Subcon PO scenario

Hi,
I saw several threads related to using the Idoc PORDCR1.PORDCR102 for sending subcon POs to SNC. However I did not find an answer on what process code needs to be used for this Message Type on the ECC side while setting up Partner Profiles.
Can someone please provide the necessary information on how Partner profiles are to be setup for the subcon PO scenario.
Thanks,
Kedar

Hi Kedar
PORDCR1.PORDCR102  is distributed through Distribution Model not by process code.
Please maintain the following settings
Trnx : NACE
Select the application EF from the dialog structure and choose Output types.
Choose Change.
Choose Edit -New ntries.
nter BAPI in the Output Type field.
nter PORDCR1 output as the name.
On the General data tab, enter 0001 in the Access sequence field and select the Access to conditions and multiple issuing indicators.
On the Default values tab, select Send immediately in the Dispatch time field, select Special function in the Transmission Medium field, and enter LS in the Partner Function field.
Save your entries.
In the dialog structure, select Processing routines by double-clicking on it.
In the Processing 1 screen area, enter BUS2012_ICH_R3 in the Program field and SEND_PORDCR1 in the Form field.
Save your entries.
TNX:NACE
Select application EFand choose Procedures.
Select the procedure RMBEF1 and choose Control in the dialog structure.
Select the entry for condition type NEU and choose Copy.
nter the next possible step number in the Step column.
nter the condition type BAPI in the column.
Save your entries.
TNX:NACE
Select the application EF and choose Condition records.
Select the output type BAPI and choose Condition records.
Create conditions for your vendors, for example, the key combination Doc.Type/Purch.Org/Vendor.
fun-LS, PARTNER-LOGICAL SYSTEM SNC, MED-8, DATE-4
SPRO- MM- Purchasing -Messages - Output Control-Message Types-Define Message Types for Purchase Orders - Fine-Tuned Control: Purchase Order.
Select the entry with the operation 1, and the condition type NEU, and choose Copy.
nter BAPI as the condition type.
Save your entries.
Select the entry with the operation 2, and the condition type NEU, and choose Copy.
Enter BAPI as the condition type.
Save your entries.
SPRO-SAP NetWeaver -Application Server - IDoc Interface/Application Link Enabling (ALE) - Modelling and Implementing Business Processes- Maintain Distribution Model and Distribute Views.
-Choose Change - Create Model View.
-nter Publish PO BAPI IDoc to SNC in the Short text field.
Enter ICH in the Technical name field.
Select your model view and choose Add BAPI.
  Enter Logical system of SNC in the Obj. name/interface field.
Save your entries.
Choose Edit -Model view -Distribute.
This will distributes the model view to the logical system of SAP SNC.
in we20 create outbound parameters for PORDCR1.PORDCR102 in tab outbound options.
message type PORDCR1
basic type : PORDCR102
Best Regards
Vinod
Edited by: Vinod Kumar Pedapati on Dec 1, 2010 3:00 PM

Similar Messages

  • Subcon process Scenario  -- Is the below process poosible

    Hi,
    We wiill raise a purchase order on supplier #1 who is required to send these parts to supplier #2.  We will then be sending,
    from our stock, some additional parts to supplier #2, together with a purchase order to manufacture a part, which we require
    them to ship directly to our customer.
    How will be mapping this above scenario in SAP.
    Thanks,
    Kiran

    We wiill raise a purchase order on supplier #1 who is required to send these parts to supplier #2. We will then be sending,
    from our stock, some additional parts to supplier #2, together with a purchase order to manufacture a part, which we require
    them to ship directly to our customer.
    1. Create a Purchase order for supplier 1 and in the delivery address tab at item details level in the vendor field give the supplier 2 number, system will automatically populate the vendor address(supplier 2) in the vendor address field.
    2. Do the GR for the PO, stock will be at supplier 2 physically.
    3.Create  a Subcontracting PO for supplier 2, issue the spare parts and the parts from supplier using 541 movement type.
    4.Create a third party PO to send the finished goods to the customer.

