In our scenario, we have the pressing machine which have the dye to create the right and left bumper of the car in a single stock . if we give the single raw material , the ouput will be two finish products 1. right bumper and 2. left bumper.
while confirming the order, how we can get two fert?

Create Left Bumper And Right bumper as FERT, Maintain a co product Indicator for Both and maintain Joint  production details in MRP 2view ( ex  50 % for Left bumper and 5o % for right bumper ) the cost will proportioned accordingly
IN BOM
Create a BOM for  Left Bumper
and maintain component as raw material with qty
and Right bumper as 1- and maoinatin co product indictor in item detail
ANd save
WHile doing GR in MB31 System will propose  Both Left and Right bumper with 101 movement type.
Regards,
Sundaresan

Similar Messages

  • Raw Material & SFG consumption required in different production lines

    Hi All,
    Customer has 5 different production lines, each line will be handle by different team.
    Each production line will consume the same and different combination of Raw material and SFG for different finished products.
    Customer wants to track
    1. how much of raw material and SFG is consumed for each production line.
    2. how much of Finished Product has been produced
    3. how much of material is lying at work in progress.
    Please suggest,how to map this functionality.
    Regards,
    Vikram Reddy

    Dear Challa,
    for this you need to create UDF with choose from list in production order where user should select the appropriate production line in each production order and then you can write simple queries for your reports based on this production line on production order
    Thanks & Regards,
    Mukesh Agrawal

  • Change the configurable material set against a ERP finished product

    One of our users has entered the wrong configurable material against a finished product in MARC-STDPD. Is it possible to change this?
    Thanks in advance

    Hi Pherasath,
    I'm not sure how changing the material type will help. What would I change it to and why? I need the material to be a ERP finished product?
    I too have noticed the OSS note but wasn't totally sure that it applied to the issue we specifically have, do you think it does?
    Regards,
    Craig

  • Raw material with variation of color

    We have a raw material car seat with different color option, the car seat is exactly the same except the color.
    For this raw material car seat, should it be different material number for each of the color option or just 1 material number for this car seat?

    Hi Eric,
    If you want to use varient you can go for single material no with diffrenet classes and charactristics.
    If you dont you have to use different material codes.
    Also in view of costing , there should be different codes.
    Hope this will help you out.
    Regards
    Gitesh
    Edited by: gitesh mahamuni on Sep 8, 2009 9:31 AM

  • Regarding scrap of Raw material with excise

    Dear All,
    I have few materials in my storage location which i paid excise duty. Now i want to scrap those material and later i will sell those scrap material. So how to handle in the system for those material with excise.
    Regards
    PR

    You can use J1IH to write of material which you had scrapped.

  • One Material with two Different In-House Production Days

    Dear Experts,
    We have 1 semi-finished material (HALB) that is common to two different locations (production version) with two different in-house Production days.  How can we separate the 2 different in- house prod. days for this specific material? Could we setup in the production version? if not, could you give us an advice.
    Ex:
    JDXZ011111 with Prod. version I000 = 3 days
    JDXZ011111 with Prod. version X000 = 1 day
    We are hoping for your help..
    Thank you.
    Regards,
    Marnelli

    Dear Mamelli,
    1.You cannot maintain  the in-house production time in the production version.
    2.In-house production time in days can be maintained in MRP2 view.
    3.If Lead time scheduling is carried out at the time of MRP run then the system uses the in-house time for the calcualtion onf basic
    start and end dates.Based on the routing data the system proposes the production start and end time.
    4.Generally exception messages 64     Production finish after order finish
    63     Production start before order start are  shown after MRP run.
    5.If basic scheduling is carried out then the system proposes only the basic dates.
    Regards
    S Mangalraj

  • Report for material with sloc,qty available, and production order

    hi friends, i need advice on getting this report for material with qty and specific sloc with the corresponding Prodn order numbers. in mb51 i could get all these details except the prodn order no. could you advice me please?

    to make sure you know how to do this.
    In the material document list, hit "Ctrl+F8" on your keyboard.
    A window will pop up. Click on the button position and look for "order" in the list of available fields. That should do it.
    Rgds.

