Planning plant in order

Hi experts,
Can you please advise on this..
My client has centralized planning.
Ex : 3 maint plant A,B, C.
       C is the planning plant for A & B.
Configured order types and assigned the planning plant C (IMG: Assign Order Types to Maintenance Plants).when I do like that Iu2019m not able to see the order types in  Define Change Docs, Collective Purc. Req. Indicator, Operation No. Interval .why is it so?
wheter we need to assign maint plants to ordertype and not planning plant?
Regards,
senthil

Hi ,
     Just a point to clear , MPP :- Maintenance Planning Plant is the plant where all the Maintenance activities are planned out
MP :- Maintenance Plant is where all maintenance activities are carried out.
So here order is created and planned in MPP and finally the work mentioned in Maintenance Order is executed  in MP , from above we need to have all the order type settings to MPP ..,even notification are created in MPP ..
In MP we can have Locations, Eqpts,F.loc ..
hope this is clear ,
regrds
pushpa

Similar Messages

  • How to change planning plant in Maintenance order

    Hi experts ...
    In maintenance order , depending on equipment , the planning plant gets defaulted . If Equipment is installed in another FL whose planning plant is different , the order's planning plant doesn't change (Greyed) . Is there anyway to change planning plant in orders
    NPB

    We have maitenance and planning plant same .Equipment was in maintenance plant XYZ and planning plant XYZ earlier . Now the same equipment is in maintainance plant ABC and planning plant ABC . In order , I am able to change maintenance plant  to ABC , but unable to change the planning plant to ABC .
    If I do not change planning plant and change only maintenence plant , what are the effects in cost reporting ? Since ultimately cost is settled to equipment cost center (which is now changed to ABC cost center) , I feel there will not be any effect . Old planning plant may only affect search right ? ....Please advise ...
    NPB

  • Priority field mandatory for planning plant-order type

    Hi
    Is there a standard way through configuration that I may contol priority field in order header to be mandatory for some order types only in one planning plant?
    Problem is that if I make the priority field mandatory for order type, it will be so for all the planning plants which i dont want. Also i dont want it to mandatory at planning plant level since there are many order types under one planning plant and requirement is to make priority field mandatory only for some order types under this plant.
    TIA.

    Hi Tehsin
    Thanks for the reply.
    In the transaction we can separately make it mandatory for either planning plant or order type.
    My requirement is for combination of both.

  • Order shop paper - default setting - can be restricted to planning plant

    Hi,
    We define Shop papers, through transaction code OIDF. Next we assign the shop papers for Order types through OIDG. Here, there is no restriction to Planning Plant.
    Is there any possibility, to make setting to restrict for Planning plant to print shop papers.
    For example,
    We have Planning plant 1000 and 2000.
    We have Shop papers Z001, Z002 and Z003
    We have order types, PM01, AND PM02.
    Here we made setting in OIDG,
    Doc type   Paper    Selection
    PM01        Z001          X
    PM01        Z002          X
    PM01       
    Z003       
    PM02        Z001 
    PM02        Z002
    PM02        Z003,         X 
    I think this is the possibility in SAP.
    Here we need to restrict with Planning Plant,
    Planning Plant    Doc type         Paper          Selection
    1000                    PM01              Z001            X
    1000                    PM01              Z002            X
    1000               
       PM01         
      Z003             
    1000                    PM02              Z001       
    1000                    PM02              Z002         
    1000                    PM02               Z003           X
    2000                     PM01              Z001           X
    2000                     PM01              Z002
    2000                     PM02              Z001            X
    2000                     PM02              Z002            X
    2000                     PM02              Z003            X
    Is this any possibility to restrict the default printing of shop papers with respect to Planning Plant with Order type.
    Please provide your suggestions.
    Raja 

    Raja ,
    Have you tried the the User Specific Print Control values (OID3).
    Switch-on the PM-Specific fields which opens the Plant field. Then make settings as required making sure the User field is "*".
    PeteA

  • Work Order - Maintenance Planning plant change

    Hi Gurus,
    Is there any way to change the maintenance planning plant in a created work order? We are having an issue on work orders and we need to tranfer our open work orders to another plants to solved the issue. Please me let me know if this is possible to do in SAP. And let me know how to do it in SAP.
    Thanks in advance,

    Hi,
    The start of the plan is not option as this will surely have an impact. Anyway, work around for this issue was provided and this is OK now. We will continue with the old orders untill such time they will finally be closed. No postings will be created against this old orders and if there's a need to do GR new orders will be created in new plants for the postings.
    Thanks for you help,

  • Change of planning plant in the production Order

    Dear Sapians
    Please suggest me how we can change the planning plant in the production order once it is saved and confirmed before taking goods receipt.
    Thanks
    GVRR

