Hi,
Raw material planned cost and quantity in table MCKALKW is not equal to cost analysis in CO01 / CO02.
Could you please let me know how to get the planned cost and quantity for production order components for report development. i checked other tables like AFPO and AFKO and it is showing only for main material and not for its compoen

Hi,
You can check the cost of the individual components in Bill of materials of each material seperately. Hope this works for you.
Thanks and regards,
Murali krishna Maganti

Similar Messages

  • Planned Cost and Qty vs Actual Cost and Qty

    Hi,
    I need to compare two BOMs (same PN but in different periods) for quantity of Parts in it and costs of these parts in different period of time.
    Thanks.

    Second is easier., just use COOIS (Order Info System) and add the field Alt Bom to the Layout, you can even filter by Alt Bom or use some combo filter between dates and alternative Bom.
    But the point of Compare Quantities & Values in Bom can be partially achieved thru CS14, however I Dont see a simple way of having material prices at the required dates in the report. Best choice for me is to run CK11N (Costs estimate) for the required Date and alternative Bom combination and download the detailed material report to excel. Or develop some special report, which will be a combination of CK11N for the two conditions...
    Let me know if this can be useful.
    Regards

  • In which table production order planned cost and actual cost i can see?

    Dear PP Guru,s,
    from which table i can see productuion order planned and actaul cost. i checked following tables AUFK, AFVC, AFVV, CAUFV, AFRU, AFKO, AFPO. but i did not found planned cost and actual cost field. is there any other way to get this data with respect production order?
    Regards,
    sree

    Dear,
    Planned and actual costs of prod order from COEP, COSS, COSP  S027 tables
    production order shows the planned cost based on the quantity structure.
    Please refer my reply in this thread for details,
    Re: Actual Halb Material Cost
    Regards,
    R.Brahmankar

  • IW32  needed Plan Cost and Actual Cost table name

    Hello ,
    In IW32 transaction Plan Cost and Actual cost in cost tab ---Table Name.
    Req: needed  plan cost & actual cost table names  for particular order number.( For New Report )
    Can you please let me know where Plan cost & actual cost get stored in IW32 in Cost tab ( table name / function module name ) or how its get calcualted for particular order number.
    Thanks in advance !
    Regards
    Rahul

    hi ,
    i too had same issue , i wrote following FS for that :
    Actual and planned cost  from PMCO-WRT00 to WRT12(the sum of values should be considered for actual as well as planned ) for  PMCO-OBJNR taken from CAUFV -OBJNR for order number  AFIH-AUFNR  and also currency from CAUFV-WAERS .
    Actual cost will have valuation type PMCO-WRTTP = 4 and planned cost will have valuation type  PMCO-WRTTP = 1 , which will be placed in different column
    hope this helps
    regards
    satish

  • Data for Actual/ Plan Cost and Budget

    Hi All,
    Can you please adviseme  which content i need to activate to get the Actaul, Plan cost and the Budget Data in SAP BW.
    Do i need to exploer CCA cubes or Fund managment Cubes.. Please let me know... I need to know the Tables in R/3 Side for budget data to make sure that in R/3 we have budget data..
    Please let me know.
    Thank you
    SAP

    Hi there,
    For those check in here:
    [http://help.sap.com/saphelp_bw33/helpdata/en/d3/561be24e8c11d596f30000e835339d/frameset.htm]
    [http://help.sap.com/saphelp_bw33/helpdata/en/60/0f07d3532c864aab7ec5f113146da2/frameset.htm]
    [http://help.sap.com/saphelp_bw33/helpdata/en/26/d0cccc8d98c344925915ec81d5a421/frameset.htm]
    [http://help.sap.com/saphelp_bw33/helpdata/en/43/de43fcf6e2154bbbbcecbc63cdf287/frameset.htm]
    [http://help.sap.com/saphelp_bw33/helpdata/en/23/d5cf85683c3348b2189199e49a35cf/frameset.htm]
    [http://help.sap.com/saphelp_bw33/helpdata/en/ad/be383fd98d1201e10000000a114084/frameset.htm]
    [http://help.sap.com/saphelp_bw33/helpdata/en/1a/8c42588afe11d496d80000e835339d/frameset.htm]
    [http://help.sap.com/saphelp_bw33/helpdata/en/d3/29ae399c1a6651e10000000a114084/frameset.htm]
    Hope this helps.
    Diogo.

