         Can somebody suggest a way where.
1. I need to restrict the stock for planning by SNP and PP/DS after it has been produced for 3 months and after 3 months it should automatically be in use.
Thanks
Sandeep

Hi Sandeep,
Few possibilities are
1) Try maintaining maturation time in material master to 3 months
so that during that period, system will not plan the stocks
2) Try using suitable movement types in R/3 system to keep the
stocks under restricted area so that it will not get reflected in
APO and available during planning.  Once in 3 months cycle, all
such stocks are to be released to APO through mass job for
planning
Regards
R. Senthil Mareeswaran.

Similar Messages

  • MB5B Report for Date Wise Stock and Value

    Hi,
    I am Taking MB5B Report for Date Wise Stock and Value.
    But I have one doubt all stocks is coming or not in these report like Unrestrected Stock,Return Stock.Blocked stock,Transist stock,Restrected Stock,qty Inspection Stock.
    I have another Doubt in these report three Stock type indicaters are there like these.
    1.Storage Location / Batch Stock
    2.valuated Stock
    3.Special Stock.
    But i have one doubt what is defferent these
    1.Storage Location / Batch Stock
    2.valuated Stock

    Hi Prasad,
    Yes MB5B report consider the Unrestricted, Quality, Blocked, Transit stock and restricted stock. Not sure about Return Stock.
    If you select the Storage location/Batch stock radio button then the system will display all the possible stock from the storage location and the corresponding batch also.
    If you select Valuated stock radio button then system will show only the valuated stock not the Non-valuated stock. Because Non-valuated material type is available in SAP system will not show those stock suppose if you select the Valuated stock radio button.
    Regards
    Karthick

  • Sale order wise stock and Issuance of external procurement material.

    Transaction : ME21N and MIGO                                           
    Dear SDNites,                                             
    When i make a account assigned PO(with ref to sale order), then material comes and goes directly for consumption.                              
    I want that when the material comes after 105 movt., it should go to un-restricted stock and i can see in mmbe(or any other transaction) how much qty. has come against 
    which sale order, so that i can issue material also sale order wise by movement 231                                                                  
    Pls. help as to how to go about it.                                    
    Rgds.,                                                    Parag                                                     09815999582.

    Hi,
    When you are trying to create PO with reference to SO what is the item category used in SO, Use item category as "TAB" then SO will generate a Purchase Requisition. Convert this Purchase requisition in to Purchase Order, account assignment will be copied as "E Individual Customer stock" Sales order and Cost element will populate from PR.
    When you post the GR for above PO, the stock is managed as Special Stock indicator "E" sales order stock, in MMBE also it displays as SO stock.At the time of GR value is booked to SO and stock will be shown in MMBE.
    This stock is reserve for particular SO against which you have procured, but you can transfer post the same from SO stock to your OWN stock
    Hope this clarifies,
    Thanks & Regards,
    Sridhar

  • Stock and value with GL account

    Dear friends,
    i want to see the stock and the stock value with respect to the GLaccount,
    i want to see the materials  posted for the GL account with stock and value for perticular period.
    Regards,
    Deviprasad

    Thanks for your reply,
    Actually i am trying with that Tcode MB5L . But unable to execute. in selection secreen i was entered ccode and GL account. But system shows error messges as no GL account exist for the Ccode.
    can u tell  is there any restrictions for selection screen.
    Regerds,
    Deviprasad.p

  • Availability check for Make to stock and Make to Order

    Dear All,
    Client is selling   Make to stock and make to Order material.
    How and what settings need to do for Avaialbility check.or we can use standard one.
    I hope in case of Make to Order availability check may not happen.
    Please correct me.
    Thanks in advance.
    Regards,
    Shrikant

