Release actual cost in Material Ledger

Dear Experts
I want to copy the actual cost of period 1 to be standard of period 2.
I did the following activities:
1- I run all steps for standard cost estimates for year 2012 and released the standard cost estimate for periods 1-12.
2- On January 2012, I did all steps in CKMLCP up to post closing. This is done mid night 12:01 (01.02.2012).
3-  I run marking CKMPRPN, I checked "Manual Date" 01.02.2012 and in "Rule Maintenance" I selected "Perioic unit price in previous period. There was no error but when I check MM03 for a specific material there is nothing in coulumn "Future Price"
4-  I run CKME and got error  "C+811"
Please advise how to copy actual PUP to be standard of next period.
Regards
Ahmed Zain

Dear Maria
Taking all the above contribution in consideration, they are valuabe. Yours has hit my direct problem. I need the following calrifications, please :
1-  In CKMLCP is it a must that marking and release of PUP takes place after "Post Closing Step" or I need to do them right away after "Revaluation of consumption step" , then do post closing? in other words, does the PUP will be calcuated after this step b"Revaluation"  and can be subject to carry forward for next period. If this is true then we can select manually the next period and do the post closing.
2-  My understanding to note 666681 is that, by the end of current period "Feb, 2012", I do  all CKMLCP steps up to post closing, then I mark PUP - select manual date 01.03.2012  ( correct me whether it will be 01.03.2012 or 01.04.2012). If I check MM03 for any material I can see PUP in Future colunmn in costing 2 view. By the end of Period 3, I will run CKME for the marked PUP and so on...
Your torsh is required to throw more light in this corner, please
Thanks
Ahmed

Similar Messages

  • Actual cost of material in COPA

    Hi Team,
    We have implemented PP, CO & COPA  our client has the requirement to see the actual cost of material in COPA as per their requirement we designed the KE30 report as product wise profitability report in that report we used the record types B( direct postings from FI), C(Order settlement), D(over head cost) from the copa assessment cycle & F ( SD billing).
    1) Is it possible to see the actual cost of material( Including activity cost) in copa.
    2) If it is possible please advise.

    Hello
    It is not possible to get the actual cost of the material in COPA. Actual cost can only be derived if you implement material ledger.
    However in COPA we may come close to actual cost to some extent. The following configuration needs to be done:
    1. Run standard cost estimate every month so that the price reflects the most recent material prices.
    2. Define assessment cycles for auxiliary cost centers (whose cost should form part of inventory cost) to production cost centers.
    3. Configure for splitting and revaluation at actual price.
    4. Take the production variances to COPA.
    5. Create a report to show the standard cost and variances.
    One of the difference is that the total standard cost is for the quantities sold during the period however the variances will be for the quantities produced during the period.
    Another difference is that the unabsorbed overheads could not be allocated to individual materials.
    Hope this helps.
    Sangram

  • Posting Actual Costs at Material Level

    Hi All
    For our standard costs we will have BOM Components, Activities from Routings and additive costs. We also have activated Material Ledger and will use it for Actual Costing, the objective being that each and every actual cost will be brought to the SKU level. For BOM components and activities that is no problem since it will be done through settlement.
    However for cost components that have additive costs how do we settle them to the material ledger? Do we need to do MR22 for difference between standard and actual? Is there a way to do this through a template allocation or some other allocation method?
    Thank you

    Hi
    Lets assume, you have Std cost of 100 USD involving Material + Labor and an additive cost of 10 USD entered manually from CK74N...
    During production order processing - You would issue material components and confirm Labor hrs... Say, this amounts to 120 USD as against the std cost of 100 USD...
    However, in prod orders, there will be nothing posted against the additive std cost of 10 USD... If you wish, you need to post it either through template allocation from some cost centers or use some assessment cycle or transfer manually from KB11N or use a costing sheet
    Regards
    Ajay M

