Settings required for KANBAN from
dear friends,
I devoloped a ZPSFC_KANBAN and attatched to WEK1 output type in NACE for std print program SAPM07DR.
but when i executed PK17 tcode it is picking standard form.
very urgent pls tell me
what should i do?
VENU
SATYAM- 9822814468
hi naresh
i given correctly
output medium 1
form: zpsfc_kanban
program SAPM07DR.
and if i put a braek point in above print program and i executed the PK17 tcode
But it is not going into the program.
what could be the problem
is print program wrong ?
if that is the case in standatrd form i modified and getting the result.
but i not able to do with Zform.
Similar Messages
-
Settings required for including changes in data in a transport request.
Hi All,
I need the settings required for saving ths data changed in a database table into a customizing request.
Kindly let me know the steps involved in the process.
To elaborate:
I have a maintenance screen for a DB table.
Whenever a user creates/changes data to/from the DB table , using the maintenance screem, the data should be saved into a customizing TR.
Regards-
Harmeet Singh,Hi there,
Any config change will be saved under a transport request TR. Also tables are of 2 types: Customizing table & application table.
Changes / new entry in a customized table are transportable. You will gte a TR when the customized table values are changed / new entry.
But application table entry / changes are non transportable. You willnot get a TR when saving the data.
To know it, go to SE11 --> give the table name --> display --> attributes --> Delivery class. Delivery class A is application table, C is customizing table.
Also some standard tables like MARA, VBAK are not allowed to maintain. If a table is allowed to be maintained, table maintaience allowed is checked in the above.
Regards,
Sivanand -
What are the settings required for QM in procurement
Hi Team,
What are the settings required for QM in procurement. I have set indicator for QM in procurement in QM view in material master.
I am not clear about following fields to be maintained in QM view.
QM Control Key
Certificate type
Target QM system
Tech. delivery terms Indicator.
Please suggest me in which case to be used this fiels. Is it relivant to Quality Certificates.
ThanksHi,
All meaning are
QM Control Key :
If you activate the indicator for QM in procurement in the material master record at the client level, you must also store a control key at the plant level for quality management in procurement.
Certificate type :
Certificate types applies to the Certificate processing in procurement & Certificate creation
Target QM system :
whether the vendor's verified QM system, according to vendor master record or quality info-record (for a combination of vendor/material) meets the requirements for QM systems as specified in the material master
- If you activate the indicator for QM in procurement in the material master record at the client level, you must also store a control key at the plant level for quality management in procurement. If you want Procurment control then accordingly define Control Key.
- If you want Vendor's perticular certificate for Material then you have to define Certificate type.
Also, you have to maintain Material, Vendor's Info record at plant level.
Thanks,
JM -
Customization settings required for Extenal service managment
Hi,
Till now we are not using External managment , now we want to confifure this , so what are the settings required for this.
regards,
zafarHi,
1. If you are selling the Service , Use Material Type u201CDIENu201D and for billing with SD module ,u have to use MM with HR module like (Time & Material ) ie ..Expense recording (PR05) then PRRW and PRFI.
2 .If vendors provide service for you and you can procure the service and pay to vendor.
The configuration required are:
2.1. Define organization status for service category
SPRO u2013>MM-> ESM->Service master- >Define organization status for service category
2.2. Define Number Ranges
SPRO u2013>MM-> ESM->Service master- >.Define Number Ranges
2.3. Define Service Category
SPRO u2013>MM-> ESM->Service master- > Define Service Category
& you can do assignment of cost object ( cost center, project, sales order) with co.code with G/L account in OKB9 t.code and in t.code OBYC account assignment of GBB,WRX with G/L.
***After above you can create Master data as Service master AC03
& the transactions are
A. Create PO ME21N (Acc,assment cat. K or P or C as required and item category D) and enter other detail with service master.
