Samples to be consided in planning and costing

Hi, as per iso standards we need to test certain samples like from 200 parts, we need to test 1 sample. so we cut a small piece from the raw material, we test. now our req is system to consider that sample qty in mrp planning and capture that testing cost? pls advise how can we map this in sap.

Hi
I could not understand your question relateD TO mrp. as per my understanding you are going to consider one metal sheet with 2.4x4.8m in dimensions and in that you are going to cut small portion of the stell piece for inspection..........right in that case it will not consider
but when you are doing production order confirmation that point you are going to maintain Yield and Scrap quantity to adjust to capture the cost
as per your 2nd question:
in Quality management view you have to maintain the order inspection type as QM01and settelement process to be followed as your requirement individual/collective and as well as QM02.
i hope it will give you an overview for your issue
Thanks
Shaik

Similar Messages

  • Table or Function module to get Internal order planning and Cost element pl

    Dear All,
    Table or Function module to get Internal order planning and Cost element planning.
    Internal order planning from T-code KO13.
    Thanks in advance.
    Regards,
    Ravi
    Edited by: Ravi Chandra on Sep 13, 2011 8:08 AM

    BPEJ, BPEG, BPEP

  • Difference between COPC planning and cost object controlling

    I want to know why do we have to calculate the cost of a manufactured product by both COPC planning and Cost object controlling by order?
    Will the cost of a manufactured product be different in COPC planning method and cost object controlling method?
    if we use only cost object controlling to calculaute the cost of a manufactured product without using COPC planning wht will be the implications?

    Raja,
    Yes the cost can be different. The cost calculating thorught Product Cost Planning may be static, you calculate it by period it is more for planning prupose ans to set standard. The cost calculated through Cost Object Controlling is resulting from your actual transactions, and the are few variables that could increase or decrease the cost of product. For example the overhead cost (Increase of salaries) can directly affect your activity rate at the work center and impact cost of your product when the production order is complete. You need both costs (Cost Planning and Cost Object releated) so at the end of the period you can calculate variance betweeen your plan cost and your actual costs.
    Hope this clarifies your doubts.
    GG

  • Explain Plan and  COST

    Hi,
    Is there any relationship between the cost factor in the explain plan and query execution time. I have come across situations in both ways, i.e. high cost and low execution time, low cost and high execution time. What parameters do we need to consider in tuning a query high cost or low cost?So my assumption is that the lower cost does not guarantee faster response time. Again i have have seen many people try to reduce the cost first.Can anyone help me on this issue please.
    Thanks-Bhaskar

    Cost is a metric that Oracle uses to estimate the runtime of a query. However, it is not something that you probably ought to pay a lot of attention to. If you are looking at the performance of a query, you are presumably operating on the assumption that the optimizer may have chosen an incorrect plan. If the optimizer chose an incorrect plan then by definition the cost is incorrect. If the cost is correct then, by definition, Oracle chose the correct plan.
    It makes much more sense to focus on things like the cardinality of each step (the number of rows each step in the plan is expected to return). If the cardinality estimates are correct (or reasonably close), then the optimizer probably chose the correct plan. If the cardinality estimates are way off, the optimizer probably chose a less than optimal plan. And when you find the first step where the cardinality estimates are wildly incorrect, you'll know where you need to start focusing your tuning efforts.
    Justin

  • Ignore already planned network cost in RA

    Dear All,
    My client uses network cost planning and option determine planned cost after release. Now client decided to use Result Analysis (RA) and want to use Unit Cost Planning (UCP).
    Now, problem is RA (KKA2) considered already planned network cost for running project. So that we cannot use UCP in loading full cost of any running project.
    Please, suggest any way to avoide network planned cost in RA.
    Regards,
    Nilesh.

    Dear Virendra and All,
    Thanks, Virendra for your useful answer.
    I want to share another two options to check its possible effects, they are as as follows:
    1) Remove costing variant from network and activate option do not dtermine plan cost.
    2) Use any suitable RA userexist for selecting plan cost in RA (From suitable source).
    Request, your opinions on above two options and any other effective option from your side.
    Regards,
    Nilesh.

