Set up condition category h profit center cost

Today we have ZPRS with  condition category G. It posts the same value to FI and PCA. We want  FI to post cost with material ledger 10 Company code currency and PCA to post with material ledger 12 Profit center valuation. SAP says to have a condition with condition category h. When I put it into my price procedure I get an error The group transfer account has not been defined.
How do I set up pricing to post Company code currency  in FI and  Profit center valuation in PCA.

Hi,
Cost center is defined as per requirement, In your scenerio cost center will be department wise like different product dept for example Desktop, hardware accessories, laptops etc.. So, every cost cenet should be assigned to profit center. As per reporting related to cost center and profit center both report has it own advantages like cost center is purely related to cost of the particular department wheras profit center is related to both cost and revenue, it is broad prospective related to profit or loss made for that particular profit center.
Regards,
Sreekanth

Similar Messages

  • Document change/display - Profit Center / Cost center name

    Hi,
    We have a requirement where client wants to display the profit center and cost center names (short or long) when displaying or changing a parked or a posted document. As we all know SAP shows only the profit center and cost center code and not the description during the document display. After all the deliberations, this seems to be an important piece of information while posting a parked document or even viewing it as a posted document.
    What are our options?
    Any help is much appreciated.
    Regards,
    Subodh

    Thanks for your response Tamim.
    Profit center / cost center naming is following a different convention and we are in a roll out phase, therefore we can't think of first item.
    About match code, the requirement is not so much during the posting but primarily while releasing the parked document or viewing the parked / posted document - they want to see the description along side profit / cost center.
    I was looking for clues on any utilities / enhancements / BTE that I may use to bring extra fields during document display.
    Regards,
    Subodh

  • Cost Center,Profit Center & Cost element report on 0COOM_C02 error

    Hi,
      I developed a report in BW on 0COOM_C02 (Business Content ) cube on Profit Center,Cost Center & Cost Element as Hirerachy ....but the some values in BW report doesn't match with that of R/3 report
    Where was i missing....
    I updated all the Hirerachies...etc
    How shall i proceed
    Thanks

    Hi
      Yes i restricted amount by Value Type-0 and Currency Type-10
    Thanks

  • Profit Center - Cost Center link

    Given the Profit Center, is there a table I can check to find which Cost Centers are linked to it?

    since we assign the profit center in the cost center master data, go by the cost center.
    use table CSKS for cost center > profit center link, then sort on profit center.

  • Profit center cost center assignment

    Dear All ,
    1) i need the total list of cost centers assigned to which profit center ?
    2) tcode to view the balance sheet
    pl guide

    Hi,
    1) Check Assignment to Profit center
    2) The T code to get into Balance sheet SA38 -> RFBILA00 or S_ALR_87012284.
    Regards,
    Akhila.

  • Profit Center / Cost Center Distribution

    Hello,
    I'm trying to send Profit Centers / Cost Centers via IDoc.  I can create the master records with PRCMAS01 / COSMAS01, but I'm not sure how to do the assignment to a company code via IDoc.  Can anyone shed some light?
    Thanks,
    Harrison

    Update:
    The cost center IDoc contains a field for company codes even though it's not mentioned in the IDoc documentation for COSMAS01.  As cost centers are only assigned to one company code the field only supports one entry
    Profit centers on the other hand do not support the assignment of company codes via IDoc.  I believe this is because SAP by default assumes that you want to assign a profit center to all company codes, therefore it doesn't have a purpose for a structure to support this in the IDoc.

  • Profit center & cost center

    Hi,
    i look for a transaction with which i can show the profit center correspond to each account.
    i hope your help
    regards
    jehade

    Hi,
    i look for a transaction with which i can show the cost center correspond to each account.
    i hope your help
    regards
    jehade