  • Issue with Standard Cost estimates / Material Ledger

    Background:
    We have been using SAP for the last 5 years with Material Ledger active. Due to a number of reasons, we have not revised its standard cost estimates from 2001 till now. This means that at month end, we do not mark and release prices as recommended, nor do we mark prices and use dynamic release.
    What Happened:
    A new material called PFSW3 was made. This is a FERT. Before production
    could start my team released the standard cost estimate for this material. Production was now able to proceed without problem. Then, when the time came to sell the material (VF02), SAP again raised the error 'cost estimate not found'. On checking the standard price in MM03, we discovered that the future cost estimate was missing. So we created and marked a new cost estimate in the middle of February 2007.
    Problem:
    When the first sale took place, SAP released the marked cost estimate and posted a Price Change document to adjust for the new standard cost. I understand this was due to dynamic release. Now, when month end came, the system settled all the production orders of material PFSW3 but did not do multi level costing on it.
    Internal Investigation:
    My team has determined that the material PFSW3 has price determination 2 set by mistake. All our other production materials (HALB and FERT) are
    set to price determination 3 in the material master (accounting view).
    Questions:
    To sum this situation up,
    we need to know why the material PFSW3 was not marked closed in its period status (CKM3) at the time of closing through CKMLCP?
    What are the implications of not closing this material in Feb 2007 (current period status is showing 'Quantities and values entered')?
    How can we close this material this month?
    The future cost estimate is again missing for PFSW3 in March 2007 and I
    fear we are going to face more problems as this material is sold to customers.
    Please respond this is an urgent issue.

    Dear Shumyl,
    Please, have a look at Note 645083 - Material period status set to "Closing Entry Completed" that might help to closing your material in previous period.
    Hope it will be useful.
    Regards,
    Flaviano.

  • Group and legal costs without Material Ledger

    I was wondering is there a way we could have both the group cost and the legal cost in the system without having to configure material ledger. Currently we have Group cost in the system and no legal cost.
    Any help would be greatly appreciated.

    Hi NIK83,
    There is no other way to have multiple valuations w/o having ML in SAP
    ML is the only solution... If you want to upload the legal values, you can use the tax price or commercial price fields and take out a report comparing the 2 values using T code MRN9
    but, you will have to uplaod these values.. these cant be calculated w/o ML
    Regards
    Ajay M

  • Effect of Activating Cross company costing in Material Ledger

    Hi all,
    We are live with ML from seven years and now we want to activate cross company costing. I would like to know if there will be an impact of this in the material ledger side. If anyone has comeacross this situation please share your ideas about this.
    Thanks,
    Santosh

    thanq for reply.
    IF I can update standard price in 3 views, how can i see three standard prices in different views?
    I am facing another problem also here.
    we have 3 company codes and 3 plants like VN01,SG01,IN01.
    When I am doing standard cost estimation for IN01 with group costing variant for group valuation, I am getting error "Object was not costed", but where as If I use standard costing varaint ( PPC1), I am not getting any error, system is showing correct standard cost estimation?
    Where as If I use group costing variant for other company codes, I am not getting any error.
    Is there any customizing missed regarding standard cost estimation, when material ledger is activated?
    regs,
    ramesh

  • VPRS Cost in Material Ledger

    hi all,
    i have some problem here.
    we use 2 local currency. first local currency is IDR, and second local currency is USD.
    our client use material ledger, so in material master accounting 1, we maintain 2 value of inventory (in IDR and USD)
    let say we create material XXX (using standard price)  in 01 jan 2011 , with IDR value 1,000,000. the system will convert to USD with exchange rate in 01 jan 2011 (which is 10,000). so the USD value will be 1,000,000/10,000  = 100 USD.
    then in 10 january 2011, Sales order is created for material XXX with document currency USD .
    cond type VPRS get 1,000,000 IDR and covert to doc Curr (USD) with exchange rate in 10 jan 2011 (which is 9,000).
    so the VPRS value in USD will be 1,000,000/9,000 = 111,11 USD.
    by this case, the VPRS value in sales order is DIFFERENT with value in Material Master. it also become a problem when we want to see PROFIT MARGIN.
    can  cond type VPRS get the correct USD value according to Material Master?
    thanks.
    Best Regard,
    Hendry