  • DTR Failure in TM due to Business partner internal ID does not exist error

    hi Folks,
    For the SubCon STO scenario a vendor is assigned with a customer ( & vice versa) in the ECC system. The PO's created for this customer (which has the partner function LF for the vendor) the XML message fails in TM system, with a message "Business partner internal ID 0006400000 does not exist".
    The business partner for 0006400000 is available in the TM system, it lacks one identification number (CRM002) when compared to the rest of the customers.
    As described in the link given below the business functions LOG_SCM_CUSTVEND_INT & SCM_SCMB_TM_FND1 are activated in the system. I was expecting that when the BP was created the vendor also has the id CRM002 with the customer id in there. For some reason this is not happening & so the message fails.
    Integration of Customer and Vendor Data into Business Partner - Integration of SCM Basis Master Data - SAP Library
    Could you please throw some light on this issue. Any leads will be appreciated.
    Just to let you know we are using TM 9.1 SP02 & SAP ECC 6.0
    Regards,
    Vasu

    Hi,
    to resolve the message BP with GUID does not exist you first need to find out which customer is not replicated.
    To do this copy the guid in the Field BP_GUID of table CRMM_BUT_CUSTNO. This is a mapping table. If the GUID does not exist in that table then use the CRMKUNNR in R/3.
    Now that you have found the right BP  you should create a request in R3AR2 for object CUSTOMER_MAIN and execute it using R3AR4. when this Bdoc is processed correctly do the same for CUSTOMER_REL. Now you should have Your BP with its relations.
    Best regards

  • Inspection Lot status not getting changed to LTCA from REL for SubCon scenario

    Dear All,
    For ERSA material 01 inspection type is active with indicator Post to inspection stock only as it can be purchased. No other indicator is set.
    This material can be sent for repairing outside with DAMAGE valuation type (stock provided to Vendor with DAMAGE valuation type).
    For SubCon scenario, Purchase Order with Account Assignment Category F and Item Category L has been created.
    Once GR using MB01 with 101 movement, consumption posting takes place and as Insp type 01 is active Inspection lot is getting created with status REL CALC.
    At this time, DAMAGE stock against Vendor is getting reduced with Qty of 543 movement.
    Now when, reversal 102 with MB01 is done against Purchase Order and details are adopted with reference to 101 material document, reversal is taking place, but at the same time respective material doc's Inspection lot status is not getting changed to LTCA. It remains REL only.
    For 122 return to Vendor using MBRL also, Insp lot status is not getting changed.
    Has anybody faced such issue? Is this standard SAP?
    Kindly throw light on the process, is correct process followed?
    Regards,
    Tanuj Parikh

    Thanks.
    Thru MBST Inspection Lot status changed to LTCA.
    Why system is not cancelling thru MB01? 

  • Error in MIGO of Subcon PO in MTO scn, not triggering Movement type 543/E

    Dear Consultants,
                                  I am trying to perform Goods receipt against a Subconctracting PO, in a MTO scenario. The components are linked to Sales Order (Special Stock - E). I have maintained '0' in the Individual / Coll requirements field in the MRP 4 view of the component.
    So after creation of PO(Subcon), I am trying to perform MIGO - without issuing components to vendor as 541/E movement type for componenets is not allowed in standard.
    While performing MIGO I am getting the error no stock available with vendor, the system is trying to trigger 543/O movement type whereas I am expecting 543/E to be triggered for the components.
    I am also not able to perform 311/411 E movement type for the components as they are linked to WIP Batch.
    Can anyone sujjest if there is a way by which the MIGO should trigger 543/E during MIGO.
    Thanks
    Arindam.

