Profitability analysis activated in POS Interface, performane/tuning issue?

We are about to golive with a SAP retail system. All purchases made by customers in store are sent into SAP via and idoc via the so called POS (point of sales) Interface.
A reciept received via an idoc creates material docs, invoice docs, accounting documents, controlling documents, profit center docs and profit ability analysis documents.
Each day we recive all receipt from each store collected in one idoc per store.
When deactivate our profit ability analysis an average store are posted in about 40 seconds with sales from an average day. When we post and profit ability analysis are activated the average time per store are almost 75 seconds.
How can simple postings to profit ability analysis increase the posting time with almost 50 %? Is this a performance/tuning issue?
Best regards
Carl-Johan
Point will be assigned generously for info that leads to better performance!

which CO document does the system creates : CCA document ?
on which cost centre ? PCA document ?
What is the CE category of the CE used for posting the variance ?

Similar Messages

  • VF03 Profitability Analysis - Cost not capture in profitability

    HI SAPFans,
    I'm facing difficulty on profitability analysis on VF03.
    The problem is, my cost of sales is not capture on Value fields tab (refer attachment).
    [vf03|[IMG]http://i303.photobucket.com/albums/nn133/kerisnagasostro/vf03.jpg[/IMG]]
    is there any maintenance that i need to check ? in order to flow cost amount into cost field on value fields tab ?

    Dear
           GOTO CONTROLLING Profitibility Analysis ---Flow of Acual Value --Transfer of Billing document --Assign value field --Maintain assignment of SD Condition to COPA -- OPERATING CONCERN(TYPE OF PROFITB ANALYSIS--SELECT COSTING BASED) AND CLICK. issue may arise to do this activity as that is FI Consultant job so u might not having require Authorization so need to take help of ur FI Consultant or asked ur Basis Consultant to give authoriztion.
    Regards
    AJIT K SINGH

  • Activate Profitability analysis

    Dear Gurus,
    Whnever My SD member is creating the Excise Invoice in J1IIN, thn the message is coming as "<i><b> Activate Profitability Analysis in Controlling Area</b></i>". After activating the same the message is coming as " <i><b>System failure during the locking of the GL account".</b></i>
    The Message no for Profitability analysis is KI144.
    SATYA

    Have you defined Excise GL code as a cost element in controlling and assigned to PA segment?
    In case you do not want to activate COPA, remove the assignment to PA and assign default cost center in case you are not able to delete cost element (t code KA04).
    Regards
    Rakesh Pawaskar

  • Profitability Analysis for Project and Project Team

    Hello Experts,
    Need your ideas and expertise to the below business case, could be simple or complicated, please provide some insight.
    the business case is like this. 2 specific project teams are available. there can be around 10 projects executed in a year. So in our PS we can have project team allocated to a project. workforce planning is done for the project for effective utilization, it is like 2 projects with 2 teams assigned. till now it is fine. the business calls for that 1 st team is assigned to another project only after closure of the assigned project.
    Let us assume P1, P2,...P10 are the projects in a year. Assume T1, T2 are the teams available. Initially T1 is assigned to P1, T2 is assigned to P2.
    Business confirms that T1 will be assigned to P3 only after completion of P1. This requirement is also straight. Assume that team T1 has executed 6 projects and team T2 has executed 4 projects.
    The requirement is profitability analysis at project level i.e at P1, P2, ...P10 which is also pretty straight. Business requirement is also to have profitability analysis against each team i.e for T1 and T2. it is like each team has a project lead and team assigned under him. based on the expenses and revenue booked against the team, there will be performance evaluation of the team.( assume that P1, P3, P5, P6, P8,P9 are the projects executed by team T1, we need to have revenue and expenses of the said projects to be mapped to team T1 as well), so we have profitability analysis at team level.
    Experts, require your advice on how to map the requirement. Is there any possibility to map projects to team rather assigning team to a project. please advice. provide some insight on how do we map the scenario.
    Regards,
    Murthy

    Hello Murthy,
    In SAP you carry out Month end closing activities. In order to carry out this activity, you post all period based data on the project. Subsequently data relevant for Profitability analysis can be determined for the given period and then this data can be settled to COPA.
    This data can be evaluated in the project information system or in Profitability analysis.
    You can check report KE30 for Profitability Analysis.
    Refer SAP help for more details
    http://help.sap.com/saphelp_erp2004/helpdata/en/7a/4c3aad4a0111d1894c0000e829fbbd/content.htm
    Regards
    Tushar

