Hello Friends,
I have a scenario where I return the used maintenance part, say alternator of truck, to vendor and he will credit me for the same. how can I configure this scenario in SAP ?
Details:
Work order --> consume alternator against work order (part doesn't exist in system any more) --> after say 6 months, I replace this alyernator with new one --> i return the used alternator to supplier --> supplier credits me.
Now as the part doesn't exist in system, how can return it to supplier?
anyway other way around ?
Thanks in Advance,
Pat

Dear Pat,
Since the material is no more in stock, you will have to bring it back to stock. If it is issued against any order you may do the 262 movement or else you will have to do 202 movement to bring it back to stock.
This will be objected by finance since the value of the material is not the same after 6 months due to its usage.
Once stock is available, you may create a returns p.o
Create outbound delivery based on the p.o
Create invoice
Hope this helps you.
Regards,
M.M

Similar Messages

  • Defaulting a Cost Center during PR/PO creation for Indirect Materials

    Dear Gurus,
    When creating a PR or PO for indirect materials (No Material Master/Numer), is there a way to default a Cost Center (maybe based on the Material Group) in the PR/PO during creation ?
    I know that there is a way to default the GL Account Code via Entry Aids. Is there something similiar for Cost Center ?
    Thanks

    I don;t think it is possible via config but you can do it with User exit where you can insert the logic for account assignment category and Material group combination and material number is blank than insert the particular cost center into the cost center field.
    use PR item level user exit for PR and same way for PO.

  • Return of Import Materials

    How to handle return of  Import Materials?? As already the import duties have been paid and require the seperate documentation. As I got feedback that , It need be handled through SD route.
    Can someone exactly tell me what is the best practices to  handle this. If we use SD route then how to map accounting enteries....
    Regards,
    Sachin Ahuja

    Hi,
    Thanks for your response.
    Why can't we do return delivery of this receipt.
    Ie., 122 movement with MBRL.
    Is it any impact as concerned to Satutory requirment.
    Please clarify.
    Regards,
    Nagaraj S

  • Problem while returning the subcontracting materials.

    Dear All,
    i have received finished material A (10 pcs) from subcontractor (BOM maintained B- 200 pcs and c- 300pcs to manufacture A).
    Due to quality rejection i am returning 1 pc of finished material "A" to the subcontractor. When i return through MIGO with 122 mvmt type system will display entire quantity ,ie 10 pcs, against the material document number.  Now i reduce the returned quantity of finished material as 1 pc, but subsequently BOM materials (components) are not getting reduced.
    please advise how to reduce the components propotionate with finished product while returning the subcontracting items.
    Eg : A received 10 pcs ( BOM- B=200& C= 300)
          returned 1 pc of A,  then system should show the components B =20 & C=30. but system shows B=200& C=300.

    Hi,
    As per your suggestions, system does not allow to do Component reversal 542 movement. How ever system will check the special stock provided to vendor 0. All the component from vendor side consumed and recived GR already for the components B and C.
    The following Error message occurs while doing 542 MVMT:
    Deficit of Stock w. vendor unr. 20,000 PC : B1 TEST O
    Message no. M7021
    Diagnosis
    Shortfall below the specified stock level or quantity amounting to 20,000 PC.
    System Response
    If the message is an error message (E), the above is not allowed.
    If the message is a warning message (W), the system will allow your input, but the warning is intended to prevent you entering a wrong quantity.
    Procedure
    In the case of a warning message, check the quantity entered.
    In the case of an error message, change the quantity or terminate processing.
    Other Possible solution,  I  have simulated
    Return delivery and refer material document number
    Manually change the Material A ( With 122 mvmt - qty as 1 ) With Reason for movement
    And Sub component as B ( 544 O + GI receipt subc.stck ) with qty 20, similarly Sub component C ( 544 O + GI receipt subc.stck ) with qty 30) 
    Finally you can check with MMBE ( Finished product A- 9 qty) MBLB - Stock provided to vendor Component B -20  and C-30 qty
    I hope this with return the Finished product and consumed subcomponents respectively.
    While doing Return delivery for against Material document system always with full qty and BOM qty only, We will manually change returnable qty to the vendor and Reason for the return in any business process flow.
    I hope this solution resolved your issues on Return process subcontracting
    Even after the Returned the goods  to the Vendor ( due to damaged - reason ) ( with 122 and 544 O+) . Later supplier finished his re -work for the returned goods / services , you can do it regular GR against PO number with as usual subcontracting receiving process ( 101 and 543 O-)
    Regards,
    Thiru
    Edited by: thiru on May 5, 2010 11:48 AM
    Edited by: thiru on May 5, 2010 11:49 AM
    Edited by: thiru on May 5, 2010 11:53 AM
    Edited by: thiru on May 5, 2010 11:55 AM
    Edited by: thiru on May 5, 2010 12:02 PM

