SLD configuration for R/3 system

hi all
i want to configure SYSTEM LANDSCAPE DIRECTORY for my R/3 system.
kindly suggest steps for same.
gud suggestions will b rewarded.
thanx

Hi Chetana,
Refer to the following links:
http://help.sap.com/saphelp_nw70/helpdata/EN/43/01ea90ab24235de10000000a1553f7/content.htm
create System in EnterprisePortal
Thanks n Regards,
Jhansi Miryala

Similar Messages

  • SLD configuration for DXI / PXI technical systems

    Hello,
    we have a problem when transporting XI configuration objects from XI dev to XI prod. The transport objects arrive in XI prod, but the name of the business system (for the SAP backend system) is not converted from dev business system (T01CLNT010) to prod business system (P01CLNT01) although the transport target for T01CLNT010 business system was set correctly (we are using business system groups Dev and Prod). And the "related integration server" for T01CLNT010 was also set correctly to DXICLNT010.
    But then I noticed that the technical system for the DXI (XI Dev) is configured as follows:
    TMS Domain ("DOMAIN_PXI") and TMS Transport Group Name GROUP_PXI ("GROUP_PXI") have the same values as PXI. Is that correct ?? We are using file transport, not CMS.
    Another strange effect is that when I set the group in business system DXICLNT010 to Dev, that is also applied to business system PXICLNT010 ! Which is of course not what I want.
    I assume I have to associate DXICLNT010 to Dev and PXICLNT010 to Prod, same as for T01CLNT010 / P01CLNT010. Correct ? Or does the group in the XI business systems not matter ?
    Can anyone post an example of a working SLD configuration with two XI system dev and prod ? What values do I have to use in the XI technical and business systems, so that the transport will work ?
    CSY

    There's obviously something wrong in the SLD configuration for the exchange infrastructure systems. The error you're describing (one system pointing to another) usually occurs when one system is generated through homogeneous system copy of another system (was that your case?). I've seen that behaviour once and they corrected it by manually deleting the exchange infrastructure systems from SLD and creating them again from scratch.
    Anyway, I highly recommend you to get an expert NW Basis consultant to realize a check in it before you proceed any further.
    Aside of that, you're correct in your assumptions.
    Your config in SLD should be like:
    DEV_GROUP:
    - DXI
    - T01
    PRD_GROUP:
    - PXI
    - P01
    It's always 1 XI BS per group.
    Also, if you use separate SLDs for XI Dev and XI Prd, you have to make sure that this configuration is reflected in both SLDs. So, if you make it one SLD instance, you must generate a delta export zip file from the SLD where you did the configuration and import this zip file in the other SLD instance.
    If you use a central SLD, then it's not necessary.
    Regards,
    Henrique.

  • Sld configuration for rfc to soap scenario

    Hi all,
    The scenario which i am planning to do, describes how the Custom RFC client application in SAP R/3 System invokes a free Web service (that is hosted over the internet) using SAP XI. For our demo purpose, we have used a free web service available on the Internet.
    In this scenario we will be using “GetQuote” method of Web service “DelayedStockQuote”. This method retrieves the Stock quote for the given Stock symbol. The method “GetQuote” has an input that takes in two parameters Stock Symbol and License Key and returns the following information.
    StockSymbol,
    LastTradeAmount,
    LastTradeDateTime,
    StockChange,
    OpenAmount,
    DayHigh,
    DayLow,
    StockVolume,
    PrevCls,
    ChangePercent,
    FiftyTwoWeekRange,
    EarnPerShare,
    PE,
    CompanyName.
    Link to web service:
                http://ws.cdyne.com/delayedstockquote/delayedstockquote.asmx?op=GetQuote 
    In this scenario, I planned to create two mappings, first between RFC Request  to SOAP Request  and second between SOAP Response to RFC Response .
    Adapter in sender communication channel is RFC.(RFC  Protocol)
    Adapter in receiver communication channel is SOAP.(HTTP Protocol)
    Result:
                On testing this scenario, In the Sender R/3 system  we have to Execute the Report program we have created earlier. When the program is executed with Stock symbol it should get the details of that stock symbol from the Web service.
    My question here is what would be the sld configuration for webservice.whether it is a Java WAS or third party.If it is a third party or java WAS,what would be the system name and host name.
    Any clarification from you all is welcome and will be highly appreciated.
    With Regards
    Karthik.