  • Customizing Monitor in Profitability Analysis

    Hello SAP-team!
    What functions are provided by the Customizing Monitor in Profitability Analysis?
    ps: thanks to SAP-community!
    Eugene

    Hi,
    Customizing monitor in Profitability analysis as follows..
    General topics:
    35288 Technical Documentation CO-PA
    69384 Account-based Profitability Analysis
    199467 New act assignment table as of Release 4.5
    2. Master data:
    a) Characteristics and value fields:
    13377 Naming conflicts in characteristics and value fields
    21207 Deleting a charctrstc/value field from an op.concern
    40336 Maintaining foreign keys for characteristics
    76493 Changing texts of characteristics or value fields
    b) Characteristics derivation and submission of characteristics values
    32719 Customer hierarchy in CO-PA
    33968 SD/CO-PA: Characteristics from sales document tables
    36557 SD/CO-PA: Transfer partner functions to CO-PA
    62690 Product hierarchy in CO-PA
    93652 Info: Variant configuration in CO-PA
    134889 Info on derv. of char:Why not all flds avail.?
    148609 Char.deriv.:deriv. rule vals miss.aft.upgrade&trnsp.
    172740 Techn.docum.charct. derivtn as of Release 4.0
    c) Valuation
    40408 Valuation for record types 'B' and 'C'
    62536 Valuation using conditions in Profitability Analysis
    67240 Info: Valuation with material cost estimate
    111232 INFO: Valuation for materials valuated separately
    144337 INFO rounding differences: Valuation with costing
    142628 Behaviour of user exit in periodic valuation
    3. Actual data transfer:
    20254 Values from SD are not transferred to CO-PA
    37114 Incorrect setup/reversal of provisions
    33178 +/- sign logic in CO-PA (SD/FI interface)
    52849 Transfer of conditions with +/- signs
    39635 Profitability segment by substitution exits
    64768 FI/CO-PA: Problems with exchange rate differences
    87704 Cost-of-goods-sold Reconciliation: FI to Co-PA
    83702 Acct assignmt logic sales order proc. - REM
    111309 Transfer of quantities into CO-PA
    185826 Enhancement COPA0005
    a) Correction of data inconsistencies
    69370 Clearing data inconsistencies in CO-PA
    70718 Correctn of data inconsistency for order recpt
    140457 Correcting data inconsstncs in incoming orders
    126937 Correction of billing data inconsistency
    93051 Restructure of the segment level from line items
    4. Planning:
    67191 Useful tips on the CO Planning Processor
    72110 KE11: Long runtimes/timeout
    77476 Information: Top-down planning
    124598 CO-PA Planning: FAQs
    5. Information system:
    21773 Performance in reporting (summarization data)
    83204 Usage strategy for summarization levels
    136216 Fast rollup for summ. levels for costing-based CO-PA
    6. Tools:
    134430 Euro conversion and CO-PA
    19015 Termination during external data transfer
    19410 Characteristic validation during external data transfer
    44658 Error with batch input for KE21
    40994 Transport Profitability Analysis (CO-PA) to 3.0
    52636 CO-PA Customizing transport
    128862 Transport Customizing CO-PA in 4.0A/B
    131664 Transport of operating concern structures 4.0
    144015 Client copy and CO-PA/EC-EIS
    65999 Information: Supported ALE scenarios in CO-PA
    94458 CO-PA Realignments: documentation
    113050 Segment table repair after realignments
    127334 Missing archiving of profitability segments
    199959 Change assignmt for operating concern
    67839 Generating parts of an operating concern environment
    69829 Delete operating concern in Release 3.0
    106314 Delete operating concern in Release 3.1
    562043 - Transfer actual costs to Profitability Analysis
    544241 - INFO:Customizing Monitor new fnc 'Report Overview'.
    429517 - INFO: Currency translation Billing document -> CO-PA
    428563 - Material cost estimate valuatn: Translaton for posting date
    400237 - CO-PA INFORMATION: Line item in company code currency
    199959 - Information: change assignmt for operating concern
    199467 - Info: New act assignment table as of Release 4.5
    185826 - Information: Enhancement COPA0005
    172740 - Info.:Techn.docum.charct.derivtn as of Release 4.0
    148609 - Char.deriv.:deriv.rule vals miss.aft.upgrade&trnsp.
    144337 - INFO rounding differences: valuation with costing
    144015 - CC-INFO: client copy and CO-PA/EC-EIS
    142628 - Behaviour of user exit in periodic valuation
    140457 - Info:Correcting data inconsstncs in incoming orders
    136216 - Fast rollup for summ.levels for costing-based CO-PA
    134889 - CO-PA Info on derv.of char:Why not all flds avail.?
    134430 - Information: Euro conversion and CO-PA
    131664 - INFO: Transport of operating concern structures 4.0
    128862 - INFO: Transport Customizing CO-PA in 4.0A/B
    127334 - Missing archiving of profitability segments
    126937 - INFO: Correction of billing data inconsistency
    124598 - Info: CO-PA planning: frequently asked questions
    113050 - Segment table repair after realignments
    111309 - INFO: Transfer of quantities into CO-PA
    111232 - INFO: Valuation for materials valuated separately
    106314 - Delete operating concern in Release 3.1
    94458 - CO-PA Realignments: documentation
    93652 - Info: Variant configuration in CO-PA
    93051 - Restructuring the segment level from line items
    83702 - INFO: Acct assignmt logic sales order proc. - REM
    83204 - Usage strategy for summarization levels
    77476 - Information: top-down planning
    76493 - Changing texts of characteristics or value fields
    75334 - INFO:Downloading CO-PA correctn package fm SAPSERV
    72110 - KE11: Long processing times / timeout
    70718 - INFO:Correctn of data inconsistency for order recpt
    69829 - Delete operating concern in Release 3.0
    69384 - Information: Account-based Profitability Analysis
    69370 - INFO: Clearing data inconsistencies in CO-PA
    67839 - Generating parts of an operating concern environment
    67240 - Info: valuation with material cost estimate
    67191 - Info: Useful tips on the CO Planning Processor
    65999 - Information: Supported ALE scenarios in CO-PA
    64768 - FI/CO-PA: Problems with exchange rate differences
    62690 - Info: product hierarchy in CO-PA
    62536 - Info: Conditions in Profitability Analysis
    52849 - INFO: Transfer of conditions with +/- signs
    52636 - INFO: CO-PA Customizing transport
    44658 - Error with batch input for KE21
    40994 - INFO:Transprt Profitability Analysis (CO-PA) to 3.0
    40408 - Info: Valuation for record types "B" and "C"
    40336 - Info: maintaining foreign keys for characteristics
    39635 - Info: finding the profitability segment using a substitution
    37114 - Incorrect setup/reversal of provisions
    36557 - Info SD/CO-PA:transfer partner functions to CO-PA
    35288 - Profitability Analysis: Technical Documentation
    33968 - SD/CO-PA: Characteristics from sales doc tables
    33178 - INFO: +/- sign logic in CO-PA (SD/FI interface)
    32719 - INFO: Customer hierarchy in CO-PA
    21773 - Performance in Reporting (Summarization data)
    21207 - Deleting a charctrstc/value field from an op.concern
    20254 - INFO: Values from SD not transferred to CO-PA
    19410 - INFO: Char.validity check f.external data transfer
    19015 - Termination during external data transfer
    13377 - INFO: Naming conflicts in charactrst. & value flds.
    Thanks
    Prasada