B. Create SES w.r.t. PO in ML81N
C. MIRO w.r.t. SES
D. Payment to vendor in F-53
For more Check the link:
http://sapmm.wordpress.com/category/esm/
Regards,
Biju K -
Requirements for upgradation from 4.7 to ECC 6.0
Hi Guru's,
Can anybody explain what are the steps required for upgradation from 4.7 to ECC 6.0, technically and functionally. If any body have documents regarding the same, please share.Full marks will be awarded.thanx in advance....Hi
You have to aware of all related program like BDC's , Screens related errors and all dictionary related problems.
Some function modules may become obsolete, and some screens will change
abnd some new fields will be added in the new versions etc.
Also take care of SPAU and SPDD tcodes.
You should be able to know about Unicode concept in sap.
chk this
http://www.thespot4sap.com/upgrade_guide_v2.pdf#search=%22upGRADE%20STEPS%20-%20SAP%22
also chk these 2 notes in service.sap.com
Technical Upgrade is only a version upgrade without any functionality changes.
The objects that are needed to be upgraded are:
Includes
Function Groups / Function Modules
Programs / Reports
OSS Notes
SAP Repository Objects
SAP Data Dictionary Objects
Domains, Data Elements
Tables, Structures and Views
Module Pools, Sub Routine pools
BDC Programs
Print Programs
SAP Scripts, Screens
User Exits
You can refer to the below links for more information on technical upgrade:
https://www.sdn.sap.com/irj/sdn/wiki?path=/display/profile/2007/05/07/upgradeFROMR3TOmySAPERP-PARTII&
https://wiki.sdn.sap.com/wiki/display/profile/UPGRADEFROMR3TOmySAPERP-PARTIII
http://help.sap.com/saphelp_nw2004s/helpdata/en/60/d6ba7bceda11d1953a0000e82de14a/content.htm
http://help.sap.com/saphelp_nw04/helpdata/en/2e/6d66647d9011d396b60000e82de14a/content.htm
https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/5ac31178-0701-0010-469a-b4d7fa2721ca
Reward points if useful
Regards
Anji -
What customization settings required for automatic availably check,
Dear Guru's
While doing Sales order my availability check should be carried out, but it is not happening automatically, what settings required for the automatic availably check. Pleasantly we are doing it manually.
Regards,
KalyanHi Kalyan,
ATP check requires following configuration setting.
1) The availability check is indecator needs to be switched on at requirement class lavel.
2) The availability check is indecator needs to be switched on at schedule line lavel.
3) Set availability check 02/ 01(individual / daily requirement) in Sales Genral plant view of Material master.
4) Set the checking group in the MRP3 view of Material master.
5) Above all a plant must be assigned to the line item in the sales order.
Please do let me know if you have any concern.
Thanks,
Rupak. -
Independent requirement for KANBAN Calculation
Hi all guru,
Now i can use kanban caculation for Semi-FG (it use dependent requirement for calculate) and i want to calculate FG too! but i don't know how to configure to use independent requirement (forecast) for automatic kanban calculation. who expert know please explain to me?
Thank you in advance...
Edited by: Konnapa on Jul 6, 2009 12:31 PMKanban Calculation takes place for requirements at a control cycle
level, specifically at a supply area level.The kanban calculation can
therefore be only carried out for dependent requirements that refer to a
supply area. This supply area is usually assigned to the BOM item but
also can be defined in production version or material master.
Please refer the following documentation:
SAP R/3 Enterprise Application Components
Logistics
Production Planning and Control (PP)
PP KANBAN
PP - KANBAN
Automatic Kanban Calculation
Calculating Depndt Reqmts for Automatic Kanban Calculation
I am afraid, independent requirements(PIRs in MD61) entered and also
sales order requirements can only be tracked at a plant level, and hence
cannot be included for Kanban calculation. On the same lines the
dependent requirements that are defined only at a storage location level
are also not included!
In fact KANBAN scenario is suitable for the business where the
procurement need not be planned well in advance, all procurement can be
initiated at any time once KANBAN is empty. This is the most important
characteristic of KANBAN. The introduction of PIRs into this scheme
contradicts this very objective of 'avoiding' lead times in planning.