    hi,
    yes for make to order we dont have AvChk.  for make to stock items u need to follow the
    below configuration.
    Availability check
    1. Availability check is an integral part of the business process that determines if the required delivery quantity can be met on a required delivery date. For this purpose the system takes into account pre-delivery activities such as scheduling for picking or packing times and the time taken to produce or obtain the material. It also performs several background functions such as Backorder processing, rescheduling and ATP quantities.
    2. Backorder processing: processing of a sales order that has not been fully confirmed or not confirmed at a certain delivery date.
    3. Rescheduling: is a proposal of how u2013 confirmed quantities already assigned to a sales order can be reassigned to other sales orders that have a higher priority.
    4. Available to promise (ATP): is a process of checking the available quantities of a material. The ATP quantity consists of warehouse stock + planned receipts (incoming stock) u2013 planned issues (outgoing stock). to examine stock on hand (CO09) proceed to logistics u2013 sales & distribution u2013 sales u2013 environment u2013 availability overview.
    5. Replenishment lead time (RLT): is the time taken for the material to become available either internally (in house production) or externally (from a vendor). The most important things to consider during an external procurement are purchasing and MRP 2 (procurement) views of MMR where the processing time for purchasing, planned delivery time and goods receipt processing time are taken into account. On the other hand internal procurement is based on in house production time (MRP 2 view) goods receipt processing time or alternatively RLT time, which is found on MRP 3 view.
    6. RLT (Replenishment Lead Time) is the time taken for the material to become available. RLT is only used when doing an ATP check (Available To Promise). The value of RLT for a material is specified on material master record.
    7. There are three types of availability checks u2013
    Check on basis of ATP quantities.
    Check against product allocation.
    Check against planning.
    Configuring Availability check through Checking Groups u2013
    1. The checking group + checking rule determine how the availability check is to be performed.
    2. The checking group determines whether and how the system checks the stock availability and generates requirements for material planning. The checking group defines what type of requirements will be passed on i.e. summarized requirements (daily/weekly) or individual requirements for each sales order.
    3. The checking rule applies to how the availability check is to be carried out at the transaction level. Note that you must define checking rules for each individual application such as for production orders for example. In Sales and Distribution, the checking rule is specified internally within the system and cannot be changed.
    4. The checking rule, in conjunction with the checking group, determines the scope of the availability check for every business operation; that is, which stocks, receipts and issues are to be included in the availability check and whether the check is to be carried out with or without the replenishment lead time.
    5. Briefly explaining the above u2013 checking group determines which type of requirement to be passed on to MRP whether it be individual or summarized and checking rule which is at the transaction level and can be configured independently for each application module, determines which stocks, receipts and issues to be taken into account. For performing an availability check checking group has to work in conjunction with checking rule.
    6. Advantages of individual processing over summarized processing u2013
    Backorder processing is possible.
    You can access (MD04) order, line and schedule line individually which gives a greater control on available stock and requirements placed on stock.
    The system automatically uses individual requirements in case of special stock items.
    7. Required data for the Availability check to be carried out u2013
    The Availability check must be switched on at the requirement class level.
    The Availability check must be set at the schedule line level.
    A requirements type must exist by which the requirements class can be found.
    A plant must be defined in the sales order for each schedule line item (in other words plant must be defined for every material in MMR).
    A checking group must be defined in the material master record in the MRP3 screen in the availability check field.
    8. Configuring Availability check and defining Checking Groups u2013
    Checking groups are introduced into the sales order based on the setting in the material master record.
    SAP standard checking groups are 01 u2013 summarized requirements and 02 u2013 individual requirements or you can create your own by copying the standard ones.
    Total sales and total deliveries columns are there to configure a checking rule to sum up requirements to post to MRP either individually or by day or week.
    Block quantity required can be set if you want several users to be able to process the material simultaneously in different transactions without blocking each other.
    The no check indicator is CHECKED when you DO NOT want the system to carry out ATP check.
    9. Defining material block for other users u2013 the block check box is an indicator that enables you to block material master records of a particular material during the availability check and restrict other users from accessing same master record and reserve the material. If the block is not set, two users can confirm the same material at the same time for two different orders, not knowing if the stock is available or not. If you select this field, the material is blocked during the availability check and other users cannot: a) Make changes in the material master record. b) Create purchase orders for the material. C) Create orders for the material.
    10. Defining default values for checking groups - Checking groups are introduced into the sales order based on the setting in the material master record.
    However if there is no entry present in the material master record for the checking group, a default value can be set here, depending on material type and plant.
    This default value will be used by the system depending on the material type mentioned in MMR and plant in sales order.
    If an entry exists, this default value is over written by MMR.
    11. Controlling Availability Check u2013 in this section, you tell the system what stock on hand and what inward and outward movements of stock it must take into account when performing the availability check in addition to whether or not to consider the replenishment lead time.
    12. These settings are based on the checking group that is assigned to the material master record and the checking rule that is predefined and assigned to the sales and distribution transaction.
    13. These settings carry out control both for sales order and delivery as well. This is due to the fact that you may want to include specific stock or incoming stock for the sales order, yet at the time of the delivery only include physical stock on hand waiting to be shipped.
    14. It is possible to indicate to the system that you would like the availability check NOT TO CHECK the stock at the storage location level. This indicator is used to set the scope of the availability check.
    15. It is used to switch off the check at storage location level. You create a reservation for a particular storage location. However, the scope of the availability check is set in such a way as to exclude the storage location. In this case, the system carries out the check at plant level only and does not take the storage location into account that is specified in the reservation.
    16. Should you not want the system to automatically check RLT, you may indicate so here. RLT is the time taken for a material to become available. It is only used when doing an ATP check and is taken from MMR.
    17. Defining the elements in the availability check entirely depends on the business needs, but a few tips are given under u2013
    When controlling the Availability check at the time of the sales order, a purchase requisition does not necessarily indicate by it is going to come into the plant.
    A shipping notification on the other hand - a confirmed purchase order u2013 is a good indicator of receiving stock on a specified date.
    It is always recommended not to select the shipping notifications for the delivery requirements type as you may not actually receive the stock into plant or warehouse for which you are creating a delivery.
    regards
    anand

