Hi Gurus,
Actually we have one scenario in QA in which for one material there are certain specification whose result we will come to know few days later after posting inspection lot in Unrestricted & also after doing UD.
I want to know how to do result recording for that perticular specification after we already did the UD for that lot?
Is it possible after UD?
Is there any additional customization setting nedded?
Thanks in advance.

Hi,
You can do this .
Those MIC for which you want to take result after UD .In control indicator of MIC put long term inspection check box on .
So that even after UD of inspection lot ,  result record for that MIC will remain open for you to take result.
Regards
SANIL
Edited by: Sanil Vadke on Jun 29, 2010 8:53 AM

Similar Messages

  • Result recording inprocess inspection for production order!

    Hi,
    I have a scenario in for prod order in process inspection.
    I have an operation to machine the shaft for 3 hrs. And every hour I need to take an reading and note down in the inspection. For the same reason I created master data of MIC Quantitative, Sampling procedure with sample size 1
    On routing for the same material, Usage 1 and status 4 Released for general, Inspection point 200 and sapmle drawing procedure with fixed qty 3.
    Generated a prod order and released, got inspection lot for lot origin 03. But when I try to enter 3 different readings per hour could not able to achieve this.
    Kindly help me out.
    Regards,
    N. Nagaraju

    Are u using physical samples? If not, I wouldn't use the sample drawing procedure.
    Set your characteristic to individual results recording in your control indicators.  Set the sampling procedure to be a fixed sample size of three.
    You should be able enter three results then for the characteristic.
    FF

  • Automatic Results Recording for Inspection Plan

    I'm trying to activate automatic results recording, at the beginning I get this meassage: "In customizing for default value of inspection type(400) you have to activate the following check boxes, " check characteristics", "Inspection with task list" & "Automatic assignment", I've done that. Yet, it sill doesn't work and the lot status is "CRTD" however it should be updated to "REL" status.

    Hi,
    Did you search enough before posting this query? There is plenty of discussions over this matter.
    Based on the details given above, I don't think you have created an inspection plan.
    Automatic assignment will assign the task list automatically to the inspection lot once it is created. You didn't mention if you have created one or not. Pl check that.
    If the inspection plan is created, there could be possibility that material is assigned to more than one task list (inspection plan). If that is the case, you wouldn't get inspection lots with REL status but CRTD only.
    ntn

  • SAP QM Result recording - Copy inspection results functionality

    Dear all,
    I have two queries.
    1) The Raw materials used in various plants are same. I want to copy the inspection results to the inspection lot if the batch is already accepted in other plant. The material, batch and vendor is common point. Some of the characteristics are caluculated characteristics. How to map this requirement.
    2) I want to test the standard functionality for copy results but in my system, the settings for copy inspection results is not appearing in quality inspections in SPRO. I want to confirm whether I am missing some other setting.
    Regards,
    Manohar

    Hello Jessica,
    you could try the following bapis:
    BAPI_INSPCHAR_GETRESULT
    BAPI_INSPCHAR_SETRESULT
    Although the desired functionality was actually implemented in higher releases.
    Hope this helps you.
    Regards,
    Isabelle

  • Goup result recording for inspection lots

    Dear All,
    Is there an option of recording results simultaneously for a number of inspection lots????
    Please help out....
    Regards ,
    rishabh

    Dear!!
    Please Check QE51n with Plant as selection And unchecke With out usage decision below and execute ull get all the Inspection Lots
    with regards
    Pushpalas

  • Multiple results recording for Delivery inspection lot

    Hi Gurus,
    My requirement is to configure for quality results recording for sales delivery document. Where client wants to record Customer, supplier, Umpire, etc results record for inspection characteristics.
    I got response from few Sapiens that I should use Inspection point concept for multiple results recording. Could anyone cna tell me how can I do this.
    Your help will be highly appreciated.
    Thanks,
    Kumar

