Subscriber Manager Integration with Radius.

I will install SCE in entrpise network but i have 6 Raduis servers. but i do not know how many radius servers can i intergrate with sucscriber manager?.

You can have many connections to the NAS using the RADIUS LEG. I dont think there is a limitaion of how many NAS you can use but how will you seperate the subsciber attributes. Mostly I have seen CU using 1 NAS and using the username to seperate the fileds :
[Radius.NAS.SMX]
domain =cisco.edu
IP_address =x.x.x.x
NAS_identifier =smart222
secret =ciscosce
# This section defines the RADIUS attribute on which subscriber ID association is
# based. Default association is based on the 'user name' attribute. Uncomment this
# section if you want to base subscriber ID association on a different attribute.
[Radius.Subscriber ID]
# Radius protocol fields name. 
# for multiple fields, use commas between the field name.
# field name shall not start or end with space bar, name shall not contain "=" char.
# Note - it is mandatory to create [Radius.Field.] section for each
#        field defined in fields property
# (default: user_name)
# fields= ,,
fields=User_Name

Similar Messages

  • Training and Event Management Integration with FICO

    How Training & Event Management is integrated with FICO?
    How it will be integrated and where?
    Could you please put it in simple way?

    Hi Rajesh,
    Cost allocation:
    Here it is possible to charge an employeeu2019s cost center with the fee for attending a business event (e.g. training course, workshop). The business event organizeru2019s cost center will be credited and the attendeeu2019s cost center will be debited.
    Crediting of the senderu2019s cost center  Debiting of the recipientu2019s cost center
    The costs incurred from actually holding a business event can be transferred from the resources cost center to the business event organizeru2019s cost.
    Crediting of the senderu2019s cost center  Debiting of the recipientu2019s cost center
    In SAP Configuration:
    Training and Event Management > Integration->Billing and activity Allocation-->Activity Allocation and cost transfer posting.
    Please do above configuration and create business events with or without resourses, in that you can maintain cost centre to post the expenditures .
    Bhairavareddy

  • Queries on Advance Complaint Management Integration with Advance Return Management

    Hello All,
    We plan to implement Advance Complaint Management and integrate the same with Advance Return Management in SAP CRM, I have gone through the following links for the same
    http://help.sap.com/saphelp_crm700_ehp02/helpdata/en/f8/d9632674dc4934a6ae266ce5e9f651/content.htm?frameset=/en/46/010af618cf3482e10000000a1553f6/frameset.htm
    http://help.sap.com/saphelp_crm700_ehp02/helpdata/en/a9/4cf641ea7a497cae3fee1c251af1c8/content.htm?frameset=/en/f8/d9632674dc4934a6ae266ce5e9f651/frameset.htm&current_toc=/en/2e/b0da18dbe84ed9bdff9a5d6d91f531/plain.htm&node_id=44&show_children=false
    http://scn.sap.com/thread/3408793
    We need to implement the return to vendor functionality and I have the following queries
    1) Does the return PO and delivery followed by the goods issue happen automatically? once the complaint transaction is released
    2) Can Service Confirmation be integrated with Advance Complaint Management
    Kind Regards
    Atul