  • Help on fox used to one/all profit center/cost center of one company code

    Hi experts,
    I have a fox formula witch is to be applied in diferent situations:
    1. To one cost center
    2. To all cost centers of one company code
    3. To one profit center
    4. To all profit centers of one company code
    I'm using the following variables:
    ZIPROFCE (1st profit center selected in query)
    ZIPROFC2 (number of profit centers selected in query)
    ZICOSTCE (1st cost center selected in query)
    ZICOSTC2 (number of profit centers selected in query)
    The formula is actually like below, guess it is not worrking because I can't have an integer number accepted by chars 0profit_ctr and 0costcentr. I am thinking of adding another char in the infocube witch is integer (without master data), and it would do the job. Is there other way out, so I can mantain actual aggregation levels and filters?
    DATA PERIOD TYPE 0FISCPER3.
    DATA PER_P TYPE 0FISCPER3.
    DATA PCENTER TYPE 0PROFIT_CTR.
    DATA PCENTER1 TYPE 0PROFIT_CTR.
    DATA PCENTER2 TYPE 0PROFIT_CTR.
    DATA CCENTER TYPE 0COSTCENTER.
    DATA CCENTER1 TYPE 0COSTCENTER.
    DATA CCENTER2 TYPE 0COSTCENTER.
    DATA PLANPER TYPE F.
    PCENTER1 = VARV (ZIPROFCE).
    PCENTER2 = VARV (ZIPROFC2).
    CCENTER1 = VARV (ZICOSTCE).
    CCENTER2 = VARV (ZICOSTC2).
    PLANPER = VARV (ZEPLANPE).
    PER_P = VARV (ZEPLAPER).
    *IF CCENTER2 = 1.
    CCENTER = CCENTER1.
    *ENDIF.
    IF PCENTER2 = 1.
    CCENTER = #.
    PCENTER = PCENTER1.
    ELSEIF PCENTER2 > 1.
    CCENTER = #.
    ENDIF.
    FOREACH CCENTER, PCENTER.
    PERIOD = PER_P.
    DO.
    IF  { ZCOMPROM, CCENTER,  013, PCENTER } <> 0.
      { 0AMOUNT,  CCENTER, PERIOD, PCENTER} = { ZCOMPROM,  CCENTER, 013, PCENTER } / PLANPER.
    ENDIF.
    PERIOD = PERIOD + 001.
    IF PERIOD = 013.
    EXIT.
    ENDIF.
    ENDDO.
    ENDFOR.
    Tanks in Advance,
    João Anastácio

    Hello João,
    you are making it more complicated than it is:
    Fields to be changed: Key figure, period
    DATA PERIOD TYPE 0FISCPER3.
    DATA PLANPER TYPE F.
    PLANPER = VARV (ZEPLANPE).
    PERIOD = VARV (ZEPLAPER).
    IF { ZCOMPROM, 013 } > 0.
    { 0AMOUNT, PERIOD} = { ZCOMPROM, 013 } / PLANPER.
    ENDIF.
    Regards,
    Marc
    SAP NetWeaver RIG

  • Trial Balance table Profit Center/Cost Center

    Hi SAP Experts,
    I want to download SAP trial balance as per profit centre,cost centre, I know there are lot of standard report but I am looking for tables where I can download these values?
    Thanks,
    Suyog

    Hello Suyog ,
    Long before I had worked on such a report.
    Please try with any of the tables between FAGLFLEXA or FAGLFLEXT  ( If I have recalled correctly  )
    FAGLFLEXT is for TOTALS so I think it will be appropriate.
    Please check.

  • Cost component split transfer for Profit center valuation in ke27

    Dear All,
    We have activated multiple valuation/transfer prices. Material ledger is also activated.
    We want to transfer cost component split to CO-PA by ke27.
    We have defined separate costing keys for access to actual cost estimate for legal and profit center valuations.
    But cost component split transfer to COPA works only for legal valution. Even we have defined type of valution for profit center  costing key -transfer cost component split and total costs.
    What should be else customized to transfer cost components splitting in profit center valuation to CO-PA from actual cost estimates?
    With best regards,
    Kamila.

    Hi,
    I have assigned the same value fields used for legal valuation to column 2, which was pointed in message.
    But now I got following message in ke27:
    For actual data, value fields that were already populated before CO-PA valuation cannot be changed in valuation.
    1. As a rule, value fields that were filled before CO-PA valuation - be it from SD or by a manual entry of a line item - can only be changed by means of user exits.
    (Note that for plan data, CO-PA valuation always has priority over the values planned manually.)
    2. The valuation steps in a CO-PA valuation strategy are numbered sequentially. These numbers determine the order in which the steps are carried out within that strategy. As a rule, value fields populated in one step can be used as a basis for calculating values for other value fields in a subsequent step.
    Value fields that were populated in a previous step are generally not overwritten by subsequent steps.
    The exception to this are steps that use a CO-PA user exit. User exits let you change individual value fields.
    3. If you valuate using multiple material cost estimates simultaneously, this means that the values of different cost components within the same cost estimate are aggregated and then entered in one CO-PA value field. However, value fields that already contain data from a previous cost estimate are not overwritten by a later cost estimate. Consequently, you should assign value fields in Customizing so that the values of different cost estimates are entered in different sets of value fields.
    4. When condition values are transferred to CO-PA value fields, note that condition types that are assigned to the same value field are added together. This is also the case when the condition types come from different costing sheets within the valuation strategy.
    So does it mean we should define separate value fields for PC valuation?
    With best regards,
    Kamila.

  • Cost element code was disappeared in NewGL Profit center report.

