Scot configuration for 4.6c systems

Hi All,
After having worked on Ecc 6 systems i am having problems understanding confog for 4.6c systems for SCOT for out bound mails.
We have a requirement where we need to change the mailhost name.In Ecc we just need to change in scot but whereas in 4.6c how do we change it.Thanks.

Hi Ambarish,
You do not configure the mail host in SAPconnect or the IMG but rather in Sendmail or the "other" mail software you will be using. SMTP was not available in releases before 6.10 as the ICM was not available. I will explain the flow of a request below:-
SAPConnect -> RFC -> Internet Mail Gateway -> Sendmail (or Sendmail equivalent) -> SMTP Mail Server
As you can see you do not enter the mail host and listening port of the SMTP server as Sendmail is the actual SMTP server. The mail is not relayed via SMTP but RFC from the SAP system and SMTP mail is forwarded from Sendmail. Note that Sendmail is a fully functioning mail server ! This method was not perfect but worked with some configuration.
Below is a "how to" that will enable you to setup mail routing from 4.6C to Exchange and all you have to do is enable Exchange to accept mails from the Sendmail clone (Emailrelay).
http://it.toolbox.com/wiki/index.php/Email_from_SAP_-_4.6C_using_MS_Exchange_2003
Using this method it is possible to send mails from 4.6C to Exchange via a hop via another SMTP server
Hope this helps
Michael

Similar Messages

  • SCOT configuration for internal & external email system in EP.

    Hi,
    I want to add SCOT configuration for internal & external email system in  SAP EP 7.0  ?
    What all steps I need to do ? any good documents on this ?

    Hi Haider,
    I have read the link you have given me to configure SCOT. I have 3  doubt plzz clarify.
    Doubt No. 1:
    In that link its mentioned that I have to add 2  profile parameter in the transaction RZ10 namely icm/server_port_<>*  and is/SMTP/virt_host_<>*
    My question is Can I put any value which i like in place of * like can I add either icm/server_port_2  OR  icm/server_port_3 OR icm/server_port_4  in icm parameter AND ALSO
    Can I put any value which i like in place of * in is/SMTP/virt parameter like can I add either is/SMTP/virt_host_0  OR  is/SMTP/virt_host_1  OR is/SMTP/virt_host_2 .
    Doubt No. 2:
    What port value I have to put in the profile parameter    icm/server_port_2  in RZ10.  Can I put any port value ? and automatically that port will work? say suppose I addded this profile parameter in RZ10
    icm/server_port_2 = PROT=SMTP,PORT=25000,TIMEOUT=180          so automatically 25000 port will work ? or will it give error?
    Doubt No. 3:
    When I go to SMICM transaction and go to services , I get the following:
    No.  Log         Service name/port     Host name           Keep Alive    Proc TimeOut   Active
    1     HTTP               8000                  epv.sopm.com           30                     60               Yes
    2     SMTP               0                       epv.sopm.com            30                    60                Yes
    3     HTTPS             8001                 epv.sopm.com            30                    180               Yes
    This means that HTTP port is 8000,   HTTPS port is 8001. My question is why in SMTP its showing 0, why no port is shown?
    I have not added any profile parameter like  icm/server_port_2 = PROT=SMTP,PORT=25000,TIMEOUT=180     for SMTP in RZ10 as of now.
    Is this the reason for this ?

  • Scot configuration for SMTP

    Hi all,
    I wolud like to know the configuration steps need to do in the SCOT transaction inorder to send the mails from SAP system to othermail servers via SMTP.
    Your help would be more appreciable
    Many thanks in advance
    rk.

    Hi RKK,
    e-mail, fax or paging/SMS via SMTP configured in the SAP Web Application Server & Which prerequisites and settings are required outside the SAP system?
    Brodly there are five steps to configure
    1. Profile parameters
    2.User administration (transaction SU01)
    3. Client assignment (transaction SICF)
    4.SAPconnect administration (transaction SCOT)
    5. Settings on the mail server (SAP-external configuration)
    For step by step visit smtp configuration guide at
    http://help.sap.com/saphelp_erp2005vp/helpdata/en/2b/d925bf4b8a11d1894c0000e8323c4f/frameset.htm.
    Cheers,
    Shyam.

