Reqmnt class assignment to material for assembly processing?

Dear All
How can i assign a requirement class to material which enables assembly processing ??
Thanks in advance

If you go though this help link it will clear your understanding.  Also  chekc thread for the assembly processing, will get lots of information .
http://help.sap.com/erp2005_ehp_04/helpdata/EN/95/1613ab837b11d2b6700000e82d8bd1/frameset.htm
http://help.sap.com/erp2005_ehp_04/helpdata/EN/41/191e9e45fd11d188ff0000e8322f96/frameset.htm
With Regards
Nitin P.

Similar Messages

  • Deletion of class assignment to material

    Hi Gurus,
       I would like to delete class assignment of material.
       Pl.provide BAPI/ Function Module.
       Helpful answers will be rewarded.
    Thanks,
    USR

    Try FM 'MATERIAL_MAINTAIN_DARK'

  • Assign variant class to service material for preconfigured service package

    Hi,
    Could somebody help with the steps on how to create a service material with variant. The requirement is to create a preconfigured service package.
    I'm trying to create a service material and assign a variant class to it. Based on some examples in IDES, i see that in MRP 3 view there is a plant-specific configuration view which holds the variant check box and configurable material reference.
    I'm unable to get that view while creating the material.
    Regards
    Rasheed

    Hi Vishal,
    From the PS perspective only one document type is allowed to be used for purchase requisitions. Therefore you can only maintain one in TA OPTT.
    However, the SAP note no. 114213 gives an explanation of about how the document type is determined and shows where a modification to change this could be implemented.
    Hope it helps.
    Regards,
    Rachel

  • Help required: class assignment and values for functional location

    Hi All,
    My requirement is to get classification data for a functional location as in IL03.
    Can any one let me know where in the standard program are they getting the assigned classes
    and class values. So that I can use the same logic.
    Thanks.

    FM BAPI_OBJCL_GETDETAIL
    OBJECTKEY                       ?0100000000000011643
    OBJECTTABLE                     IFLOT              
    CLASSNUM                        ZPMI_BLDG          
    CLASSTYPE                       003                
    KEYDATE                         29.07.2009         
    UNVALUATED_CHARS                                   
    LANGUAGE                        EN                 
    Cheers!

  • Problem in Assembly Processing in Project System

    Hello All,
    My Client want to implement Assembly Processing. We have configured the system as per SAP Standard. we are testing this in Quality System along with SD & PP Modules. we have template which contain Material WBS Process WBS & Other Cost WBS But we are getting all cost of material and process cost on one Material WBS after Production order confirmation. How can we divide this cost separately for Material & Process WBS.
    As SAP Standard Process we maintained activities for different process also but when we tested this we are not clear about the use of these activities. We are not getting any cost or don't have any relation in any way for these activities.
    Please Help me about this Assembly Process.
    Thanks
    Warm Regards
    Sunil