    Hi,
    I would suggest you is to use third party. It is a web service, and does not matter the technology behind it (if it is java, abap, .net, cobol, no difference! it will be described by a wsld).
    System name and host name doesn't matter too, you will not use this information in runtime, and you will specify host name and so at integration directory. You can make your standard on it, for example, put the name as DelayedStockQuote and host as http://ws.cdyne.com.
    regards.
    roberti

  • SAP DMS - How to do an external DMS configuration for the existing system ?

    Hi All.
    Greetings.
    Request help and understanding.
    Am new to the world of SAP. And request SOME clarity for understanding of DMS.
    We are wanting to put an external DMS server and wish to configure for the same.
    So that the load on the production SAP R/3 database is reduced.
    We are now wanting to test the same on Dev environment.
    From SDN Link :
    I understand that :
    DMS basically has a content server. which stores documents.
    That can be accessed through Web, SAP R/3 Gui , SAP Portal.
    I have gone thro various links and the following links i have found to be informative and helpful :
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/c1/1c31a243c711d1893e0000e8323c4f/frameset.htm
    http://wiki.sdn.sap.com/wiki/display/PLM/DMS+Customizing
    http://help.sap.com/saphelp_nw70/helpdata/en/59/fba637fcf7dc39e10000009b38f8cf/frameset.htm
    However, would like to know the following because am not getting the clarity :
    1) Is there any supported platform / compatibility guide for DMS ?
    if yes, can someone send me the link?
    2) We have oracle 11g as our for SAP R/3 backend.
    Windows 2003 server 64 bit system.
    When i check the system status on the dev server of sap.
    It says. ECC 6.0 Rel 7.00 update 20 (hOpe am reading it correctly)
    After much search on the SMP site,
    we finally discovered and downloaded the DMS software for unicode and / 64 bit.
    Which we saw under the maintenance components separately seen for DMS 7.0
    Now for this DMS content server which we would like to make it external for storage of documents -
    do we need to have a separate database for this purpose as a repository.
    If i run a setup of DMS - will that automatically install any default repository for this or
    will it allow me to choose any other repository for the same ?
    Can anyone advise on this.
    Because this link says content server is based on Instance of MAXDB : http://help.sap.com/saphelp_nw70/helpdata/en/59/fba637fcf7dc39e10000009b38f8cf/frameset.htm
    3) I read some thing like this on some of the SDN links :
    P40 - Integration of DMS
    P62 - R&D Document Manage¬ment and Workflow
    P71 - Document management
    What are they referring to.
    4) We would be accessing these thro web, gui, customised portal.
    This content server configuration is a bit confusing.
    5) Is SNC configuration required to be done for the separate DMS server setup.
    If yes, how to do that ? any configuration link for that please ?
    Can anyone advise on the things to do.
    Steps to do.
    What all are the pre-requisites to check, before we start the set up of DMS.
    Can anyone help me understand this whole thing regarding the DMS installation and configuration.
    Step-wise.. from the start to end.
    Because it gives me a lot of uneasiness without having everything in place before we could say we could start the whole process of configuration / installation.
    Many thanks for your help in advance.
    Wishing you a happy and relaxed weekend.
    Kind regards
    Indu

    Thanks christoph & pradeep kumar.
    did a few more research and atleast have come to understand that.
    DMS server installation has content server which works only with MAXDB.
    So my understanding is correct.
    And what we see as Easy DMS is a client installation.
    which probably i would look at at a later stage.
    Found this link to be a little more informative :
    http://www.sapfans.com/forums/viewtopic.php?f=12&t=330558
    I really wish. That life were to be so easy. To call a consultant and finish it off
    Wishful thinking
    thanks and cheers
    indu

  • MM configurations for SAP AFS System

    Hi,
            I'm working in MM configuration for SAP AFS production system, After uploading AFS Materials successfully and also created Purchase order to make a stock for that material, but PO created successfully but not able to do Goods receipts for created PO.
           Errors : Purchase order xxxxx has no items,
    Once created sales order for the same material again we got the error while GR but error is different.
          GR is not possible for this PO number.
    But material type is ROH , and its external procurement only.
    Please let me know when we will get this type of errors.
    Thanks and regards
    Nisar.