    Hi Kumar,
    Okay!
    First of all letu2019s try to understand whether inspection points are really suitable for your requirement or not. Accordingly further errors can be eliminated. I just try to understand.
    A- Using Inspection Points
    1.     Inspection points are used when you inspect the same parameters again and again.
    2.     When you click on results tab in QA32, system asks you put some identification number. Letu2019s say you put A1 and then press enter. Thereafter you record the actual results (LENGTH, WIDTH etc.) You save this without giving UD.
    3.     For the next time when you again click on results for the same inspection lot, system again asks you to put identification number. This time suppose you put A2. Then again you record the results (LENGTH, WIDTH) for A2.
    4.     Likewise you can retrieve the inspection results from system with respect to inspection point (identification point).
    5.     Typically this can be used for chemical industries where you record the temperature of the same chemical after every ½ an hour. Here 10:00 am, 10:30 am can be used as identifications numbers. As a result of which you can get the information that at 10:00 am temperature was 40 Deg and at 10:30 am it was 75 degree Celsius.
    If your requirement resembles this situation, then only the use of inspection points would be fruitful.
    B- Without Inspection Points
    But if you want to record the readings by various agencies like customer, umpire (refer following pattern)and want to compare them there are other ways.
    1.     Reading by your inspector
    a.     LENGTH u2013 100, 101, 102mm (average is 101mm)
    b.     WIDTH     - 10.50, 10.50, 10.60mm (average is 31.6mm)
    2.     Reading by customer
    a.     LENGTH u2013 100, 101, 102mm (average is 101mm)
    b.     WIDTH     - 10.50, 10.50, 10.60mm (average is 31.6mm)
    3.     Reading by umpire
    a.     LENGTH u2013 100, 101, 102mm (average is 101mm)
    b.     WIDTH     - 10.50, 10.50, 10.60mm (average is 31.6mm)
    You can achieve this without using inspection points also. For this in QP02 you need to create 3 operation; Inspector, Customer and umpire respectively. Feed the MICs in each of these operations. When you click on result tab system will throw pop up for these 3 operations. Double click on Umpire if you want to record results noted by umpire. Likewise for rest of the operations. You can do this even after UD also (after 1-2 months also). You need to use MIC with control indicator as long term characteristics for this in QS23.
    Regarding averaging of results u2013 This can be achieved using single result recording MIC with or without inspection points. Use appropriate sampling procedure. When you feed results in QA32 system automaticaaly averages out the reading. This can be viewable against phi symbol.
    Finally you did mention that u201Chere I am not getting the newly created inspection lotsu201D. Does that mean inspection lot (10 origin) has not created?
    Regards,
    Anand Rao

  • Error in operation level result recording

    Hi,
    I need held; result recording of inspection type =03 (operation level Quality inspection)
    A product manufacture via three operations (10, 20, 30)
    All operation quality inspection active let operation no-10, all products reject and confirm as rework.
    Next operation level quality record is done but confirmation not allow Reason is operation -10, rework quantity, (Actual quantity is more than planned quantity)
    How to add the quantity after reworks for next operation quality inspection?
    Pl helps me finding the solution.

    Hi,
    As per your more clearence , As per Example  production order Quanity =1, passes 3 operation10,20,30
    Operation=10 require rework as per quality ,
    Operation =20 system raise the error message = Operation =10 rework .
    If want to operation =10 ok Quantity =1 then system raise error messges =Actual quanity more than planned Quanitity
    ( 1 Rework + 1 Ok ) .
    Supose rework order create and confirm then next 20 & 30 operation how complete .
    Real scenerio :- Rework on operation =10 then again Quality check then goes to 20 operation Quality check pass / Rework if rework then again quality pass then goes to next operation level
    I hope under stand my problem
    Need help- please

  • QM-Calibration Procedure -Error during Result Recording

    Dear Sir,
    During mapping of Calibration Process in SAP,I am getting error ( status check error ) for Result recording of Inspection lot (QM-Calibration).I have follow all the required steps,I am not getting reason of error,Please Advice.
    Thanks

    Dear
    Maintain in sampling procedure radio button palnt maintainance. then check if ur using inspection plan with inspection point.
    else make sampling management radio button on..
    regards
    SANIL

  • Short Text Display of Insp. Char in Result Recording (QE01) Screen

    Hi All,
    I have created Inspection plans with MICs. MICs Short Texts are maintained in multiple languages. (Ex: EN & FR)
    I have created an Inspection lot with Login Language EN. When I want to result record this inspection lot (QE01) with login Language FR,  Display of "Short Text for the inspection characteristic" in QE01 is in EN rather than FR.
    Is it a standard SAP behaviour? If yes, what is significance of maintaining short texts in multiple languages?
    If not, How can this be corrected?
    Thank you in advance.
    Regards,
    Pradeep

    hi
    Not very sure but
    In Su3-->Parameters Enter
    CP13     BC Sets: List of languages for language-dependent values
    DYL     Screen language
    HLG     PC translation interface help language
    This might solve you problem
    Regards
    Sujit