  • Regarding the activate the profitability analysis

    Hi,
      This is sumanalluri sap fi/co consultant.I am hitting an error while doing the profitcenter accounting.when i want to to do the transfers of material stock balenses ,the system is asking accounting based pca is not active in the year 2007 in controlling area.But in the controlling area it is not allowing me to keep  profitability analysis in active status.By default it is kept as inactive .How can i rectify this error.Please do the needfull.
    Regards,
    suma

    Hi Suma
    go to KEA0 or follow the below path
    IMG>CONTROLLING>PROFITABILITY ANALYSIS >FLOW OF ACTUAL VALUES>ACTIVATE PROFITABILITY ANALYSIS
    once you complete operating concern
    then go to OKKP and activate Operating concern there
    regards
    prasad

  • Profitability Analysis document

    Dear All,
    At the time reversal of Sales delivery system is not generating Profitability analyses document.
    Scenario is like this
    At the time of delivery to customer the standard price is 10, but at the time of reversing the delivery the Standard price is 12.the difference 2 system is posting to variance G/L Account.
    For variance cost element we activated the PA Segment posting in OKB9.
    but for variances system is creating only controlling document, it is not creating Profitability analysis document.
    pls help me, issue is urgent.
    Advance
    Message was edited by: Nalluri Surendra

    which CO document does the system creates : CCA document ?
    on which cost centre ? PCA document ?
    What is the CE category of the CE used for posting the variance ?