    Please check the following notes which may help you
    a)  Note 547570 - FAQ: VPRS in pricing
    b)  Note 640692 - Currency conversion VPRS
    c)  Note 1365939 - VPRS logic and Customizing settings in SD
    thanks
    G. Lakshmipathi

  • Actual cost for Material - Very Very urgent

    < MODERATOR:  Message locked.  Please read the [Rules of Engagement|https://www.sdn.sap.com/irj/sdn/wiki?path=/display/home/rulesofEngagement] before posting next time. >
    Dear All,
    I have a very urgernt requirement.
    My client wants to prepare MIS report, in which they need details of actual costs of FG i.e cost sheet (which includes RM qty/cosst, PM Qty/cost & overheads). We have not yet got any ABAP report developed for the same.
    We have just 2 days to work this issue.
    Can any one proivde some solution to this
    Regards,
    Ankita

    Can i take some field values from process order and map it in SQVI query to get data ???
    Regards,
    Ankita

  • Actual Costing/Material Ledger (CO-PC-ACT) - Actual costing

    Hello,
    I have same problem with actual costing in material Ledger.
    When I perform the actual costing a price differences that belongs to materials (orders) which at the end of the period are WIP, remain not split and don not book them on Accruals and defer.acct(material ledger) (OBYC - Transaction LKW).
    Moreover,  in the following month, system does not taking into account the value.
    Does anybody had similar problem or  knew how tu handle it?
    Thanks in advance,
    Rafal

    Hi Rafal,
    there is a functionality built into acual costing to cover this:
    [WIP Revaluation  |http://help.sap.com/saphelp_erp60_sp/helpdata/en/9e/9e7a74681f1d4f9ba6f5d64aba4a44/frameset.htm]
    best regards,
                   Udo

  • Blogs for Material Ledger

    Hi
    I have a situation where Material are using 2V and the material inventory left with some price difference .
    For example we have issued PO for 10 pieces as Project Stock @ 10 $ each , At the time of MIRO we have a price diff of 0.50$ each piece .
    Before MIRO we have issued the stock to Project . In one of the material the price diff of 0.50$ was absorbed by the consumption to Network where as another material left with Price Diff which is causing a diff in GL and Inventory Values .
    My question is why this happened where the two material has same setting . Second question , how to adjust the Inventory diff ?
    Logicaly this price diff should be absorbed to Project Network .
    Thanks
    Vijay

    Hi,
    First of, thanks for the valuable information.
    We are getting ready to activate actual costing.
    Material ledger has been active for quite some time now (multiple fiscal years), with all materials activated at standard (S) and price determination "transaction based" (2). Costing runs are only run on a yearly basis.
    I am currently establishing my conversion plan.
    I believe I have all the necessary steps identified (exception made for one little clarification) and am still working the timing.
    A couple of questions:
    1. Should I update my materials with a price determination value 3 before or after my configuration is imported in production? I understand that the configuration will really fall in place at the time I run actual costing at month end (CKMLCP) but I am wondering if there is any dependency with the price determination update (2 to 3) from a timing/sequence standpoint.
    2. Is it necessary to run, mark and release a cost estimate right after the price determination has been changed (from 2 to 3) and before any goods movements take place or does updating the price determination to 3 is sufficient to support actual costing at month end (i.e. is the cost estimate in existence with a price determination 2 sufficient)?
    3. Any particular aspects/steps I should pay attention to as far as going live with actual costing? In general, what would be the ideal sequence of events?
    Thanks a lot for your help,
    Regards.

