Report-Report Interface from BW to Project Systems

I'd like to jump from BW reports based on 0PS_C04 into the corresponding R/3 line items. If I specify CJ74 as the transaction target then run the BW report and choose the corresponding option from the 'GoTo' menu the following message is displayed. I find this very confusing -- it seems to be saying that the report behind the transaction cannot be used in the report-report interface, but in the procedure says always use the program in the report-report interface.
Can anybody understand what the message is telling us? Can anyone tell me how to jump to an R/3 line item report from BW Project System cube?
Thanks
Robert Williams
  You cannot use the report-report interface to call up report RKPEP000                                                                               
Message no. HF 800                                                                               
Diagnosis                                                                               
Line item report RKPEP000 is not suitable for the report/report        
      interface.                                                                               
Procedure                                                                               
Always enter RKPEP000 as the receiver report for project line items in 
      the report/report interface. This program uses the transfer parameters 
      to determine which line item reports can be accessed.

Hi
I dont know whether you have solved the problem or not yet
But i came up with the same issue....
Use interface program RKPBW000 instead of RKPEP000 in the RRI settings.
OSS Note : 356166
Thanks

Similar Messages

  • Drill Down reports in Project System

    Hi Gurus,
    I executed transaction code S_ALR_87013534, it works fine. When i exit from this report using back arrow button it goes to SAP main menu, but i want to be there in the transaction code like incase of other reports.
    It happens to all project system drill down reports.
    Can i know the reason and what should i do to overcome this.
    Will assign good points.
    Thanks
    Prashanth

    Hi Prashant,
    You can try T code CJE0 - report 12KST1G . Here at least you remain in the screen of CJE0 instead of going to SAP menu after exit from the report. But this also doesn't solve your problem.
    I have checked transaction code S_ALR_87013534. It is giving same problem. As suggested by Shrikant , you can raise OSS note to SAP.
    Regards,
    Amit More

  • Does report generation possible frm 2 diff projects within single database

    we have two seperate projects created in our eme DB. also we have few results present in first project say P1 and Few results are present in Project 2 say P2
    Query is
    Does it possible to generate Single report for P1 and P2?
    if it is possible then this will be a big relief for us.
    thanks
    gajananp

    yes only if it is stored in the same database. If both projects results are stored in the same databse, you may view the crystal report graphs that is provided in addition to the built-in reports that is viewable using the report tab. To open the crystal report viewer, go to tools and select Crystal Report Viewer. So, once you have selected the report whose data you would like to see from both project, then click on Add Filters.
    In the Add Filters popup, move all the projects you want from available to selected. Once you are completed adding filters, then click OK on the view report popup to render an html report with data from both the projects. Please let me know if this answer was helpful.

  • Project system extractors in BI

    hi,
    We are trying to generate reports in BI, based on 'Statistical Key-Figures' in Project Systems.
    These Stat KF's are coming from Network activity level from PS in ERP. (CJ20N, KB33N)
    The fields are :
    StatKF (STAGR)
    SKF Rate (SKFRATE)
    Doc. Date (BLDAT)
    Quantity  (MBGBTR)
    Do we have Data sources in ERP  (Tr : RSA5) which contain these fields, so that we can replicate these in BI and use it to load data and then generate reports?
    Thanks
    Neelam

    Hi Neelam:
    Check Project system tables like PROJ etc and create a View for the fields you want.
    Use this View as your datasource to extract data.
    Thanks,
    Jagadish B V

  • Interface from MS SQL Server to Oracle 8

    We have a situation where we need to have Oracle PO tables updated with data from SQL Server tables. This would need to happen on a daily basis, by way of an automated interface. The folks "in the know" here have indicated that it is not feasible. Is this really that difficult to do? I am new to Oracle, but it just doesn't make sense to me that Oracle would be that difficult to deal with. Your help is greatly appreciated.