    Hi
    i donr think the movement type 543 E will trigger as the subcontracting only supports 543 O in standard , you need to do customizing as follows
    Also check in SPRO > Logistics - General > Tax on Goods Movements > India > Business Transactions > Subcontracting > Maintain Movement Type Groups > here for Movement Type Group "0002", Movement Type "543 E" should be maintained.
    just check following link for the subcontracting with sales order ,
    [Sub Con 1|http://help.sap.com/saphelp_470/helpdata/en/4d/2b90b043ad11d189410000e829fbbd/content.htm]
    [subcon 2|Subcontracting for project stock;

  • SNC : Error while creating Subcon PO with Order (F) account assignment cat

    Hi,
    I am trying to implement Outsourced Manufacturing scenario with ECC 604 and SNC 7.0
    We would like to demonstrate "Real Time Consumption" once a phase has been completed for WO in SNC.
    For this, it is necessary create Subcon PO with A/c assignment category F. While trying to create PO, i get the following error:
    1. Acct assignment determination is not poss.in the account assgnmnt manager
    Message no. IAOM220
    Diagnosis
    Errors occurred during the determination of the account assignment in the account assignment manager. Thus it is not possible to determine the account assignment.
    2. Characteristics for Controlling object have errors
    Message no. IAOM034
    Diagnosis
    There are errors in the characteristics that are transferred when creating or changing a Controlling object.
    System Response
    Processing stopped.
    Procedure
    Look at the messages prior to this object in the error log. They give an indication as to which characteristics have errors.
    3. Hierarchy level 01 not defined in business scenario Outsourced Manufacturing
    Message no. IAOM027
    Diagnosis
    In business scenario 'Outsourced Manufacturing', hierarchy level 01 was accessed. There is no key characteristic defined for this hierarchy level.
    System Response
    Processing is terminated.
    Procedure
    Inform SAP or the provider of the business scenario, if the business scenario was not provided by SAP.
    If you are responsible for the business scenario yourself, check the definition of the business scenario.
    Settings specific to CO order that have been maintained:
    IAOM1 - Maintain Controlling Scenario
    IAOM2 - Maintain Controlling Integration
    KA02 - Default Cost assgnmnet
    Tick RT consumption in ME11 (Vendor Purchasing Info Record).
    Any idea???
    Regards,
    Sandeep

    Dear,
    Did you also experience the following?
    We are at the following step in the scenario:
    Supplier confirms production progress =>Manufacturingworkorderproductionprogressnotification XML is generated => POST component consumption is executed in the R/3 system (ECC 6 EHP4).
    We see the following problems after posting the component consumption
    -     table EKBE_SC is not filled
    -     in transaction kkf3 => CO production order => no booking/posting of progress
    -     Component consumption is reflected in an outbound delivery with movement type 543, but it is missing the link with the purchase order+item (see screenshot below) => as a result any post issue booking is not possible.
    Thanks for your help.
    Kindr regards,
    Stefan Hemeryck

  • Error while creating Subcon PO with Order (F) account assignment cat

    Hi,
    I am trying to implement Outsourced Manufacturing scenario with ECC 604 and SNC 7.0
    We would like to demonstrate "Real Time Consumption" once a phase has been completed for WO in SNC.
    For this, it is necessary create Subcon PO with A/c assignment category F. While trying to create PO, i get the following error:
    1. Acct assignment determination is not poss.in the account assgnmnt manager
    Message no. IAOM220
    Diagnosis
    Errors occurred during the determination of the account assignment in the account assignment manager. Thus it is not possible to determine the account assignment.
    2. Characteristics for Controlling object have errors
    Message no. IAOM034
    Diagnosis
    There are errors in the characteristics that are transferred when creating or changing a Controlling object.
    System Response
    Processing stopped.
    Procedure
    Look at the messages prior to this object in the error log. They give an indication as to which characteristics have errors.
    3. Hierarchy level 01 not defined in business scenario Outsourced Manufacturing
    Message no. IAOM027
    Diagnosis
    In business scenario 'Outsourced Manufacturing', hierarchy level 01 was accessed. There is no key characteristic defined for this hierarchy level.
    System Response
    Processing is terminated.
    Procedure
    Inform SAP or the provider of the business scenario, if the business scenario was not provided by SAP.
    If you are responsible for the business scenario yourself, check the definition of the business scenario.
    Settings specific to CO order that have been maintained:IAOM1 - Maintain Controlling Scenario
    IAOM2 - Maintain Controlling Integration
    KA02 - Default Cost assgnmnet
    Tick RT consumption in ME11 (Vendor Purchasing Info Record).
    Any idea???
    Regards,
    Sandeep

    well it seems to be an CO issue
    please check if the g/l is maintained as cost element
    also check the setting s of account assignment catergory F and let us on which modifier key is maintained there make sure in OBYC-GBB the g/l is maintained for the material valuation class and which should be cost lement

