Super Bom

Hi,
Can any one give all the details like how to mainatin the BoM for the configuration material & other setting like creation of character type currency ,class, cration profile & info record
so the price flow automatically in the po depending upon selection of material
matter is most urgent
award point for correct reply
sudhir

hi,
Before you create a variant BOM, please note the following:
The material for which you want to create a variant of an existing BOM must not have a BOM.
The BOM of the material that you want to use to create a variant cannot be a multiple BOM.
The material whose BOM (variant BOM) you want to copy must have a BOM with the same usage as the one you selected for your new variant.
Does the BOM that you want to use to create a variant have a history requirement?
If so, which change number do you use? If you want to make the change with reference to an engineering change request (ECR), the ECR must first be converted to an engineering change order (ECO).
The base units of measure of the variant materials must be the same, because the BOMs base unit of measure must be the same as the base unit of measure in the material master record.
All the variants of one variant BOM form a BOM group. Within the BOM group, each item has a unique item ID. You can enter the same item ID for logically-related items, such as different versions of an item.
How to maintain the initial screen for creating a variant BOM:
From the bills of material menu, choose Material BOM -> Create.
You see the Create material BOM initial screen.
Enter the data for the variant BOM you want to create.
The material for which you want to create a variant of an existing BOM cannot have a BOM with the same usage in the selected plant.
u2013 In the Material field, enter the material for which you want to create a variant.
u2013 In the Plant field, enter the plant in which you want the variant to be valid.
The BOM that you want to use to create a variant must exist in this plant.
You can extend the area of validity of the BOM later on by using the Create plant allocation function.
u2013 Enter the Usage.
If a default parameter is defined for the Usage field in your user master, you see this value. Otherwise you see the usage that was last entered in this field.
When you select a usage, please note that the usage determines which item statuses you can set. This means that you can only maintain certain indicators (for example, relevant to production, relevant to costing) at item level.
The material that you want to use to create a new variant in the selected plant must already have a BOM with the usage that you enter here.
u2013 Do not make an entry in the Alternative field, for a variant BOM.
In a variant BOM, the alternative is not relevant to the user. The alternative is only required internally for storing the variant BOM. For this reason, if you do make an entry in the Alternative field, the system ignores your entry.
Enter the validity data for the variant BOM.
See also:
Maintaining the Create Material BOM Initial Screen:
If you create the variant with reference to a change number, the entire BOM group (this includes all variants of the variant BOM) has a history requirement.
This means that you can only change or extend the BOM if you enter a valid change number.
If you want to check the data you enter, choose Check entries.
Do not confirm your entries by choosing ENTER, because this creates a simple BOM.
How to select a variant BOM to copy:
If the data you entered on the initial screen is correct, choose Create variant of.
You see the Create variant of dialog box.
In the Material field, enter the material whose BOM you want to use to create a variant.
Confirm your entries.
The system makes a series of checks, for example:
The system checks whether a BOM already exists for this material. The system determines the values for the plant and usage from the data you entered for the new variant on the initial screen.
If no items are valid on the valid-from date you entered on the initial screen, you see the following warning message:
No items are valid on <valid-from date>
Confirm this message. You see the Quantities/long text header detail screen.
If your data is correct, you see the Copy from screen. This screen shows the items of the BOM you are copying.
Other more information inside it:
http://help.sap.com/erp2005_ehp_03/helpdata/EN/ea/e9b5aa4c7211d189520000e829fbbd/frameset.htm
Regards,
Priyanka.P
AWARD IF HELPFULL

Similar Messages

  • Super BOM doesn't generate while run MRP from Sales Order

    Hi all,
    I am trying to make a Super BOM
    where i have a material x as finished product, and i have 2 material as component for that finish product ( A and B )
    i already create characteristic and assign it to the class 300, i also have created the configuration profile for the finish goods material and the object dependencies selection condition type for those material component in the BOM Item,
    i also have check using simulation CU50 and the BOM is ok
    But when i try to create Sales Order, entry the characteristic and run the MRP using MD02, the Super BOM doesn't explode
    Is there anyone who can help to solve this problem??
    Regards,
    Marufat

    Hi,
    Does any planned order generated for the finished material? or you are talking about the components explosion?
    If all the answer is Yes, then check and maintain the 2 collective requirement in MRP4 tab for the components material master.
    And reprocess the MRP and check.
    Thanks
    Hrishi

  • Reg. Creation of Super BOM

    Hi all,
    Pls tell me how to create Super BOM.
    I am using ECC6.0
    My Requirement is i want supply a finished Product for Eg. Car which has many variants like Colour,Engine Type etc.,I have to create Variant BOM that is Super BOM for this Fin.Product Car.
    Here it is tedious for me to create all type of Variant materials in the material master.So By using Variant BOM my work will reduced by creating Finished Product car single item in the material master.
    But i am not fully clear about how to create this form the materail master to linking to the Super BOM.
    So pls. help me by sending me the Flow of this item from material master to Super BOM.
    Take the same Example.
    Regards,
    M.Badrinarain.