  • Order value fields by field label in the profitability analysis document

    Hello,
    I am displaying a profitability analysis document and I want to order the value fields by their technical name (VV001, VV002, VV003...) instead of in alphabetical order (the system orders them by the field label).
    Is it possible?
    Thank you very much
    Bea

    Hello,
    Check in KE4M whether sd condition type FKLMG  is mapped corresponding value field in COPA.As you are getting the value for other company codes, this setting should be there.
    You can also try checking simulation of billing document transfer through KE4ST. Check the details analysis
    thanks
    Hari

  • Handling of Down payments / advance payments retail POS interface

    Hi all,
    Does anyone know if there´s a best practice to handle down payments with POS interface?
    thanks in advance
    Mariana

    Hi Mariana,
    Pl use the following link:
    help.sap.com/bp_retailv1470/documentation/EN/Store%20Business%20Offline%20EPOS_EN_PRES_V147.ppt
    <b>IDOC</b> for down payment is <b>WPUTAB01</b>. 
    Entries will be as follows:
    If a customer is making a down payment of Rs.1000/-
    <b>Cash a/c    DR                                                                                1000/-
    Customer or Site CR(Retail Stores if u dont maintain individual customers)     1000</b>/-
    When sales are closed say for example Rs.10000/-
    <b>Cash a/c     DR    Rs.9000/-
    Customer   or Site DR Rs.1000/-
    Sales         CR     Rs.10000/-</b>
    In SAP u need to create a <b>Special G/L with Indicator A </b> and this special G/L will be assigned to your main a/c in Tcode <b>OBXR</b>.
    <b>F-29</b> Post Customer Down Payment ,<b>F-32</b> Clear Customer ,<b>F-39</b> Clear Customer Down Payment are the FICO transactions which will be used. Pl contact yr FICO
    consultant for further details.
    Hope this helps you.
    Regards,
    Mani

  • Field catalog in Profitability Analysis

    Hi,
    In profitability analysis, if we want to use a particular characteristic or value field, then they should be maintained in field catalog.
    Could anyone please explain me where we will define this field catalog.
    Thanks
    Chandra

    You need to create the Characteristics and/or Value Fields using transaciton KEA5 / KEA6
    Once this is done, assign these to the Operating Concern using transaction KEA0
    In this transaction, enter the Operating Concern you need to modify, and then enter the Data Structure in the Data Structure tab. Assign the Characteristics / VFs in this screen (click on the respective tab to access the assignment). Once done, remember to generate the Operating Concern.
    If you exit the maintenance screen on saving, the system normally prompts you to Generate the Op Co. Once this is generated, you can use these in your config./ analysis.
    Cheers.

  • Project wise profitability analysis

    Hi
    I have to create MIS for project wise profitability analysis .  In sales order we used additional tab as project and we assigned projects to each and every sales order
    Now they want one Report "Project wise profitability analysis" . So i have do that through Infoset (Lis)
    Please tell me what are the charecteristics & what are the keyfields to select to get the cost
    (i want material number - Planned cost - Actual cost - variance)
    Rgds
    pradeep

    Hi,
    This is standard report to get acutal cost and  planned cost and variance.
    S_ALR_87013532 - Plan/Actual/Variance
    S_ALR_87013566 - Actual Contribution Margin
    S_ALR_87013568 - Project Results
    Regards,
    Chandra

  • Profitability Analysis not generated in Contract billing Document

    I have created the Billing document against the contract order but the Profitability Analysis is not getting generated.  But any sale order related billing document is created; system automatically creates the Profitability Analysis.
    Can you tell me where the problem is or have I missed any steps?
    Regards,
    Devendra

    1) For a service material (DIEN), We are creating an Sales Order (VA01) and doing a order based billing (VF01). In the Sales Order we are giving the plant (no shipping point and storage location as it is a DIEN material).
    Once we do the billing we are able to see the Profitability Analysis document.
    2) Now we are using the same material we are creating a Contract (VA41) for a period of one year and doing a monthly billing. In this case we are using VF04 for doing the bills that are due.
    We are getting two results in this:
    a) If we give a Plant in the contract, the Profitability Analysis document is not getting generated at the time of billing.
    b) If we do not give any plant, the Profitability Analysis document is getting generated at the time of billing.
    Please note that we are using the same material, same pricing procedure in both the above cases 1) and 2). Only difference is that the source documents are different i.e., one is Sales Order and the other one is Contract.
    In our copa valuation we have assigned the conditions to value field, no derivation rule assigned.
    Regards
    Devendra
    Edited by: Devendrap on Apr 14, 2009 10:38 AM