  • GOT STUCK IN MAKE TO ORDER SCENARIO

    Dear All,
    Ours is a Make to order concept where in PP would run MRP against a sale order and as a result planned orders will get generated.
    we under MM will convert those Plnd orders into PR'S using MD15.while doing so it is obvious that system will copy the account assignment as "E".Till this there was no problem.
    i have a semi-finished product which needs to be sent for subcontracting.Now for this i could able to convert the Plnd order into P.R where the account assignment "E" and the special procurement type from MRP2 "L'" is getting captured. Then i had converted into P.O. Eventually when i am trying to issue the components referring to that P.O, the system is issuing a message as"PO HAS NO ITEMS".
    Kindly suggest as to any further settings are required.

    Hi Syed,
    Sorry, your process isn't totally clear to me.
    You wrote:
    1. 'i have a semi-finished product which needs to be sent for subcontracting'
    2. 'here SFG will be my finished product for which i will issue the components'
    Maybe I didn't understand your problem well, but according to your statements there's inconsistency in your scenario.
    1. you have SFG
    2. you send this SFG for subcontracting, and you want to send components as well
    3. you want to get the SFG as the result of the subcon process
    In my opinion:
    1. you have SFG
    2. you should issue 'L'-PO for your FG, where components are: SFG, component1, component2, etc
    3. as the result of the process you should get FG
    (and you can solve this as third-party PO - of course if you want)
    BR
    Csaba

  • Subcon service Purchase order

    Hi,
    In my scenario I am sending material i.e Shirts ( item) for ironing process to the vendor as subcontracting   ironing service through order. I would like to get back the material from  vendor  w.r.t PO order and payment to made to service performed throgh invoice verification  w.r.t service entry sheet.
    My thought up on the process to create subcontracting PO  on subcontracting vendor  along with articles. Article will be received to vendor  as subcon article   w.r. t subcon PO. After  completion of service  it will be return to our end w.r. t  PO. GRN will be performed. Since it is regular practice, I would like to create service master   for repective services and will be  treated /incorporated in PO  similar to service purchase order. Based on this purchase order  SES will be created and payment of service will be settled through invoice verification   w.r.t service entry sheet.
    Please let me know  whether my thinking are in line or not. if not please suggest the alternative.you can reach  through phone also.
    Thanks & regards,
    Sanjay Rahangdale
    09327162228

    ok

  • Scenario in MM

    hi,
    one of my clent requirement is about mapping the business scenario of returnable gate pass/non returnable
    gate pass.the scenario is like this  whenever a material is going out of factory then it can go out on the basis of returnable gate pass or a non returnable gate pass each having a separate unique identity
    number.in case of returnable gate pass the material has to be returned on stipulated date.
    as when a new returnable gate pass/non returnable gate pass is to be made system checkm should inform that whether any retunable material is due on vendor's account or not.how to capture it in SAP.
    THANKS
    sandip