  • On hand stock and avilable stock

    Hello experts,
    Could you please tell me the difference between "ON HAND STOCK" and "AVAILABLE STOCK". How is it maintained in the system??
    Regards,
    Sanjay

    Hi Sanjay,
    Companies have stock on hand to safeguard against uncertainties and fluctuations in demand. However, holding an excessive amount of stock ties up too much capital and generates high storage costs. If there is insufficient on-hand stock, there is a danger that unexpected demand might arise that cannot be fulfilled.
    Therefore, the SNP optimizeru2019s main purpose in stock planning is to keep the on-hand stock between specific upper and lower bounds.
    In system:
    http://help.sap.com/saphelp_scm50/helpdata/en/79/70833c8b079c2ee10000000a114084/content.htm
    Availibility Stock:
    The inventory on-hand minus allocations, reservations and backorders.
    Thanks and Regards,
    Naveen Dasari.

  • 0IC_C03 material stock and movement

    Hi Experts,
    I posted this issue before.  I did not get any response.  My co-worker and I opened several messages with SAP, we could not get any meaningful answer either.  Now, I'd like to give it one more try.  I truely believe that with all the experts we have out there, there must be one can give some advises on this issue.
    I loaded 0IC_C03 cube strictly according "How to handle inventory ..." regarding compression and marker update.  This is a QA system.  So, I don't have delta.
    I created a query to display stock quantity and value for unrestricted stock (stock type A) and quality inspection stock (stock type B).  I restricted stock type in key figures.  The openning stocks look perfectly fine.  However, when I try to view historical data, it is really messy.  Some materials show negative values before the material was created.  Some materials show 0 quantity with a positive values.  Of course, some materials show perfect correct figures.
    I am using 7.0 datasource and transformation. 
    Is there anybody out there has any experience with this kind of situation?
    Any response will be greatly appreciated!

    Hi,
    Refer the below link.
    http://help.sap.com/saphelp_nw04/helpdata/EN/5b/8dc73cee4fb55be10000000a114084/content.htm
    Hope it helps you.
    Regards,
    Ravindra.