  • Time event C019 integration with results recording

    Hi ,
          Posted this in the QM forum and got no response so reposting it here.  I am asking for a discrete manufacturing scenario. Does any one know how to integrate CO19 time event confirmation with the results recording transaction. Usually on the mfg floor the mfg people will do in process inspection. They are used to more of a clock in clock out way of working. They clock into the operation, they do the manufacturing activities and then they do the inspection activities. Once both are done they clock out and the material moves to the next operation. I knoe we can tie in manufacturing confirmation (CO11N) transaction with the results recording for inspection points. But I am looking to tie in the CO19  time event transaction to do the clock in clock out and tie it with the inspection point results recording transaction. The operators on the floor do not want to go to mutliple transactions to record thier time on that operation. Do you know how that can be done and if its even possible ?
    Also do we have to use inspection points or can we do it without inspection points ?.
    Thanks

    GS, Time events are always tied to a record group technically and this prohibits free/extended usage of the transaction compared to say CO11N.
        Explore further on the details provided in the sap help site which states,
    'You can only confirm quantities when you confirm processing time events.
    You can only confirm activities that cannot be assigned to a particular record type group (Set-up,processing, teardown) by using the time event ‘Variable activity’. The confirmed value is assigned to corresponding value in the standard value key parameters'..

  • Result Recording Specification field Table entry

    Hi SAP QM Gurus!
    In QM Result recording against Inspection lot, there is a column called "Specifications".
    Can anyone tell me from which table I can get the avlues of Specification field/
    Typically, I have below specification values. For one of my report I want these field values.
    Description the material
    <=  0,5 %
    >=  99,0 %
    98,50 .. 100,50 %
    85 .. 90 °C
    >=  0,10 mg/tab
    Kindly help me to get the field values.
    Thanks

    explore bapi BAPI_INSPCHAR_GETREQUIREMENTS----
    >parameter READ_CHAR_REQUIREMENTS
    Also BAPI_INSPOPER_GETCHAR
    can Results Recording QAMV Characteristic specifications for inspection processing  be used ?

  • Result recording Department Wise

    Hi Gurus
    I want make result recording according to the department wise.
    Eg.
    [ Purchase requestation is given by different department so the corresponding department QC should result record the inspection]
    How can map the scenario in SAP
    Thanks in advance

    Hi Srinivasan
        In your case you can maintain operations department wise in inspection plan.so that they can do the result recording department wise.
    For each operation you can maintain seperate inspection characteristics(Department wise).
    thanks
    S.Murali

  • Assignment of notification type while doing results recording

    We use a different quality notification while doing results recording.
    It is taking a notification type different from what we want to make it defaulted.
    Please advise the configuration steps for defaulting a QM notificaiton type , while doing resuolts recording for defects.
    Thanks,
    Manohar

    Hi,
    Quality notifications are created as part of defects recording and defect recording can be done during result recording of inspection lots. Defects are confirmed during inspections and recorded for specific inspection lots. Hence you need to assign a suitable quality notification type to each inspection type, for which defects are to be recorded.Menu path is :Quality Management>Quality notifications>Defects recording>Define notification type>Define notification type for Inspection type.
    Note: You should use this inspection type to make sure that only one quality notification is created, even if defect records have been created for several operations.
    regds,
    atul

  • Result recording for quantitative inspection characteristic

    Team
    Greetings!
    Please find the following requirement.
    We are using quantitative characteristics inspection.
    Inspection lots are created automatically and the sample size for each characteristics are determined based on the sampling proceedure.
    when we do result recording for a characteristic, say the sample size is 5, even if any one of the sample does not fall under the limit, we need the characteristic to be rejected.
    How can this be addressed.
    Gobinathan G

    .

  • Requirement of displaying inspection method in result recording

    Dear All,
    My clients requirement is to have the inspection method code in the result recording screen. I have the option of inspection method short text in the result recording screen. But i want a code should appear so that user can see the same for his convinient reference.
    Regards,
    Anil

    Dear Anil,
    You can create attachment in word of whatever data you want to maintain for inspection method. you can also save drawings in this attachment. assign this attachment to inspection method .You can assign attachment by
    Service for Object=> Create=>Create Attachment
    Now this attachment u can view while doing result recording & parallaly u can record results. Hope this will help you.
    Regards
    Amit