  • Double actual cost in Profitability Analysis for cancelled billing doc

    Dear expert
    Say we have a billing doc posted in May, and we run ML closing and KE27 during month end closing, which transfered actual cost from material ledger to value field in PA.
    In June, we cancelled that billing document, the question is why the system automatically posted actual cost of cancelled billing docs to value field in PA right away (without KE27)?
    The reason I asked is because when we run KE27 for June closing, the SAP transfer again actual cost from material ledger to value field in PA. So we will have double posting of actual cost for cancelled billing document
    Please help, which setting did I missed to prevent SAP automatically posted actual cost of cancelled billing docs to value field in PA right away (without KE27)?
    Thx

    Hi
    Thats because you had double +ve also..
    Let me u/s your situation better
    1.PGI Posted COGS of Say, 100
    2. KE27 posted, say, addnl 20
    So, total COGS is now 120
    3. You posted a reversal now... It should post -100 and not -120.... Is it posting -120?
    Run KE27 for this month and see if it really posts -120 again... If it does, raise an OSS message to SAP... They are liable to help
    In my opinion, there is no Config set up for this... At best, you can try to assign different VF in KE4R for PV = 02 as compared to PV=01 and see if it helps
    br, Ajay M

  • Actual costs for laboratory exams / Material Ledger

    Hi Experts
    I have a doubt for actual cost scenario for laboratory industry.
    My  background is for product cost for consumer goods, specially food companies, so this is a new segment for me.
    This laboratory has baseline version, no service/production order, it means all material consumption goes to cost center and they use activities to send costs from cost center to cost center.
    They have BOM for all exams (finished product). They only run CK40N for standard costs but they don't have actual cost (material ledger - CKMLCP) implemented.
    This is the issue: they want actual cost for every exam in the way we have for consumer goods industry.
    So they can analyse profitability for product (exam) x customers.
    I wounder if the same industry actual cost scenario can be applied to this business segment or if there is a special SAP solution for this segment.
    The main issue is the stock, there is no stock, it´s service. I believe we could change the account in BSX key (OBYC) for some P&L accounts but I´d like your opinion/experience.
    I hope you help me to  clarify these doubts
    Thanks in advance.

    Dear Rupesh,
    I don't think so there will be any std.report in PS module to show plan vs actual cost of material component.
    For looking plan vs actual cost in PS having many std reports but they don't show for material component.
    I think for this you need to develop a Z report which will show Plan vs Actual cost of material component.
    In CN52N report (Component overview report) you can add two fields one is for plan cost & other for actual cost.This can be one of possibilty you can try.Otherwise develop a new Z report for the same.
    For this you need to take yr abaper's help.
    Regard's
    Sandeep

  • Actual Costing concept in Material Ledger

    Hi
    Masters , can any body please explain the concept of Acutal costing in material ledger i think that involves the following steps:
    1 Activate actual costing.
    2.Define userdefined names for receipts and consumption
    3.Assign user defined names for receipts and consumption /
    for the above 2 and 3 points what is the purpose we have to define and assign user defined names in coantrolling level selecting the B+ Procurement and V+ Consumption.
    thanks in advance