    1. Create a Inquiry in VA11 --OK
    *2. Create Quaotation in VA21 wrf to Inquiry*--OK
    3. Create a Sales order in VA01, while creating sales order, as soon as we assign the material component in SD line item a pop will come for entering std wbs, std ntw, network profile. once we enter this at bottom we can see that scheduling is carried out. Note: if we define material/std wbs/std ntw in CN08 then pop will not come. Now check for errors and save the sales order, at bottom we can see that project order is created. Note: Project number is same as sales order no:---OK
    4. in Billing plan tab at item level we can see the milestones for new project.--In sales order i don't see any milestone or any type of setting. can you please tell me about this we are not able to execute milestone billing in our case.
    Ans to Query: For Milestone billing to work you need to do the following settings in SAPSD
    1.     Create Billing Plan in SD and assign the Billing Plan to Sales Document type you are using. Path: IMGSDBillingBilling Plan
    2.     In the above node , do settings for Define Billing Plan Types, Define And Assign Date Categories, Maintain Date Proposals For Billing Plan Types, Assign Billing Plan Types To Sales Document Types, Assign Billing Plan Types To Item Categories.
    By doing above settings you will get an additional tab u201CBilling Planu201D in Sales order where you can get the milestones generated for new project. For exiting project you can copy milestones to SD from project.
    If you want Billing Plan at sales document item level, assign the billing plan type in Item category.
    5. In Sales order we can see that billing lock is set against the milestones.---Not Found
    Ans to Query: By doing the above settings as in slno 4, you can see the billing block against the milestone*6.Now open the project in Cj20n and go to network we can see sales order no with line item no.*---OK
    7. Now verify the mile stones in the project.--Adding milestone but no effect in billing
    *Ans to Query : you can see that milestone no in Sales order and Project will be same. Note: Subject to in your standard network you should have milestones, so that we you create a sales order new milestones will get generated wrt to milestones in Std network. So when project is created you can see mile stones are also created.*8 .check the requirement list in MD04 against the Finished product we can see that requirement is generated againt project wrt to sales order.---No requirement is displayed .
    To generate the requirements. Check the settings in requirement class.
    9. Run MRP in MDBT/MD02/MD01, based on procurement type in MM , PR's and Pld order will generated. Note: ALL PR's and PLD Orders are account assigned to WBS.---When we execute this MRP this is not picking requirement from project. BOM created by CS01. if we assign material to activity than this MRP is picking requirement from project.
    10. Now do Pr>PO>GR>(ALL all accounted against project.--OK
    11. Convert Pld order to Production order> release the order> Goods issues against production order.--OK
    12. Confirm the Procution order wrt routing operation one by one in CO11N.--OK but we want sageregated cost for material cost and process cost to different WBS as we have material WBS and Process WBS.
    Ans to Query: This is not possible because in Assembly order processing single account assignment is only possible for the finished products, and for that finished product routing is also account assigned to the WBS assigned to Production order. So operation cost comes and sits in same WBS. If at all you want to track separately you can  transfer the actual cost for process to process WBS in tcode:KB11N
    Using KB11N tcode we can manual transfer cost from one WBS to another WBS.13. in cost element reports at projects we can see the cost breakup for all production activities as well as for material.--you mean CJI3 report 
    *Ans to query: Yes you can see in CJI3 report or in SALR_870135452 report also_*14. settle the production order.----where to settle this production order? and how?
    *Ans to Query: For assembly processing account assignment is u201CQu201D so automatically in production order we can see the settlement rule is set against the WBS. So the cost from production order is settled to WBS and subsequently from project to the respective receiver as per settlement rule in project.*
    15. conform all activities in Project.----OK CN25 or CJ20N
    In any of the above tcodes
    16. Do billing in SD as when when mile stone reaches to post actual revenues.----OK
    17. run RA in KKA2 and save the RA results--OK
    18. Run settlement in CJ88 ---Not using any settlement
    19. set the status of Project as Teco and Clsd.---OK
    Please let me know if you need more clarifications
    Regards
    kishore
    Edited by: Virendra Pal on Jun 1, 2011 11:53 AM
    Please do not use bold and underline text message short cuts etc - in future your posts will be removed
    Secondly all that you are mentioning is available in SAP Help or in the wiki

  • Assembly Processing Error

    Hi,
    When I try to create a sales order for assembly processing, I get
    these two errors one after the other and the Sales order creation
    terminates. Does Anyone have an idea?
    "Error when process Production order"
    "Order type PS04 not found(check entry)"
    do you know where it's looking for a production order? I don't know
    what in the material master or the sales order is triggering this.
    I have assigned a requirements type KMPN, requirements class 212,
    strategy group 83 in the material master. Sales document type is OR
    (Standard Order). I have created a standard network and WBS and
    assigned them to the material master in CN08. Is there any other
    setting(s) I am missing?
    Regards,
    Venkat.

    Strategy group should be 85. Check this:
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/95/1613ab837b11d2b6700000e82d8bd1/content.htm
    Regards

  • Acct Assign of material without material master

    Dear all:
    Here's the scenario
    In IMG setting, I assigned my own accout modification (CIP) to my own account assignment category (0)
    and I made configuration in auto posting OBYC to assign GBB/CIP to G/L account for no specific valuation class.
    And when I create a PO to purchase a material without mateirla master with accout assignment category (0) and material group.
    The system only auto assign G/L account to material group which no valuation class was assigned in OME9 (Entry aids without material master in MM IMG setting)
    But I read the PA material it says "If you do not want to differentiate according to valuation classes you do not have to maintain a valuation class for a transaction."
    Yes, I don't want to differentiate according to valuation classes, but the system result is not what I expected.
    Any response might be helpful. Thanks in advance.

