentiate between Plan cost and actual cost. Is there any business contect report for this ? can anybody throw light on this.
    Regards,
    Bill

    Hi Bill,
               There is no std content for this as far as I know , Not sure if your report is based on cost for a given version then its really a mystery . If you are looking to pull the cost for PS then check the table RPSCO in r3 , this is the PS cost table , and you can differentiate Plan/Actual based on the Field Value type .
    hope this helps ,

  • Target cost, planned cost, actual cost difference

    Hi!
    As per my understanding , the target cost, planned cost, actual will be calculated like blow:
    Actual cost = Actual quanity * Actual price ( standard price or moving average price) existed at the time of goods movement.
    Planned cost = Planned quantity * Planned price ( standard price or moving average price) existed at the time of production order release based on valuation variant strategy.
    Target cost = Planned Quantity * Actual price ( standard price or moving average price) when calculating variances.
    whether above formulas are correct?
    I have one scenario, where in process order, I am not seeing Planned quanity for compoenent/raw material, but target quanity is existed. How it is possible. When I have checked the BOM in process order, the BOM does not contain the componenet.
    regs,
    ramesh

    Hi,
    Target Cost = Costs as per the standard cost estimate * Actual Qty delivered.
    For e.g. Std cost for one unit of material-x is as follows.
    RM 1 - 10kg * 10 /-  = 100
    Activity 1 - 5 Hr * 50 /-  = 250
    If the actual delivery from the production is 2 units, then target cost will update as
    Under Goods Issue, RM 1 - (10kg*2units) * 10 /- = 200
    Under Confirmations, Activity 1 - (5 Hr*2units) * 50/- = 500
    Total = 200+500 = 700
    Target cost for goods issue/confirmation of activities will update only when the Goods receipt has been done but not at the time of goods issue or Confirmation of activities.
    Target cost for Goods Receipt will update only when the variance has been calculated for the order.
    Regards
    MadhuSekhar Gupta G

  • Differentiate Planned Cost, Actual Cost & Targeted Cost

    Hello Friends,
    I am searching for job and went for interview in Wipro. They asked me the difference between Planned, Actual and target cost..... I tried to search on Google and SAP Blog's but couldn't find the appropriate or understandable answer yet, So it would be great if you you can guide me a bit on this......
    Thank You,

    Hi,
    Any PP related queries you can search in Forum ERP: Manufacturing.
    Pls refer the link.
    planned cost and actual cost
    Thanks,
    nandha

  • PLANNED AND ACTUAL COST IN A PROCESS ORDER

    From where the planned cost of material and activity types in cost itemizationafter creation flow ?From where the actual cost of a material and activity types in  cost analysis of process order after confirmation flow?

    You may be knowing you give Costing Variants ( Both actual as well as Planned ) in Order type. These Costing variants contains Valuation variants which says which costs are to be taken while creation ( for Planned Cost ) and Actual cost ( while confirming and Moving Goods) to be calculate. These Variants decides mode of Cost Flows.
    Now, Data in Planned costs are Standard Cost figures or Current prices for material or Planned Prices of Activities.
    As far as Actual costs are considered it may be the price for the consumed quantity @ the moving average price of the day or activity price for the qty. consumed which include up planned consumption too.....
    Reward if you find useful

  • Product Costing: Actual Cost by Component

    Hi SAP Gurus,
    Products are manufactured in plant X, and have all the standard cost components (MP, DL, FOH, etc.) that one would expect of internally-manufactured skus. Traditionally, these products were shipped from Plant X to Plant Y and then to Plant Z. Once sold out of Plant Z, the actual Cost of Goods Sold (COGS) in the system likewise includes costs for MP, DL, FOH, etc.
    However, last year we started also selling product directly from Plant Y. On Looking in ZCO_ACTUAL_COST(Actual Cost by Component), we see that, when sold, a given SKU is treated as a purchased finished good. That is, all of the standard costs & variances associated with the sku are aggregated into Purchased Finished Goods, a materials account. Because SAPu2019s actual cost has zero for all other line items (i.e. DL + FOH), the system generates favorable variances that eliminate these standard costs.
    Please note that the issue is not standards (which appear to be fine) but actual cost allocation upon sale of the product.
    Summary : The issue is that product sold out of Plant Y is incorrectly treated as a purchased finished good, instead of as an internally manufactured item.This is an issue because our materials costs are then overstated and other costs are understated
    How to show the product sold from Plant Y as internally manufactured Item. (with Cost Components M+P, DL.FOH etc) like how it was showing for product sold from Plant Z?
    Regards
    Jaswanth

    Hi Ajay,
    In the material master for the material, I verified that the Price control is set as S( Std price) for both the Plant Y and Plant Z.
    And the issue here is with the Actual Cost component and not the Std cost component. Can you please clarify where in MRP view for Plant Ywe need to set the indicator as transferred from Plant X.
    Also I verified that the valuation class for Plant Y and Plant Z is different, ( For Plant Y it is set as Mfg Fin goods and for Plant Z it is set as Purchased Fin goods). Is the Actual cost component split has any relation with this Val class setup.
    This is how the Actual Cost component looks
    Mat No   Plant   Raw Mat  Packaging Mats  Pur Fin Goods  Direct Labour  FOH
       A          Z         XX              XX                     XX                         XX            XX
       A          Y           0                 0                     XX                          0                0
    All the cost for Plant Y is rolled to Pur fin goods.
    Kindly give your inputs
    Regards
    Jaswanth Kumar

Maybe you are looking for

  • Comma in long text of routing comma is appearing sepecial character

    Hi Experts, When I am trying to insert comma in long text of routing comma is appearing as sepecial character like <<,>> in long text preview. Please advice how insert comma. Regards, Sandy Edited by: Sandy2 on Apr 20, 2011 10:30 AM

  • Disposition Area (MRP) in MM02 (BAPI_MATERIAL_SAVEDATA)

    Hi All, My mass upload program uses the FM BAPI_MATERIAL_SAVEDATA. Now I want to develope a mass upload program to create the disposition area of MRP. Q: Does someone know a FM or Global Class method that I can use for the mass upload program ?? Blac

  • Source system activate error

    Hi, I have created new source system for R/3 quality , when i am activating then getting following error. Kindly suggest how to resolve this error. Thanks in advance. BI unknown in source system     RSAR     8      BI IDoc type ZSDB018 is not the sam

  • White square when using Falsh 7.0.14.0

    I use an old program about d-day and the last months of the second world war. There are maps, newspaper reports, photos and also videos on. On the DVD disc is Flash player version 7 included. On my PC is, of course, the latest version of Flash Player

  • HTML Email Newsletters

    Hi, Im tying to find out the best way to create HTML email newsletters but cant find a good starting point, in terms of what application to use (if any) and a sample template? Thanks in advance.