  • Displaying stock and sales orders for aggregated product in Product View

    Hello,
    We have successfully created an SNP aggregated planning scenario which uses CTM to plan purchase requisitions and planned orders at the aggregated product level.  The disaggregation to the sub-product level is working as well.
    We have one issue.
    We would like to be able to use the Product View (SAPAPO/RRP3) to view the sales order and stock information for both the aggregated products and the sub-products. 
    Currently, the sub-products (which are the materials in the stock and sales orders functions in ECC) show the disaggregated planned orders and purchase Reqs, and the sales order and stock information in the Product View.
    The aggregated-products (which aren't included in the ECC sales order and stock functions), only show the aggregated planned orders and purchase Reqs. 
    Is there a Product View configuration which will show the aggregated stock and sales orders in the aggregated product view?
    thanks in advance for any comments and/or assistance.
    Sarah

    Hi Sarah,
    The Product view configuration is available under customisation menu under the below path.
    spro > sap guide > APO > supply planning > PPDS > settings for order view/product view
    Under this, you can configure your customised product view structure.
    Regards,
    R. Senthil mareeswaran.

  • Safety stocks and STO's

    Hi everyone,
    I am new to APO but I am writing a functional spec. The safety stocks and STO's obtained after running SNP optimizer must be sent to third party system. I have to do the field mapping. Can somebody tell which table and technical name I should use. I know we can use /sapapo/rrp3 but I am not sure. Can somebody help...

    Hi Bopanna,
    We are using version SCM5.0 and a using planning book which is copy of standard planning book 9ASNP94. We have assigned correct KF function (3003) to safety stock key figure. I stillc nat figure out whats wrong
    Mylene

  • Safety stock and safety period

    Can anybody help me in understanding the effect of safety period in MRP..
    CAn anybody give me an explanation with numbers so that i could test and understand..
    Please help me out..

    Dear
    There are plenty of earlier posting on Safety stock and safety periods .
    Safety Stock : This is one kind of Un-restricted stock which will be used to full fill the un-expected damand for any material apart from the normal stock .Safety Stock calcuation depends on requireiment .It can be pre-defined ( manual safety stock -MRP3 view-Safety Stock ) or Automatic Safety Stock based on the MRP Type set up in OMDQ.If you want automatic safety stock , then it will calcuated based on Forecasting view parametrs , forcast model , MAD, BASIC value calcualted wheil excuting Forecasting collectively or individually .
    Safety Stock Calcualtion happend based on following CONDITION :
    1.MRP type should be Forecast Base MRP -VV,VB,VS,V1,V2.Here MRP type calculates the Automatic Safety stock based on the Forcasting View Maintained in MM02 with proper Consumption History .( 261,501 etc update control in MMR through OMJJ set up --Please check MMR Forcasting View -Cosnumption Histry at least 6 months are there or not ?)
    2.In MRP Type -SPRO-MRP-Check MRP Type -Select any one of the MRP Type like VV , you will find that Calcualtion of Reo-Order Point and Safety Stock Check Box Ticked .Based this set up and above Forcasting view , safety Stock will be calcualted with certain formaul .Here in the Material Master MRP3 view u need to maintain Service Level Percentage of that Material whcih will be consideredr as Service level factor to calcvualte the Safety Stock automatically based on the MAD and Basic Values calcualtion in Forcating View Individually (MM02) or collectively in MP38 .
    Hope this above facts will help you to understand the calcualtrion of Safety Stock .
    Formula : Safety Stock = R x Sq.rt. W x MAD
    Safety Stock = R x W x MAD
    Refer our earlier posting on the similar issues :
    Automatic reorder point calculation
    safety stock and min safety stock
    Hope it clarifies
    Regards
    JH
    Edited by: Jiaul Haque on Feb 21, 2011 10:31 AM

  • Opening Stock and Closing Stock Calculation

    Hi,
         My report requirement is to display the material, opening stock for the lower date, closing stock for the higher date and the in between all stock operations..how to fetch the opening stock and closing stock for a particular  material ???.. what are the tables and fields for calculating them??..
    Thanks,
    Sri
    Edited by: Sri on Feb 13, 2009 8:33 AM