  • Vendor Returns for SLED materials which are blocked

    Hi All,
        We have certain materials for which Shelf Life has been expired. Using QA07, we have blocked these materials. Now we need to return those materials to vendor. We tried creating return PO. While doing MIGO (using 161 mov type ), it is showing the error "SLED 09.06.2011 of batch A has been exceeded".
    Please let us know how to return those material to vendor from blocked stock.
    Regards,
    Rosh

    Hi,
    It depends if vendor is ready to accept the expired materials then we return it to vendor.
    If this is not the same then we have to keep it blocked (Transfer from unrestricted to blocked stock, MvT - 344) for that time till we destroy (scrap) it. And once we have decided to scrap it then we do Goods Issue using MvT 551.

  • Return of Indirect material

    Hello Friends,
    I have a scenario where I return the used maintenance part, say alternator of truck, to vendor and he will credit me for the same. how can I configure this scenario in SAP ?
    Details:
    Work order --> consume alternator against work order (part doesn't exist in system any more) --> after say 6 months, I replace this alyernator with new one --> i return the used alternator to supplier --> supplier credits me.
    Now as the part doesn't exist in system, how can return it to supplier?
    anyway other way around ?
    Thanks in Advance,
    Pat

    Hi,
    Plz raise a credit memo in the MIRO.
    Then do return delivery in the MIGO transaction, ans select as return delivery to the vendor and use Mov trype as 122.
    Hope it clears,
    Regards,
    Andra.

  • Tables for Materials in Maintenance Order

    Hi experts,
    I need to implement a program that let me view the materials contained in the maintenance order, but I can not find the tables that contain this information.
    Can anyone help me or tell me how to get this information (Function or other)?
    Thanks in advance
    L.

    Hi,
        Check in RESB- Reservation table..,enter order no 
       Alternatively for Purchase requisition generated from Maintenance Order - u can find EBKN Table ..
    Check if IWBK Report - satisfies your requirement or no
    regrds
    pushpa

  • Return delivery of materials uploaded intially with mvt 561

    Some of our materials which are uploaded with movement type 561.
    (Currently in Block stock)
    These materials are to be returned to vendor . What is the procedure for such materials in terms of finance/mm transaction.

    Hi Tapan,
    Your answer was usefull. Thanks. It lead me in direction of solution after doing some search.
    Well complete procedure i followed is -->
    1 ) Create PO using ME21N transaction. In the line item tick the Returns flag. This will create PO for returns.
    2 ) Enter goods receipt through MIGO transaction.
         During Goods Receipt for Return Purchase Order, you do not have to change the movement type from 101 to 161 as the system will automatically assign the movement type to 161 upon saving the postings.  However, before saving, check if there is a tick in the Return Column to ensure that it is a return Purchase Order.
    3) Create Credit Memo using MIR7/MIRO transaction.
    Regards,
    SATYAJIT

  • Vendor return of rejected materials

    Dear experts,
    I have one issue related with vendor returns. My client have almost 45 purchased materials of different quantities in legacy system which are rejected in quality.then all those rejected materials were uploaded in SAP by 561 movements.Now all rejected materials are to be returned to vendor. My client want all Materials to be returned to SAP.All the goods are excisable.
    May i know the process in SAP?  Client also want materials financial impact to be done prefectly along with proper excise entry. so wil it be done as per normal return PO cycle? Or any other process?
    Also i m not clear logically.about " On-Order Stock".which we view in MMBE.Please explain Me,.
    Thanks and regards,
    Ravi

    As you added those material by 561 movement type so you can returned them by 562 movement type as those purchases did not complete the purchase in SAP, so no need to run return purchase cycle in SAP. Regarding the on order stock means you already created another PO for those materials in SAP.
    regards,
    qsm sap

  • Return of unused spares against maintenance order

    Hi All,
    I have issued 6 qty of a spare material agianst a maintenance order / resrvation no.Now I have used only 4 qty & rest 2 qty I need to return to store agianst the same maintenance order or reservation no . I am trying to return it through MIGO t-code , but I can not change qty field in MIGO screen when I am selecting "goods receipt" & "reservation no" combination .Also I have tried through t-code MB11, mov. type - 262 where I have entered my maintenance order no , but system is not picking the material no in this screen automatically.
    Can any one please suggest how can I return my unused material issued agianst maintenance order? My requirement is to enter the referecne no either as maintenance order no or reservation no & system should pick the material no & qty field should be in edit mode.
    Thanks in advance
    rgd
    rajib