    Hi Utsav
    Hope you are aware of the field G/L account in Account assignment tab in PO.
    G/L account will be automatically populated here based on the Material grp you use for the PO without Material master.
    System will check the valuation class assigned to material grp ( Tcode OMQW) then the system will look for the G/l account in OBYC
    Transaction event key GBB/Genral modifier/Valuationcls/Gl acc..
    If there is an entry with Genral modifier ( from account assignment category) and valuation class ( from material grp) then the system will pick this G/L and
    populate it in PO account assignment tab.
    This G/L account will be used for further postings
    Hope it is clear
    Thanks/karthik

  • Assembly Process related configs..

    Hi,
    At Present I am working on " Assembly Processing" (i.e), A project(Project System) has to create, once I create the SO. I have done the config settings in Ps & MM. I want to know the Configs settings in SD for assembly process. ( Already I have defined the Org. Structure for SD)
    If anyone know, Pls. share your ideas.
    Regards
    Prabu

    Closed

  • Reading material for ALE IDOC

    Hi Friends,
    Can anybody provide me any reading material for IDOC process so taht I can learn and use the IDOC functionality. I want to process few SAP transactions in the background through IDOC.
    Thanks & Regards
    Satya

    Hi Friends,
    Can anybody provide me any reading material for IDOC process so taht I can learn and use the IDOC functionality. I want to process few SAP transactions in the background through IDOC.
    Thanks & Regards
    Satya

  • Assembly Processing Information

    Hi,
    I'm new with SAP technology. I'm working on Assembly Processing in order to have automatically filled WBS element in a sales order, once saving it.
    I would like to kindly ask you if the Assembly Processing can be implemented only with Standard WBS (Standard Network) or if it can be implemented with WBS normally (not standard).
    With Standard WBS it is not possible to store any planning data, planned costs or revenues, but business needs is to manage them.
    Thanks a lot,
    Isa

    Hi,
    I agree with what Abdul has to say. Refer SAP Help and get the concept of Assembly Processing cleared. Most of your doubts will get cleared once you are through with that. Secondly, you can refer the WIKI section in SDN. There is a very good article that explains the configuration details required for Assembly Processing.
    This should suffice as of now. Revert later with specific queries.
    Regards,
    Gokul

  • Finding material codes for creating process orders ??

    Dear Experts,
             How can we get the list of material for which the process orders can be raised .In other words from a list of materials ,how one can know the material code ,relevent for raising the proces order & maintaining recipe.
    Pls update
    Regards

    Dear Dennis,
    It's difficult to answer your query with the given information.But in general for the in-house manufactured materials
    (procurement type E in MRP2 view) which has a BOM,which can be checked through CS03-->F4 display serach using the
    materials by Bill of materials,mention the plant,BOM usage and remove the maximum no of entries and you can download this
    data) and get an idea for which materials the BOM exists.
    Further to this you can identify for which materials the master recipe exists in C203 and based on these data or else for the
    plant check in C223,for which materials a production version exists for a combination of BOM and master recipe.
    For all these materials you can create a process order.Also if your process order type is configured in such a way that
    without a BOM and master recipe the order can be created means,then for the in-house manufactured materials the process
    order can be created.
    Similarly for all the in-house manufactured materials the master recipe can be created.For to this in config in SPRO-->production
    planning for process industries->settings for task list types->assign material types--->check for which material type the task
    list type 2 is linked,only for the materials created with these material type you can create the master recipe.
    Regards
    Mangalraj.S

  • Material to class assignment table

    we can assign class to a material in the material master of the material.
    in which table can i find this assignment?

