Planning in Plant Maintenance using MCB.

Hi Experts,
My client is into Mining Industry. This is a Greenfield SAP Implementation.
Client is not clear with the Planning requirements in the Plant Maintenance module.
Therefore, I have suggested that all the Standard Businenss Content Extractors and relevant Queries will be delivered as part of Maintenance Planning.
I tried but could not find any Plant Maintenance Planning (MCB) related DataSources and Queries in the BI 7.0 Business Content page @ http://help.sap.com/saphelp_nw70/helpdata/EN/f6/7a0c3c40787431e10000000a114084/frameset.htm.
Could you please help me with this?
Thanks in advance,
Chandu

Hello Chandra,
We are in the Health Care sector and I have a similar requirement as of yours. We are not really sure what all we would require from PM, so we are thinking to go ahead with all the Business Content Reports and I have been asked to install all the Cubes, DSO's, Extracots, Reports Etc, Etc....
I just also have the above link in my hand and it doesn't give us a whole lot clear picture..? So how did u carry out with your requirement? What all you ended up installing? Please do share it, will be a great help for me.
Thanks in advance, Venu.

Similar Messages

  • Planning for plant Maintenance and CS (MCB)

    Hi there
    We are looking into implementing the Budtet Planneing for Plant Maintenance and Customer Service (MCB). However vi lack som information regarding the complexicity in this solution.
    Does anybody knowledget about the time and resources needed for implementing this?
    Chris

    Hello Chris,
    this is like asking how much a car costs. It's not possible to answer it with a lot more information about the business requirements.
    Regards
    Marc
    SAP NetWeaver RIG

  • Intergration of Production Planning with Plant Maintenance (SAP Modules)

    Our SAP Implentation Consultants are creating work centres in Production Planning which are different to the workcentres in Plant Maintenance as follows.
    Work Centres in PP
    Mixing
    Blowing
    Filling
    Packaging
    Work Centres in PM
    Mechanical
    Electronics
    Electrical
    My observation is that in PM the work centres should be identical to PP work centres. whereas Mechanical, Electronics and Electrical should be configured as divisions or departments. The idea is that by having PM WC identical to PP WC the costing will be simplified.
    looking forward to expert's advices, please
    Amjad

    I am locking this thread in PI forums. Ask your question under SAP Solution forums
    /community [original link is broken]
    Regards,
    Prateek

  • Budget Planning for Plant Maintenance

    Explain functions for Budget planning through SAP BW-BPS (SAP Business Information
              Warehouse)

    SAP has the MCB functionlity for this.
    With maintenance cost budgeting (MCB) functionality, SAP offers a product life cycle management cross-application component supplying a solution for planning a maintenance cost budget. A MCB in general is a budget for all costs for maintenance, inspection, and repair of technical assets. In the stricter sense of SAP R/3 software, a MCB is a budget for PM order costs.
    MCB provides the following planning scenarios with pre-configured standard entries:
    - The history-based scenario is history-based and the budget categories are combined in one overall planning scenario. This scenario can create records with budget categories “preventive”, “planned” or “unplanned.”
    - The ad-hoc (hist) scenario
    - The maintenance plan scenario is zero-based and can only create records with budget use “preventive.”
    - The task list scenario is zero-based and can only create records with budget use “planned.”
    - The ad-hoc (plan) scenario is zero-based and can create records with budget categories “planned” or “unplanned.”
    The benefits of an appropriate budgeting tool include:
    - Tool to drive down maintenance costs
    - Better data integrity than spreadsheet-based budgeting
    - Access to your plan data from everywhere with a user-friendly front end (Web interfaces)
    - Ability to reflect changes in near future
    - Flexible and accurate reporting
    - Integration with other enterprise systems
    - Data extracted automatically from back-end system
    - Reduction of the budget preparation time
    - Continuous planning with standardized, automated budget processes
    - Better transparency of the budget planning process
    - Support of planning as a company-wide effort, with a great number of managers and employees contributing
    - Not just a tool but analytical applications
    Regards,
    Paul

  • Plan cost in Plant maintenance order

    Hello,
          I need to show plan cost in plant maintenance order on the report. It appears in the cost tab (overview tab inside the cost tab). Please let me know if you know any function module.
    Regards,
    Eswar.

    Try
    CALL FUNCTION 'PM_WORKORDER_PLAN_COSTS_SET'  
    Standred program is using this FM and it has table " PMCO "<b>
    include = LCOIHF2Y</b>
    Hope this’ll give you idea!!
    <b>P.S award the points.</b>
    Good luck
    Thanks
    Saquib Khan
    "Some are wise and some are otherwise"<b></b>

  • Use of Alternate BOM in Plant Maintenance

    Hi All,
    Please let me know the use of Alternate BOM in SAP PM.
    Sundar

    From SAP Help.
    The BOM structure is reflected in the different technical categories of BOM provided in the PM system:
    Simple BOM
    The first BOM that you create for a technical object or material has no defined technical category and a simple structure. It is described as a "simple BOM".
    Variant BOM
    Variant BOMs have a more complex structure. They are used to group together several BOMs to describe different objects that have a high proportion of identical parts.
    Multiple BOM
    Multiple BOMs have the most complex structure. They are used to group together several BOMs to describe one object, for which different combinations of materials are used for different production methods. Multiple BOMs are usually used in production planning and have little or no use for plant maintenance.
    Note: There is no concept of Alternative BoM for PM.