    Hi,
    Create reservation for same material in same maintenance order with negative quantity (quantity to be returned to stores).
    Now use the newly generated reservation for GI. This leads to movement 262 against maintenance order in question for material return to stores.
    Vijay

  • Indirect Materials  process in BOM and Production

    Hi Experts,
    I just have a question regarding SAP B1 process in Production. Let say I have an item we call it indirect material, then in BOM this indirect material is not included but in Production order the cost of this indirect material should be included. Can you suggest a better way on how we gonna treat this in SAP B1?
    Thanks,
    horhe
    Edited by: sapsaphorhe on Jul 22, 2011 5:02 AM

    Hi Horhe......
    Welcome to SAP Business One Forum........
    The costing of the produced material affects in the production process. So if your one of the component items is irrespective of BOM then you can plan it on Production Order level.
    It is not necessary to have this item in BOM, but it is important to take that item in production order when you plan it.......
    Regards,
    Rahul

  • Procedure of Return of subcontracted materials

    Dear Expert,
    we are using subcontracting procedure in our company,sometime material provided by subcontractor is faulty this material we want  return to subcontractor..how to do ?
    Thanks

    You want to return parent material sent by subcontractor after job work,
    If material is taken for production,move stock rejection storage locatin,
    ask quality poeples to bring stock to new material(Material you want to return) in QA32
    Create a recrusive BOM(Parent & Child are same),Create a purchase order with item category L,Check recrusive BOM,
    Do MB1B(541 matl doc.) to tranfer material to subcontractor,Create Challan to send materials

  • Goods return against maintenance work order exceeds goods issue

    Is there a way to prevent returning more quantity (262 movement type done within MB1A) than was issued (261 movement type done within MIGO_GI) against a maintenance work order component?
    Thanks in advance,
    Rick

    Hi,
    Movement Types 261 and 262 works in Planned as well as in Unplanned both ways.
    If you do Goods Issue w.r.t. Maintenance/Work Order (Movement Type - 261) then components and their quantity get defaulted from the reservation created automatically during order creation and system does not allow us to issue more that the quantity in reservation.
    Similarly when you cancel the Goods Issue Document then it hits Movement Type 262 automatically and does not allow to edit the quantity.
    The above two processes are planned ways.
    Now when you want to do extra consumption of components against Maintenance/Work Order then you do not do Goods Issue > Order, instead of this you do Goods Issue > Others and then specify all the necessary details manually (Like; material, quantity, etc...) and enter Maintenance/Work Order as an Account Assignment on which the cost is getting loaded.
    Similarly when you are receiving materials from Maintenance/Work Order using option Goods Receipt > Others then here also there is no control and you can receive any quantity from Maintenance/Work Order since here also Maintenance/Work Order is working as an account assignment not a control document.
    The above two processes are unplanned ways.
    So in short, there is not any control on this movement when it is unplanned.

  • Material Return Slip for maintenance order

    Hi All,
    During goods issue for a maintenance order, we can take print out of material list (for planned items) and produce the same to stores personnel for issuance of material.
    Is there any similar slip available in system so that a print out can be taken for items to be returned to stores for a maintenance order?
    Thanks in advance and with Best Regards.
    HAPPY NEW YEAR IN ADVANCE !!!
    JK

    The material issue slip will be printed at different locations after releasing the mtc
    set the printer at OID1 .check thro OOCU work flow we can go , but i have not yet worked this scanario.
    According to this work flow after reservation by ur order release  it will print the materials issue at stores end.
    Some industries having the authorisation signature from dept superiors at the time u may go take print out at location to get the sign manually.
    std print form with sap some modifications or abap report will be created for this
    Sry iam not able to give full soln
    We may expect from others
    thenna

  • Materials Return to Vendor

    Hi All,
    How do I return Non valuated materials to a Vendor? (Without reference to a Purchase Order)
    Which movement type do I use and what transaction do i use?
    Thanks
    Adeel

    Hi Rahul,
    For booking in NVM (Free Materials)  i will be using movement type 511 as no financial postings are made using this movemnt type. For Returns, I will be creating a returns PO with Returns and Free Item Ticked. This again doesn't give any financial postings as doesn't expect an invoice and is perfect for what I am looking for.
    This has all been tested and works.
    Regards
    Adeel