Process in QM for Calibration of guage & destructive material testing

hello all,
can somebody help for sequence of process and setting required in QM  to
- send the Gauges for Calibration to out sidevendor and receive back.
- To send the material outside for (destructive)testing and receive the material back and book it on scrap account.

Hi,
Refer the link below for calibration process thro PM in SAP.
http://help.sap.com/saphelp_46c/helpdata/en/fe/67f9609d6f11d189b60000e829fbbd/frameset.htm
Depends upon your requirement ,  you need to decide the extent of calibration data to be stored in the SAP system.
Sequence of process will be depends upon your business requirement.
Regards
K.M.Arun

Similar Messages

  • Sending Gauges / Equipment for Calibration

    I want to send the Gauges / Equipment for Calibration to Outside party (Vendor). Would you please tell me how to map this process in SAP.
    The process is:
    1. Gauges / Equipments are sent for Calibration to vendor.
    2. Vendor Calibrates and those are verified for the usage.
    Your valuable inputs will be helpful, points will be awarded accordingly.
    Thnkx and Regards,
    Rashmi

    hi rashmi
    while planning the calibration order , create  a task list with a control key for external operation, and maintain the requiured outline agreement or services.while scheduling a PR will be generated then you can process further. you can also look in to the web site for better understanding "http://help.sap.com/saphelp_46c/helpdata/en/fe/67fbcc9d6f11d189b60000e829fbbd/frameset.htm"
    regards
    thyagarajan

  • Sending equipment for calibration

    Dear all,
    what is the process to send test equipment for calibration.
    ours is external calibration:
    as per QM they are running the scheduling for calibration so system automatically creating one purchase requisition .
    so then how to send that equipment through MM .
    please give step by step
    regards,
    prasad

    Hi,
    Generally, Repair of Materials are handled via concept of Gate Pass (Returnable & Non-Returnable). But, SAP doesn't provide any option for creating Gate Pass (Returnable & Non-Returnable) in standard.
    Try the below suggested procedure as a work around process;
    Repair Process via Returnable Gate Pass: -
    1. MM01 - Create Material Master for every Spare Part / Machinery to be sent to Vendor for Repair as Non-Valuated (Material Type "UNBW") (Do not extend Accounting and Costing views since you don't require postings of Stock value and consumption values, you only want to track the Service/Repair Charges)
    It's not necessary to have materials as Non-Valuated always, it depends on your requirement.
    2. MIGO - Goods Receipt > Others (Receive the quantities of these materials using Movement Type 501 / 511) - Only if Stock of Material is not available.
    3. ME21N - Create Subcontracting PO (Here Main Material and Component will be same material)
    4. MB1B - Transfer Posting w.r.t. Subcon PO (Mvmt Type - 541, Spare Part stock will get posted to Vendor Stock)
    5. MB90 - Take Print out of this Material Doc as Returnable Gate Pass (U need to configure Message Determination of Inventory Mgmt)
    6. MIGO - GR against Subcon PO (101 - Receive Spare Part, 543 O - Consumption of Spare Part form Vendor Stock)
    7. MIRO - LIV for Service Charges w.r.t. Subcon PO
    Note: - If PM Module is implemented then use PM Order as origin of the Repair Process. If it is not then follow the above process.
    Else if you don't want to track the material stock then follow the Service Process Cycle
    1. ME21N - Create Service PO (With Item Category D and Account Assignment Category K )
    2. ML81N - Create Service Entry Sheet w.r.t. Service PO
    3. MIRO - LIV for Service Charges w.r.t. Service PO or Service Entry Sheet
    For Service Process, refer following link;
    [SAP External Service Management|http://www.sap123.com/showthread.php?t=52]

  • No inspection lot for calibration

    Hi all,
      I am facing one problem in equipment calibration.The problem is that no inspection lot is generated for calibration
    I have maintaimed following seeting
    1)Equipment cration(IE01)
    2)Created eqipment task list ( IA01)
    3)Created maintenance plan (IP41) wherein order category is maintenance order and order type as  calibration order.
    4) And sheduled the plan ( IP10)
                Inspection type is already active against the order type
    Please guide what i am missing is the orde category correct?
    thanks
    ASD

    Hi,
    Also please check the following settings in SPRO
    SPRO  --> plant maintenance -->  maintenance and service processing --> maintenance and service order --> assign inspection type to maintenance/service order type
    here u have to assign inspection type 14 to your respective order type for calibration secenario
    please check and revert back.
    Regards,
    Vinay

  • Could I use the square grid for calibration in IMAQ vision?