    ok

  • WLC not integrating with Radius Server

    Hello world,
    I have the following situation:
    One WLC 2000 Series (software version 7.0.230.0) with multiple SSID`s, one is with 802.1x integrated with a Radius Server.
    Everything worked fine until fiew days ago, when users were unable to logon via they`re certificates on Windows XP.
    The infrastracture didn`t suffer modifications.
    What i have checked: Radius certification isn`t expired, client certification isn`t expired, the password between controller and Radius is correct.
    There are no ACL`s between the WLC and the remote Server. I can ping the devices, other SSIDs on the same controller (wpa/psk) are working correct.
    The AP`s are 1242.
    I have tried deleting the SSID, configure it back. The OS on Windows Server is  2003 Standard. The AP`s are configured H-Reap.
    I have increased the Server Timeout from Radius Authentication Servers from 2 to 30 sec.
    The message logs recived on WLC Trap Logs:
    RADIUS server X.X.X.X:1812 failed to respond to request (ID 161) for client xx.xx.xx.xx.xx.xx/ user 'unknown'
    The message from the debug dot1x aaa enable:
    *Dot1x_NW_MsgTask_7: Mar 06 09:37:07.318: 00:15:e9:33:75:df Adding AAA_ATT_CALLING_STATION_ID(31) index=1
    *Dot1x_NW_MsgTask_7: Mar 06 09:37:07.318: 00:15:e9:33:75:df Adding AAA_ATT_CALLED_STATION_ID(30) index=2
    *Dot1x_NW_MsgTask_7: Mar 06 09:37:07.318: 00:15:e9:33:75:df Adding AAA_ATT_NAS_PORT(5) index=3
    *Dot1x_NW_MsgTask_7: Mar 06 09:37:07.318: 00:15:e9:33:75:df Adding AAA_ATT_INT_CISCO_AUDIT_SESSION_ID(7) index=4
    *Dot1x_NW_MsgTask_7: Mar 06 09:37:07.318: 00:15:e9:33:75:df Adding AAA_ATT_NAS_IP_ADDRESS(4) index=5
    *Dot1x_NW_MsgTask_7: Mar 06 09:37:07.318: 00:15:e9:33:75:df Adding AAA_ATT_NAS_IDENTIFIER(32) index=6
    *Dot1x_NW_MsgTask_7: Mar 06 09:37:07.318: 00:15:e9:33:75:df Adding AAA_ATT_VAP_ID(1) index=7
    *Dot1x_NW_MsgTask_7: Mar 06 09:37:07.318: 00:15:e9:33:75:df Adding AAA_ATT_SERVICE_TYPE(6) index=8
    *Dot1x_NW_MsgTask_7: Mar 06 09:37:07.318: 00:15:e9:33:75:df Adding AAA_ATT_FRAMED_MTU(12) index=9
    *Dot1x_NW_MsgTask_7: Mar 06 09:37:07.318: 00:15:e9:33:75:df Adding AAA_ATT_NAS_PORT_TYPE(61) index=10
    *Dot1x_NW_MsgTask_7: Mar 06 09:37:07.318: 00:15:e9:33:75:df Adding AAA_ATT_EAP_MESSAGE(79) index=11
    *Dot1x_NW_MsgTask_7: Mar 06 09:37:07.318: 00:15:e9:33:75:df Adding AAA_ATT_RAD_STATE(24) index=12
    *Dot1x_NW_MsgTask_7: Mar 06 09:37:07.318: 00:15:e9:33:75:df Adding AAA_ATT_MESS_AUTH(80) index=13
    *Dot1x_NW_MsgTask_7: Mar 06 09:37:07.318: 00:15:e9:33:75:df AAA EAP Packet created request = 0x1cff348c.. !!!!
    *Dot1x_NW_MsgTask_7: Mar 06 09:37:07.318: 00:15:e9:33:75:df Sending EAP Attribute (code=2, length=6, id=10) for mobile xx.xx.xx.xx.xx.xx.
    *Dot1x_NW_MsgTask_7: Mar 06 09:37:07.318: 00000000: 02 0a 00 06 0d 00                                 ......
    *Dot1x_NW_MsgTask_7: Mar 06 09:37:07.318: 00:15:e9:33:75:df [BE-req] Sending auth request to 'RADIUS' (proto 0x140001)
    *radiusTransportThread: Mar 06 09:37:07.328: 00:15:e9:33:75:df [BE-resp] AAA response 'Interim Response'
    *radiusTransportThread: Mar 06 09:37:07.328: 00:15:e9:33:75:df [BE-resp] Returning AAA response
    *radiusTransportThread: Mar 06 09:37:07.328: 00:15:e9:33:75:df AAA Message 'Interim Response' received for mobile xx.xx.xx.xx.xx.xx.
    *Dot1x_NW_MsgTask_7: Mar 06 09:37:07.329: 00:15:e9:33:75:df Skipping AVP (0/27) for mobile xx.xx.xx.xx.xx.xx.
    The messages on Windows 2003 Standard:
    User Y was denied access.
    Fully-Qualified-User-Name = xx.domain.com/Users_T/user
    NAS-IP-Address = X.X>X.X
    NAS-Identifier = Cisco_
    Called-Station-Identifier = ---------------------
    Calling-Station-Identifier = ---------------------
    Client-Friendly-Name = ---------------------
    Client-IP-Address = ---------------------
    NAS-Port-Type = Wireless - IEEE 802.11
    NAS-Port = 1
    Proxy-Policy-Name = Use Windows authentication for all users
    Authentication-Provider = Windows
    Authentication-Server = <undetermined>
    Policy-Name = Wireless Policy
    Authentication-Type = EAP
    EAP-Type = Smart Card or other certificate
    Reason-Code = 262
    Reason = The supplied message is incomplete.  The signature was not verified.User Y was denied access.
    Fully-Qualified-User-Name = xx.domain.com/Users_T/user
    NAS-IP-Address = X.X>X.X
    NAS-Identifier = Cisco_
    Called-Station-Identifier = ---------------------
    Calling-Station-Identifier = ---------------------
    Client-Friendly-Name = ---------------------
    Client-IP-Address = ---------------------
    NAS-Port-Type = Wireless - IEEE 802.11
    NAS-Port = 1
    Proxy-Policy-Name = Use Windows authentication for all users
    Authentication-Provider = Windows
    Authentication-Server = <undetermined>
    Policy-Name = Wireless Policy
    Authentication-Type = EAP
    EAP-Type = Smart Card or other certificate
    Reason-Code = 262
    Reason = The supplied message is incomplete.  The signature was not verified.
    Can anyone help why i cannot log the users via 802.1x ?