    Hi Prasanna,
    1. Order is with material
    2. This order is created independently
    3. yes there are dependent requirements
    Scenario is we have created Production orders with X plant. Later after confirmation and before GRN planning plant is changed as per the business decission. Now client wants to receive the goods in new planning plant.
    I want to know, How can business area and functional area help us to receive the goods in changed planning plant scenario. can we maintain the plant values in this fields.
    Regards
    GVRR

  • Change planning plant in production order

    Hi Gurus,
    my business scenario is the following:
    I have 2 plants that are assigned to 2 different company codes. Plant A (ordering plant) and Plant B (supplying plant).
    The users place a sales order on plant A and through MRP with special procurement key 80 the planned order is turned into a production order in plant B.
    But in the order confirmation the system tries to post the GR in plant A. Is there a way to change the planning plant of the production order at any time i.e in order creation or order confirmation? Because I need the GR against the production order to be done in plant B. Since the subsequent posting according to the business scenario would be after production, the goods should be sold from Plant A to Plant B via a sales order.
    Your help would be greatly appreciated.
    Panos

    Hi Panos,
    SPK 80 doesn't suit your requirement, since by design it is doing GR in the ordering plant.
    Alternatively you need to work with a SPK like 40, that is stock transfer from B to A. Just set up the intercompany process for this stock transfer.
    This way, when MRP in A detects a need for replenishment, a stock transfer requisition from B to A is created. Then MRP in B will create a planned order for production (that you will convert into a production order later). GR is in B. The stock transfer requisition is converted into a stock transfer order, and the actual transfer takes place.
    Check also this for more details:
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/f4/7d2d4d44af11d182b40000e829fbfe/content.htm
    Regards,
    Mario

  • Plan cost in Plant maintenance order

    Hello,
          I need to show plan cost in plant maintenance order on the report. It appears in the cost tab (overview tab inside the cost tab). Please let me know if you know any function module.
    Regards,
    Eswar.

    Try
    CALL FUNCTION 'PM_WORKORDER_PLAN_COSTS_SET'  
    Standred program is using this FM and it has table " PMCO "<b>
    include = LCOIHF2Y</b>
    Hope this’ll give you idea!!
    <b>P.S award the points.</b>
    Good luck
    Thanks
    Saquib Khan
    "Some are wise and some are otherwise"<b></b>

  • Change Service Order Planning Plant

    Hello -
    I have a business requirement for changing the Maintenance Planning Plant (CAUFVD-IWERK) on the service order mid stream during processing if a location can't handle the workload.  Rather than changing the work center and plant (CAUFVD-VAWRK), they want to flip the entire order to the central distribution center.  My issue is that the Planning Plant field is a protected field on the service order, and I can't find any configuration point to change this setting.  I can change this on the Notification, but then I have two service documents that are out sync with their org level assignments.  The business objective is to eliminate the step of creating a new order by flipping the planning plant assignment.  Any ideas?
    Regards,
    Nick Carmichael

    We have situations where orders are created by local Planning Plants for national customers, if they determine they cannot meet the demand for the order, they have the right to change the assignment of the order to the national planning plant.  Currently, the only way to complete this process is to close the current order and create a new order for the national planning plant.  The business requirement I am trying to meet is to allow a 'flip' of the order from one planning plant to another without going through the process of closing the current order and creating a new one.
    Regards,
    Nick

  • Actual & planned costs calculated while creating Plant Maintenance Order

    Hi All,
    I would like to know how the actual & planned costs calculated while creating Plant Maintenance Order (PM Order)
    Thanks,
    Ajay

    You need to create an activity rate for 2014 for cost centre 51260201 and activity type NAHG20.
    This can be done via transaction KP26, but is usually performed by your Finance team.
    PeteA

  • Make to order Planning Plant

    Dear experts,
    I have a configurable material which is produced in plant A and consumed in plant B. The customer order is created and cofigured in plant B. I want to produce my configurable material in plant A according to the customer order which is created in plant B. I can open the production order in plant A configured with this customer order but the planned plant is set B automatically by the system. However I want to issue(101) my material first in plant A and then transport it to plant B with stock transport order. But the system does not allow me to do 101 into plant A.  Is there any way to do this.
    Edited by: ahmet hasan on Sep 5, 2011 3:51 PM

    Hi
    Kindly ref to the below tables
    MCAFVGV : Versions: Order Procedure
    CAUFV: View "Order Headers PP/CO"
    Regards
    S.Senthil

  • BOM is not getting displayed in case of centralized planning plant.