    Thanks for the reply.
    I am not sure what you mean by PO tables <I am referring to Purchase Order tables.
    I haven't done any analysis yet - I don't even know the table names, but surely there is a PO Header table and a PO Line table, for example. What is needed is an automated interface from a separate PO system (running on SQL Server) that will update the appropriate Oracle PO tables. Apparently there is no "open interface" delivered by Oracle for these tables. So I guess my question really is: do shops typically do custom interfaces between Oracle and other systems? Surely Oracle doesn't drop support if you exercise a little intelligence and tie your systems together. My feeling is that they do, and it is simply that this particular shop prefers not to, for whtever reasons. Also, it seems to be more of a challenge given that the source data is on SQL Server, at least that is the impression I am getting. Thanks.

  • Scenario for interface between a non sap system and a SAP erp

    Hello,
    I need some help in order to elaborate a interface between a SAP ERP and a non-sap system with the help of a XI system.
       -  At first regarding the interface from the non sap system and a SAP ERP :
           the non sap system sends a flat file to the XI system. The flat file contains a row with header data and rows with item data. We were thinking when the file arrives to the XI system, to save the data in a header database and in a items database in XI. is it possible ?
    And then to have like a job that reads the database and creates idoc and sends them to the SAP erp and updates the xi header and items database  with a flag that means that the records have been sent to the SAP erp.
       -   Regarding the interface SAP erp to non SAP system:
           the SAP erp sends idoc to XI. Then the idocs are transformed into flat file.
    Is this scenario possible ?
    Do we need any adaptator between the non sap system and the XI ?
    Thank you for your help
    Christophe

    Hi Bontron,
    Idoc doesnot support synchronous call. So you can use either proxy or function module and inturn call the idoc from them and send response back to xi. You need to have two scenarios for your design.
    Scenario1:   Source File (file adapter) -- xi -- Dump into database tables (Jdbc Adapter)
    Scenrio2:  Pickup form Database tables  (Jdbc Adapter) -- xi -- RFC Adapter  ---> This is synchronous call.
    Regarding the interface SAP erp to non SAP system
    You can send idoc to xi and from there use File adapter to send to the receiving system.
    These blogs may help you to some extent:
    /people/sap.user72/blog/2005/06/01/file-to-jdbc-adapter-using-sap-xi-30
    https://wiki.sdn.sap.com/wiki/display/XI/step%2bby%2bstep%2bRFC%2bto%2bJDBC%2bscenario   (your scenario will be opposite to this)
    Regards,
    ---Satish

  • Report Painter Drilldown on Cost Element for Project Systems

    I am currently working on a report for Project Systems. I am trying to copy the functionality of the Internal Order summary (60I2-001) into report group 6P3. I was able to copy the whole layout and also the values of 6oI2-001 into a copy of 6PP4-001 but when I double click on "Balance" it is bringin up the ALV report that 6PP4-001 is using. I would like to call another report which looks like 6LS0-001 but contains Project System info made in report painter when I double click on Balance. Is this possible? Please let me know how.

    Hi Avinash,
    See my replies below.
    1 a & B: You are planning Qty on NWA and capturing costs - labor & Equipment on NWA elements.
    When  you are having elaborated to NWA-Element level, split your total work on each NWA-element and post labor cost. Thus you will have planned Vs actual costs at one place.
    coming to equipment cost - are you capturing using PO through GR?.
    2.a : Option1- create a separate WBS elements for materials and plan cost at WBS level. That value would be your total planned cost of material procurement as estimated. Under this WBS elements create NWAs and assign the materials. With this set up you can assign material and procure so that will have actual costs coming from GR.
    Option 2: Create a one General Cost activity and assign the total planned cost of material on this NWA.
    When you assign the material components, diligently you have to reduce the equivalent amount from the general costs activity. Also note that on component screen, you have to check box "Cost relevant" so that material cost will add to Cost NWA. Let the different materials  have their own valuation class and have default CEs accordingly. that would not be big issue.
    Please discuss with your MM team to get more information. Also my suggestion is to leave blank CE field in configuration.
    The option2 is very cumbersome and high risk but one have to be very cautious to reduce the value from Cost NWA in order to sustain the planned material costs whenever they added.
    3. I have answered the relevance of Cost relevance check box in above.
    Hope above makes sense.
    Thanks,
    Sudhakar