    Okay that is good..... this is what I would do next.  I would create a test ssid that uses PEAP MSchapv2 and create a new policy in IAS that is basic.  Allow 802.1x wireless and user group only and see if you can reconfigure one of the XP machines for PEAP.  Can you also post a screen shot of your polices (connection and network) so we can review it. 

  • Solution Manager Integration with Maximo

    Hi All,
    I believe all you know what is Maximo. Those who do not know, I would like to take an opportunity to brief them about the same.
    Maximo is a ticketing tool from IBM. This tool is basically used to record and keep track of all change requests taking place in SAP landscape.
    Having explained in brief above about Maximo, may somebody please tell me if this can be integrated with Solution Manager?
    Has anybody done it before? If so, may you please share your experience with me?
    Hope to get reply.
    Regards,
    Faisal

    Hi Faisal,
    If you could share your findings and docs and plan if possible , would be appreciated.
    I have gone through the SAP notes for integration of Service desk with third party ticketing tools and some white papers on SDN but it does not help much.
    Thanks,
    Regards,
    Kaustubh.

  • Solution Manager Integration with Tivoli and TSRM

    Hi,
    Has anyone done an integration of SAP Solution manager with Tivoli or TSRM. Solution Manager can perform the same capabilities of Tivoli or TSRM of monitoring and Service desk. However we want to use the best of both. I would appreciate if if someone can share thier thoughts on this.
    Regards
    Jasvinder

    Hi,
    Heres a good news for you.
    IBM Tivoli Service Request Manager version 7.1 software has now SAP-certified for integration with SAP Solution Manager 7.0 via the service desk interface scenario (SMG-SDI 4.0).
    [The News|http://www.cbronline.com/news/ibm_launches_new_service_to_help_automate_it_service_desk_operations_091013]
    To Inegrate refer [this guide.|http://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/e3eeb4a8-0b01-0010-bd99-f4a700a49d32]
    Hope this will solve your problem.
    Feel free to revert back.
    -=-Ragu

  • Training & Event Management  - Integration with FI

    Hi,
    In the standard configurations Training & Event Management is integrated with Controlling(CO)but how to integrate Training & Event Management with FI.

    What functionality are you looking for?

  • Document on Positive Time Management & Integration with payroll

    Hi,
    Can any one suggest me any link from where I will get the IMG steps of Positive time management implemetation, time evaluation, time wagetype detail as well as the steps of integration with payroll..
    Thanks in advance.
    Ajay

    Hi Chandrashekar,
    Can you please advise how actually the transfer of clock times from time recording terminals to SAP R/3 will work?
    I read from help.sap.com that there is a SAP certified CC1 interface (BAPI based) which can be used for this purpose. However, in such a case, the time recording terminals should be SAP CC1 certified.
    If the time recording terminals are not SAP CC1 certified, then what is the method to be used? Will we write a custom BDC program in this scenario and what all should be considered in functional specification of such a BDC program.
    Please advise.
    Thanks and warm regards,
    Vianshu

  • SAP Travel Management Integration with Time Management

    Hello Gurus,
    Need some assistance with Travel integration with Time Management.
    Scenario.
    Punch in Punch out system at the client so when the employee is traveling or when he enters the Trip Request, after approval the attendance should be counted.
    Is there a config step for the same or a BADI needs to be implemented in this scenario ?
    Regards,
    BLITZZ

    A direct update of time infotypes is not possible. You can however switch on the integration in view V_T702N_A. With add. user parameter START_CATS = X you have the possibility to jump to CAT2 to record the time. For the update of the infotypes you have to follow the subsequent steps in time management.

