Process order creation for Heat Number

Hi experts ,
Heat Number (Hot Metal) is produced from the Steel Melt Shop in steel Industry. Approximately 30 Heat Numbers will be produced per day 
One HEAT Number = 75 Billets (PCu2019S)
One HEAT Number is Approx 150 Tones, by taking the Each Billet weight as 2 Tones.Approx 2250 Billets will be produced per day.
Raw Materials to produce the billets are DRI, Coke, and Lime etc.
Finished Materials will be HEAT Number & Billets
How to create the Process Order for HEAT Numbers & Billets?
What function has to be done with each Process Oder for Heat Number & Billets?
How to Apply the Original Batch Concept ?

Hi Ranjan,
I am new to this forums and I saw ur thread today.
I was wondering if u found the solution for you thread.
I have implemented SAP ECC ^ for steel industry.
Here we have Heat capacity 78 TO around 36 Pc of billets.
We used collective order and we create Process Orders for Billet and it will in inturn create process order for liquid steel.
After producing Liquid steel users will do (auto GR) GR without Batch and issues directly to Billet order(As Collective Order is used).
After Producing Billets GR will be done and billets are Batch Managed.So we put external Batch number (Ex:Heat Number) will given to these Billets.
Hope this will help to feel the overal view.
If any queries revert back to me.

Similar Messages

  • External Number gneration for process order creation

    Hi,
       I need to generate external number range for process order creation and at the time of goods receipt.
       How can I do this in the include ZXVBZU02.
    Regards
    SAi

    You might want to try search first:
    http://www.google.com/search?hl=en&source=hp&q=externalnumberrangeforprocessordersite%3Asap.com

  • TCODE for Process order creation against Sales order

    Hi gurus,
    Pls tell me what is the TCODE for Process order creation against Sales order
    Eg. CO07 is for production order from sales orde

    Typically, in MTO scenario after the sales order is created you run MRP which will create planned order and then you convert that into production order using MD04.
    Or if you have SD settings correctly directly from the release of Sales Order it will create planned order or production order.
    please check and revert back.

  • Problem in process order creation.

    Dear Sir/ Madam
                             i am facing a problem while process order creation.
    the problem is:
    Error when calculating cost for order ATFEDEC11  "see log Log is deleted when saving
    Do you still want to save?"

    Hi,
    The log for production order preliminiary costing is not saved. Therefore, once the order is saved, there is no log available anymore (this is by the way a question of PP; none of the logs is saved).
    Hope that helps...
    Regards,
    Declan

  • REGARDING PROCESS ORDER CREATION

    Hi All,
    While creating the process order for material, system showing the message that "Manual process order cannot be created for this product". But if we try with another user id, i could able to create the order for the same material.
    Plz suggest the solution to get rid of this error.
    Thanks
    Arvind S

    Hi,
    The message "Manual process order cannot be created for this product" clearly indicates that the user is not authorized for Manual process order creation by COR1 transaction for this material and may be this material is planned through MRP or SOP etc. and in critical or certain situations manual process order creation is allowed to another user/user id for the same material ( type of materials/material code).
    Some time organizations put such restrictions through enhancements. You can search the exact reason or logic of restriction by the help of ABAP consultant.
    Regads,
    Narresh

  • Block Production Order Creation for Particular Order Type

    Hi Experts,
    I want to disable the production order creation for a particular order type XX01 however there are some existing orders for this order type which should be processed further.
    In other words my objective is to -
    1. Block new Production order XX01 creation -
    2. Processing of order type XX01 should be possible.
    Is there standard setting available to achieve this or user exist is the only option..
    Regards,

    Hi
    You can use the user exit PPCO0006 and its function mdoule EXIT_SAPLCOZF_003 to archive that. That function module is called when the user click enter after inputting the material/plant/order type in CO01 then you just need to check the imported value CAUFVD_IMP-AUART which contains the inputted order type then rasise an error message to tell user that the order type cannot be used due to certain reason. The source code need to be written there is very simple.
    Regards.
    Leon.

  • Dump during sales order creation for a config material (uding order BOM)

    Dear all,
    I am getting the following error during sales order creation for a configurable material
    When I click on 'Engineering' tab in the characteristics value assignment for the parent material i.e. sales order material I get dump with following message,
                                   'Field symbol has not yet been assigned'
    Thanks,
    Yogesh

    Yogesh,
    what was the problem ?
    Thanks,
    Pavan Verma
    Edited by: Pavan Verma on May 11, 2010 9:31 AM

  • Restricting Sales Order Creation for Customers with specific AccountGroup

    Hi
    We have 2 Accont Groups for Customers namely Actual & Prospective.
    We wish to allow Enquiry / Quotation and Order creation for customers with Account Group ACTUAL and wish to allow only Enquiry and Quotation creation for customers with Account Group as Prospective.Is there anyway i can apply Sales Order creation block on an ACCOUNT GROUP on whole and not on Individual customers...
    Regards
    Sanjeev Bagaria