  • SAP DMS - How to do an external DMS configuration for the existing system ?

    Hi All.
    Greetings.
    Request help and understanding.
    Am new to the world of SAP. And request SOME clarity for understanding of DMS.
    We are wanting to put an external DMS server and wish to configure for the same.
    So that the load on the production SAP R/3 database is reduced.
    We are now wanting to test the same on Dev environment.
    From SDN Link :
    I understand that :
    DMS basically has a content server. which stores documents.
    That can be accessed through Web, SAP R/3 Gui , SAP Portal.
    I have gone thro various links and the following links i have found to be informative and helpful :
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/c1/1c31a243c711d1893e0000e8323c4f/frameset.htm
    http://wiki.sdn.sap.com/wiki/display/PLM/DMS+Customizing
    http://help.sap.com/saphelp_nw70/helpdata/en/59/fba637fcf7dc39e10000009b38f8cf/frameset.htm
    However, would like to know the following because am not getting the clarity :
    1) Is there any supported platform / compatibility guide for DMS ?
    if yes, can someone send me the link?
    2) We have oracle 11g as our for SAP R/3 backend.
    Windows 2003 server 64 bit system.
    When i check the system status on the dev server of sap.
    It says. ECC 6.0 Rel 7.00 update 20 (hOpe am reading it correctly)
    After much search on the SMP site,
    we finally discovered and downloaded the DMS software for unicode and / 64 bit.
    Which we saw under the maintenance components separately seen for DMS 7.0
    Now for this DMS content server which we would like to make it external for storage of documents -
    do we need to have a separate database for this purpose as a repository.
    If i run a setup of DMS - will that automatically install any default repository for this or
    will it allow me to choose any other repository for the same ?
    Can anyone advise on this.
    Because this link says content server is based on Instance of MAXDB : http://help.sap.com/saphelp_nw70/helpdata/en/59/fba637fcf7dc39e10000009b38f8cf/frameset.htm
    3) I read some thing like this on some of the SDN links :
    P40 - Integration of DMS
    P62 - R&D Document Manage¬ment and Workflow
    P71 - Document management
    What are they referring to.
    4) We would be accessing these thro web, gui, customised portal.
    This content server configuration is a bit confusing.
    5) Is SNC configuration required to be done for the separate DMS server setup.
    If yes, how to do that ? any configuration link for that please ?
    Can anyone advise on the things to do.
    Steps to do.
    What all are the pre-requisites to check, before we start the set up of DMS.
    Can anyone help me understand this whole thing regarding the DMS installation and configuration.
    Step-wise.. from the start to end.
    Because it gives me a lot of uneasiness without having everything in place before we could say we could start the whole process of configuration / installation.
    Many thanks for your help in advance.
    Wishing you a happy and relaxed weekend.
    Kind regards
    Indu

    Thanks christoph & pradeep kumar.
    did a few more research and atleast have come to understand that.
    DMS server installation has content server which works only with MAXDB.
    So my understanding is correct.
    And what we see as Easy DMS is a client installation.
    which probably i would look at at a later stage.
    Found this link to be a little more informative :
    http://www.sapfans.com/forums/viewtopic.php?f=12&t=330558
    I really wish. That life were to be so easy. To call a consultant and finish it off
    Wishful thinking
    thanks and cheers
    indu

  • MM configurations for SAP AFS System

    Hi,
            I'm working in MM configuration for SAP AFS production system, After uploading AFS Materials successfully and also created Purchase order to make a stock for that material, but PO created successfully but not able to do Goods receipts for created PO.
           Errors : Purchase order xxxxx has no items,
    Once created sales order for the same material again we got the error while GR but error is different.
          GR is not possible for this PO number.
    But material type is ROH , and its external procurement only.
    Please let me know when we will get this type of errors.
    Thanks and regards
    Nisar.