    Dear CO-FI expert,
    I implement profit center accounting module with NewGL.
    When I execute Profit Center Report of NewGL, for example S_E38_98000088 S_E38_98000089, cost element was blanked.
    My client would like to display NewGL profit center report with cost element code and cost element text.
    I solve this problem with note 991753, after implement this note only cost element text was displayed.
    Please help to advise me how to display cost element code in NewGL Profit Center report.
    Thank in advance for your help.
    Best Regards,
    Nattakarn

    Sorry for the slowly response,
    You can display CE description by setting characteristic display when executed profit center report.
    Edited by: Nattakarn Anantawut on Jun 27, 2010 10:07 PM

  • How to set default value in Profit Center field of Tcode F-02.

    Hi!
    Is it possible to set a default value for 'Profit Center' field in t.code F-02? Is there a way wherein the value will be copied in reference to the entered Business Area?
    For example, if during parking/posting of document, user input a value of 300 in the Business Area field, the system will automatically put 300 in the Profit Center field. Is there a way to do this?
    Hoping for your feedback.
    Thanks,
    April

    Hi
    Using the substitution this can be achieved.
    TC:GGB1
    Step-1: Prerequiste select the Company code for which this requirement is needed
    Step-2: In Substitution field, select the the "Profit center" field on selection of the field - system'll asks you -  How would you like to substfield BSEG-PRCTR ? with the 3 options
      i.constant value
      ii.exit
      iii.Field-Field assignment
    Select the 3rd option on selecting 3rd option before going to save that substitution it'll ask you to input which field should input the field BSEG-GSBER:Business area
    Step-3: activate the above substitution in TC:OBBH
    With the above settings whenever any value inputs in Business are field then the same value will be substituted in the Profit center field.
    Note: Make sure in all FSG - business area & profit center having the field status optional
    Can you tell me onething why this requirement has came ? Is business area and profit center are same in number and prupose
    regards
    Ramana
    Edited by: Ramana on Jan 8, 2008 9:33 AM

  • Report for actual cost of WBS, Profit center wise

    Hi Experts,
    Do we have any standard report that gives the actual cost of WBS/Project with Profit center wise.
    Thanks,
    Krishna

    Hi,
    Thanks for your solutions.
    But I m looking for the Profit center in the report (display screen), not in selection screen.
    My scenario is like, the cost was posted to WBSE with X profit center/cost center in January, now I changed the profit center to Y for the same WBSE and posted.
    Want to see thru which PC I have posted to WBSE and how much. So that I can reversal.
    Thanks again.
    Krishna.
    Edited by: krishna.gujju on Jul 8, 2011 6:56 PM

  • Relationship Of cost Center & Profit Center

    Hello
    Can anybody explain what could be cons of having relations of 1:N between profit center & Cost center
    Regards

    Hello,
    It is not necessary you should have 1:1 relation before profit center and cost center.
    You can group costs of some cost centers to a profit center. Accordingly you can have 1:N relation between profit center and cost center. There are no cons as such. It is all based on your reporting requirement.
    Regards,
    Ravi

  • Profit center accounting and cost center relationship

    Experts, in the future as we look to tie the PCA cube with the CO cube, the referential integrity will be important.  What I see as being important is capturing the profit center, cost center and account that was used at the transactional level and not from an arbitrary hierarchy.  As such, in the PCA cube, it would be optimal to have the cost center assigned to the transaction be available.  This assumes that the PCA totals are by profit center, cost center and account.  Furthermore, I will want to build a jump target from the PCA cube to the CO cube where we can see this data by cost center and cost element or vice versa.  There seems to be some uncertainty on if the PCA cube has the cost center informaiton, so how would I do this?

    I don know if i understood it correctly but If you assign you profit center in your cost center you should be able to get all that you need.
    Assign points if helpful

Maybe you are looking for

  • RFC to Flat file XSLT mapping

    Hi all, we are working on RFC to Flat file XSLT mapping. RFC Structure RFC Name --Item f1 f2 f3 FLAT File Structure MT_FF --Record f1 f2 f3 Can somebody provide the XSLT code template for the same.....

  • M7126  Manual reservation for order category 30 is not

    Dear Experts, Our's is extended classic scenario. Here I am trying to create a cart for stock material and in const assignment I am assigning order as maintenance order number. After cart is approval it is showing the status as Error in process, no r

  • HT1918 i have a problem with my prepaid card

    i have a problem with my prepaid card i put all the correct payment informations and have a message your payment method declined please enter valid payment information <Personal Information Edited by Host>

  • Non-hex character in hex string after upgrade to Yosemite

    Hi, When I try to open some of my files I get an error: "Acrobat PDF File Format is having difficulties. Non-hex character in a hex string". I could open the files before. The only thing I've done since I opened the file last was to upgrade to Yosemi

  • Multicam Angle viewer issues

    I am trying to edit a multicam clip.  The angle viewer footage is not playing from the project.  But when I highlight the multicam clip in the events folder, they are all synced and play well... I just cant edit the clip in the project because the fo