    GATE PASS
    No, SAP doesn't provide any option for creating Gate Pass (Returnable & Non-Returnable) in standard.
    Returnable Gate Pass: -
    1. MM01 - Create Material Master for every Spare Part / Machinery to be sent to Vendor for Repair as Non-Valuated (Material Type "UNBW") (Do not extend Accounting and Costing views since you don't require postings of Stock value and consumption values, you only want to track the Service/Repair Charges)
    2. MIGO - Goods Receipt > Others (Receive the quantities of these materials using Movement Type 501 / 511)
    3. ME21N - Create Subcontracting PO (Here Main Material and Component will be same material)
    4. MB1B - Transfer Posting w.r.t. Subcon PO (Mvmt Type - 541, Spare Part stock will get posted to Vendor Stock)
    5. MB90 - Take Print out of this Material Doc as Returnable Gate Pass (U need to configure Message Determination of Inventory Mgmt)
    6. MIGO - GR against Subcon PO (101 - Receive Spare Part, 543 O - Consumption of Spare Part form Vendor Stock)
    7. MIRO - LIV for Service Charges w.r.t. Subcon PO
    Non-Returnable Gate Pass: -
    1. MIGO - Goods Receipt > Others (Receive the quantities of these materials using Movement Type 501 / 511)
    2. MIGO - Goods Issue > Others (Issue the quantities of these materials using Movement Type 501 / 511)
    3. MB90 - Take Print out of this Material Doc as Non-Returnable Gate Pass (U need to configure Message Determination of Inventory Mgmt)
    Note: - If Client is not satisfied with this then you need to go for development of Gate Pass System.
    also, please check transaction code LECI
    Related configuration
    SPRO --> Logistics Execution --> Shipping --> Basic Shipping Functions --> Registration of Visitors and Means of Transport
    i have never used it ,but check it it may be useful
    hope it help
    regards
    kunal

  • Subcon Quota Arrangement behavior during MRP

    Dear Gurus,
    Currently, we have a scenario wherein during subcon process there can be 3 Vendors active. During MRP, we would like to have an output as per below:
    Requirement: 1500
    Vendor A: capacity 500 - priority 1
    Vendor B: capacity 700 - priority 2
    Vencor C: capacity 500 - priority 3
    If I run MRP, I would like system to have PR's Vendor A with 500 then as the Vendors capacity is only 500 the remaining requirement should be passed on the succeding vendors. So from my example, Vendor B should have 700 and Vendor C should have 300.
    Is this possible using Quota Arrangement. I was trying to test but I cannot get my desired result.
    Please note that the settings in the material master is already set to Quota usage 4 and the lotsize is weekly with splitting quota activated.
    Thanks,
    Raymond
    Edited by: Raymond on Oct 10, 2011 11:17 AM

    Hi,
    Yes I have maintained below in MEQ1 just for testing but I cannot get the desired result:
                      Quota Percentage        Maximum Lot size      Priority
    Vendor A:   100                                 500                           1
    Vendor B:    100                                 700                          2
    Vendor C:                                           500                          3
    Set-up Weekly lotsize with splitting quota and quota usage 4.
    But during MRP execution, I think the system splits the requirement quantity into 2 and distribute to Vendor A and Vendor B then if it reached maximum lotsize it proposed to vendor C.
    our requirement is first to consider Vendor A then Vendor B then Vendor C according to maximum lot size and priority.
    Any idea if this is possible?
    Thanks,
    Raymond

  • Please help with subcontracting scenario............

    Hi All,
    Can anyone please help me in dealing with subcontracting scenario with scrap taken into account. Please provide the screen shots from BOm creatio to challan closing. the requirement is urgent. please help me. all replies will be suitablly rewarded.
    regards,
    vvr sharma

