Calendar configuration for peoplesoft source system

Hi All,Need one clarification.
we are using people soft as our source system.now we need to configure globalcalendar id parameter in dac.for that we ran below query in given source DB
SELECT SETID|| ‘~’|| CALENDAR_ID FROM
PS_CAL_DEFN_TBL.But for this no results were presenting in given database.So we thought of proceeding with default parameter 'SHARE~01'.Shell we proceed like that?will data load?otherwise any ware house generated calender we need to configure?.If yes what we need to configure.Please provide your valuable suggestions on this.
Thanks in advance.
Thanks,
Anusha

Its better to check with functional guys from your project, they better know what they need for reporting as of your client.

Similar Messages

  • Message "Creation of DataSources for SAP source system is not permitted"

    Hi,
    I am in DW Workbench: Modeling and I need to copy a DataSource.
    It's impossible, beacause I have this Message "Creation of DataSources for SAP source system is not permitted"!
    What can I do?
    Thks

    Hii.
    You can not copy the standard datasource to any other source system it will not allow you to do that.
    But if you want to copy you can copy it to PC FILE source system.
    It will allow you to copy there.
    Right click in Datasource->Copy-> Give Target datasource name -
    > intarget Source system tab -
    >Give Source system for File.
    Thanks
    Mayank
    Edited by: Mayank Chauhan on Sep 4, 2009 5:41 PM

  • Creating DataSources for File Source Systems in csv format in sap bw 7.0

    Hi,
    Please explain how to Create DataSources for File Source Systems in csv format in sap bw 7.0. WITH SCREENSHOTS
    Thanks
    JINI
    Edited by: Jini  Jayan on Jun 11, 2008 11:36 AM

    Step 1. Select Source systems under Modelling in the left panel. In the right panel, right-click Source systems and select Createu2026.
    Step 2. Select the FileSystem, manual meta data, data using file inte option, and then click  to continue.
    Step 3. Enter a name and a description for the source system, and then click  to create the source system.
    Now create an application component
    Step 1. Select InfoSources under Modelling in the left panel. In the right panel, right-click InfoSources and select Create application componentu2026.
    Step 2. Enter a name and a description for the application component, and then click  to continue. (BW automatically adds a prefix of "Z" to the technical names of application components, unlike the naming system used for other BW objects.If u give the name as AC_DEMO it will be saved as ZAC_DEMO in the system.
    Now create infosource
    Step 1.Select InfoSources under Modelling in the left panel. Right-click the newly created Application Component , and then select Create InfoSourceu2026.
    Step 2. Select the option Master data/texts/hierarchies, and then click  to continue.
    Step 3. Enter your infoobject name, and then click  to continue.
    Now you will be asked
    Infosource(name) assigned to Appln component(name)?
    Click continue
    Now go back to workbench and see the Infoobject listed under the Application component name (under Infosource)
    Right click the infoobject name and select Assign Datasource
    Enter the Infoobject name as Infosource name and the source system name and continue
    Now you ll get datasource assignment confirmations for Infosource_ATTR and Infosource_TEXT for master data and text.
    Click yes and continue
    Now you ll be taken to the Infosource(master data) change screen
    Source system name will be given
    Below that u need to give the datasource name u2026.._ATTR
    Click Activate.
    Now Click the tab transfer rules
    Copy the communication str infoobject names to an excel sheet
    For ex if your infoobj are IO_MATNUM and IO_MATNAME (material number and material name) copy and paste as
    IO_MATNUM      IO_MATNAME
    MAT001     TEA
    MAT002     COFFEE
    MAT003     SUGAR
    GIVE YOUR DATA IN THE EXCEL. AND CLICK File Save As CSV(comma delimited) and save to ur system. Give file name as something like infosourcename_ATTR.csv
    Now back to the Infosourcechange screen
    Source system name will be given
    Below that u need to give the datasource name u2026.._TEXT
    And activate
    Now Click the tab transfer rules
    Copy the communication str infoobject names to an excel sheet
    GIVE YOUR DATA IN THE EXCEL. AND CLICK File Save As CSV(comma delimited) and save to ur system. Give file name as something like infosourcename_TEXT.csv
    Now create Infoobject to load data
    Go to Infosourceu2014Appln Componentu2014InfoObju2014SourceSystemu2014rightclick->create Infopackage
    Step 2. Select the DataSource Material number (Master data), enter a description for the InfoPackage, and then click  to continue.
    Give infopackage description as Infopackage:InfoObj_ATTR
    Now take care to select the first item in datasource and click continue
    In the next screen click external data tab
    Click client workstation
    Datafileu2026.file name (browse to give the file u saved in ur system)
    There will be an option to remove header data from file.remove 1 row.
    File typeu2014csv file
    Now click schedule tabu2014start dataload immediatelyu2014start.
    In the same way
    Go to Infosourceu2014Appln Componentu2014InfoObju2014SourceSystemu2014rightclick->create Infopackage
    Step 2. Select the DataSource Material number (text)enter a description for the InfoPackage, and then click  to continue.
    Give infopackage description as Infopackage:InfoObj_TEXT
    Now take care to select the second  item in datasource and click continue
    In the next screen click external data tab
    Click client workstation
    Datafileu2026.file name (browse to give the file u saved in ur system)
    There will be an option to remove header data from file.remove 1 row.
    File typeu2014csv file
    Now click schedule tabu2014start dataload immediatelyu2014start.
    Click the icon below admn workbench to go to monitor and check the load
    Or you go back to Infosourceu2014Appln Componentu2014InfoObju2014right clickmaintain master data
    Click execute
    You can see the data load
    Hope this helps!!!