  • Oracle Meter Data Management Integration with SAP ISU

    Hello Everyone,
    I am aware of the fact that Oracle has released a Media pack for the subject integration as discussed here and that media pack works only for SAP ERP 6.0 EHP 5 with ISU_AMI_2.
    We have got OU MDM Release 2.1 Media Pack v4 and SAP ERP 6.0 EHP 4 with ISU_AMI_1 and hence Adapter in MDM won't help to achieve integration with SAP as our SAP EHP is lower than what is required for the MDM adapter. We have got SAP PI which would help the SAP End in the integration.
    What are the possible work-around(s) to achieve the integration between Oracle MDM and SAP ISU without using the Media Pack/Adapter?
    How does MDM exposes its services (inbound/outbound) to be consumed/triggered by External systems (i.e. SAP ISU)?
    List of Services (inbound/outbound) exposed by Oracle MDM for integration?
    Your time and help is much appreciated.
    Regards,
    Adil Khalil

    Did you find the document Oracle Utilities Customer Care and Billing - Meter Data Management Integration Implementation Guide?
    I searched on eDelivery and Oracle Support, but cannot find the document.

  • Event managment , integration with CS ?

    is it possible to integrate or refer from event managment to Customer Service to a serviceorder ??
    If it goes through infotypes which infotype is suitable for this connection ??

    Where can we setup different activity rates against particular order (which table or IMG path)? 
    - Not sure about the CS side as i'm a pure payroll and time eval person
    What are the different important attributes as part of CS integration? I am new to CS module and it will be easy during field selection process.
    - Sorry not familiar enough with CS, normally the CS consultant tells me which fields (Activity Type, Cost Centre, Order Number etc) to turn on for import.
    In order to setup a different business process, you are recommending to create different attendance types for regular, overtime and shift differential. So that employee will enter the hrs against a particular order with the right attendance type. Later the timesheet can be posted to CS. Am I correct?
    - Yes config different attendance types for regular, overtime and shift and have the employee enter the hours against the correct attendance. Or you could use 1 attendance type and then use different activity types which are linked to different rates in CS. Normally when integrating with CS I have someone familiar with that side of things.
    We don't have any HCM in place right now. I am planning on setting up the mini master data for the required employees. Assuming that we do maintain HR time data (attendance/absence recording and time evaluation). How to post the time data to CS? If you are referring to posting time evaluation results, how to achieve this? This is just for my knowledge purposes.
    - I only asked about HCM because you mentioned you wanted the system to determine regular, overtime automatically - but since you will only be using mini master to populate CATS forget I mentioned this path. For future reference though if you had full HCM (payroll) there are options in posting from HCM to CS rather than going from CATS.
    Cheers,
    Brad

  • Training & events management integration with controlling

    Dear TEM Gurus
    I am doing the SAP TEM integration with Controlling module. I have run the Cost transfer wizard with all the settings.
    But while running the programme RHXCCOS0 HR Document is not created.
    it doesnt even show any error message. Pls suggest
    If any body has any doc related to this pl pass on.
    Thanks & Regards
    Vidushi

    What functionality are you looking for?

  • Change Management integration with Project Administration

    Hi,
    Could someone help me understand the integration of Change Management and Project Administration within Solution Manager, pls? I would be very grateful for a sample process to demonstrate the complete workflow. Eg.
    1) Support Messages is created
    2) Change Request is created from Support Message
    3) A project is created for the Change Request
    4) ??? What about the blueprint, configuration, testing, learning features? How do they integrate with CHARM?
    x) at the end, how does the project created for the Change Request integrate with the project that documents the business process? I mean, if the actual processes of an R/3 system are documented in a SolMan project, and a Change Request is processed, how do I modify the general project with the change project?
    This is absolutely not clear either in the on-line help or in the book "SAP Solution Manager"
    Thanks in advance,
    Adam

    Hi,
    > 1) Support Messages is created
    https://websmp206.sap-ag.de/~sapidb/011000358700000035912008E.sim
    > 2) Change Request is created from Support Message
    https://websmp206.sap-ag.de/~sapidb/011000358700002931432006E.sim
    > 3) A project is created for the Change Request
    https://websmp206.sap-ag.de/~sapidb/011000358700005479242006E.sim
    > 4) ??? What about the blueprint, configuration, testing, learning features? How do they integrate with CHARM?
    > x) at the end, how does the project created for the Change Request integrate with the project that documents the business process? I mean, if the actual processes of an R/3 system are documented in a SolMan project, and a Change Request is processed, how do I modify the general project with the change project?
    I am not quite clear what exactly is your requirement here. Change Request Management and Project management are different in their ways. You can handle the documenation tasks through your project management and ChaRM is used for the changes.
    https://websmp206.sap-ag.de/~sapidb/011000358700000059722008E
    https://websmp206.sap-ag.de/~sapidb/011000358700006819152005E
    Rajeev