    Hi
    We have done a similar reports. One showing opening stock/Closing stock and another one showing all the transactions for a particular day. What we did was we developed a program to fetch data from MARD table for unrestricted, blocked & Qulaity stock(Our requirement talks only about these 3 stocks). And we scheduled the program exactly at system time 00.00 hrs with A class job.(today's closing day stock is nothing but tomorrow's opening stock)
      And for the second report which needs to pick all the transaction for a particular day, we picked it from MB51 entries. It is nothing but query between MKPF and MSEG.
    I hope this helps.

  • Ipod touch apps "stocks" and "weather" will no longer update data.

    the apps on my Touch "stocks" and "weather" have failed to update since 1-30-10.
    I have done a full "restore" and reloaded all other apps and music files but these 2 apps still fail to update? could it be the new software package? Both apps are "powered by yahoo"

    I'd wonder if for some reason your ability to contact that yahoo widget is failing....
    Did anything recently occur?
    I've had this happen breifly in the past, but that was resolved once the yahoo services came back online.
    It's strange, but as long as you have internet connection and the yahoo services can respond (saying that its not blocked by your ISP, WLAN, or other services) it should update.

  • Report for Reorder point, safety stock, current stock and fixed lot size

    Hi,
    Purchasing Dept. is looking for a report which can give list of materials falling below the reorder point, so that they can go ahead and create procurement proposals for those materials.
    They also want to see the Reorder Point, Safety Stock, current stock and fixed lot size in the same report.
    Let me know if there ia any standard report availbale which displays the same or any approach to get the same.
    Thanks in Advance.
    Regards,
    Shankar Goud.

    Hi,
    There is no standard report because this is meant to be managed by the MRP run.
    The MRP lists show all materials that have a problem (such as stock below reorderpoint) but MRP generates requirements for these anyway and so all you need to do is to look for the MRP generated requirements (requisitions?) and you have your list?
    Are you using MRP?
    If so then please use the standard functions in MRP to get this.
    If not, then WHY NOT?
    Steve B

  • Report on Total U/R stock and Open PO quantity

    Dear Friends,
    Is there any standard report or table which gives the present unrestricted usage stock and Open purchase order stock for all materials in a storage location or material group as selection instead of single material. If we can have open Puchase requisition quantity also in report then it will be more helpful.
    Thanks for timely help ......
    Best Regards
    Varsit

    Hello Varsit,
    There is not stardard report available for this information, but you can link EKPO, EKBE (PO history) table and MARD table to get this information. For Purchase requisition, you can use EBAN table.
    Hope this helps
    Regards
    Arif Mansuri

  • Custom Report for the Stock and Stock value for a specific date

    Hi SAP Gurus,
    Is there any SAP standard t-code or any logic to get the transcations (additions (for example: Purchases) and subtractions (Sales) to the inventory) for a particular materials in a plant and with Total Stock and also Total Stock value when that particular transaction happened?
    Our system is R/3 4.7
    I looked at the MB5B, MBCE, MBCA, MC44, MB51 and some other standard T-codes but could not find the total stock value at the time of Transaction happened.
    The history tables MBEWH and MARDH  are updated after the month end closing procedures, right, which means I will have the inventory value changing every month if material has Price "S".
    Thank you,
    -Harter

    Hi Harter,
    Unfortunately, you cannot see in a single tcode the value of stock and stock quantity on a specific date. As you yourself have pointed out, we only have to make use of the history table MBEWH, MARDH for the month wise stock quantity and value. Along with that you should also make use of the table MBEW to take teh stock quantity and value. So the total value of stock on a particular date will be
    Stock qnty = MBEWH value until the previous month (for teh specific valuation class, period etc) + MBEW value for the present date.
    But this will nto work out if you want to find out teh stock quantity and stock value on a past date basis. For past data, only  m onthwise data is available. For this anyway you can refer to MC.1 and so on reports.

Maybe you are looking for