Raw material issue for inspection from inspection lot

Hello friends,
My sample size is fixed i.e.75 gm for all  raw material quality testing. I have defined sampling procedure with sampling type "fixed sample". I want that this amount should be decreased from total lot quantity when i am posting it to unrestricted use. i.e. for 10 kg inspection lot quantity, 9.925 kg quantity should be posted .Now, system propose whole quantity for stock transfer from quality to unrestricted after usage decision.
Waiting for reply!
Thanks in advance!!

Dear Kiran
1)  System doesnot take decimal in samples. if your basic unit is KG and you procure 10kg material system will consider sample amount as 1 kg. it will not take 0.075kg as the sample.
2) Other option is make the procurement in GMs but that  will be difficult for purchaser to handle
3) or esle make use of this exit and do the posting based on that
QEVA0009 - UD: Predefinition of quantity to be posted to sample stock 
This will help
Regards
Gajesh

Similar Messages

  • Material issues for equipment from already issued materials for FL(Func Loc

    Hi,
    At my client place, the working nature is 24x7. Store is closed by 3:00PM and no material is issued after that. So, Departments get issued materials for the Functional location at once and distribute(consump) materials for Equipments as per requirement under that Funcitonal location. Our client wants that when material is consumped for equipments it should be issued from functional location issued materials.
    E. g. : For the funtional location "SSSL-1000-DG" 50,000 litre oil has been issued. Now, for lubrication of Equipments under this Functional location, Oil should be issued(debited) from this functional location. suppose, 1000 litre has been consumped for "ABC" Equipmnets. So, balance Oil of Functional location will be 40,000 litre.
    Please help me.
    Dinesh.

    Hi Dinesh,
    Generally material/consumption booking is done thorugh warehouse only.
    Once you issue the material from warehouse against F.L. cost center it will get updated with that F.L only.
    If you want that material to be booked against equipment then you need to issue against equipment only.
    You can create another store at maintenance side. Or just take the material from store and on next day book against required equipment.
    Sundar

  • Raw Material to go to quality inspection upon GR

    Hai all
    I am having a raw material which is recieved from external Vendor. Upon making GR against Purchase order this material has to go to quality inspection with automatic inspection lot creation. What settings i need to do in customization and in the material master of the material . I am new to QM module. Thanks in advance.

    hi
    for inspection of raw material u require 01 inspection type.
    conf. setting:
    Quality Management>Quality Inspection>Inspection Lot Creation>Maintain Inspection Types> maintain setting for 01 inspection type Goods receipt insp. for purchase order
    material master settings:
    in material master create quality view,inspecton setup - maintain 01 inspection type(mark post to inspection).
    if u want to inspect material using inspection plan set' insp. with task list' (make sure that u maintain inspection plan).
    please rvert if u have any query

  • Break up of raw material cost for released finished materials

    Hi All,
    I have searched various threads before posting this question.
    Is there any standard report available to view the breakup of raw material cost for a release finished material.
    I have cost component split report but it shows everything in raw materials.... is there any report to show a break up of this raw materials cost.
    If there is no standard report can you please how I should develop a customized report.
    Thanks,
    Srini

    Dear Srinivas,
    You will get the cost breakup in the following report:
    CK84_99 - Itemization
    CK86_99 - Costed Multilevel BOM
    CK80_99 - Cost Components
    You will get the same information in CK13N
    From the standard SAP,  no report will show breakup for all the materials in single report at a time.
    We have developed the report through ABAP functionality
    Regards,
    Pavan Kumar Arvapally

  • Issue for DTP from DSO to open hub destination

    Hello Gurus,
            I have a issue for DTP from DSO to open hub destination, long text for error in the monitor is as follows:
              " Could not open file
    SAPBITFS\tst_bi\bit\BIWork\GENLGR_OneTimeVendr_2 on application server"
              " Error while updating to target ZFIGLH03 (type Open Hub Destination)     "
          for open hub destination, I check the configure for logical file name , which is "
    SAPBITFS\tst_bi\bit\BIWork\GENLGR_OneTimeVendr",
    I am wondering where that file " 
    SAPBITFS\tst_bi\bit\BIWork\GENLGR_OneTimeVendr_2" in the error message comes from?
    Many thanks,

    Hi
    You do not need to create a file in application server. It will be created automatically.
    But if you have defined a logical file name in tcode FILE and used that in OHD and if it is not correct then it will show a conflict. Check this out.