    Hi Nasir;
    Some possible causes are;
    1.     Defining inbound delivery (Or kind of a confirmation) in the PO LI level and not maintaining the document subsequently
    2.     Not releasing the PO before the GRN
    3.     Creating the PO with a material with Grids (AFS Basic Data Screen) and not maintaining the grid value at item detail level of the PO
    Azwath Mohammad
    http://www.sapafs.net

  • Charm configuration for a 4 system landscape

    Hi Experts,
    We are planning to implement charm for a 4 system landscape: Development Server, Integration Server, Quality Server and Production Server.
    We could configure TMS related steps, activated Charm in Solution Manager, created a maintenance project in solar_project_admin.
    However, the standard delivered transaction types like Normal correction and Urgent Correction are not working in a 4 system landscape.  They are only working for 3 systems (DEV, QAS and PRD).
    Are there any documents or blogs that would specially explain all the steps required for 4 systems? Any kind of help would be highly appreciated.
    Thanks,
    Ravali

    Development --> Integration --> Quality --> Production.
    First, I will import the transport of copies into integration
    Yes, and you test the changes here.
    Second, the whole transport is released and imported to Integration - in the Test phase of the maintenance cycle and NC status being consolidated.
    Third - Now, keeping the maintenance cycle in the TEST phase and NC phase in consolidated, will I be able to schedule the transport into quality server?
    Nope. You consolidate your normal correction, which releases your original transport and import them into Integration, and then immediately into Quality (you already proved it worked in Integration) BEFORE you set the phase to Test. Otherwise the original transports are NOT released. And if you set your phase to Test before importing the originals, you'll get a message that you cannot import transports into Quality during this phase.
    If you need to get transports into Quality for break fixes during the Test phase you need to use a Test Message and these are imported during Go-live as well.
    Fourth - if the above process works, I will then change the MC to Go Live and schedule the import to Production.
    With the corrected process mentioned above, yes, you will then change the phase to Go-live and it will import everything that was brought into Quality. 
    Hope this helps.

  • SCOT Configuration for output format XLS in ECC6

    Dear All,
    Currently the ECC6 that I'm trying to configure the SCOT does not have a XLS format for Abap List, so I couldn't proceed with it.
    Since the ECC6 only have standard output format. (HTM , PCL , PDF , TXT)
    Is there anyway to add the output format for the XLS output format for SCOT configuration.
    Thanks & Best Regards,
    Rahim.

    Hi,
    Please refer SAP note 1151258.
    Thanks
    Sunny

  • How to remove the complete ALE configuration for a given system

    Hello everybody,
    Through ALE ,data is transferred between a number of SAP systems and the necessary ALE setups are in place.
    Now,a particular SAP system,which used to be a receivor to the central SAP system,is to be retired.
    Hence,the associated ALE set up is to be completely removed from the central SAP system.
    Is the following sequence correct?If not and I have missed something,please enlighten me with the correct sequence.
    1.Removal of the receivor logical system  and its assignment to client ,through transaction SALE.
    2.Removal of partner profile, through transaction WE20.
    3.Removal of RFC destinations,through transaction SM59.
    4.Removal of transactional ports for the logical system,through transaction code WE21.
    5.Removal of Distribution model between the retiring system and the central SAP system.
          (a)Regarding distribution model,I have a question-if the distribution model is maintained such that it contains the linking relationships between the central system and several receivor systems(in addition to the one I wish to remove),then is it possible to remove only the desired linkage and not touch the rest?   
          (b)Through BD64,I have tried but I am able to delete only the entire distribution model  as a whole,while I would like to keep the distribution model and delete just one of the nodes,so as to cut  the connection between only central system and the retiring system.
    This is so because the other receivor systems are working fine,involving a lot of batchjobs and I am afraid that deleting the distribution model wholly will create unnecessary trouble.
    Any help will be appreciated.Thanks
    Papri