    Sub Contracting Cycle
    (1) You have a material that can be procured externally, and you have maintained BOM with components. Any waste generated and received during subcontracting process can be maintained as component with negative quantity. 
    (2) You create a subcontracting PO (PO with Item Category L). You can also maintain Purchase Info Record for Subcontract category for material and subcontractor. 
    (3) You make a transfer posting to issue components for SC PO. Material is sent to subcontractor.  As material remains under your ownership, system does not make any value entry. But quantity is shown as "Material Provided to Vendor" 
    (4) You receive finished material against SC-PO. You also specify components consumed in manufacturing of finished goods. Additionally, if you have negative components in BOM, now you'll also receive subcontracting by-products. There are three events, so three accounting entries are generated: 
    DR FG Stock/ SC By-Product Stock 
    CR Change in Stock (FG/ SC By-Product ) 
    (for finished goods received) 
    DR Subcontracting Charges 
    CR GR/IR Clg 
    (for moneys payable to Subcontractor) 
    DR Consumption (Components) 
    CR Change in Stock (FG/ SC By-Product ) 
    (material provided to Vendor is now charged to expense) 
    (5) You do the IV for SC Invoice, and the process is complete. 
    Process of Subcontract in MM
    Sub-contract business process: 
    You want to buy material from the supplier (processed material/ assembled item) , but for some reason (quality of certain item / price ) you will give some component to vendor . 
    Vendor shall process the item / use the item provided & supply the final item. 
    SAP process: 
    1.Create the finished goods material code. 
    2.Maintain the BOM for the material. 
    3.Create PO with item category as "L" . 
    4.Issue material to vendor with movement type 541 
    5.Receive the material against the PO with movement type 101. 
    6.MIRO to account for vendor's invoice for the service charge& material used by him. 
    Can anybody tell me how a process has to be given to subcontracting?
    Suppose, I have 3 operations  1)weaving 2)dyeing 3)cutting & packing 
    if no 2 process (i.e Dyeing) has to be given to subcontracting, what process should i follow ?
    The following process to be followed for subcontracting. 
    1. Item code(material master) to be created at the stage of before dyeing. 
    2. Item code(material master) to be created after Dyeing as subcontracted item.(F30) 
    3. Bill of material to becreated for the material(2) calling for material(1) 
    4. Inforecord and source list to be created for material(2) with the corresponding vendor 
    5. PO to be released for material (2) 
    6.Along with PO the material(1) to be issued to vendor 
    7.On receipt of material when GR is made the stock with vendor will get updated. 
    How to Create a Subcontract Order?
    To create a subcontract order, proceed as follows: 
    Enter the material you want to order and the item category for subcontracting (L) in the order item. 
    Press ENTER to display the screen for component processing. 
    Enter the components that the vendor requires to manufacture the product. 
    Please note: 
    – You do not need to enter the date required for the components. This date is proposed by the system when you press ENTER. 
    It is calculated as follows:
    Delivery date of the item - Planned delivery time
    – If you do not want the quantity of the components to be changed if the order quantity of the end product is altered, set the indicator Fixed quantity (column F). 
    – You can determine whether the components are available on the date required by selecting Edit -> Availability check. 
    If you entered a bill of material as the material in the subcontract order, the components are created automatically. 
    If you want to determine the components in the bill of material at a later date (for example, if the bill of material is subsequently changed), choose Item -> Component -> New BOM explosion. The existing components are deleted and redetermined in the bill of material. 
    Save the purchase order. 
    When you print the purchase order, the components are printed per order item
    Subcontracting - Key Points
    Special Procurement Process.
    Item category: L
    Order type: NB
    In info record vendor should be maintained as subcontractor.
    Vendor (Subcontractor) receives the components used to manufacture a finished product directly from your company or through third party.
    Your company should place a purchase order for the finished product.   In this manually you can enter the required individual components or it can be determined via the explosion of BOM (if exists).
    Stock check at vendor level: ME2O
    Company stock check: MMBE
    GR for individual components through movement type: 501 or 561 (if with out PO or without reference).
    GI to subcontracting vendor: through movement type 541.
    GR from sub contracting vendor: through movement type: 101
    Movement type 543 is displayed to cancel the material cost account.
    If the subcontracting order has to be generated through materials planning,the special procurement key has to be set in MRP 2 screen.
    - To create the Subcon Info Record : Tcode ME11 - Info Category - Click Subcontracting
    - To create Material BOM : Tcode CS01
    - With the Info and Material Setup, you can then create the Purchase Order in Tcode ME21N
    Hope this is helpful.
    Regards
    Ravi

  • Trading with Sub-Contracting Scenario

    Dear All,
    I have one requirement of Traded Material Scenario, where the material is delivered by Sub-Contractor directly to Customer.
    The details are -
    Sub-Contractor delivers material A to customer.
    The material A has BOM maintained, where component B is maintained in the BOM.
    My company purchases B from another Vendor & which is again directly supplied to Sub-Contractor. Sub-Contractor processes the component B to manufacture material A & delivers the same to my Customer.
    The following issues need to be addressed -
    1) Item category is L in Sub-Contracting, where as it is S in Third Party scenario. How can I have two item categories in same line item of Order.
    2) Excise paid by Vendor (supplier of component B) can be availed by Sub-Contractor as set-off & I have to debit the same to Sub-Contractor, as payment to Vendor for component B is  done by me.
    3) Excise paid by Sub-Contractor is to be inventorized at my end (as it is cost to me) & can be availed for set-off by the customer.
    Can anybody has any input for this?
    Regards,
    Prashant