  • Excess Raw Material  issue & FG reciept in Make to order Production

    In MTO Scenario I have created sales order for 10EA.After MRP run planned order of 10EA was created.I converted to Production Order.GI of raw material & GR for FG happens during order confirmation.If for that customer during Production physically 11Ea was produced.How i will show that extra FG (1EA) production & raw material booking against the order..

    Can you clarify, does it  mean you have consumed raw material for 11 EA FG, or you consumed only equivalent of 10 EA and due to production efficiency increase you gtot 11 EA output.
    In any case you can post this as a normal production order output. For additional 1 EA you can add this in Tolerance.

  • Raw material planning for process industry.

    I am going to implement SAP R/3 in process industry where i get raw material from farmers.I have to accept all raw material from surrounding villages because it's a government rule.So its necessary that all farmers should produce well quality yield. For that they must follow standard procedure to grow their crop.Is it possible to plan this using SAP PP?
    How to face this type of sceanrieo?

    Hi kiran Ghule,
    With the functions of the Quality Management (QM) module, you can implement it.
    The QM application component supports tasks associated with quality planning, quality inspection and quality control. In addition, it controls the creation of quality certificates you can do this
    Explore your self in this module if any problem then come back.
    Regards
    R.Brahmankar

  • MM: Goods issue for scrapping from quality

    Hi Experts,
    I want to scrap a stock from Quality Inspection using transaction - MB1A and Movement type - 553. When I do the transaction it gives me following error:
    <b>Change the inspection stock of material 83565 in QM only</b>
    Message no. QA495
    Diagnosis
    You want to make a stock posting to/from the inspection stock. This is not allowed for material 83565 because the quality inspection control has been activated by QM.
    The following cases can occur:
    The inspection stock should be increased, although an inspection is not foreseen for the current goods movement
    The inspection stock should be released, although  you can only do this using the QM transactions.
    System response
    You cannot carry out the stock posting.
    Procedure
    Check both the QM inspection setup data and the movement type for material 83565 in the quality management view of the material master.
    Can anyone help me out here ?
    Thanks
    Shiv

    Hi,
    In transaction QA11, you can take the usage decision & then in inspection lot posting tab, you may post the QI stock to required option (unrestricted, blocked, scrap) as per your requirement.
    This is because, the QI stock linked to a particular QI Lot can not be posted from MB1B / MB1A transaction. This has to be done through QM only.
    If you have already taken usage decision, then you can select the stocks with usage decision & then make required stock posting.
    Hope this helps.
    Regards,
    Prashant Kolhatkar
    - Reward points if answer is helpful.

  • Consignment RAW material cost estimate selection from Purchase Info Price

    I'm unable to determine the logic SAP is using to update the Cost Est. Standard for Consignment Raw Materials.  For instance we have (3) vendor Purchase Info Records for the same material.  One vendor PIR is w/ Info Category for Consignment and the other two vendors w/ Info Category for Standard.  When creating the cost std. the system selected the lower of the (2) Standard costs.  I don't understand why the system overlooked selecting the vendor in the Source List (the vendor w/ Info Cat. Consignment), with that vendor even being the lowest cost of the three vendors. 
    The only time that I can find where SAP selects the vendor w/ a Info. Category Consignment is when it's the only vendor listed in a PIR.  Any time that a Standard one exists, it overrides the Consignment line when updating cost stds.!?