    Hi,
    Actual costing is a huge concept. It is difficult to explain the concept in few words
    Please go through the following link for detailed informaton:
    http://help.sap.com/printdocu/core/print46c/en/data/pdf/COPCACT/COPCACT.pdf
    Configuration Points:
    Path: IMG>Controlling>Product Cost Controlling --> Actual costing/Material Ledger
    1. Activate Material Ledger for valuation areas
    2. Assign Currency types to Material Ledger Type
    3. Assign Material Ledger Type to Valuation Area
    4. Configure Dynamic Price Changes
    5. Define Material Update Structure
    6. Assign Material Update Structure to a Valuation Area
    7. Activate Actual Cost Component Split
    8. Activate Actual Costing
    Coming to your Questions 2 and 3. they are required to be created if you want your own Controlling level for transactions that you would like to differentiate in the material ledger, further than the standard system offers. Normally we don't use unless there are some specific business requirements
    Some key points would be:
    ML records all receipts, consumptions and variances for each material.
    ML gives overview for each material of the starting balance, receipts, consumption, variance and ending balance.
    ML calculates the actual cost for each material u2013 finished goods, packaging.
    If a material has BOM, variances of lower levels are rolled up to next higher level up to finished goods, to calculate actual cost for raw material, semi finished & Finished goods in ML as unit price.
    Calculated actual cost at end of month can be used as standard price for next period in the material master.
    SAP MM is on standard price based costing, ML can do monthly average costing.
    Direct settlement of all kind of price differences / exchange rate difference/ to materials at the end of the period.
    Once activated , it is not that easy to deactivate although possible with implications like not having historic data.
    Cannot be used in isolation : All the plants within the company code shall be material ledger active.
    Material Price change is not possible after first transaction in that period.
    Using material ledger, inventory in US plant in Canada will be available in USD and CAD
    Hope this would help you.
    Best Regards
    Surya

  • Material ledger- pipeline materials actual costing

    Dear all,
    I am having problem with pipeline materials not being included in multilevel actual BOM in Material ledger actual costing. My client need information about actual quantity of pipeline material (natural gas) being consumed in multilevel production. I am not sure if pipeline materials are subject to actual costing/material ledger. Actual cost component is showing the amount of costs of natural gas, but in multilevel BOM, pipeline materials are not included. Am I right about this?
    thanks in advance,
    Duu0161ko

    Hi Rafal,
    there is a functionality built into acual costing to cover this:
    [WIP Revaluation  |http://help.sap.com/saphelp_erp60_sp/helpdata/en/9e/9e7a74681f1d4f9ba6f5d64aba4a44/frameset.htm]
    best regards,
                   Udo

  • Material Ledger,Revaluation Production Cost Center ,Standard Cost

    Hi, I have a problem with  revaluation of production cost centers.
    Firstly,  production cost center expenses are settled via activity types onto the production order at the end of the period. However,  CKMLCP revaluate cost centers after the settlement because of using standard price. So cost centers at the end of the period have some amount.
    As a result we can not find  actual price for production orders.
    If I use standard cost in order to consume on cost centers, material ledger revaluates again this cost centers. I dont want this condition. Because this cost center is settled to other cost object before closing.  
    Thanks.
    Message was edited by:
            Ergul Taslacioglu

    Hi
    Go to the following path in SPRO:
    Controlling -> Product Cost Controlling -> Actual Costing/Material Ledger -> Actual Costing -> Activate Actual  Costing. Double-click on "Actiavte Actual Costing" and change the indicator from "2" to "1".

Maybe you are looking for

  • Dunning Printing

    Hi colleagues, I am running the Dunning Wizard but I am having problems when printing the letters. I set the Dunning Settings to One Letter per BP and ticked the Apply Letter Template by Highest Level option.  In spite of this, when I choose to print

  • Saved Objects are not displayed in designer view after insert

    Hi All, My HFRS is acting weird today. I tried to insert a saved Object(text,Image) into my report. I have inserted them by (Insert>>Saved Object) but I'm unable to view them in designer view after insert. When I run the PDF Preview I'm able to see t

  • Problem in Tabstrip Control

    Hi All, i had created an Custom Infotype. In that infotype i had created Tabstrip control with 2tabs. Each Tab contain 4 fields. When creating( F5) a record in transaction PA30, it allowing me create a record and the record is available in Data base

  • How do you save edits to bookmarks in Adobe 10?

    After editing the bookmarks in a PDF file when the file is saved it appears that the bookmarks revert back to the original text.  Is there a specific way to save these bookmark changes?  Do you need to perform a Save As to capture the bookmark change

  • How to get a colored JButton?

    I wanted to have a coloured button, I set the background of the JButton to the desired color, but when I set the desired look n feel to the one of the system, like Windows Xp Look n feel, i could only see the border of the button with that color and