  • I noticed that when I develop in light room 5 that the raw files are larger and the finished product is 80 percent smaller

    anybody have an idea why or is that the norm
    my raw file was 11,2 and my JPEG was 1.26

    The RAW files are the same size as the camera made them. Lightroom doesn't change the file size or image size.
    The JPG size depends on a dozen or so things, some of which you can control and some of which you cannot control, but almost always the JPG is smaller than the corresponding RAW.. I see no particular problem with a JPG that is smaller, depending on the export options you chose, and I have never yet seen Lightroom produce an incorrect size JPG
    By the way, normally numbers have units, you did not mention any units, so I really can't comment further without knowing the units for the numbers you show

  • Report for raw material usage

    Hi All,
    i need to take the report for the raw material that used in the finished product.
    in the finished products, how much the raw materials are used .

    Hi Raj,
    Option 1. You can get the data from MARD, MAST & STPO tables.
    From MARD you can read the unrestricted stock i.e. LABST field.
    From MAST, read the finished product i.e. MATNR & WERKS (Material & PLant)
    From STPO read the component i.e. IDNRK & MENGE (Component & Qty).
    Option 2. You can get the data from MARD, AFKO, RESB tables.
    This would give you an exact consumption feedback.
    AFKO for production order details. (PLNBEZ for header material).
    RESB for components (qty consumed) for the order - Fields MATNR (Component), BDMNG (Req. qty), ENMNG (Withdrawn qty).
    You can now build the logic with the required multiplication i guess. If any further info is required, revert back.
    If helpful award points
    Regards,
    Vivek

  • Collective requirement of raw material

    How we can create the collective requirement for the raw material i.e. when I run the mrp of two finished product.Raw material AW-122 of the finished products  are common.So instead of two planned order,Can i get one planned order after mrp.
    Regards,
    Sunil Patil

    Hi Sunil,
    Yes it is possible to get one planned order if for that material master in MRP4 screen if you set indicator for Individual/coll. as 2-Collective requirements only then it is done also with this in MRP1 in Lot size also give lotsize keys Fix/weekly/Monthly
    Hope this will help you.
    Regards,
    Rajesh

  • Break up of raw material cost for released finished materials

    Hi All,
    I have searched various threads before posting this question.
    Is there any standard report available to view the breakup of raw material cost for a release finished material.
    I have cost component split report but it shows everything in raw materials.... is there any report to show a break up of this raw materials cost.
    If there is no standard report can you please how I should develop a customized report.
    Thanks,
    Srini

    Dear Srinivas,
    You will get the cost breakup in the following report:
    CK84_99 - Itemization
    CK86_99 - Costed Multilevel BOM
    CK80_99 - Cost Components
    You will get the same information in CK13N
    From the standard SAP,  no report will show breakup for all the materials in single report at a time.
    We have developed the report through ABAP functionality
    Regards,
    Pavan Kumar Arvapally

  • Final product of raw material

    Hi,
    I need to develop a report, when I give a raw material end result must be a final product omitting all other semifinished assemblies.
    can anyone guide how to solve this

    Hi Krishnan,
    Study the report CS15, it is doing what you are expected to do. The only difference is, it reads all levels upto the top parent.
    Anyway you can use the FM - > CS_WHERE_USED_MAT to achieve the same. You need to loop back the output to input & this way read all the way upto the top parent.
    But a word of caution, if a single raw material is associated with multiple top parents, then you will have to handle this case.
    Hope the above helps.
    Regards,
    Vivek

  • BOM Creation for different FG from 1 Raw material

    Hi Experts,
    In my company I have 1 scenario where Sheet is a Raw material. After doing operations in 1 sheet (RM) 10 Finished Product are produced.
    So please can anybody help me to create BOM for FG as from 1 same Sheet (RM) 10 different Fgs are produced.
    Regards,
    Uttam