    In IMAQ vision 6.0, NI provide the circular grid for system calibration.But now for some reasons,we need to use the square grid for calibration.Could the square grid be used with the calibration functions in the IMAQ vision for system calibration? What special things do we need to consider when we use the square grid for calibration?

    Are you talking about the layout of the points that make up the grid, or the shape of the points, or something else?
    Using dots in a rectangular grid with regular X and Y spacing is the standard grid for the NI calibration routines.
    I don't think the shape of the dots is critical. They could be small squares instead of circles.
    If you are talking about making a grid using lines instead of dots, like a tic-tac-toe board, I think you will have problems with the NI routines. You could probably do some processing on the grid image to reduce it to dots at the intersections, but it doesn't seem like it would be worth the effort. I would just use a grid made of dots instead.
    If this doesn't help, explain your problem more clearly.
    Bruce
    Bruce Ammons
    Ammons Engineering

  • Design the New process set up for Materials in one physical stock plant

    Hi Experts,
    The requirement is one physical plant as two different logical plants in the system. The main issue is how to administrate or how to find the set up which allows one Physical warehouse in Hamburg which we have supplying two Logical warehouses in the system without having thru really physically separate the warehouses into two different ones. Materials physically will be only for one warehouse.
    Requirement is for Design the New process set up for Materials in one physical stock serving plant into two different system plants.
    Most of the things are pointing in the direction that order Backlogs will not be converted into new organization. We have backlogs for the material requirements for purchase orders, sales orders whatever we have in the current setup; then there will have all are new orders from the certain dates taking in the  new organization set up. These backlogs are very long at least three to four years.
    We would like to find some way to have the all the material requirements ending up in one basket instead of two baskets. That still be able to deliver at least in system point of view from two different baskets.
    We need to do analysis on one physical stock serving plant into two different system plants that could be done either by material master data or as i understood that could be from PS side.
    can any one please tell me how we can maintian this setup in the system.
    Please provide your valuable inputs.
    Brgds,
    RK

    RK,
    Sorry, the creation of such an end-to-end solution is outside the scope of an online forum.  Most consulting companies would send a multi-disciplinary team to perform this task, and would take several weeks to research your requirements, and come up with a prototype.
    Sales order availability checking is described in SAP online help
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/93/744b51546011d1a7020000e829fd11/frameset.htm
    I will say this.  If your goal is to have two plants, with two company codes, and you wish to only procure or produce in one of the plants, then generally I would recommend using Special Procurement via Stock Transport Order (in standard SAP, Special Procurement 40).  This based on a very small knowledge of your requirements.  I have already cited the Sap online help for special procurement.
    SAP online help for Warehouse management is at
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/c6/f8386f4afa11d182b90000e829fbfe/frameset.htm
    As you begin to read the required topics, I am certain you will realize that this task is beyond the capability of an untrained person.  I again suggest that you search for professional consulting services to assist you in this project.  It will be money well spent.
    I am now closing my responses to this thread.  Good luck in your project!
    Best Regards,
    DB49

  • Process Controlled WF for Shopping Cart

    Hi,
    We have implemented process controlled workflow for shopping cart approval.
    1. Created a bespoke schema for the approval process
    2. Defined 5 process levels in the schema
    3. changed the BRF event at the schema evaluation level. It now
    contains a constant with the name of new schema create in step 1.
    4. Decision set used is item based approval for partial documents (Type 4)
    4. The first process level is get the technical approval from bespoke
    table based on material group. For that we have first created a
    Responsibility Resolver Name - ZTECHNICAL_APPROVER.
    We have implemented the BADI - /SAPSRM/BD_WF_RESP_RESOLVER. Assigned
    the filter as BUS2121 and ZTECHNICAL_APPROVER.
    5. Now we have placed the external debugger in BADi. when we create
    the shopping cart the flow doesn't stop at the break point. The item
    reaches to the last step of Automatic approval (Rejected).
    6. We think that schema is getting evaluated, however the process
    level is not getting called.
    7. Before we created schema, all the carts wer getting "Approved" by
    automatic step. In our schema the automatic step is "Rejected", hence
    the carts are getting rejected.
    Could you please let me know what could be reason for BADI
    implementation not being called or is there any config step which we
    are missing?