    HI,
    As per Standard SAp, system will pick up the value from standard PIR. It will not look into any sub-con, consignment or pipeline PIRs. If you want to pick up the same, there are 2 methodologies
    1. User exit in costing variant to pick up speicific PIR
    2. Use procurement alterntive methodology
    Vijay

  • Excess material issue for subcontract should not be add in GR

    Hi,
      I have one problem,   we have one Finish materia   X   for making one    X we use three raw material  A,,B & C to make one X 1 qty of each A,B,C required  so while we make the GR for one X  we issue One A and B  but as C is having std. packing of 5  so we want to issue the 5 qty of C to vendor,  now    when we make the GR   for X  with MB01,  first we ahve to give the Qty. of X material  so we ahve given  1  as the PO is for 1 qty  X , then we ahve to give the qty. of raw materials for A,B,C   here sytem first automatically taking qty. 1 for A  one for B  and 5 for C  but we want that as only one C is required to make one X  so sytem should take only one C qty  and remaining 4 qty. of C should be with vendor  stock  that we wil adjusct in next PO for X materail  and challna should be close properly,
        How we can handle this.
      regards,
        zafar

    Hi,
            I want to transfer the material with ref. to purchase order only, so that all the material which are present in that PO should automatically conme in the MB1B for transfer of material,
            Is there any other way such that while making GR the qty. will come as per BOM only for consumptio.
      regards,
       zafar

  • Material Issue for both MTO & MTS

    Dear Guru's
    I have to do REM Backflush for a MTO scenario.
    The corresponding raw material are available in stock which was not purchased over a period of  time.
    When I try to do post with correction the system is not allowing me to do the posting, the system is giving error as sales order item is not available.
    Can anyone help me consumming the raw material available in the stock .
    Is there any settings to be done to consume the material which is available in the stock for bothe MTO & MTS.
    Kindly do the needful.
    Helping hands will be appreciated with good points.
    Thanks & Regards,
    Arul.

    Hi Arul
    Please check the below in your DEV server.
    If you put the Individual/coll indicator to 2 in MRP 4 view in material master the raw materials can be taken from unrestricted use stock while back flushing.
    Or
    IN MB1B you can use mvmt type 412E to convert unrestricted use stock to sales order stock.
    SO u can do the backflushing after the conversion.
    Cheers
    JOJI

  • Query for calculating raw material requirements for the remaining quantities in sale order.

    Dear SAP Experts,
    Clients requirement :
                                         Client wish to know the quantities of raw materials needs to run the production order inorder to complete the remaining quantities in sale order.
    Need Clarification:
                                  I"m using the below query for this requirement. I wish to know whether this query suits for my clients requirement or not. If its so, I need to know how to group by T4.[Code] (Raw material Name)   and need to get the sum of    T4.[Quantity]  (BOM quantity)      and  (T1.[OpenQty]*T4.[Quantity]) as TOTALQTY under each raw material group
    SELECT T0.[DocNum], T0.[DocDate], T0.[CardCode],T0.[CardName], T1.[ItemCode], T1.[Dscription], T1.[Quantity] as salesorderQty , T1.[OpenQty], T2.onhand, T4.[Code] as Raw material Name,T4.[Quantity] as BOMQTY,  (T1.[OpenQty]*T4.[Quantity]) as TOTALQTY FROM ORDR T0  INNER JOIN RDR1 T1 ON T0.[DocEntry] = T1.[DocEntry] INNER JOIN OITM T2 ON T1.[ItemCode] = T2.[ItemCode] INNER JOIN OITT T3 ON T2.[ItemCode] = T3.[Code] INNER JOIN ITT1 T4 ON T3.[Code] = T4.[Father] WHERE  T0.[DocStatus] ='o' 

    You're posting in the Portuguese B1 space.
    You might want to post in the English one: SAP Business One Application

  • Differentiation of raw material and finished goods from tax / valuation

    Hi,
    There are certain materials which are sometimes produced inhouse (considered as finished goods) and sometimes procured from outside (considered as raw material) i.e the same material can be raw material or finished goods depending on its use. Taxes and valuations are different depending on whether the material is RM (Raw material ) or FG (Finished goods) .  How can we differentiate if we intend to have the same material number. Do not intend to have split valuation.
    Thanks in advance .
    With regards,
    Mrinal

    You cannot differemntiate them. Only way to differentiate such materials is by either  by different codes, or by split valuation.