This is also the reason why KANBAN calculation is more appropriate for
dependent requirements from supply area, characteristic of most
automotive industries, where make-to-stock planning happens mostly at
higher Sub-assembly levels and not at component levels.
Kanban is more relevant to only one subset of MRP requirement elements
i.e, the Dependent requirements.
Also, incase you want to include all storage locations / supply areas
in the plant for the control cycle in question,then in PK02, for the
said control cycle , under Kanban calculation tab, click on "Additional
Requirements Button" and enter the plant (without the storage
location/supply area). In this case,the automatic kanban calculates all
the dependent requirements in the plant.
In automotive releases we have the BADI MPKC_REQ_SELECTION
hooked in the function module PK_READ_DEPENDENT_REQUIREMENTS.
Customers, who want additional requirements such as the ones from APO to
be included for calculation, can program here.
Production Supply area is the key for the requirements to match with the
control cycle. Hope I have clarified your query. -
Initial settings required for Made to Stock -10 strategy.
Dear Frndz,
Kindly help me with the step by step procedure to do the initial (SPRO) settings required in SAP PP to carryout the Made to Stock -10 strategy in the system.
Regards,
SriniHi,
For MTS, maintaining the Planning Starategy 10 in Mtrial MAster is the Only thing we need to do.
System by default will do the rest of the things for you.
In MD61, system will propose Requirements Type LSF.
Sales Order will be for Inforamtion Purpose.
PIR will be reduced after PGI to the SO.
If you require any specific thing pl. inform.
Regards,
Siva -
Requirements for upgrading from LR3 to LR4
The processor requirements for LR4 reads "Multicore Intel processor with 64 bit support." The processor description in the iMac I bought in early 2009 reads "2.8 GHZ Intel Core 2 Duo." Will my processor handle LR4?
Thank you
Jim BAs mentioned above the d/load will be the current release whereas the disk version will be 4.0 and need updating.
There are many differences between Lr3 and 4 though including catalogs (Lr3 catalogs will have a copy made and upgraded) and processing (a new process version) which can alter image appearance of existing files. So don't update the process version on existing files before you have experimented - I do it only when reviewing a file if I feel I can work it better with the new version, not updating the whole lot at once!! -
What are theSNP Settings required for Forecast Consumption with Sales Order
Hello APO Folks,
I have one SNP scenario: (We don't have GATP)
Forecast for Finsihed Product - "PNG_Fert" in Location "1000".
I have forecast quantity of 500, now our requirement is - when SNP heuristic run will take place (without any sales order quantity) then there should not be any planned orders creation.
Planned order creation should happen Only if any one places sales order from ECC , which comes to APO then against that sales order forecast quantity should consume and should create the planned orders equal to the nos. of sales order quantity.
So if I have forecast of 500 qtys and sales order of 90 qtys then heuristic run should yield/create the planned order of 90 qtys and there should be 500-90 = 410 forecast quantities remaning.
Please let me know which strategy will be used and other setting in ECC and APO for SNP. I
The setting with strategy 50 in ECC and 30 in APO worked properly with PPDS - RRP3 view but from interactive planning /sapapo/sdp94 it is not working, so there will be different setting for SNP.
Thanks in Advance,
Regards,
Vishal
Edited by: Vishal24a on Oct 13, 2011 9:15 AMVishal
Can you please explain what issue you are facing when you load the product in planning book. First thing is do you see 410 against forecast and 90 against sales order key figure ? If yes then it means the forecast is getting consumed properly by SO.
As far as your other requirement goes (planned order should only be created for sale order quantity) you have to change your total demand macro calclation logic. Your total demand key figure should show 90 instead of 500 - so just include sales order in your total demand calculation (stock balance macro) and run heuristic. Your requirement will be satisfied
Thanks
Aparna -
What are network settings required for starting Web Dynpro for ABAP
hi,
I am learning Web Dynpro ABAP from SDN e-tutorial.