    Hi,
      I think your process level evaluation id is not true, that is the reason system skips the process level.. Can you check your evaluation event-expression code. What do you see in SLG1?  For testing purpose change the evaluation id to 0EV000 and check. Make Sure you debug through the user(requester) that you are creating the SC. Please test and let me know...
    Saravanan

  • Background Scheduling of Maintenance order for Calibration.

    Dear Experts,
    I want to scheule my calibration order in QM for calibration of Test Equipment in background.
    I have created my maintenance order for calibration of Gauges / Instruments (which are defined as Equipments). The dates for the calibration have been calculated based on time. When I go to the transaction of scheduling the order & save, the inspection lot for calibration is generated & the equipment task list is assigned to the lot.
    I want this to automatically happen in background. This is because I have thousands of equipments, for which I can not schedule the calibration manually.
    Regards,
    Prashant

    Hi,
    Please check below link if this can help it.
    http://help.sap.com/saphelp_scm2007/helpdata/en/c3/9e443cfb06e532e10000000a114084/content.htm
    Regards,
    Anil

  • Digital signatures for calibration inspection (inspection type 14)

    Hi,
    I want to use digital signatures for results recording and usage decision (ud) when performing a calibration (inspection type 14). Normally you'd set-up the material authorization for digital signatures. But this can't be added to maintenance plans or equipment. Is there any way to set-up digital signatures for calibrations?
    Regards,
    Maarten

    Explore SAP Note 576307
    It may help u.

  • Reg : To view process chain flow for a cube

    HI Experts,
    I need to view process chain flow for a particular cube of sales distribution.Can you please tell me stps to perform .

    Hi,
    If the cube is already loaded then you can just to the infopackages which are loading it and in the infopackages you have option in the "schedule" tab to see which process chain it is loading.
    if not then you will have to identify which data source is loading to the cube and check for the infopackge.
    and I think the DTP will be in the same chain  as well.
    For DTP it is alreday mentioned by the others.
    Thanks
    Ajeet

  • Disk Utility: after creating the .DMG (compressed image) When "scan image for restore" finishes it displays "unable to scan (internal error)". Since the process was scanning for about 1 hr is this a fake warning?

    External 500GB drive is partitioned with 400GB for Mac OS extended (journalling) and 2nd partition formatted today as "ExFAT".
    Yesterday I tried to create a disk image of my HD to no avail - this was compressed on a FAT partition. I got a warning after running the <scan image for restore> saying "unable to scan (internal error)"
    I rang Apple support who suggested formatting a partition as MAC OS extended (journalling) and choose to save the image as "read/write'. The image process stopped writing at about 200GB and then the file size jumped to 499GB (ie the size of the HD). But the process did nothing for about an hour so I foce quit disk utility (as suggested by apple support)
    My current attempt was to format the external drive again; this time with a 400GB Mac OS extended (journal) format; plus a 100GB ExFAT format partition. The new image was created after about 2.5hrs with a compressed size of 149GB. However, after running the "scan image for restore" facility I got the warning message "unable to scan filename " (internal error). The process was scanning the image file according to the progress bar - this took about hour - thus the warning is a puzzle.
    If anyone can say more about this error I would really appreciate knowing tips for using disk utility. The screen grab is below.
    "unable to scan filename " (internal error)
    thanks

    Thanks for a quick reply <baltwo>. You’ve answered that it is not a fake message!
    fyi: I thought that I would use my external Buffalo for two purposes; namely the smaller ExFAT partition for copying stuff to my win7 netbook. The larger partition was to be used as my imac image of SL. So this was my first attempt at using disk utility - the idea being to hold an image backup at another location. Plus I now have the Lion thumbdrive ready to upgrade from SL and so being cautious wanted to have a SL image backup
    Anyway I followed the apple instructions using my mac 10.6.3 install DVD but it would appear from other discussions that <unable to scan (internal error)> is not unique to me.
    I’ll get back to apple telephone support for further advice.
    I would though be grateful for an “idiots’ guide to making an image backup of my internal HD that runs SL 10.6.8
    eg should I have just one partition on the external USB drive? format it as Mac OS extended? create the image as compressed or read/write? Basically I’ll do whatever will work!!
    thanks again

  • Mostly tables in process or scheduled for a longer period of time

    Hi Folks,
    I am a newbie to SLT. Sorry if I ask some basic stuff.
    I am using HANA and SLT and can see below list of tables are in state or 'In Process' or 'Scheduled' for couple of days.
    For one of my Ztable its says 'scheduled' in HANA and trigger state is DEACTIVATED in SLT.
    Now what I want to do is delete the same from HANA and replicate it again but I am not able to do.
    Below are the list of the tables which are creating issues,
    I am attaching both HANA as well as SLT screenshots.
    Kindly let me know the approach needs to be followed to solve the issues.
    I have one more query , I am trying this on my home HANA system but in projects
    will loading of data or migrating of tables from ECC to HANA will be done by BASIS guys or by HANA developer?
    By profession I am ABAP as well as HANA developer.
    BR
    Sumeet