  • Plant Maintenance - Linkage between Task List and Maintenance Plan

    Sir,
    In Plant Maintenance, I have an equipment for which there are 9 maintenance activities that have to be performed every year. Out of these 4 activities will be carried out every month. 1 activity will be carried out during the months of February, June and October. 5 activities will be carried out only in the month of December.
    I need to create Task List for all these activities and subsequently create Maintenance Plans for all these Task Lists.
    Can I group all the 4 activites which will be carried out every month into one single Task List, with separate operation nos and time against each activity?. I don't know whether it is correct or not.
    If I use the above method I can create 3 Task Lists for this particular equipment with same Group no and 3 Group Counters.
    How to create Maintenance Plan for the above scenario?.
    Eventhough, 4 activites are carried out every month and they have been grouped into a single Task List (Group counter 1) and if these activites are carried out on different dates within a month how can I create Maintenance Plan and subsequently create a Maintenance Order?.
    I need some help in this regard. A detailed reply will be helpful.
    Can anyone throw some light in this regard.
    Regards,
    R. Vijayakumar

    you need to create one task list with a maintenance strategy with packages and hierarchy to outline the work requirements i.e. some tasks to be carried out 3 monthly some 4 monthly etc, and also if common tasks appear in 3 monthly package vs 4 monthly package then to suppress the duplicating task
    you would then define a strategy based maintenance plan and run it to get the respective maintenance orders

  • Can I do plant maintenance cost planning in functional location wise?

    Dear Experts,
    My customer plans to prepare annual plant maintenance cost planning in "functional location" wise.
    Can this be done?
    If yes, what are the steps?
    regards,
    Abraham

    Abraham,
    You could do it indirectly in ECC using a cost centre for each FLoc. You can then plan the costs in the cost centre
    PeteA

  • What is the use of service entry sheet in plant maintenance module.

    Hi Expert,
    I want know about, What is the use of service entry sheet in plant maintenance?
    Regards,
    Ram Rathode

    Hi dear,
    Service entry sheet concept is used in all the modules.
    Service entry sheet is created to do the service confirmation and to pay the vendor for the services which he has performed.
    Based on the service entry sheet invoice is booked by Finance.

  • Using SmartForm for Plant Maintenance service order processing

    Greetings everyone,
    I am working in R/3 4.6C and I have a SmartForm that I would like to configure as a shop paper in plant maintenance and print along with various types of work orders.  However, the config in this area only allows configuration of SAPscript forms with print programs and form routines. 
    Does anyone know if there is a way to configure or convert a SmartForm so that I can print it as a PM shop paper?
    I will definitely reward helpful answers/solutions.
    Thanks,
    Geoff

    Thanks for the quick response, Anji.
    So just to be sure, there is no way I can configure this form to work with the shop paper config, correct?  If I want something to automatically print with different work order types, I guess I have no choice but to use a SAPscript form with a print program?  I am just not clear on what you mean when you talk about the Z t-code, since I never want to execute this form directly, but always automatically in work order printing from IW32 or similar transactions.
    Thanks..
    Geoff

  • Actual & planned costs calculated while creating Plant Maintenance Order

    Hi All,
    I would like to know how the actual & planned costs calculated while creating Plant Maintenance Order (PM Order)
    Thanks,
    Ajay

    You need to create an activity rate for 2014 for cost centre 51260201 and activity type NAHG20.
    This can be done via transaction KP26, but is usually performed by your Finance team.
    PeteA

  • Maintenance plant & maintenance planning plant

    Hi,Experts,
    Logistic plant is created by MM consultant.Why to create again maintenance plant & maintenance planning plant? can anybody please explain the logic behind it.Incase say, there is only one logistic plant created by MM consultant,if maintenance plant & planning plant is not created in this case how will it affect?can anybody pl explain this ?
    rgds
    mehbub

    Hi
       Please read SAP help you get complete deteails
    in brief logistic plant created by MM thats fine. As the Plant maintenance you need to have the Maintenance plant and Maintenance planning plant.
    If you consider logistic plant as Maintenance plant. for this maintenance plant you need to carryout the planning ie is thorugh maintenance plannig plant.
    so you need to assing to each other in the enterprics structure.
    bascially maint plant is plant where you perform the maint task and maint plan is the plan aganit the maint plant you plan the maintenance .
    regards
    krishna