  • Project System - Report Painter - Cost roll up issue

    Hi,
    We have an issue with the roll up of the costs in Report Painter report in Project Systems. The problem occurs only with those costs which have been settled to an internal order from a WBS element.
    We are using the same cost elements to settle to the Cost Center and Internal order and roll up of the costs work fine for those settled to cost center. But the roll up does not happen for the costs settled to an internal order. Would appreciate if someone can guide on how to fix this issue.
    Raj.

    Here are the values:
    Period/year     000.1900     Remainder 1900     PERIO     Period/year
    Value Type     4     Actual                                                 
    Value Type     10     Statistical Plan                                                 
    Object ind.     P     Project item                                                 
    Object ind.     1     Order plan values: appended, apportioned     9     Order values: not appended, deleted
    Debit type     1     Costs and credit-side payments                                                       
    Thanks for your help.
    Raj/

  • Project system Report Developement

    To,
    Dear Colleagues,
    I have a requriement to develop a new report for Project system. Apart from Table PRPS,BSEG,MSEG Please let me know the table and logic to pick up the fileds and displayed in the report
    The requirement is as follows
    Month   WBS Element no  Budget uploaded   Budget utilized  Balance  G/L Code   Vendor code   Amount
    These are the coloum heading, out of this  Balance= Budget uploaded-Budget utilized.
    I need table name, process logic, and some helpful hint so that the performance will be optimum.
    Thanks and Regards
    yogi

    It is possible to write such a report.
    Get a good ABAPer to fulfill your requirements.
    There is a very good article in the SCN Sheetal Deshmukh which gives all the table details. Look that up

  • Project System Restructuring -- Reporting Requirement

    Hi All,
    Due to Restructuring in our client.Our Project System is adopting the following method and asking for BI input on this please let me know if anyone has come across this situation.
    Projects are going to move from one Company Code to another Company Code. So they are closing the existing projects in Old Comp. Code and new projects are being created in New Comp. Code . In doing so they are closing the Old Projects(say  P1 u2013 total budget 100) consumed 60 and then new project they will create with remaining balance 40. (say P2). Also
    Reporting Requirement :
    Then when they run the report for the New Project P2 then it should bring the information of P1 also.
    Please let me if it is  possible to achieve this.
    Regards,
    Mayank

    interesting, load previous data in a cube completely for all the previous years and have the new data load in another cube and create a multiprovider to join them. and in your selection for wbs use both data selection...thats all i can think of on top of my head..

  • BW Report requirement (Trend Analysis Report (Project Systems))

    Hello, BW experts……
    I need some help….
    This requirement is for Trend Analysis Report (Project Systems)
    I am loading data from ODS to Cube as a Delta Upload
    ODS is getting data from R/3 data source as a full upload (no delta in the Datasource)
    I added one custom field in the cube (0PS_C04) and that custom field (Date field) is going to pick current date (Sys date) through formula in the update rules.
    When I am loading data from ODS to Cube, if the value is coming to the amount field, then the current date field is going to get the current date to the cube
    If there is no record is updated in R/3, then delta is not going to update any record to the Cube.
    If no record is updated to the cube to the particular project number, then Date field is not going to get any data from update rules.
    But I need to see all dates in the cube even though there is no update in the R/3 for that project.
    Example:
    Proj---day1        2       3      4     5      6
    -XYZ---     10        5      --      3     --     2
    In the report now I am able to see some thing like this
    Project   day1        2      4     6
    XYZ        10        5     3     2
    But I am expecting some thing like this…
    Project   day1        2       3      4     5      6
    XYZ        10        15       15     18     18     20
    Can anyone please help me in this…..
    Any input is strongly appreciated
    Thanks,
    Rajesh

    Rajesh,
    Exception aggregation with last value and reference characteristic as calday should solve the problem.
    Cheers
    Aneesh

  • How to download the custom Reports to xls from the system?