    Hi Nasir;
    Some possible causes are;
    1.     Defining inbound delivery (Or kind of a confirmation) in the PO LI level and not maintaining the document subsequently
    2.     Not releasing the PO before the GRN
    3.     Creating the PO with a material with Grids (AFS Basic Data Screen) and not maintaining the grid value at item detail level of the PO
    Azwath Mohammad
    http://www.sapafs.net

  • Charm configuration for a 4 system landscape

    Hi Experts,
    We are planning to implement charm for a 4 system landscape: Development Server, Integration Server, Quality Server and Production Server.
    We could configure TMS related steps, activated Charm in Solution Manager, created a maintenance project in solar_project_admin.
    However, the standard delivered transaction types like Normal correction and Urgent Correction are not working in a 4 system landscape.  They are only working for 3 systems (DEV, QAS and PRD).
    Are there any documents or blogs that would specially explain all the steps required for 4 systems? Any kind of help would be highly appreciated.
    Thanks,
    Ravali

    Development --> Integration --> Quality --> Production.
    First, I will import the transport of copies into integration
    Yes, and you test the changes here.
    Second, the whole transport is released and imported to Integration - in the Test phase of the maintenance cycle and NC status being consolidated.
    Third - Now, keeping the maintenance cycle in the TEST phase and NC phase in consolidated, will I be able to schedule the transport into quality server?
    Nope. You consolidate your normal correction, which releases your original transport and import them into Integration, and then immediately into Quality (you already proved it worked in Integration) BEFORE you set the phase to Test. Otherwise the original transports are NOT released. And if you set your phase to Test before importing the originals, you'll get a message that you cannot import transports into Quality during this phase.
    If you need to get transports into Quality for break fixes during the Test phase you need to use a Test Message and these are imported during Go-live as well.
    Fourth - if the above process works, I will then change the MC to Go Live and schedule the import to Production.
    With the corrected process mentioned above, yes, you will then change the phase to Go-live and it will import everything that was brought into Quality. 
    Hope this helps.

  • Scot configuration for 4.6c systems

    Hi All,
    After having worked on Ecc 6 systems i am having problems understanding confog for 4.6c systems for SCOT for out bound mails.
    We have a requirement where we need to change the mailhost name.In Ecc we just need to change in scot but whereas in 4.6c how do we change it.Thanks.

    Hi Ambarish,
    You do not configure the mail host in SAPconnect or the IMG but rather in Sendmail or the "other" mail software you will be using. SMTP was not available in releases before 6.10 as the ICM was not available. I will explain the flow of a request below:-
    SAPConnect -> RFC -> Internet Mail Gateway -> Sendmail (or Sendmail equivalent) -> SMTP Mail Server
    As you can see you do not enter the mail host and listening port of the SMTP server as Sendmail is the actual SMTP server. The mail is not relayed via SMTP but RFC from the SAP system and SMTP mail is forwarded from Sendmail. Note that Sendmail is a fully functioning mail server ! This method was not perfect but worked with some configuration.
    Below is a "how to" that will enable you to setup mail routing from 4.6C to Exchange and all you have to do is enable Exchange to accept mails from the Sendmail clone (Emailrelay).
    http://it.toolbox.com/wiki/index.php/Email_from_SAP_-_4.6C_using_MS_Exchange_2003
    Using this method it is possible to send mails from 4.6C to Exchange via a hop via another SMTP server
    Hope this helps
    Michael