    Buddy,
    You need to search in "KSSK" table for class type "001" (KSSK-KLART) to look for class assignments for material. By the way have you used <b>*</b> before the material number before searching?
    Please try to do as suggested... otherwise you wont get results, also let us know if you are giving any other selection criteria in the table browser selection screen.
    This should certainly solve your understanding problem...Reward your points,,, which would encourage further answers to your question if any,
    Regards,
    Prasobh

  • How to assign a class to the material through ABAP code

    Hi,
    I am working on a transaction in ABAP which takes material name, material description and a class from the user. Now, after this much input I create the material, its configuration profile through the ABAP code. For this I know I have to make relevant entries in tables MARA, MAKT, CUCO.. and also check for the existence of the class in the table KLAH.
    Now the point where I am stuck is that I am not able to get how to assign the class to the material through the code. I am able to get the internal class id from the table KLAH but I am not able to figure how the internal material number is being generated in the table INOB and i need this number as well as the internal class id number to insert a record in the table KSSK to show proper assignment.
    Can anyone please suggest me some solutions?
    Thanks....

    Hi,
    I tried using BAPI_OBJCL_CREATE. In order to understand it functioning better I created a material and class (of type 300) through transactions MM01 and cl01 respectively. Then i  created a report and called the FM BAPI_OBJCL_CREATE, gave the material name as the material above, table as MARA, class as the one i created above and class type 300. I even analysed the message of the table return (return-message) after executing the report. The messahe said assignment done. But when I checked mnaually in cl20n there was no assignment done to the required material. There was also no entry for the required material in the table INOB which I need.
    Can anyoene tell me that where am i going wrong? Please do help.

  • Assigning valuation class when creating Material

    Hi
    I want assign "3100 -Trading Goods valuation class" to my material which i am creating. in Tr.code MMH1
    In the accounting1 view, under the current valuation section, there are no options at all to select valuation class.
    please help me figure out how to get the 3100 option into my valuation class.
    i will send u a screen shot of my problem,if u need..gimme u r email id.
    i will assign points
    thanks

    hi
    u need to assign val classes to act cat ref.That act cat ref assign to mat type .
    then syst automatically will give option of val class when ur creating mat of that mat type.
    Log gen->mat master-> basic settings-> def att of mat type
    here u assign act cat ref to mat type.
    MM-> val & act assign ment -> act detr wth wizard-> def val class
    here u assign val classes to act cat ref.
    ok
    if its ok
    assign points
    nani

  • No delivery type for returns processing assigned to item 00010

    Dear all,
    I want to create a Return Purchasing Order.
    I have got an error: No delivery type for returns processing assigned to item 00010
    Please help to to find out problem. What do i have to check?

    Hi,
    Regarding the error ME392, please check the customizing under
    the IMG path:
    Materials Management
    -> Purchasing
       -> Purchase Order
          -> Returns Order
             -> Store Return
    Here, for the supplying plant in your Cross-company-code return, you
    need to set up a delivery type.
    In order to know the supplying plant, please, open the vendor master
    data (XK03).
    Select the 'Purchasing data' section.
    Once you are in the screen SAPMF02K 310 follow the menu path 'Extras' ->
    'Add.purchasing data'.
    Here you will see the Plant that is linked to your vendor.
    So, now, for this Plant, under the IMG path mentioned before,
    set a a delivery type for the store return (NCR - Ret.StTranspOrd CC
    can be used, for example).
    Best Regards,
    Arminda Jack

Maybe you are looking for

  • Calculating duration between cue point?

    I'm using Flash Pro CS3. My project is AS2 targeting FP8. I have an flv component on stage. My .flv has cue points and I have buttons underneath the component that show the title of each navigation cuepoint in a dynamic text field. I have another dyn

  • Drag and drop forms, shapes and images VS 2013

    I am new ti visual studio and cannot seem to get image, form or shape drag and drop to work in webpage designer. can anyone please point me in the right direction. Cheers

  • Restriction of data in workbook in SAP BI 7.0

    Hi All, We are restricting new queries and workbooks but a particular work book is displaying data even when the analysis authorization is removed from the user ie wether the user has this authorisation or not he is able to view the result in the wor

  • Using Oracle OCI Driver 8.1.6 in Compaq Tru64 fastVM

    Hi! I try to using Oracle OCI Driver in Compaq Tru64. I used fast VM (with -fast option weblogic startup) then the result during populating Connection Pool, weblogic server down with core dump I attached core file. is there anyone in this situation?

  • How to align printer for cd labels

    How do I align printer for CD lables?