  • Org management (integration with SAP ECC 6) and shopping cart approval

    Background:
    We currently use EBP 3.0 - Classic Scenario.
    Our current Organisational plan was manually created in EBP, and is not the same as the HR hierarchy in SAP ECC 6
    Shopping cart approvals use the workflow WS10000276 u2013 Approval Single Level over Limit, which utilises the SLAPPROVER attribute. The user name assigned to the SLAPPROVER attribute does not have to be the manager of the user. To meet our Business requirements, a fairly flat structure was created at the time we implemented EBP 3.0. The approval level an approver is allowed to approve up to is controlled with the use of roles assigned to a user.  Each of the approval roles has an appropriate value set against the BBP_APPROVAL_LIMIT attribute under Personalisation.
    Moving onu2026
    We are just about to move from EBP 3.0 to SRM 7.0 u2013 Classic Scenario - by carrying out a new installation.
    Our Business requirement has changed, in that they want the approval of shopping carts to be carried out by the line manager, if that person can approve the value of the shopping cart. If not, for the approval to go up the HR hierarch until a manager with a suitable level of approval is found.
    I believe it is possible to create the Organisational structure in SRM from the HR hierarchy in SAP ECC 6. I have tried to do this in our play/test system using - Integration Business Partner-Organizational Management, without much success as yet!
    I have a few questions in this area:
    1.     Not all of the users in the SAP ECC 6 HR hierarchy will be SRM users. E.g. In the SAP
                 hierarchy there are 3 users u2013 User A, User B and User C. User B is the manager of User
                 A and User C is the manager of user B. In SRM only User A and User C are users. That
                 being the case, is it still possible to initially create the organisational in SRM from SAP ECC6?
    2.     If it is possible to create the organisational structure as described, then using Process
                 Controlled Workflow we could use the Shopping Cart BC Set One-step manager approval.
         If we did this, what would be the best way to incorporate the approval limit of a manager?
         Can this be simply achieved by setting the BBP_APPROVAL_LIMIT attribute in conjunction
                 with the One step manager approval?
         We want to avoid having to use the SLAPPROVER attribute due to the high level of
                 maintenance we currently experience.
    Thanks to anyone who can advise me.
    Claire

    Hello Clarie,
    this might help
    HR Data Synchronization (Org Unit, Position and Employee) to SRM
    Arshad

  • Cisco call manager integration with mediant

    How can we add and integrate mediant with cisco call manager ?
    Can you have doc for this kind of setup ?

    Hi Sachin,
    We do run a hybrid Callmanager to Nortel Meridian setup (works well).
    Here are some great docs;
    Cisco Unified CallManager
    Case Study: Nortel 61C PBX to Cisco IP Telephony Migration
    From this good doc;
    http://www.cisco.com/en/US/products/sw/voicesw/ps556/products_white_paper09186a00801115e0.shtml
    Nortel Meridian PBX and Cisco CallManager Integration
    http://www.cisco.com/en/US/products/sw/voicesw/ps556/products_configuration_example09186a008011888c.shtml
    Cisco Unified CallManager System Guide, Release 4.2(1)
    Cisco DPA Integration
    http://www.cisco.com/en/US/products/sw/voicesw/ps556/products_administration_guide_chapter09186a008055cd53.html
    Hope this helps! Let me know if you need additional info.
    Rob

Maybe you are looking for

  • Has anyone multiplexed 5 or more cameras?

    Has anyone setup a system using a lot of cameras? I have an application that will require either 5 or 9 cameras. Speed is not a critical factor (the part will not be moving) but I'd like the acquire rate to be on the order of at least a second or two

  • Can "recent items" in the Finder be chronological, not alphabetical?

    I'd like to display them chronologically (by last used) rather than alphabetically, since if you're looking for a recent item that would tend to be the way you'd look for it......isn't it? Is there any way to do this?

  • Please:How to repeat the return values multiple times in sapscript

    Currently my subroutine is returning a value called TOQBSSHB single time and i am working with standard layout called RFFOUS_C.Please can anybody tell me if i want to show multiple times TOQBSSHB for different values of VBLNR .Is it possible if it is

  • Which version of GarageBand for OS 10.2?

    I'm trying to help a friend who wants to install GarageBand on an old computer running OS 10.2. Which edition of iLife do we need to be looking for? I can't remember which one ran on 10.2.

  • Save Report before last Step

    I have a vi that I created that takes a Teststand Report, cleans it up and modifies it in several ways (including changing the filename and saving it on a server). The problem is that I must wait for Teststand to finish the sequence and save the repo