  • How to remove the complete ALE configuration for a given system

    Hello everybody,
    Through ALE ,data is transferred between a number of SAP systems and the necessary ALE setups are in place.
    Now,a particular SAP system,which used to be a receivor to the central SAP system,is to be retired.
    Hence,the associated ALE set up is to be completely removed from the central SAP system.
    Is the following sequence correct?If not and I have missed something,please enlighten me with the correct sequence.
    1.Removal of the receivor logical system  and its assignment to client ,through transaction SALE.
    2.Removal of partner profile, through transaction WE20.
    3.Removal of RFC destinations,through transaction SM59.
    4.Removal of transactional ports for the logical system,through transaction code WE21.
    5.Removal of Distribution model between the retiring system and the central SAP system.
          (a)Regarding distribution model,I have a question-if the distribution model is maintained such that it contains the linking relationships between the central system and several receivor systems(in addition to the one I wish to remove),then is it possible to remove only the desired linkage and not touch the rest?   
          (b)Through BD64,I have tried but I am able to delete only the entire distribution model  as a whole,while I would like to keep the distribution model and delete just one of the nodes,so as to cut  the connection between only central system and the retiring system.
    This is so because the other receivor systems are working fine,involving a lot of batchjobs and I am afraid that deleting the distribution model wholly will create unnecessary trouble.
    Any help will be appreciated.Thanks
    Papri

    HI Nicolas,
    I chatted with Rev-Trac support earlier today and here is what they have come back to me with.
    Assuming the change in question was carried out in the development  system. Changes to fields in tables should in most cases be captured in transports. Assuming it was a transportable change then go to the development system and execute transaction SE16 and query Rev-Trac table /RSC/T_MFM_4T filtering by TABLENAME.
    On executing the query you should see a list of transports involved with changes to the transport. You can then check to see if there is a recent transport associated with the change - if so then you can find out who created the transport by using standard SAP functionality."
    If you find this doesn't help, then please contact your Rev-Trac Administrator who can then log a support request on our support portal at www.xrsc.com
    Hope this helps, Rick

  • SLD Configuration for WEB As JAVA

    SDN TEAM,
    PLease can you send the screen shots for configuring SLD for WEB AS Java
    For valuable answer definity i will reward points
    Regards'
    CHANDU

    Hi,
    Fisrt you have to define a technical system in SLD
    using the URL
    http://<host>:<port>/sld u2192 Link Technical Landscape
    there you have select under landscapes---->technical systems
    select new technical system.
    select the server either (web As ABAP.Web AS java)what ever is ur server select it.
    next u have another screen
    asking SID,Installation no.,Database host name.
    For all the details webas abap.
    you can view after looging in the option in the menu bar system->status.
    next
    Enter the message server host, application server host, the instance number, the
    message server port and all logon groups.
    On the next screen you can add the name of all application server hosts (and their
    instance numbers) belonging to the same SAP system. Press Next.
    Now enter all clients, you want to use with the JCo connections. At least one
    client has to be defined
    Thnaks & Regards,
    Lokesh.
    If you have any doubts.
    please let me know

  • SLD configuration for NW04s EP7

    Hello,
    Is there any step by step procedure to configure SLD for NW04s EP7.
    Backend system is ECC6
    *Points will be awarded based on answer

    Mickey,
    Still I am facing problem.Please send me configuration document to the following E-Mail ID
    [email protected]
    I will give you points once I received you E-mail
    Thanks in advance

  • SLD Configuration to New Technical System is failed.

    When iam trying to create a new technical system in sld after selecting the product i got this error.Please help me on this iam new to Portal SLD.
    CIM_ERR_ALREADY_EXISTS: Instance already exists: SAP_InstalledProduct.CollectionID="24457af4-fdf7-e5f4-63ac-00f98079457a",ProductIdentifyingNumber="01200615320900001296",ProductName="SAP ERP",ProductVendor="sap.com",ProductVersion="2005",SystemID="STV.SystemNumber.0020620473.SystemHome.stravist"

    Hi,
    As per the error - the technical system already exists in the SLD. You could check in the list of existing technical systems if system STV already exists. If you want, use the same entry or else delete it first and try registering the system.
    Also, why are you recreating the system manually now? Was there a restore, system copy or any other activity?
    Manually creating the is not recommended. Auto register the system to SLD via RZ70 for ABAP or SLD Data supplier in Visual Admin for Java systems.
    Regards,
    Srikishan

  • Calendar configuration for peoplesoft source system

    Hi All,Need one clarification.
    we are using people soft as our source system.now we need to configure globalcalendar id parameter in dac.for that we ran below query in given source DB
    SELECT SETID|| ‘~’|| CALENDAR_ID FROM
    PS_CAL_DEFN_TBL.But for this no results were presenting in given database.So we thought of proceeding with default parameter 'SHARE~01'.Shell we proceed like that?will data load?otherwise any ware house generated calender we need to configure?.If yes what we need to configure.Please provide your valuable suggestions on this.
    Thanks in advance.
    Thanks,
    Anusha

    Its better to check with functional guys from your project, they better know what they need for reporting as of your client.