    Hello
    I did this through Listing Inclusion / Exclusion.
    (1) We created a new Customer Group 99 for Prospective Customer
    (2) We then created a new Condition table xxx with Customer Group & Material Type(as footer)
    (3) We then created this new Access Sequence Customer Group / Material Type to Exclusion Procedure B00001
    (4) We then assign the Exclusion Type B00001 to Sales Documents ZDOM & ZEOR our Order Sales Documetn Types
    (5) And finally we created a record for Exclusion with 99 Customer Group and Material Type as FERT..
    This now restricts creation of Sales Orders for all my Prospective Customers provided Customer Group is maintained in Customer Master. We are now also able to make Enquiry / Quotation and Sample Sales Order for Prospective Customers sicne we have Different Sales Document Types for all these and have assigned Exclusion only to normal Sales Order Document Type.
    Thanks a lot for all the suggestions provided.
    Regards
    Sanjeev

  • BAPI for Process order creation (COR1)

    Hi All,
    Can any please help me to find a BAPI for creating a process order which is done normally by transaction code u201CCOR1u201D.
    Thanks in advance.
    Kind Regards,
    Abhi.

    Try this BAPI - BAPI_PROCORD_CREATE.
    there are many BAPIs in Fuinction group 0001_BAPI realted with Process Order
    Thanks,
    rajinikanth G

  • Process order creation problem

    I am creating a process order . while creating the process order system is throwing error as Auto batch numbering not set up for material type XXXX in plant xxxx . System is not allowing to create process order.
    How to resolve the issue.

    Check in CORW   and switch off batch creation  to isolate the problem if needed.   Also see whether you have any batch managed compoents   for which you have set master data for automatic batch determination.
    There is no setting for material types and plant for batch.  May be the error message is not correct.  What is the message number?

  • Process Order Creation without Standard Cost

    Hello All,
    I need a functionality.. If standard cost is not released for a period , system should not allow me to create a process order in the certain period.
    Is any standard configurations allow me to achieve this????
    Thanks & regards
    Mahesh
    Message was edited by:
            Maheshbabu M G

    Mahesh,
    Standard SAP allows creation of order without Std cost estimate. Only in REM you could make it give error.
    However I suggest you could implement the exit PPCO0006.
    In this the function module EXIT_SAPLCOZF_003 contains the import parameter CAUFVD_IMP which has material number (MATNR) and plant (WERKS). Pass these to table MBEW and get the value of STPRS (std cost). If this value is 0 then give the error.
    Hope this is useful....if so reward points and close this thread.
    Regards
    Ram

  • Sales order creation for a project

    Dear all,
    I would like to know how to create quotation ,sales order, delivery and Billing for a total project. Let me explain the situation.. Customer has 4 different product.. they have 4 Plants to produce those materials.. They will sell each products individually and combination of others also. Their sales process is Customer will place an order for the total project which involves supply erection and Training. The erection and training may take 3 months to 1 year. The requirement is customer wants to create quotation and sales order creation in SAP. Also they want to map the erection and Training in SAP. They would like to capture the expenses involved during the erection and Training period. In this case excise duty, Sales Tax and service Tax all are involved in the same project.
    Can any one suggest some idea
    Thanks in advance
    Sriram

    Hi,
    It is understood that your client has 4 plants for 4 different materials. Your client sells materials and service (1.Installation of equipment and 2.Training the users). Your client wants to know the cost of the sold items (Materials and services). The billings are subjected to all applicable taxes.
    As you know, these requirements can be mapped in SAP by SD and PS modules.
    SD Module: Whatever the customer places the order (either partially or as total), you can create quotations. The materials are finished goods (FERT) and service materials (DIEN). The pricing procedure should consider all applicable duties and taxes.
    The business flow: Quotation >> Sales order >> Delivery of goods >> Billing (VF01) >> Excise Invoice >> Account receivable.
    Note: To link the sales order with PS module you have to maintain respective u2018WBS Elementu2019 in the Account assignment tab of the sales order. This is used for planned revenue in PS.
    Since you are supplying goods from all plants, maintain all plants to Sales organization and distribution channel combination in Assignment of Enterprise structure.
    PS Module:
    If the customer orders for an entire project including supply of materials, installation and training the users, create a project definition for that project in the project system. Assign a main WBS element under the project definition. Assign lower level WBS element according to your need. Under the WBS element network is assigned. Under the network activities are assigned. Under the activity there are activity elements. There are different types of activities; internal, external etc.
    You can assign different WBS element for services. Under this the relevant activities are assigned.
    You can budget for the project; you can assign supplementary budget if it is required. 
    When you release the project the Purchase requisitions are generated. The MM persons will create PO and procure the materials for the project.
    All the materials required are initiated from PS. Here every activity is routed through PS including service.  So, all the expenses are captured.
    By settlement rule, the cost is arrived at different levels.
    The configuration is to be done accordingly.
    Hope this give you an idea on the subject.
    Regards,
    K Bharathi