    HI Nicolas,
    I chatted with Rev-Trac support earlier today and here is what they have come back to me with.
    Assuming the change in question was carried out in the development  system. Changes to fields in tables should in most cases be captured in transports. Assuming it was a transportable change then go to the development system and execute transaction SE16 and query Rev-Trac table /RSC/T_MFM_4T filtering by TABLENAME.
    On executing the query you should see a list of transports involved with changes to the transport. You can then check to see if there is a recent transport associated with the change - if so then you can find out who created the transport by using standard SAP functionality."
    If you find this doesn't help, then please contact your Rev-Trac Administrator who can then log a support request on our support portal at www.xrsc.com
    Hope this helps, Rick

  • SLD configuration for R/3 system

    hi all
    i want to configure SYSTEM LANDSCAPE DIRECTORY for my R/3 system.
    kindly suggest steps for same.
    gud suggestions will b rewarded.
    thanx

    Hi Chetana,
    Refer to the following links:
    http://help.sap.com/saphelp_nw70/helpdata/EN/43/01ea90ab24235de10000000a1553f7/content.htm
    create System in EnterprisePortal
    Thanks n Regards,
    Jhansi Miryala

  • Calendar configuration for peoplesoft source system

    Hi All,Need one clarification.
    we are using people soft as our source system.now we need to configure globalcalendar id parameter in dac.for that we ran below query in given source DB
    SELECT SETID|| ‘~’|| CALENDAR_ID FROM
    PS_CAL_DEFN_TBL.But for this no results were presenting in given database.So we thought of proceeding with default parameter 'SHARE~01'.Shell we proceed like that?will data load?otherwise any ware house generated calender we need to configure?.If yes what we need to configure.Please provide your valuable suggestions on this.
    Thanks in advance.
    Thanks,
    Anusha

    Its better to check with functional guys from your project, they better know what they need for reporting as of your client.

  • SCOT Configuration--for external mail

    Hi All,
    I am trying to configure SCOT on my solution manager server. and able to send mail inside comapny  mail domain but not able to send mail on any external mail domain like yahoo,hotmail.gmail.
    we are using MS exchange server for mailing. please advice me if any further setting require on Mail server side.
    Thank
    Gyan

    Hi,
    Yes this is because your SMTP email server does allow sending emails to the outsid world.
    If you are using SAP WAS 6.10 or above you do not need any extra configuration you need only to follow the following steps:
    https://service.sap.com/sap/support/notes/455140
    This is because the SMTPplug-in from WAS 6.10 and onwards - supports all SMTP mail gateways and you do not need any SAP Exchange Connector as well to connect to MS Exchange Servers. Please find below the details from SAP as well:
    https://service.sap.com/sap/support/notes/122657
    if you have followed all the steps as mentioned in sap note 455140 above, please liaise with your M/S Exchange Server administrator so that he can unblock the sending of emails to the outside world as well, if that is permitted.
    - Regards, Dibya

  • Configuration for Central Monitoring System in SAP Solution Manager.

    Hi Folks,
    I am trying to setup Central System Monitoring in SAP Solution Manager, I am following the document which mention the step by step instructions.
    There are couple of items on which  I am really confused.
    In the documentation it says to activate Background Dispatching & Central System dispatching in 000 client of Solution Manager,
    it also mentioned about creating CSMREG user, but it did not say in which client this activity needs to be performed, and there are lot many steps in which there is no mention about the client of solution manager in which we have to perform the configuration.
    Can you guys please help me to configure properly?
    One set document which I saw talks about the configuration using RZ21 and other document discuss about Configuration using System Monitoring Work Center, which one do we need to follow, are both methods are 2 different options doing the same thing, can you please clarify?
    Also, is there any document which clearly explains the setup of  Central System Monitoring in SAP Solution manager using both approaches and also to test the monitoring?
    I have SAP Solution Manager 7.0 EHP1.
    Thanks.
    Jennifer