  • Transfer Rules for two Source System in Production

    Hi All,
    I have a question.
    I have source system ECDCLNT230 (ECC Devlopment) which is connected to BIDCLNT200(BID Devlopment) I have two production source system ECPCLNT410 (ECP Pre Production Client) & ECPCLNT400 (ECP Production Client) which i want to connect with BIPCLNT400. when i transport my content from ECDCLNT230 to ECPCLNT410 and ECPCLNT400 , it works fine. i created 2 source system in BIPCLNT400 and replicated data source in to BIPCLNT400 so all data source has replicated.
    Now when i transport the request from BIDCLNT200 to BIPCLNT400, i need two transfer rules, two transformation one for each source system. for that what kind of settings are required.
    Thanks is advance.
    Regards,
    Komik Shah

    Hi,
    If I understand correctly, in your BW Production system, you want to connect / load data from your ECC Pre Production and Production system.
    In this case, to automate the transport needed for changes of transfer rules for both source system, you will need to have two tranfer rules in your BW Dev. You can either create two source system in Dev pointing to the same ECC Dev system, or one to ECC Dev and the second to ECC QA. Use different name for this two source system.
    In BW Production, you then then maintain the source system conversion of both source system.
    Thanks.

  • Tcode for deleting source systems

    Dear all,
        is there any tcode for deleting source systems in BI 7.0? I tried RSAP_BIW_DISCONNECT and RSAR_LOGICAL_SYSTEM_DELETE, but these two didn't exist in BI 7.0. Please help. Thanks.
    Jin Ming

    hi,
    chk the below link
    How to delete source systems?
    Ramesh

  • Prevent objects being transported for Sandpit source system

    Hi there,
    We have a 3-tier systems landscape for BI: DEV, QAS, PRD (we do not have a sandpit BI). In our R/3 development system we habe two clients which are both setup as source system for BI DEV. One of the clients in R/3 DEV serves as sandpit in that system and objects can't be transported from it. However, since this client is connected to BW, objects related to this source system can be transported from BI DEV. We want to prevent that, so only the objects in BW DEV for the real R/3 DEV development client are allowed.
    Is there a way in BI to configure a source system in such a way (other than via security roles/profiles), that objects related to this source system can't be transported?
    Cheers.

    Sander, you should post this in BASIS also. By posting in both the forums, you have a better chance.
    In case BASIS folks say that they cannot stop this, try this work-around.
    In BWQ, in RSA1, there is a Source System Mapping in one of the tools menu. There, your DEV is mapped to QAS, etc.
    There, you may have your R/3 DEV mapped to R/3 QAS.
    See if there is an entry for your R/3 Sandpit/Sandbox. If there is one, leave the mapping for it as Blank.
    See, the only Objects that are related to Source System in BW are InfoSource-DataSources. If there is no mapping for SOurce System in BWQ, then the transport will fail.
    This is just a thought.
    Uday-Ram Chamarthy

  • SAP DMS - How to do an external DMS configuration for the existing system ?