  • Missing stock during Process Order creation

    Hello Masters.
    I'm facing a new problem here in my client.
    Thats the situation:
    We are trying to generate a subcontracting process order to delivery a semi finished material to a supplier in order to be packed. We already have a contract with this ssupplier, its been saved as a supplier, we already did this operation with him more than once.
    The question is that during the process to create the process order, system is giving us a message that there is no enough stock off semi finished material to be send to the supplier.  (it comes a message that is missing a small quantity to fiill the right amout we want to send to the 3rd party - something around 1,5% of the total amount)
    But if we go to MMBE we can see the same amount of stock we want to delivery to the supplier in free utilization.
    Besides we are using here WM we didn't see any difference that could give us the error.
    In QM inspection batch all the amount were released (321 movement) no sample quantity was taking/retained.
    The most insteresting part is the we did the same operation for the next batch of the same semi-finished material. I mean for the batch produced yesterday (monday may 9th) we already sent to the 3rd party for packing but for the batch from last friday, we are facing the issue.
    In this case we have the same kind of process order, same 3rd party, same materials, same process a so on.
    Please could you give me an idea where should I look for a solution.
    Thanks in advance.
    Harlen

    Hello Vivek thanks for your anwer.
    However, Ive talked to a QM consultant and presented the issue for him. He told me to use a SAP program QEVAC20 ( notes  48815 and 717622 ) to check possible inconsistences  between QM and IM stock.
    So We will try to use this report to check if there is an issue. Have you used this program before? Do you think it should help us?
    Due to the process to create the process order, there is no issue, no issue with batch number or inspection lot. The error message comes when we try to select the batch number of semi finished material in COR1 tcode.
    The message complains theat is missing a small quantity of the batch.
    Tks,
    Harlen

  • Automatic Reservation at the time of process order creation

    Hi Experts,
    As you are aware, when we create a process order and save, system automatically generates the reservation and the reservation will be for movement type 261. My requirement is like this. When system creates reservation, system should consider for which order type the process order is created and create a reservation for other movement type also.
    For eg. Iam having order type ZRRW. When system creates reservation at the time of order creation, system should check the order type and reservation should be created for a movement type Z11 instead of 261 in the normal case.
    Is there any user exit for the same. Please let me know.
    Else how can I post the goods issue with a movement type other than 261. MIGO is not accepting other movement types.
    Anticipating your reply
    Regards
    Prathib

    Hi Ayethebing,
    Thanks for the reply. we created the new movement types inorder to use the SAP standard reports and get the different types of goods movements based on the different processes.
    We can do the goods issue using the custom movement type through MB1A. But I was trying to use in MIGO and this is where system wont allow this.
    In MIGO, system will do the goods issue based on reservation only. The reservation is created at the time of order creation and it uses movement type 261 irrespective of the order type.
    I was trying to find out whether any option is there to use custom movement type to create reservation so that system would propose this movement type in MIGO for goods issue against process order.
    This is an interesting case but unfortunately dont have any option of user exit or Badi. Only one user exit related to reservation is to change the str loc and back flush indicator.
    @Sabine: Thanks for your reply. But the BADI that you provided wont serve the purpose.
    Thanks
    Prathib

  • At the time of Process order creation Batch determination

    Dear All,
    When i am creating process order at the time system not allowing me to execute batch determaination after release only it is allowing me to do.
    My requirement is At the time of order creation i want assign batches ( Execute Batch Detrmination)for the material.
    how to do this one, kindly hel me
    Regards,
    s.sakthivel

    Hi sakthivel 
    Go to OPKP (Production scheduling profile)  txn code and select in Batch management tab Automatic Batch creation at order creation (1) and check this profile is assigned to material in work scheduling view
    Regards

Maybe you are looking for

  • Intermittent 'Unable to read file' error when exporting/opening .html to .xls

    Hi, hope someone can help. I have an issue where I export a report from the Salesform platform to Excel. The file that is being exported is in html format and the report does not include any Pivot tables. The 'Unable to read file' error occurs interm

  • PDF size exceeds 50kb

    Hi all, We are developing a smartform wherein the requirment is to convert the smartform into PDF. The present size of the PDF is 700 kb and we want to reduce it 50 kb. We have tried by changing the logo and the font but that has helped us reduce the

  • Can't install drivers from CD or downloaded dri

    Ok, I just reinstalled windows and was installing all of my drivers which mainly went ok until I started my sound driver. My pc locked up during the installation so I had to hold down the power button for it to start, then pc locked up at windows loa

  • How do I setup additional mail boxes?

    How do I setup additional mail boxes?

  • Tool cost capturing and calibration of tool:

    Hi, to capture tool cost, we defined tool as fhmi material type and included in bom. Accordingly it is issued to production (thru alternate unit) and tool cost is collected in production order.  Now we need to do calibration also for that tool. To do