While creating view, the layout is displaying following error message
"Network Access Message: The website cannot be found . The IP address for the website you requested could not be found. "
Please guide about network settings needed in order to work in webdynpro ABAP.
I am working on SAP system's
Component version SAP ECC 6.0
Regards,
Tanaya
Edited by: Tanaya A on Oct 8, 2008 12:53 PMHi,
I have made entry in Microsoft Window's drivers>etc> host, but still following error message is coming "The IP address for the website you requested could not be found."
Technical Information (for support personnel)
Error Code 11001: Host not found
Background: This error indicates that the gateway could not find the IP address of the website you are trying to access. This is usually due to a DNS-related error.
Date: 10/10/2008 12:07:26 PM
Server: SURFCONTROL.odc.infotech.com
Source: DNS error
I think that i also need to make configuration settings in SAP.
Please guide me further.
Regards,
Tanaya
Edited by: Tanaya A on Oct 13, 2008 11:37 AM -
Settings required for external vendor catalog
Hi Experts,
Please advise if i have external vedor catlog and want to use it for shopping carts. What config settings i need to do for it.
Regards,
KamalHi,
You must define your catlog here in EBP
SRM server- > master data-> Define external web services .
You must give inbound parameters for the vendor catalog to access from ebp.
As well as this catalog definitions must be defined in CAT attribute in PPOMA_BBP.
Also please refere the OCI config document for further setting.
Cheers!!
NMK -
Settings required for Forecast Consumption with Sales Order
Hello Folks,
I have one scenario:
Forecast for Finsihed Product - "PNG_Fert" in Location "1000".
I have forecast quantity of 500, now our requirement is - when SNP heuristic run will take place (without any sales order quantity) then there should not be any planned orders creation.
Planned order creation should happen Only if any one places sales order from ECC , which comes to APO then against that sales order forecast quantity should consume and should create the planned orders equal to the nos. of sales order quantity.
So if I have forecast of 500 qtys and sales order of 90 qtys then heuristic run should yield/create the planned order of 90 qtys and there should be 500-90 = 410 forecast quantities remaning.
Please let me know which strategy will be used and other setting in ECC and APO.
Thanks in Advance,
Regards,
VishalHi,
Please use planning strategy "PLANNING WITHOUT FINAL ASSEMBLY". Strategy 50 in ECC and 30 in APO. In this you can have forecasts and you can do the planning for the forecasts. But the planned orders created cannot be converted to production order. When the sales order comes in the forecast will be consumed and only for the sales order quantity a new convertible planned order will be created.
Also the forecast and sales orders will be handled in different segments. This will help you to clearly track the changes.
If you don't want to handle the sales orders in MTO segment, then the same can be achieved by using strategy 52.
For more information please check the below link,
http://help.sap.com/saphelp_erp60_sp/helpdata/en/cb/7f9b7043b711d189410000e829fbbd/frameset.htm
Regards,
Manimaran M. -
We need the download of SCOM 2012 without Service Pack1.
Upgrade from SCOM 2007 R2 (select license) fails while upgrade check with error: Logs shows "At least one of the following applications is installed on this computer. Due
to incompatibility with System Center 2012 - Operations Manager, these applications must be uninstalled."
Upgrade was started from dos elevated prompt with modified parameters like this:
setup.exe /silent /upgrade
/AcceptEndUserLicenseAgreement:1
/UseLocalSystemDASAccount
/DataReaderUser:<domain\user>
/DataReaderPassword:<password>
Research in internet and we found another person with same issue, which reports that direct upgrade from SCOM 2007 R2 to SCOM 2012 SP1 is not possible but if upgrade is done over
SCOM 2012 to SCOM 2012 SP1 it succeeds.
Unfortunately, we don't find any downloads for the first release of System Center 2012 e.g. Operations Manager.
Everything shows Service Pack 1 or the newer R2.