  • Different exchange rate on each material issued for order

    Hi all,
    I have strange situation like this. Controlling area currency is USD and object/company code currency is THB. When i do Good Issue for production order, system use different exchange rate for each material although all of these material are posted on the same posting date for good issue.
    Example :
    I do Good issue material A and material B for production order 100000 at posting date 01.03.2008. When i look into cost analysis and look for USD currency, i found that exchange rate for material A is 30 THB/USD and exchange rate for material B is 25 THB/USD. FYI i use exchange rate type m. How can this happen?? How can each material have different exchange rate although its transaction at the same posting date??
    I'm waiting your advice.. Maximum point will be given.
    Best regard,
    Yudha

    I think its a bit misleading...The requirement is to post an Invoice with a base taxable amount of  Exchange Rate A and a tax amount of Exchange Rate B. The Base Currency is JPY and the System Currency is SGD. So the Report S_ALR_87012357 should see the amount in SGD there. The Issue is caused by the different exchange rate on the tax amount submitted by the Vendor Invoice.
    Example: Vendor Invoice Amount: 926,413.00 JPY, then we created PO to Invoice with Base Currency JPYalso amounted 926,413.00 JPY. However, in the Vendor Invoice Amount, the Tax Chargeable is 923.00 SGD (based on their exchange rate 65.66 JPY per SGD). But our Exchange Rate (System Rate) is 63.49 JPY per SGD. How can we reflect the Tax Amount as 65.66 JPY but still the correct SGD amount is based on the Vendor Original Invoice Exchange Rate 65.66 and not the System Exchange Rate, 63.49 in the same Invoice Creation (MIRO)?

  • MB1B - Bulk material issue for sub-con PO

    Hi All,
    For a subcon PO, the user has by mistake done a transfer of a bulk material using MB1B. The vendor has used this material as well. Now when i receive the material from the vendor, this bulk material is not consumed by this PO with a 543 mvt, which is normal.
    But the issue is, this item is now shown as lying with sub-contractor, & there is no way i can post a 543. I can post a 542 & reverse the issue, but then how do i treat this stock?
    Hope my question is clear, await inputs.
    Regards,
    Vivek

    Hi Vivek,
    Thanks for your explanation.
    Still I have doubts. Are you speaking of bulk material in terms of BOM?
    I haven't got experience with them BUT SAP help definetly says that bulk material is not 'withdrawn specially for the order' and 'a bulk material item is only for information'.
    http://help.sap.com/saphelp_46c/helpdata/en/b1/c043f4439a11d189410000e829fbbd/frameset.htm
    Considering this, we cannot expect consumption by mvt 543 of bulk material when GR against subcon-PO takes place.
    It's only my opinion so please think about this yourself as well.
    BR
    Csaba
    Re: Items with Bulk Indiactor in subcontracted assembly.
    http://www.sapfans.com/forums/viewtopic.php?f=9&t=289342&p=869693&hilit=bulkmaterialconsumption#p869693
    http://www.sapfans.com/forums/viewtopic.php?f=6&t=310542&p=938766&hilit=bulk+material#p938766

Maybe you are looking for

  • How to configure multiple smtp servers per domain

    Hi, how do we configure multiple smtp servers per domain/corporate in iplanet messaging server 5.2. i wanted to do this so that i can configure some domains with virus scanning and some domains without antivirus.

  • Problems appending email pdfs to existing portfolios using Outlook plugin.

    I'm trying to use the outlook pdfmaker plugin that comes with Acrobat X Pro to append Outlook 2010 emails to an existing portfolio.  I'm getting this error: "PDFMaker cannot append to the selected Adobe PDF archive because it was not created in Outlo

  • How to allocate more ram to T410 IntelHD graphics? CONFUSED

    Hello There I have a T410 Thinkpad, and I would like to know how  to allocate more ram to the IntelHD graphics so that I can run my video games a lot better. I have searched through the bios and cannot find how  Sorry for my English -Jack

  • Itunes Error 42003.  Cannot Authorize and sync with phone

    Windows 7, 64 bit. Updated new 4G Phone. Updated Itunes to 10.1 64 bit. Changed to new email. Now cannot authorize computer and get error code 42003. Help. Cant import my aps to my phone.

  • Labview 2011 64-bit install problem

    I'm trying to install the 64 bit version of LabView onto a win7 64 laptop. The install seems to go ok. When I try to run it, it crashes with this exception 0xC06D007E$r. I've tried uninstall/reinstall and I still get the same error. I have the 32 bit