  • Function module for calculating planned and actual cost of production order

    Hi ,
    Do we have any standard function module for calculating planned and actual cost for production order?
    i need to implement this in a Z-report.
    Thanks
    Srini

    Hi,
    try below function module
    CRMCO_GET_PLAN_ACTUAL_COSTS
    CO_IH_GET_PLANNED_COSTS_TOTAL
    Regards,
    Sankaran

  • Report to display Mat Cost Planned Labour Cost and Over head cost

    Hi Abapers,
    Greetings of the day..
    I need a Report that Display Material Cost , Planned Labour Cost,Actual Labour Cost and Over head value
    where do i start from and what are the tables involving in this report..
    if already done this A code snippet is more helpful...
    Thanks In Advance...
    Thanks & Regards
    Sathish

    Assuming you are talking about Maintenance Order.
    Use table: PMCO.
    Here the line with field VORGA having value KPPS gives the Planned Costs of the Order in the field WRT01.
    Similarly, the line with field VORGA having value RKL gives the Actual Costs of the Order in the field WRT01.
    Also have a look at Tcode KKBC_ORD.
    Jogeswara Rao K

  • BAPI KPF6 POST PLAN COST FOR INTERNAL ORDER AND COST ELEMENT

    Hi all gurus,
    I would like to use in a custom report a BAPI/Function Module that help me to simulate KPF6 in order to post planning costs for internal order and cost element (layout 1-401).
    So the input should be:
    1) Version
    2) period from
    3) periodo to
    4) year
    5) internal order n.
    6) cost element n.
    7) value
    I found a lot of BAPI but don't know the correct one and how to use it (example how to fill the input value).
    Can anyone help me on that?
    Kind Regards

    In additio  to the previous I found the BAPI_COSTACTPLN_POSTPRIMCOST but don't know if it's the correct one and how to use it (some example fitting the my case will be very appreciated).
    If the quoted BAPI is correct.
    I tested it filling all fields as following:
    HEADERINFO:
    CO_AREA=FFCA
    FISC_YEAR=2008
    PERIOD_FROM=001
    PERIOD_TO=012
    DOC_HDR_TX='blank'
    INDEXSTRUCTURE:
    OBJECT_INDEX=000001
    VALUE_INDEX=000004 (hope this point at Interna Order)
    ATTRIB_INDEX=000000
    COOBJECT:
    OBJECT_INDEX=000001
    ORDERID=ZO53-08IMZ
    TOTVALUE:
    VALUE_INDEX=000004
    COST_ELEM=3224048
    FIX_VALUE= 200,0000
    DIST_KEY_FIX_VAL=2
    The Return table is set to 0. Nothing happens.....I suspect something related to indexstructure or index is wrong..
    Could anyone help me on that?
    Kind Regards

  • Where and how to enter plan data cost and profit center wise to get data in grr1

    Hi Gurus,
    Appreciate you can tell me where and how to enter plan amount cost center wise for cost elements and profit center wise for revenue elements????
    So that we can get this data in grr1 report.....
    Can we upload this planned data, if yes how??
    Thank you

    Hi..
    If you use classic PCA, refer to Plan Data Transfer - Profit Center Accounting (EC-PCA) - SAP Library.
    If you use new gl pca, refer to Transferring Plan Data from Controlling - General Ledger Accounting (FI-GL) (New) - SAP Library

  • Missing iviews for Personnel Cost Planning and Simulation

    Hi,  We are implementing "Personnel Cost Planning and Simulation" in R/3 version 5(mySAP ERP). At present we have the following Business packs in our Enterprise Portal Server. 60.1.5 and 60.1.1(mySAP ERP 2004). We uploaded both the BP's in our test environment to make sure we get all the iveiws that we need.
    SAP presentation has all the iviews, But we are unable to locate/identify under MSS the iviews for "Web Based Detail Planning for Line Managers",  "Detail Planning:  Detail Costs per Cost Object" and so forth for Personnel Cost Planning and Simulation component.
    We researched other BP's such as 50.4.5 and 50.3.9 but in vain.
    We truly appreciate if some can guide us to get these iviews.

    Finally I got the answer and thought I can share this with you all.....
    For Personnel Cost Planning and Simulation, SAP has not delivered mss iViews, but SAP has realized the detail planning pages for the line manager and the personnel cost planner by using the Business Server Page (BSP) "hrhcp_planning".
    You can find the description of it's usage in the online documentation under the following path:
    Human Resources>Personnel Management>Personnel Cost Planning and Simulation-->Personnel Cost Planning and Simulation Flow -->Creating Personnel Cost Plans
    --> Providing Detail Planning for Line Managers
    --> Detail Planning by Line Managers
    --> Detail Planning by the Personnel Cost Planner
    If you wish to use the detail planning page in an mss environment, you can integrate the BSP as an external service into the manager's portal. Otherwise, you can also use it, by providing the URL to the managers.