Who can help?Our “Recommended” rolling upgrade path looks like the following:
SCOM 2007R2 CU4+ > SCOM 2012 RTM UR2+ >
SCOM 2012 SP1 UR4+ > SCOM 2012 R2
Also you can refer below link
http://blogs.technet.com/b/kevinholman/archive/2014/01/20/do-i-need-a-specific-cumulative-update-release-ur-in-order-to-upgrade-to-scom-2012-or-2012-sp1-or-2012-r2.aspx
Please remember, if you see a post that helped you please click "Vote As Helpful" and if it answered your question, please click "Mark As Answer"
Mai Ali | My blog: Technical -
Changes required for Migration from CR 8.5 to CR 11
Dear All,
We have successfully migrated all the reports which were created in CR 8.5 to CR 11. But those same reports developed in CR 8.5 are called through .exe which has been built with Microsoft Visual Studio .NET 2003. The old reports of CR 8.5 is working fine. while we are unable to open CR 11 reports through .exe. It says DLL missing. I guess some higher version of p2sodbc.dll and some more required.
Can you please help me out.
Warm regards,
Santosh Kumar PrashantIf you have VS .NET 2003, then all you need to do is install CR XI Developer. I would not recommend using the RDC in.NET for two basic reasons:
1) The RDC has not been tested in .NET (thus no escalation is available for any fix issues)
2) The RDC has been retired in CR 12. This may have implications for the lifecycle of your project...
To see how to use the RDC in .NET, check out the article [Using the Report Designer Component in Microsoft Visual Studio .NET|https://www.sdn.sap.com/irj/boc/index?rid=/library/uuid/f0751a7f-a81d-2b10-55a0-e6df0e1bab6d&overridelayout=true]
My recommendation would be to use the CR assemblies for .NET. The following resources should get you going:
[Sample applications|https://wiki.sdn.sap.com/wiki/display/BOBJ/CrystalReportsfor.NETSDK+Samples]
[Crystal Reports For Visual Studio 2005 Walkthroughs|https://www.sdn.sap.com/irj/boc/index?rid=/library/uuid/2081b4d9-6864-2b10-f49d-918baefc7a23&overridelayout=true] (most of the concepts will apply to .NET 2003)
[Advanced use of Crystal Reports for Visual Studio .NETu2019s feature set and object model|https://www.sdn.sap.com/irj/boc/index?rid=/library/uuid/702ab443-6a64-2b10-3683-88eb1c3744bc&overridelayout=true]
Developer libraries:
https://boc.sdn.sap.com/developer/library
http://devlibrary.businessobjects.com
Also, ensure you apply the latest CR XI r1 [Service Pack|https://smpdl.sap-ag.de/~sapidp/012002523100006008952008E/crXIwin_sp4.zip]
Ludek
Maybe you are looking for
-
New Update 1.1.1 Has Serious Problems!
my father in law had his iphone updated at the apple store and he lost all of his info. the mac idiot (far from genious) said that my father in laws computer died when installing update cause the mac idiot failed to plug it in when he was working on
-
I want to sell my iphone 4s to a friend but i have a carrier question
I want to sell my iphone 4s to a friend and i have it on att and they have sprint. is that possible since its a world phone? is there anything i have to do? cuz the software and hardware is the same for each 4S on each carrier.
-
10gOAS RepCA into db disconnects after TS creation
Hi, Trying to use RepCA to install into my existing database. Have confirmed all the options, parameters, etc per install instructions. Looking at Log, installer disconnects after successful tablespace creation. GUI indicates breakdown when it tries
-
Suddenly the soft edge of a brush leaves a hard line
Hi all, System... Photoshop CS4, on a MacPro, Snow Leopard, with a Wacom Intuos, PSD file, 16bit. Document... I have a full-height portrait with an almost--white background. In photoshop, I added a layer and painted full white to cover the backgroun
-
Automator to scan images using Twain into Photoshop CS
Hi, I Need to scan about 500 certificates to my hard drive. I have Photoshop CS and Epson 1650 scanner. What I would like to do it to be able to run an automate task from Photoshop that scans, imports and opens the certificate. To import at the momen