  • Goods issue for plant maintenance order

    Goods issue with ref to plant maintenance order( Componenets of the order) is not possible in transaction code MIGO. Error message " MIGO is not possible for the refurbishment order".
    Goods issue for the same order can be posted with transaction MB!A.

    hi santhosh
    kindly check the order type .i think you are using MB1A for refurbishment process.but it is not possible.only maintenance order can be posted via MB1A
    follow the procedure for goods issue in refurbishment order.
    Choose Logistics ® Plant maintenance ® Maintenance processing ® Completion confirmation ® Goods movement ® Goods movement.
    The entry screen for a goods issue appears.
    Choose the pushbutton For order.
    Enter the relevant order number in the dialog box and choose Continue.
    An entry screen appears.
    Choose Copy.
    The Maintain Serial Numbers dialog box appears.
    Choose Reference document.
    Enter the order number in the Refurbishment order group box and choose Execute.
    A list appears with the planned serial numbers for the refurbishment order.
    Check the selections of serial numbers, for whose material you want to post a goods issue, and choose Copy.
    The serial numbers are copied into the Maintain Serial Numbers dialog box.
    Choose Exit window.
    The goods issue is posted.
    regards
    thyagarajan

  • Pur Req via Plant maintenance order

    Hi,
    When Non stock item is assigned to a Plant Maintenance order, A purchase requisition is created automatically for that item.
    During the creation of purchase requision it is required to enter goods recipient and unloading point( few fields are made mandatory)
    Issue: At this stage we are giving planne delivery time and GR processing time.
    But when we check the Purchase req for that item, Only GR processing time is considered not Planned delivery time.
    Please provide your suggestion, why planned delivery time is not considered for scheduling of purchase req.
    Thanks and regards,
    Nataraj

    Hi!,
    I think you should check the operation control key you are using. Whether that key allows 1. Externally processed opearation 2. allows the scheduling of externally processed operation. If both are true then it will take the standard values defined for that opearation for scheduling. if 2nd is not true then it will schedule as per planned delivery time.
    I think this will solve your problem.
    Regards,
    Uday

  • Urgent Issue in Plant Maintenance Module

    Dear Experts,
    We have requirement as described below, please give us your solutions / comments on this.
    We have GTC company which is having around 800 trucks for transporting the products. I n this company we have implemented SAP Plant Maintenance Module, as we have the maintenance activities done for vehicles.
    Under the same group of companies, we have PM1,PM2,PM3 companies which provide maintenance to GTC. These companies are not external to the group.
    When I raise a maintenance order for a vehicle then I will mention hours of work and material that need to be used in the activity. This maintenance work / labour is provided by PM1/PM2/PM3 company.
    In plant maintenance we have external service management, but that is for external vendors who provide service to GTC.
    But how to handle the same with internal vendors like PM1/PM2/PM3.
    Please tell me how to handle this kind of scenario.
    Thanks in advance.
    Nagesh

    Hi,
    this is a major topic and cannot be covered in a blog. Even if it can it will take a lot of time to clarify. So, first do your checks within your module. Check if u really need to treat the services from the other company as external services. You might as well create workcenters in the plants of the other companies. And make a single maintenance planning plant for all the plants in these companies. This will make a better solution technically. But think also from the perspective of the cost of this solution. Meaning, is it worth doing all the jobs such as maintaining activity prices, work centers in the other plants etc..
    In general, my suggestion is include the FI and CO consultants at least in the discussion. It will b good if u can have the MM consultant also during the discussion.
    Bala

Maybe you are looking for

  • Can't open IE 11 for users of my domain

    Hi, I have prepared a windows 2012 server standard r2, acting as remote desktop server At the beginning, all is ok but now (after some win updates ????), my users can't open IE 11 I have a blank page for 5-6 seconds and then ie 11 closes. I have test

  • Installation of Oracle 10g over Fedora 8??,

    Hi, I am installing Oracle 10g over Fedora 8 running on VMWare . Now the problem that I am facing is listed below:- --> When i try to run ./runInstaller, it gives me some following error Exception in thread "main" java.lang.UnsatisfiedLinkError: /tmp

  • Can I build templtes in OBIEE 10g??

    Hi, Can Ibuild any templates without populating the data into the particular tables in rpd? I have a requirement to show the templates first before the data get populated. Is this possible in OBIEE?? Thanks Pavan

  • Adding Internal Drives

    Hi, I'm new to Macs and hope you guy's out there can help me. I have emailed WD, and spoken to Apple support without success and spent hours looking through discussion group threads trying to find an answer to what appears to be a simple question; Wh

  • How do you upgrade to latest camera raw version?

    CS5 tells me I do not need an update, I checked and I am running version 6 something.  However lightroom is bugging me everytime I transfer a raw file to Photoshop that I do not have the latest raw and so may not open.