    I think this process was earlier called as 52 A operations. 
    This is what we had done 52A did not have requirement of jobwork challan)
    1: Create the Subcontractor' Location as a "non excisable-Plant " in SAP.( The subcontract vendor was supposed to maintain his own excise records)
    2.PO for raw material /Component will be raised from Subcon Plant .
    3.The Excise in the PO will have to be configured as a Condition similar to VAT Deductible(so that during  MIRO it is sent to another GL account for tracking and further FI-debit note to recover from jobworker )
    4. The Production of the Main FG can be shown by Subcontracting PO .
    5. There has to be another Virtual Plant ( A RG23D registerd depot normally) which will depict your companys local office near the Subcontractors Location , as the Final SALES Invoice should be from your companys Name.
    6. Goods will first be sent by a STO to this Virtual Plant , here in This STO you can also add the Excise Duty condition types for Inventorization purpose.
    7. Create Sales Invoice (and if RD23D then  Depot invoice) from your Virtual Plant .( Excise invoice will be created by the subcontracting  vendor , against which your customer can claim Modvat)
    I have mentioned the Process above , for config settings of each process  you can check many threads here in SDN.

  • Subcontracting Semifinished Product, without providing component to Subcon.

    Dear all
    I have the following scenario for subcontracting, all involvoing placing Subcon PO for Semifinished Product, GI raw materials and GR Semifnished Product back for further production processing in the own factory.
    Scenario:
    My factory places a subcon PO for chroming a raw metal (FG = Chromed Metal). We only provide the raw metal but do not provide the Chroming paint (GI only raw metal to subcontractor), Subcontractor will use their own Chroming paint. After chroming the raw metal, we will perform a GR for Chromed Metal from the subcontractor.
    My question, how do we tackle this in subcontracting? As we never provide the Chroming Paint. Does it mean I create a single item single level bom and at the time of Invoice verification, I will put in 2 lines item Subcon Service + Chroming Paint?
    Please advise.

    Sorry, YMREDDY, I just want to confirm.
    Hi
    Question: In that case, I just changed the BOM Header to put HALB (Chromed Metal) and Component as ROH?
    Question: In that case, I will only GI Raw Metal (ROH Material in BOM Component) and then GR the HALB, that is it?
    If you are doing as above , you can as well go ahead with subcon it self ?
    And you include the cost of chrome paint in your subcontrating cost.
    Pl. try.
    Regards
    YMREDDY
    You put a question mark at "you can as well go ahead with subcon itself?". What does it mean? Is my previous 2 quesions set the correct logic?
    Thanks.

  • How to setup a Subcontracting Scenario Part II

    Guys,
    I created a supply chain model to reflect subcontracting scenario. Here are the results as I ran SNP Heuristics.
    1. I have a forecast demand at DC = 10.
    2. Supplier gets a purchase requisitions.
    3. In response Planned Order is generated and dependent demand is placed for components.
    4. Purchase Requisition is created against DC for Component.
    My question is why is it system not generating subcontracting purchase requisition. I was expecting a Subcon purchase requisition to be created a Supplier end for FGI.
    Would it be that subcontracting purchase requisiton will be created in R/3 and then land in APO and APO would assign right ATP Category?
    Regards
    Najam

    Hi,
    Can you confirm which planning book you are using, is it standard planning book for "Subcontracting", if not have you included "Subcontracting" key figure.
    You will get Subcontracting Pur Req only after you have included the key figures for Subcontracting Demand and Receipt.
    R/3 does not generate any Pur req for Subcontracting movement but reserves the stock as Stock to vendor which comes to APO in category 'CE'
    Thanks,
    Sanjog