  • Condition category B,F and planned delivery cost indicator in MIRO

    hi,
    i would like to clarify the linking between condtion category and planned delivery cost indicator in MIRO.
    1) if in PO, i have condition type where category is B(delivery cost) or F(freight), then during GR, system will credit freight/customs clearing account. subsequently in MIRO, i have to choose planned delivery cost indicator when create invoice, correct?
    2) if my PO has no condition type where category is B or F, i do not have to choose planned delivery cost indicator during MIRO as no freight/customs clearing account to be set off. correct?
    thanks

    Hi Eliana,
    I think you are on right track.

  • Table for Production order planned and Actual cost

    Hi Experts,
    Can anybody please tell me the name of table where Production order planned and Actual cost gets saved ?
    Thanks in advance.
    Regards,
    Bijay

    Table COEP
    don't forget the points

  • MIRO planned delivery cost and document reference

    Hi
    I create  a purchase order with one position including the planned delivery  with flag  Indicator: GR-Based Invoice Verification. OK
    I create the good receive with reference to purchase order: in Migo I update field xblnr Number of External Delivery Note. OK
    I enter an invoice to reference to purchase order number including the planned delivery costs using transaction MIRO: SAP enter the document and in RSEG update 2 record: on first record (refer to material) the field rseg - LBRNR (material document GR) and the field rseg - XBLNR are update BUT on second position (refer  planned delivery  cost) the fiel rseg - LBRNR (material document GR) and the field rseg - XBLNR are missing.
    I wanti to updat it. Is it possible?
    TKS

    Help me....

  • MIRO: Delivery note and Planned Delivery Costs

    Hi experts,
    I'm trying to register planned delivery cost starting from the delivery note selection in MIRO.
    The reason is that i usually have many GR of the same PO and i want to register the correct delivery cost only for the material that i have actually received.
    How and where could I work to set the correct solution? (price conditions maybe)
    Any help is appreciated.
    Warm Regards,
    Pierluigi

    go  to  miro
    select the planeed delivery layout variant and select the po or delivery note for the refrence
    i sugget u to mark the gr based iv check box in po and then do the miro so that system will suggest the values for the specific delivery of material in miro

  • IW32  control data tab cost varaiant actaul and cost varaiant planned field

    Hi Team,
    In my preventive maintenance order , in control data tab cost varaiant actaul and cost varaiant planned field is not avialble it is hidden , but comming in PM01 order tye.
    Tcode OIAN for preventive maint. order type
    Cstg variant actual CAUFVD-KLVARI             
    Cstg variant planned CAUFVD-KLVARP
    Input indicator is selected.
    What may be the reason.
    Thanks in advance.

    Hello,
    I already ran the report Z_FILL_COSTING_VARIANTS and after that I will go to calculate costs in the order but nothing. I this order I already had confirmations but when running the cost calculation the system doesn't made the calculation.
    Can you help me?

Maybe you are looking for

  • Unable to update iPhoto and iMovie?

    When i try to update iPhoto and iMovie, this first message appears: "Update Unavailable with This Apple ID - This update is for an app downloaded with a different Apple ID. Sign in with that Apple ID and try again" so i press ok and a second message

  • Using '\n' to split lines

    I've used '\n' to split lines of text but it doesn't work with all phones. Is there any other way to do it? I'm not using canvas. append("Title"+'\n'+"something");Edited by: Sypress on Mar 13, 2010 11:12 PM

  • Can't get the zte mf627 to work with 10.9.2

    Hi I have an older 3 ZTE MF627 3G dongle. Cant get the loaded software to work with 10.9.2 on Macbook Air. Also cant find a download for new sofware for it to work....

  • Workers not working in AIR

    HI, I'm trying to get a worker working in an adobe air application, the problem is: the code seems to work in a flash projector, the calls come and go between workersm but when that same code is used in the air app, the call is made to the secondary

  • IOS 8.1 Erratic Connection to Phone Network and keyboard freezing iPhone 5S

    I have an iPhone 5s running on AT&T's network with IOS 8.1 running.  The phone has erratic connection to the cellular network.  I worked with Apple tech support and they sent me a new phone, but I still had the problem.  Resetting network settings wo