  • How to copy the payload from onMessage Activity in BPEL interface

    Hi All,
    how to copy the payload from onMessage Activity in BPEL interface when it is there at the starting of the process and when clicking on the OnMessage Activity
    i'm able to see the View XML Document link. By Clicking on View XML Document Payload is getting opened for me but at this point i'm not able to copy the payload and more over the scroll bar is also not there.
    When i'm saving it as .xml i'm able to see the payload but not in an xml format.
    When trying the payload in SOAPUI it's not getting reformatted.
    How can we solve the issue.
    Regards,
    CH

    The input payload can be seen from "Audit Trail" tab and "Flow" tab of any BPEL instance. The XML shown in "Flow" tab are not rightly formatted XMLs and you may not able to copy them "as is" to a text editor. But, the XML shown in "Audit Trail" should be in the right XML format and you should be able to click on any audit trail entry and copy the XML payload to a text editor. soapUI should also be able to format such XMLs without any issue. Just make sure that you don't overwrite soap header/body section when pasting to soapUI request.

  • COPA Values in the Profitability analysis for a credit memo request

    Hi All,
    When I am trying to create an Invoice document for a Credit Memo request having a Configurable material , in the accounting document profitable analysis Profit Center view fields are not getting updated.
    If we do the same thing for a reference material profit center view fields are getting updated properly.
    What is the problem with the Configurable  material.
    Thanks in advance,
    RajaMahi

    I would start fresh with a new sales order.  When you create with reference both the return delivery and credit memo are created with reference to the return sales order.  Here is an example document flow to clarify:
    Document                                      Date               Qty/value   UoM/Cur   Overall proc. status
                                                                                    Return 60000077 / 10                          08/25/05               10.000  EA      Completed                                 
    . Returns Delivery 500000016 / 10             08/25/05               10.000  EA      Completed                                 
    .. GD returns QI 4900030060 / 1               08/25/05               10.000  EA      complete                                  
    .. Credit for Returns1 10000017 / 10          08/25/05               10.000  EA      Completed                                 
    ... Accounting document 10000017              08/25/05               10.000  EA      Cleared

  • Exchange Rate in Profitability Analysis Document

    How is the exchange rate populated in profitability analysis document?
    We have couple of scenarios:
    Scenario 1: Credit memo request created without any reference and credit memo is created successfully. Exchange rate populated in the profitability analysis document is the exchange rate which applicable to current date.
    Scenario 2: Credit memo request created with reference to customer invoice document and credit memo is created successfully. Exchange rate populated in the profitability analysis document is the exchange rate which applicable to the past date. We dont know how the system picked the exchange rate which does not applicable to the current date.
    Any poiniters to this issue?

    HI,
    try SAPNET note 429517.
    Best regards, Christian

Maybe you are looking for

  • IOS 6 has messed up my backup

    I've been having issues with backup ever since I upgraded to IOS-6 on my iphone 4S.

  • CRXIR2 image from blob field and some fonts not displaying in PDF export

    I used CRXIR2 developer edition to create a report linked to a SQL 2000 database table.  There is a blob field containing a JPG image that is different for each record in the table.  I am using VB.NET code with ASP.NET 2.0 to programmatically change

  • Global navigation not working after SP 2010 upgrade from MOSS

    We are upgrading a MOSS site to SP2010, using in-place upgrade and keeping the MOSS UI. The in-place upgrade seems to have worked well and most of our work is coming over pretty well. The one immediate exception is that the global navigation is not s

  • Swing jdk1.4 is a buggy release !!!

    Hi Gurus !!! I'm wondering if anyone in the forums could solve this problem: I have a JDialog class with a swing textfield added with an ActionListener (JDK_1.4.2_04). When I press down the Enter Key, actionEvent is continuously being fired while the

  • Elements 10 Menu Bar on image

    In Elements 10 when you open a picture only the X for close appears on the menu bar. How can you restore the normal menu bar choices the minimize - and full screen double box choices?