    Uttam,
    Do you always produce 10 different FG's from single raw material sheet? or it is just a possibility to  use same raw material in different FG's.
    You can maintain independ BOM with sheet materiila as a compoenent . hope you have exact measure of qty you need in each BOM.
    If all the FG's are produced together then go with co-products.
    Regards,
    Santosh Sarda

  • How to create production order for multiple items having common raw materia

    Dear all,
    We are running a sheet metal fabrication company at Vadodara Gujrat.
    Please guide us how to create single production order for multiple items using single raw material??
    For example, We want to produce baby shirt(item code AAA001), shirt with full sleeve(item code AAA002), shirt with half sleeve(item code AAA003),shirt slim fit (item code AAA004),shirt loose fit(item code AAA005) from single raw material say(item code XXX001).
    Right now we have to create 5 production order to produce above 5 items of single sales order  in SAP B1 though it is made from single raw material which is foolishness and time consuming too. (Please also note that to produce any finfish good item, raw material required for that item may vary every time in our process.)
    Kindly guide us how to solve the problem.
    Thanks.
    RUPESH  +91-9227744273
    WEB : www.gorasia.co.in

    Hi Rupesh Gorashiya,
    This is possible through MRP for that you have to put Sales Order first and Run MRP Wizard
    MRP Wizard Put Multi Production Order as per Item Taking in Sales Order just click it on and execute.
    Thanks,
    Srujal Patel

  • CK24 error for raw material

    Dear All,
    We have executed CK11N of current period for single Raw Material ( w/o quantity struc. Selected in material master) and saved it, but when try to mark & release the material for the current period, the system  displays a message as u201COf 0 materials, 0 cost estimates were updated successfullyu201D. Its newly procured raw material.
    When we check in KEKO, KEPH & CKIS table the entry exists, but we are not able to execute the standard price for this raw material. In the start of this period we have executed CK40 for all the material (including raw materials) has been updated with standard price.
    We have deleted the costing run couple of times and recreated the cost estimation,but of no use.
    We have activated Material Ledger and this raw material has price control u2018Su2019 with price determination u20183u2019. We are in ecc 6.03
    Do suggest.

    Hi ,
    We are facing this problem for all type of material. Once we save cost estimation in CK11N  and when we try execute once again CK11n for the same material system is calculating Cost estimation again without error message and we are not able to Mark & Release the Cost estimation.
    Normally the system will not allow to calculate the cost estimation,if the cost estimation has been already calculated.
    We have currently changed price control S from V for all type of material to maintain Standard cost from Actual cost.
    Do suggest,if we have left out any config settings.
    We are facing this issue in production client.
    Do revert.
    Regards,

Maybe you are looking for

  • My iphone 3g wont allow me to dowload any apps

    Hey my iphone 3g wont let me download apps onto my phone i need help its really annoying me ! ! ! ! ! !

  • Time Machine no longer finds the backup disk

    Time Machine running smoothly for the past 6 months. Then had an error that the "......sparsebundle" was in use by another user. So, went into Time Machine preferences, removed the Backup Disk I had been using. Also renamed the hard drive on my lapto

  • Can i charge my american ipod touch in UK?

    can i charge my american ipod touch in UK? I could try to use an adaptor, but i know there is a difference in electric current, and would hate to fry my ipod. Does anyone have any experience with this? many thanks for any suggestions you might make.

  • Calling a java class in a JSP file

    Hello, I have a jsp file in which I call a java class. I work with Tomcat 4.0.1 If I modify the java class and then I execute my JSP, it still be the old version of my class that is executed. I don't understand why since if I creates a main function

  • Official Zen Micro Case. Any Go

    Hi, I have just received zen micro number 4 from the Creative RMA department after a string of problems?with dead players and headphone jack?issues. ?I wondered whether I should get the official zen micro case. Has anyone got good experience with thi