    Hi
    How to download the custom Reports to xls from the system?
    I know the t code SE38 for reports.
    Vijay

    Hi
    Here the programa name is nothing but a report name???
    Vijay

  • Error in RBDMIDOC report run in E-REC, for data transfer from HR to EREC system

    Hi,
    We are on EHP5, EREC 605, SP0007. EREC is on a standalone, separate instance. HR in a separate instance.
    We have created new org.units & positions, which we are trying to move from HR to EREC system for starting the EREC process.
    In the report message type, gave input "HRMD_ABA", The output throws this error. (Screenshot attached)
    Please provide your helps on the reasons for the error and corrective action to be taken.
    Regards,
    ER.

    Thank Nicole for the reply.
    Just extending my query,
    I have  created newly 2 org.units & 2 positions under the org.units in HR system.I
    If i want to create a requisition as a recruiter from EREC portal,  for that newly created vacant positions, what needs to be done?
    How  to move that new vacant org.unit with position to EREC system ?
    Should I run the org.unit with positions using PFAL (Insert/update mode) or use RBDMIDOC method ?
    Look for inputs.
    Regards,
    ER.

  • Report of Project System

    Hi All,
    Is there any report in SAP ECC 5.0 version through which we can check total cost accumulated for each project.
    We are looking for following type of standard SAP report on Project System
    Name of project                        Cost of the project
    Project -1                                      1000
    Project -2                                       2000
    Project -3                                      7000
    Please let us know if anyone comeacroos this type of report.
    Thanks,
    Rupen

    Please refer the below report:
    S_ALR_87013531
    CJ13
    Pls assign points as way to say thanks

  • Display ALV on click of custom filed in custom project system report

    Hi All,
    Need your guidence.
    I am working on custom project system drill down reports which is created using report painter CJE1/CJE2.
    Requirement is to display one custom field in drill down output and on double click event of that custom field , need to display one ALV.
    I am able to manage to add new custom field in output but not getting how to handle double click event as no user exit / or BADI getting triggered.
    Please let me know is it possible to develop such scenario or not?
    Thanks in advance.

    Hi Rachna,
    First let us know is custom field z? or standard?
    if z then for achieving this functionality please search same word key in abap forum as functionality is related to abap.
    if standard then share few screenshot what is already exist and what you want to add.
    Regards,
    Sanjeev

Maybe you are looking for

  • E1200 Working Fine but DHCP only shows two of four connected

    Would appreciate a bit of educating.  My router is connected sucessfully with two computers via ethernet, one printer by ethernet and one Nexus 7 by WiFi.  However if I check Status | Local Network and click DHCP Client Table, I only find the two com

  • Drag and drop doesn't work on non-intel machines

    It may be just me but Pages on my Macbook Pro allows me to drag and drop. The same document on my work G5 doesn't have this functionality. Both machines run 10.4.10 though the G5 doesn't have all the latest updates (corporate firewall issues) I am as

  • WRT54GX2; WPA2 AES

    Windows XP Hot fix has been installed.  Intel 2200 b/g driver is updated.  WRT54GX2 firmware is updated. (There is no version info on the router, so I assumed it version 1.  Accordingly I downloaded firware update for version 1 from the support)  Whe

  • 'Apeture cannot be opened because of a problem'

    My apeture has stopped working and is reporting an error message since i installed final cut express. i've tried uninstalling both programs and then reinstalling apeture, but no luck. below are the details on the error message - any help appreciated

  • SalesForce XI Integration...

    Hi,    We are trying SalesForce-XI Integration using WSDLs. We are facing the following issues:   a. The SalesForce SOAP Calls require a session id string to be passed as part of the SOAP header. This soap header is not visible as part of the message