  • Raw Material Planning Through script logic

    I am trying to do a Raw Material Planning in BPC based on Item Bill of Material.
    I am capturing the Bill of Materials of Items in an Application
    FGMaterial on one Dimension
    and Raw Material in another Dimension
    In another application (an input schedule) the users can do their Sales Planning of Fininshed Goods.
    The Raw Material consumed

    Hi
    I am using the following code
    *LOOKUP RMBOM
    *DIM PRICECONSTTIME="NOTIME"
    *DIM ENTITY="XXX"
    *DIM CAT="BUDGET"
    *DIM MEASURES="PERIODIC"
    *DIM MATL_ACC="%MATL_ACC_SET%"
    *DIM RM1:RAW_MATERIALS="RM1"
    *DIM RM2:RAW_MATERIALS="RM2"
    *DIM RM3:RAW_MATERIALS="RM3"
    *DIM RM4:RAW_MATERIALS="RM4"
    *DIM RM5:RAW_MATERIALS="RM5"
    *ENDLOOKUP
    Then I used the code
    *WHEN MATL_ACC
    *IS MAT1
    REC(EXPRESSION=%VALUE%LOOKUP(RM1),JINDAL_MATL_ACC="MAT1"
    *ENDWHEN
    But my requirement is that I need to run this for all Materials of Type(Property FG)
    Can you suggest how I might proceed

  • In IW32 no Planned Cost and Actual is showing Zero

    hi,
    In IW32 no Planned Cost and Actual is showing Zero,since activity type is mentioned.
    how it could be displayed.
    Thanks

    Dear Sharma,
    1. This is regarding Maintenance order, frist you confirm by clicking on the operations tab-> double clicking on the work center->click on costing tab, check here activity type, activity unit is maintained.
    2. then in in KP26 check the activity price in the current period.if it is zero u will get zero
    3 then in the order click on components, if components are consumed  also check the component price in material master.
    this will resolve your issue
    sree

  • Difference between the planned cost and the target cost

    Hello guys,
      I am really confused between the planned cost and the target cost.As Per the sap help target cost is cost required to produce certain quantity of material.And planned cost even carry the same definition.
        So is there any difference between these two cost.Are they same?

    Jitendra,
    Genarally in CO we will define Target cost is getting calculated in the Production order based on the "Standard Cost Estimate" after GR. Planned costs are calculated based on the current costs.
    Example:
    Assumption: Assembly Material A with Standard Price, Component B and Component C is maintained with Moving average
    Material A Cost 1EA = (component B = $10 + Component cost C = $20+ Activity Price $1) = $31, this is the standard cost estimate for the material.
    Now I create a production order on 15th of the month, and the Moving average price for component is now $20 due to subsequent GR with higher price. Now the planned cost for the order would be (20201)=$41, whereas the Target cost would be still $31.
    Hope I was able to clarify,
    Regards,
    Prasobh

  • Service Order Planned Costs and Cost Center Planned Line Items

    Experts,
    I am curious of Service Order Planned costs, and whether or not these planned costs are being posted to the Cost Center linked to the Service Order Operation's work center.
    I am a but puzzled as I don't see any planned costs from any Service Order Operation in a cost center linked to the Operations work center, when reviewing "Cost Centers: Plan Line Items" report.
    BR,
    Cenk

    The planned costs were input in one of the Service Order operations as planned hours. There is a column for it in the operations list. The amount of hours have incurred a planned cost on the Service Order header.
    I simply assumed that this cost would be credited to the Cost Center linked to the operation's Work Center. But that is obviously not the case. I am not familiar with the PLICC field and the functionality it provides.
    Thanks!