    Dear All,
    there are 2 plants for which we have centralized planning. the users have created Equipment BOM for the two plants. but in case of the second plant for which the planning plant is different from the maintenance plant, the BOM is not getting displayed in the Maintenance Order (i.e. in the components tab).
    kindly through some light on it. whether i have to do some settings for it.
    Regards,
    Ritesh Kapoor

    Hi,
    Yes while using IH01, i have ticked the BOM explosion option, but when i am giving the plant there then only it is displaying the BOM of that equipment.
    Also when i am creating an order for the same equipment, then it does not displays the BOm & shows the message which i have written in my previous mail.
    Ritesh

  • Plant for PR in case of Centralized planning plant

    Dear All,
    In case of centralized planning, if a Service PR is created then  it is taking the plant as the planning plant & not the maintenance plant.
    For example: Maintenance pLant A & Maintenance Plant B have a common planning plant as "A" & if a PR is created for maintenance plant "B" then it is taking the plant as "A" & not the other.
    please suggest where we can change the plant in case of service pr created through the maintenance order.
    Regards,
    Ritesh

    Hi,
    The planning plant will always be passed to the purchase requisition as you have found. Only alternative is to use a user exit
    For components use exit COZF0002 (EXIT_SAPLCOZF_002). The exit is called on creating purchase requisitions for components from PM/CS orders. Customer exit COZF0001 can be used for external operations.
    This exit allows change of fields in structure EBAN_ORD_CUST. Field WERKS is not included in this structure but you can append this field to the structure.  After that you have to add a line into your exit (example):         
    ... move afvgd-werks to EBAN_ORD_CUST-WERKS...                      
    Through this method it should be possible to change the plant on the requisition.
    -Paul
    Use the forum Enterprise Asset Management (EAM) for PM/CS specific topics
    Enterprise Asset Management (SAP EAM)

  • Goods issue for plant maintenance order

    Goods issue with ref to plant maintenance order( Componenets of the order) is not possible in transaction code MIGO. Error message " MIGO is not possible for the refurbishment order".
    Goods issue for the same order can be posted with transaction MB!A.

    hi santhosh
    kindly check the order type .i think you are using MB1A for refurbishment process.but it is not possible.only maintenance order can be posted via MB1A
    follow the procedure for goods issue in refurbishment order.
    Choose Logistics ® Plant maintenance ® Maintenance processing ® Completion confirmation ® Goods movement ® Goods movement.
    The entry screen for a goods issue appears.
    Choose the pushbutton For order.
    Enter the relevant order number in the dialog box and choose Continue.
    An entry screen appears.
    Choose Copy.
    The Maintain Serial Numbers dialog box appears.
    Choose Reference document.
    Enter the order number in the Refurbishment order group box and choose Execute.
    A list appears with the planned serial numbers for the refurbishment order.
    Check the selections of serial numbers, for whose material you want to post a goods issue, and choose Copy.
    The serial numbers are copied into the Maintain Serial Numbers dialog box.
    Choose Exit window.
    The goods issue is posted.
    regards
    thyagarajan

  • Pur Req via Plant maintenance order

    Hi,
    When Non stock item is assigned to a Plant Maintenance order, A purchase requisition is created automatically for that item.
    During the creation of purchase requision it is required to enter goods recipient and unloading point( few fields are made mandatory)
    Issue: At this stage we are giving planne delivery time and GR processing time.
    But when we check the Purchase req for that item, Only GR processing time is considered not Planned delivery time.
    Please provide your suggestion, why planned delivery time is not considered for scheduling of purchase req.
    Thanks and regards,
    Nataraj

    Hi!,
    I think you should check the operation control key you are using. Whether that key allows 1. Externally processed opearation 2. allows the scheduling of externally processed operation. If both are true then it will take the standard values defined for that opearation for scheduling. if 2nd is not true then it will schedule as per planned delivery time.
    I think this will solve your problem.
    Regards,
    Uday

Maybe you are looking for

  • Why are my video podcasts playing slow?

    After installing the latest update in iTunes for windows, my video podcasts are playing in slow motion, but the audio is normal. I tried uninstalling, reinstalling, shutting down, restarting.....nothing works. Has anyone experienced this before?

  • No Value in VPRS Condition type

    Dear Experts While preparing a sales order , i am getting zero value against the cond type VPRS.It was working fine until recently this problem has started coming.In the Conditions details , it shows Incative-Inactive via formula of incorrect. the ac

  • Reinstall / uninstall / install on top???....Logic Studio

    I am missing many presets. Most of the Space Designer default presets,mastering presets ect. I did reinstall Logic.I think and I say I think because some people on this forum have said the installed Logic on top of their previous installation. How do

  • How to recover a deleted/overwritten mailbox in Exchange 2013?

    We had a mailbox in our exchange database 1 called, example, [email protected] And I had to create another mailbox called, example, [email protected], which I created in the same database. This either deleted or overwrote the first mailbox (@abc.com)

  • Compatability Issue with Mavericks affects Open GL?

    I run CS6 and CS5.5 on a 13" Mac Book Pro from Early 2011 with an Intel HD graphics 3000 chipset and 512 MB VRAM.  I just installed Mavericks, and now I cannot open Photoshop CS5, and the 3D function in Photoshop CS6 extended does not work.  I cannot