    Hi,
    >
    > it also mentioned about creating CSMREG user, but it did not say in which client this activity needs to be performed, and there are lot many steps in which there is no mention about the client of solution manager in which we have to perform the configuration.
    >
    You should created this user in working client.
    > Can you guys please help me to configure properly?
    >
    > One set document which I saw talks about the configuration using RZ21 and other document discuss about Configuration using System Monitoring Work Center, which one do we need to follow, are both methods are 2 different options doing the same thing, can you please clarify?
    >
    You can use RZ21 or System monitoring through work center. From Solution manager 7.1, you need to use work center only. So, I would suggest you to use work center only.
    Thanks
    Sunny

  • Configuring EarlyWatchAlert for all the systems in the landscape

    Gurus ,
    In SDCCN can i configure EARLYWATCHALERT session with targethost as SDCC_OSS
    now this has been only for production system . can this be done to all the systems in the landscape ?

    Hi Susin,
    As per me i could say the EWAlert only be configured for your production system rather
    than the other systems(Dev/QA) existing in your ladscape.
    If you are thinking to schedule this Alert for other products(BI/EP/XI) or for other SIDs,
    then yes...please go ahead.
    Why i am saying we can only schedule the EWAlert for production system, coz the
    the EarlyWatch report uses the SDCC_OSS RFC, which is a copy of the SAPOSS connection. And the target destination refers to SAP's system where one copy of your
    weekly shceduled EWAlert report goes to SAP end as well.
    Please inform me incase any other queries...
    Thank you,
    Tilak

  • Is there a trick when you configure MAPI for the mail system in Central Pro?

    Hi,
    I'm using Central Pro 5.6 on Windows 2003 and It is working fine, but I need to change the configuration for the email system. I'm using SMTP, but I need to use MAPI.
    In the documentation says that I only need the user=profile name and that's it. But this doesn't work. I have this error:
    2011/03/31 17:13:38 C:\Program Files\Adobe\Central\Bin\jfemsend: Logon failed...
    Do I need to do something else??
    Thank you.

    Hi,
    I'm using Central Pro 5.6 on Windows 2003 and It is working fine, but I need to change the configuration for the email system. I'm using SMTP, but I need to use MAPI.
    In the documentation says that I only need the user=profile name and that's it. But this doesn't work. I have this error:
    2011/03/31 17:13:38 C:\Program Files\Adobe\Central\Bin\jfemsend: Logon failed...
    Do I need to do something else??
    Thank you.

  • Logical Component for HANA DB system

    Hi Friends,
    I am doing Managed System Configuration for HANA DB system.
    I have created Logical Component for the same, but I am unable to put it in Solution(in SMSY).
    Can some one suggest.
    Thanks & Regards,
    Solman Starter

    Hi,
    What is the error you are getting ?
    What your solution manger version and SP level ?
    Check below note and see if they help.
    1958910 - EarlyWatch Alert For HANA Database
    Regards

Maybe you are looking for

  • Default View Size In My Own Template

    I have created a template of my own called "My Template" and have set it to open automatically as a new document in preferences. Everything works great except it opens at 100% view size I want it to open at 150% view size, I've tried saving it as a t

  • Reports and applications WEB ABAP in MSS

    Good Night. I am implementing MSS with BP 1.41, ECC 604 and Portal 701. I need publish a report created in ABAP and two applications WEB Dynpro ABAP in the area of Overview  of the Manager. Ie. I want that in the area of navegation appear the Applica

  • 5.1 on Windows and Mac

    Okay, i'm looking to buy the Griffin Firewave for 5.1 Audio Output and also the Logitech X-540 as 5.1 Speakers. Now mainly, i use Mac OS X as my main OS for web browsing, work etc. But i sometimes use Windows (Vista) for games, music and what not. No

  • Acrobat Distiller Application Error: acrodist.exe ntdll.dll

    Hello All, When submitting a doc to the distiller I intermittently get the follow error; Faulting application acrodist.exe, version 8.2.2.217, faulting module ntdll.dll, version 5.2.3790.4455, fault address 0x0001b404. Can anyone offer an explanaion

  • Application icon in launchpad disappeared

    after the update, app icon within launchpad most are disappeared, olny few left, why????