  • Function Module to find Planned Costs and Actual Costs against WBS element

    Dear All,
    We have a requirement where we need to find out the Planned Costs and Actual Costs booked against a WBS element, in a year. The costs can be against all the plan versions or on individual plan version.
    Are there any function modules to retrieve this value?
    Thanks for the help.
    Warm Regards,
    Judith

    Hi,
    The easiest way would be to get the OBJNR for all WBS elements from PRPS and look up RPSCO and summarize for Value type (RPSCO-WRTTP) 1 for planned cost and 4 for Actual cost.
    Please let me know if this helps.
    jibat

  • User Exit for Material Plan Costs

    I have an escenario where the client needs another option to calculate the material plan costs, but need to identify the correct user exit.
    In transaction OKYF exist the option "U Valuation Price with User Exit" but need the user exit to use.
    Hope to receive information soon...
    Best Regards...

    Hi
    you can use unit costing for material option for this...
    Automatic netowrk costing for material component
    you need to maintain proper costing variant for material component in config.
    in projects assign material then select material -edit - cost - unit costing.
    which will get reflected in network cost in CJ40.
    Venkatesh

  • Actual Costs , Planned Costs and Variance

    Hi,
    I know that there is a standard function module that gives the actual costs , tha target costs and variance, K_KKB_KKBCS_ORDER_REPORT. But is there any Funcion Module  for calculating the Actual and planned costs and variance?  or could the same FM be used for the purpose?

    OK

  • Dashboard content is not populated with Planned Cost and Actual Cost

    Hi
    We are working in cProjects 4.0 + ECC 6.0 implementation. I could not get the data for columns in Planned Cost and Actual Cost in cProjects Project Dashboard. I have properly mapped the config settings and created and assigned a Project in PS
    Has anybody got this data in the Dashboard?
    Kindly suggest the solution
    with regards,
    K Rama Krishna
    9394712743

    Hi Rama,
    It is difficult to say, where the problem is.
    but typically, the causes of the problem are
    customizing is  set incorrectly or the evaluation is not carried out.
    You can run the the evaluation DPR_EVE_BATCH_DPO additionally, please untick the flag 'check the last changed date'.
    Hope, it helps.
    Kind regards,
    Zhenbo

  • Planned cost and revenue changes

    Hi,
    Upto which event we can change planned costs & revenue?
    How to track planned cost and revenue changes?
    Thanks!

    Hello Harsh,
    The planned cost and Revenues can be changed during any phase of the project. As far as monitoring goes you can create versions (snap shots) each time when you change the planning. You can use s_alr reports to compare 2 different versions.
    On costing side you can use supplement budget or return functionality. You can use tcode CJ3A or CJ3B to chk the Budget document.
    Hope this helps.
    Sarang

  • Raw Material price change and its effect in costing of Quotation.

    I have a scenario in which the Quotation is given on 11th May, and the costing of the Order is done where the Raw materials Details along with overhead costs is determined, and then sales value is quoted, after the production is done after 2 months, and at the time of dispath there is a change in the price of raw materials. The user wants to known that the net loss or profit against that order due to price change in the Raw material.
    Will it be possible at the sales Order Level and whether it will give the costing as per the current RM rates.

    I think the best way is to use a Make to order scenario with cost calculation in the order. the calculated cost is then stored in EK02 condition, the at invoicing time you can calculate the variance in CO/PA between real cost and estimated cost.
    You have to ask the help of smart CO guy to do this.
    Roberto

Maybe you are looking for

  • How to  limit the access of a transaction

    please provide hw to create an authorization object... like hw to limit the access of a particular userdefined trasaction to a particular user

  • Automation testing Flash 8

    Our project is currently faced with having to build an automation testing framework for our flash games. We are currently using Flash 8, flex, and ActionScript 2, but we are wrapping everything for easy transition into Flash 9 and AS 3 as soon as it

  • Drag-drop video into iphone not working

    All my music and video all of a sudden disappeared off my iphone (the video podcast still were there though). I was updating and poking around, but I really don't think I delete them accidentally. I've always just dragged and dropped videos from the

  • IBooks cannot be downloaded at this time, iBooks cannot be downloaded at this time

    I have bookis in iBooks and when I click on it I cannot get access to my books because a pop up says:"Unable to download Application - iBooks cannot be downloaded at this time

  • Airtunes streaming no longer works since last update

    I have been using my Airport Express to straem Airtunes to my speakers for over a year. Immediately following my last software update, it no longer works. In iTunes, I can see the speakers, it just won't let me check them for use. The Express unit se