    Hello sumeet durgia
    Now what I want to do is delete the same from HANA and replicate it again but I am not able to do.
    Remarks:
    Sometimes, the UI side does n't seems to be working as expected in the Hana studio side.
    Did you try this:
    SLT System -->  LTRC -->
    Stop and restart again.
    BR
    Prabhith

  • Errors in the OLAP storage engine: An error occurred while processing the indexes for the partition of the measure group of the cube from the database.

    Errors in the OLAP storage engine: An error occurred while processing the indexes for the partition of the measure group of the cube from the database.
    I have dropped and recreated a fact table to refresh the data as the table is having identity columns. So not able to directly insert data. After that cube is throwing above error.
    Please suggest.

    Hi Md,
    It hard to analyse the issue base on the limited information, Are there any error message on the log? Under C:\Program Files\Microsoft SQL Server\MSAS11.\OLAP\Log (this could be different for your server), there are 3 log files that are generated:
    msmdrrv.log
    FlightRecorderCurrent.trc
    FightRecorderBack.trc
    The msmdrrv.log simply points to the other two logs. There might be some detail information for this error. Please provide us the detail information about it, so that we can make further analysis.
    Regards,
    Charlie Liao
    TechNet Community Support

  • INBOUND MAIL PROCESSING in SAP for Offline ADOBE FORM Concept

    Hi to all,
    Please can anyone tell me, what INBOUND MAIL PROCESSING in SAP for Offline ADOBE FORM?
    What is concept and how to use it, is any program need to write for that or only need to configure it.
    I have searched the SDN, but only get topic how to configure inbound mail processing.
    I am new to this area; please any one put some light on it.
    I shall be thankful to you for this.
    Regards
    Pavneet Rana

    Hi Pavneet,
    Inbound processing of an offline adobe form consists of several things -
    a) an email id to be created on the server (to accept the mail & process the adobe form - this needs to have the right roles)
    b) the smtp config needs to be done by basis
    c) the abap developer needs to create a handler class that gets called when an email is recd in SAP. This handler class has 3-4 methods (first to read the mail and extract the pdf, convert data in pdf to the abap variable, process the form to do the specific function in sap (which will vary from requirement to another).
    I found this blog very useful when I was getting my adobe form done -
    /people/thomas.jung3/blog/2004/09/09/receiving-e-mail-and-processing-it-with-abap--version-610-and-higher
    Hope this helps.
    Cheers, Liz
    (ps: you might get more help in the adobe form specific forum in sdn)

  • Why did my apple watch go from processing to preparing for shipping then back to processing? Did this happen to others? What does this mean?

    why did my apple watch go from processing to preparing for shipping then back to processing? Did this happen to others? What does this mean?

    thanks.. I'm about to... was just wondering if anyone had a similar experience and it got resolved, before I wait on the phone... thanks though..

Maybe you are looking for

  • F4 Help for Purchase Order field in SRM

    Hello, I am working on developing a report program in SRM in which I have the fields Purchase Order Number, Fund, WBS Element for which I've taken the reference type as crmd_orderadm_h-object_id, BBP_PDACC-FUND, BBP_PDACC-WBS_ELEM_E respectively. I w

  • Short dump on production server

    ABAP runtime errors    GETWA_NOT_ASSIGNED        Occurred on     28.12.2007 at 11:16:11 >> Short dump has not been completely stored. It is too big. Field symbol has not yet been assigned. What happened? The current ABAP/4 program "SAPLCEI0 " had to

  • G/L account item without tax code in document with deferred taxes

    Hi , While releasing the billing document to accounting i get this error " G/L account item without tax code in document with deferred taxes". Not able to release it to accounts. What could be the possible reason?? Actually, this error is occuring on

  • How to change resulution in bridge

    Hi i want to change res in bridge when file have less than 300 dpi i want to change  res 300dpi  without and change width and height

  • CUPS - Conferencing profil problem

    Hello, I've a little problem with a CUPS 8.6, so, when I create my conferencing profil i put my name, the description and the primary conferencing server. This is work perfectly, but when i want to add one user in the conferencing profil, I click on