    Hi All.
    Greetings.
    Request help and understanding.
    Am new to the world of SAP. And request SOME clarity for understanding of DMS.
    We are wanting to put an external DMS server and wish to configure for the same.
    So that the load on the production SAP R/3 database is reduced.
    We are now wanting to test the same on Dev environment.
    From SDN Link :
    I understand that :
    DMS basically has a content server. which stores documents.
    That can be accessed through Web, SAP R/3 Gui , SAP Portal.
    I have gone thro various links and the following links i have found to be informative and helpful :
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/c1/1c31a243c711d1893e0000e8323c4f/frameset.htm
    http://wiki.sdn.sap.com/wiki/display/PLM/DMS+Customizing
    http://help.sap.com/saphelp_nw70/helpdata/en/59/fba637fcf7dc39e10000009b38f8cf/frameset.htm
    However, would like to know the following because am not getting the clarity :
    1) Is there any supported platform / compatibility guide for DMS ?
    if yes, can someone send me the link?
    2) We have oracle 11g as our for SAP R/3 backend.
    Windows 2003 server 64 bit system.
    When i check the system status on the dev server of sap.
    It says. ECC 6.0 Rel 7.00 update 20 (hOpe am reading it correctly)
    After much search on the SMP site,
    we finally discovered and downloaded the DMS software for unicode and / 64 bit.
    Which we saw under the maintenance components separately seen for DMS 7.0
    Now for this DMS content server which we would like to make it external for storage of documents -
    do we need to have a separate database for this purpose as a repository.
    If i run a setup of DMS - will that automatically install any default repository for this or
    will it allow me to choose any other repository for the same ?
    Can anyone advise on this.
    Because this link says content server is based on Instance of MAXDB : http://help.sap.com/saphelp_nw70/helpdata/en/59/fba637fcf7dc39e10000009b38f8cf/frameset.htm
    3) I read some thing like this on some of the SDN links :
    P40 - Integration of DMS
    P62 - R&D Document Manage¬ment and Workflow
    P71 - Document management
    What are they referring to.
    4) We would be accessing these thro web, gui, customised portal.
    This content server configuration is a bit confusing.
    5) Is SNC configuration required to be done for the separate DMS server setup.
    If yes, how to do that ? any configuration link for that please ?
    Can anyone advise on the things to do.
    Steps to do.
    What all are the pre-requisites to check, before we start the set up of DMS.
    Can anyone help me understand this whole thing regarding the DMS installation and configuration.
    Step-wise.. from the start to end.
    Because it gives me a lot of uneasiness without having everything in place before we could say we could start the whole process of configuration / installation.
    Many thanks for your help in advance.
    Wishing you a happy and relaxed weekend.
    Kind regards
    Indu

    Thanks christoph & pradeep kumar.
    did a few more research and atleast have come to understand that.
    DMS server installation has content server which works only with MAXDB.
    So my understanding is correct.
    And what we see as Easy DMS is a client installation.
    which probably i would look at at a later stage.
    Found this link to be a little more informative :
    http://www.sapfans.com/forums/viewtopic.php?f=12&t=330558
    I really wish. That life were to be so easy. To call a consultant and finish it off
    Wishful thinking
    thanks and cheers
    indu

  • MM configurations for SAP AFS System

    Hi,
            I'm working in MM configuration for SAP AFS production system, After uploading AFS Materials successfully and also created Purchase order to make a stock for that material, but PO created successfully but not able to do Goods receipts for created PO.
           Errors : Purchase order xxxxx has no items,
    Once created sales order for the same material again we got the error while GR but error is different.
          GR is not possible for this PO number.
    But material type is ROH , and its external procurement only.
    Please let me know when we will get this type of errors.
    Thanks and regards
    Nisar.