  • Configuration for Central Monitoring System in SAP Solution Manager.

    Hi Folks,
    I am trying to setup Central System Monitoring in SAP Solution Manager, I am following the document which mention the step by step instructions.
    There are couple of items on which  I am really confused.
    In the documentation it says to activate Background Dispatching & Central System dispatching in 000 client of Solution Manager,
    it also mentioned about creating CSMREG user, but it did not say in which client this activity needs to be performed, and there are lot many steps in which there is no mention about the client of solution manager in which we have to perform the configuration.
    Can you guys please help me to configure properly?
    One set document which I saw talks about the configuration using RZ21 and other document discuss about Configuration using System Monitoring Work Center, which one do we need to follow, are both methods are 2 different options doing the same thing, can you please clarify?
    Also, is there any document which clearly explains the setup of  Central System Monitoring in SAP Solution manager using both approaches and also to test the monitoring?
    I have SAP Solution Manager 7.0 EHP1.
    Thanks.
    Jennifer

    Hi,
    >
    > it also mentioned about creating CSMREG user, but it did not say in which client this activity needs to be performed, and there are lot many steps in which there is no mention about the client of solution manager in which we have to perform the configuration.
    >
    You should created this user in working client.
    > Can you guys please help me to configure properly?
    >
    > One set document which I saw talks about the configuration using RZ21 and other document discuss about Configuration using System Monitoring Work Center, which one do we need to follow, are both methods are 2 different options doing the same thing, can you please clarify?
    >
    You can use RZ21 or System monitoring through work center. From Solution manager 7.1, you need to use work center only. So, I would suggest you to use work center only.
    Thanks
    Sunny

  • Reg : Initial configuration for SLD

    HI all ,
    In the netweaver administration portal we have a option for deploy and change .when we click on that we have some options for initial configuration.Now the doubt that i have is that we have installed netweaver java stack on a server .We have configured local sld on that .We want to connect to a seperate ECC 6.0 system.That system doesnt have a sld configured for it .So we want to bring that system into our sld.I have configured NWA_01 i.e .configuration for local sld and NWA_03 i.e. create a connection to the SLD and Setting required authorizations for SLD (CIM client settings) in netweaver administrator portal.Do i need to configure only these or anything else other than this .One more thing is that when i enter the netweaver administrator portal i am getting these error messages.
    System Landscape Directory is not accessible
    Only local system can be administered
    Any pointers regarding this.Thanx in advance .

    Hi there,
    The java stack is installed as standalone or ABAP+Java?
    You need to maintian SLD server details in RZ70 on ECC server and test if data is sent successfully. Check for RFCs SLD_UC/SLC_NUC in ECC.
    Also, check if SLD server is running.
    regards, Sean.

  • Configuring EarlyWatchAlert for all the systems in the landscape

    Gurus ,
    In SDCCN can i configure EARLYWATCHALERT session with targethost as SDCC_OSS
    now this has been only for production system . can this be done to all the systems in the landscape ?

    Hi Susin,
    As per me i could say the EWAlert only be configured for your production system rather
    than the other systems(Dev/QA) existing in your ladscape.
    If you are thinking to schedule this Alert for other products(BI/EP/XI) or for other SIDs,
    then yes...please go ahead.
    Why i am saying we can only schedule the EWAlert for production system, coz the
    the EarlyWatch report uses the SDCC_OSS RFC, which is a copy of the SAPOSS connection. And the target destination refers to SAP's system where one copy of your
    weekly shceduled EWAlert report goes to SAP end as well.
    Please inform me incase any other queries...
    Thank you,
    Tilak

Maybe you are looking for