    Hi Nasir;
    Some possible causes are;
    1.     Defining inbound delivery (Or kind of a confirmation) in the PO LI level and not maintaining the document subsequently
    2.     Not releasing the PO before the GRN
    3.     Creating the PO with a material with Grids (AFS Basic Data Screen) and not maintaining the grid value at item detail level of the PO
    Azwath Mohammad
    http://www.sapafs.net

  • How to create DataSource for BI Source System in RSA1?

    I have a BI Source System defined, however I can't figure out a way to create a new DataSource for it. I can create DataSource objects for all my other Source Systems, but I can't figure out how to do this for this BI system.
    I select my BI Source System, right-click, choose "Display DataSource tree". When I right-click from the DataSource tree, I expect to get "Create Application Component" and "Create DataSource" options, but instead I only see "Replicate Tree Metadata" and "Replicate DataSources" options.
    How can I create DataSource objects for my BI system?

    Hi,
    I guess you want to create a custom developed source in BI itself. For that you need to create the data source in RSO2 and inside you need to give the specific aplication component under which you want this DS to be in. Generate a data souce and then go to BI My self Source system and then replicate that particular appl component o view your data source.
    Hope this helps
    Regards,
    Srini

  • Charm configuration for a 4 system landscape

    Hi Experts,
    We are planning to implement charm for a 4 system landscape: Development Server, Integration Server, Quality Server and Production Server.
    We could configure TMS related steps, activated Charm in Solution Manager, created a maintenance project in solar_project_admin.
    However, the standard delivered transaction types like Normal correction and Urgent Correction are not working in a 4 system landscape.  They are only working for 3 systems (DEV, QAS and PRD).
    Are there any documents or blogs that would specially explain all the steps required for 4 systems? Any kind of help would be highly appreciated.
    Thanks,
    Ravali

    Development --> Integration --> Quality --> Production.
    First, I will import the transport of copies into integration
    Yes, and you test the changes here.
    Second, the whole transport is released and imported to Integration - in the Test phase of the maintenance cycle and NC status being consolidated.
    Third - Now, keeping the maintenance cycle in the TEST phase and NC phase in consolidated, will I be able to schedule the transport into quality server?
    Nope. You consolidate your normal correction, which releases your original transport and import them into Integration, and then immediately into Quality (you already proved it worked in Integration) BEFORE you set the phase to Test. Otherwise the original transports are NOT released. And if you set your phase to Test before importing the originals, you'll get a message that you cannot import transports into Quality during this phase.
    If you need to get transports into Quality for break fixes during the Test phase you need to use a Test Message and these are imported during Go-live as well.
    Fourth - if the above process works, I will then change the MC to Go Live and schedule the import to Production.
    With the corrected process mentioned above, yes, you will then change the phase to Go-live and it will import everything that was brought into Quality. 
    Hope this helps.

  • Transfer rules are missing for selected source system in BI content

    Hi All!
    The problem is: in BI content (Release 704, level 0003, SP SAPK-70403INBICONT) when I select needed source system (for example, A) only I can not find any transfer rules (0RPM area, 3.X transfer rules). When I select more than 1 source system (B, C..), I can see lot of different transfer rules for 0RPM area, but with assignment to another systems (B, C..). How can I get in Business Content transfer rules for data sources from needed source system (A)? Any help appreciated!
    Regards, Iryna.

    Hi Rathy!
    Thank you very much for your quick help! Usually I do the same. Now I faced with BI system, where data source were already activated in system A and replicated. I can see all needed active sata source un BI already. But I can not see transfer rules in content!
    What you can advise?
    Reagrds, Iryna.

  • BI Content Activation going for wrong source system

    Hi,
    I am trying to activate business content for the Customer cube in BI 7. The problem is that although the source system selection shows client 200 selected, the content activation goes for client 500 (which is the BI client). That is, during the activation process the process diverts to client 200 for no apparent reason. I have tried selecting other source systems, but the system still goes for client 200. Any idea of what is going on?
    Many thanks!
    Regards,
    Adeel Hashmi

    Hi Reddy,
    I checked it already and it shows the T90CLNT090 - IDES ALE Central system (client 800) which is shown as "Self-def'd" and not R/3, infact i dont have any source system specified under R/3 option. How do i fix this, as mentioned earlier we have both ECC and BI in the same box, will this affect???

  • Datasource Creation for Informatica Source system in NW2004s

    Hi,
    We are upgrading BW 3.5 to SAP NW2004s. In NW2004s Create datasource
    is new feature provided in BW 7.0.
    I tried to create this datasource for Flat file and worked fine. We
    are also using Informatica as source system (External System).
    Whenever I tried to create datasource for External system such as
    Informatica, it gives message
    "Datasource ZTEST(INFPCPD):Object Type RSDS not supported in BAPI
    Source System"
    Is it a bug? or Creation of datasource is not supported incase of
    Informatica or external system?
    Thanks
    Rupesh

    Hi Rupesh,
    The latest BI release in SAP NetWeaver 7.0 (2004s) includes a new type of DataSource for which staging BAPI has not yet been aligned.
    Third party ETL tool vendors can therefore only implement their load processes using the original type of DataSource from BW 3.x. This DataSource is still provided in the new release without any changes. Upgrading to NetWeaver 7.0 (2004s) BI (BI 7.0) does not therefore endanger existing implementations based on BW 3.x and NetWeaver 2004 (BW 3.5).
    It is also possible to migrate third party ETL implementations based on BW 3.x into the new data-flow concept of a NetWeaver 7.0 (2004s) BI environment using new DataSources, transformations (also new), and data transfer processes (DTP) (also new). This is possible because the system provides an emulated view for BW 3.x DataSources, which makes it possible to combine them with NetWeaver 7.0 (2004s) transformations and DTPs for regular batch load processing (this does not include direct access and real-time data acquisition (RDA)).
    This allows the benefits of the new data loading concept to be made available in such third party ETL-based loading scenarios.
    Regards,
    Anil

  • Scot configuration for 4.6c systems

    Hi All,
    After having worked on Ecc 6 systems i am having problems understanding confog for 4.6c systems for SCOT for out bound mails.
    We have a requirement where we need to change the mailhost name.In Ecc we just need to change in scot but whereas in 4.6c how do we change it.Thanks.

    Hi Ambarish,
    You do not configure the mail host in SAPconnect or the IMG but rather in Sendmail or the "other" mail software you will be using. SMTP was not available in releases before 6.10 as the ICM was not available. I will explain the flow of a request below:-
    SAPConnect -> RFC -> Internet Mail Gateway -> Sendmail (or Sendmail equivalent) -> SMTP Mail Server
    As you can see you do not enter the mail host and listening port of the SMTP server as Sendmail is the actual SMTP server. The mail is not relayed via SMTP but RFC from the SAP system and SMTP mail is forwarded from Sendmail. Note that Sendmail is a fully functioning mail server ! This method was not perfect but worked with some configuration.
    Below is a "how to" that will enable you to setup mail routing from 4.6C to Exchange and all you have to do is enable Exchange to accept mails from the Sendmail clone (Emailrelay).
    http://it.toolbox.com/wiki/index.php/Email_from_SAP_-_4.6C_using_MS_Exchange_2003
    Using this method it is possible to send mails from 4.6C to Exchange via a hop via another SMTP server
    Hope this helps
    Michael

  • Activating transfer rules for new source system

    Hi
    we are having 2 R/3 source system in BI. I had activated all the transfer rules with the first source system and now i have created a new source sytem connecting to a different R/3 client. I tried to change the transfer rules point to the new source system using the program RS_TRANSTRU_ACTIVATE_ALL giving the new source system and the infosource name. But i get the error "No Transfer Structure Selected" when i execute the prg.
    how can i change the source system without creating the transfer rules for the new source but use the existing transfer rules and just change the source system assigned to it????
    Regards
    Sujai

    Hi Sujai,
    There are many cases when this program is used.
    When the Trans rules get de-activated due to impact,we need to first replicate the data source and activate the TR using this program.This generally occurs during the data loads in prd.
    It does not makes sense to transport it when there r no changes done to the TR.So simply,u can use this program to activate.
    If the program does not work,then you are left with the transport option.
    Thanks & Regards,
    Suchitra.V

Maybe you are looking for