    Hi,
    1 Create characterstics in CT04.
      EX: colour(red, blue, green), engine etc., with characterstics value.
    2 Create class in CL02 with class type 300. And assign all characterstics in class.
       EX: car
    3 Creat object dependecy in Cu01.
       Assign the condition type.. it should consists of charater = 'char.val'
    4 Create material master with variant material type or create normal finished material and            activate material is configurable in basic data 2. Assign classification view with the type of 300.
    5 Assign configurable profile in CU41. for variant material
    6 In BOM assign variant and non variant material then for variant material assign object depency.
    Regards,
    S.Suresh.

  • Creation of super bom-- mrp run

    Dear Friends,
    i want to create one super bom for any fert.
    what i understand from super bom is that, it defines all possible components(bom data). when we require specific type of product, we have to consider some of the components relevant to the particular type of fert before proceeding to mrp.for this i need some clarification!
    i am giving small example....In cars blue and red colors are there. for this i have created  super bom through the t-code CS01 by considering two colors.
    what are the next steps(screen inputs required)involved to survive the purpose? some clarification on objects and its dependences,classes.
    can anybody tell the procedure involved in creating super BOM form material master to running mrp?
    thanks in advance

    Dear satheesh,
    Thanks for your reply I want some more clarification, which will be solve my problem.As per your explanation,i tried procedure,but i am unable to do the needful. I am facing the following problems in the following menus.
    when i went for creating configurable material in BASIC BATA 2---PLANT CM CONFIGURABLE filed is asking some reference material. how to go about it?
    AND IN MRP3---> PLANT CM CONFIGURABLE --- variant material and classes field are showing!
    I am familiar abt clasees and characteristics.but how to create variant class and items!
    can u please explain how to go about it? it will be very helpful for me to overcome my problem.
    I know abt clasees and characteristics,but how to create variant class and items?
    can i get ur e-mail id for further communication(if required.)
    Thanx Dosth.

  • I want to know about super bom

    dear exports
        i m working in  furniture company. my product is chair(kmat)  . bom for chair is three sfg and one raw material.in that one sfg (seat)  having three rms . one is seat cover and under seat cover they having fabric , leather. in fabric they having black , red colour. i m create seat cover as class and fabric as characteristic. black and red colour is value . so  but want to kow i m define this in bill of material plz  
    reply me.

    Hello Dear
    Create all the materials required for producing the Finished Product (FERT).
    You hv to create chair as finished product .
    you hv to create 3 semifinished product .
    create 3 raw materials and bill of material for the 1st SF with the 3 raw material As line item.
    then create Fabric and leather.
    you have to create Fabric black and Fabric red as raw material ...
    and this should be included in BOM as line items ..
    since the BOM contains aall the parts that are required for possible variants it is called Super BOM.
    The rest of the process in variant you have to follow .
    if u hv doubts please reply.
    Regards
    Rakesh

  • Super BOM in Variant configuration

    Hi SAP gurus,
    Can anyone tell me the difference between Variant configuration and Super BOM, if possible with an example.
    And also please forward any information on configuring the Super BOM.
    Thanks & regards,
    Praveen Kumar,
    [email protected]

    Hi,
      For super BOM u need to do do the following configurartion settings.
    1. For Min item pricing go to VOV7 and select TAQ , go to structure scope and keep B(Explode Multi BOM)
    2. then go to v0v4 do the settings
             OR ERLA TAQ
             OR NORM TAQ  TAE
             OR NORM  TAE   TAE
    3. Maintain the records in CS01.
    Regards,
    Sree

  • Super BOM for not KMAT materials

    Hi Gurus
    I have a client requirement to maintain the BOM for finished product as a Super BOM even though the material is not KMAT material. Super BOM has got KIT materials. Based on this customer requirement only certain materials which goes in to finished product are get selected and should check the availbility of those components and it should create a planned orders and purchase reqn After MRP run.
    My question is how the KIT materials are maintained in BOM?
    how the materials get selected while creating a Sales order w/o usinf Variant configuration?
    Does all the super BOM materials get consumed after the production confirmation?
    Quantum.

    Hi,
    What do you mean by KIT materials.
    By the way you can still maintain material as Configurable w/o selecting material type as KMAT.
    Just you need to do is select material type  FERT / HALB as applicable and then maintain material is configurable check box ticked in Basic Data 2 View in material master.
    Pls revert with more details.
    Regards,
    Tejas

  • Fields for Super BOM, Work Center & Super Routing for Variant Config

    hi! gurus,
    Please can you give me mandatory fields & values for Super BOM, Work Center & Super Routing for Variant Config
    thank you

    Hi,
    In the Super BOM you need to maintain the object dependencies.
    Workcenter fields are as usual for other production processes.
    Also you can use search option in the forum to view the threads posted in the past. There are many posts related to variant configuration.
    Regards,
    Senthilkumar

  • Configurable Material and Super BOM

    Hi All !
    Can anybody help me out to construct a Super BOM (starting from pre-requisites) to be done from Material master for the same.
    Regards,
    Srinivasan

    Use Material Type KMAT only for the Configurable material and not for all the comps.
    Following are the steps for creating varient configuration.
    1 Create a material master
    Material type: KMAT (or) check the indicator material is configurable in Basic Data 2
    2 Create Characteristic (CT04)
    3 Create Class (CL02) class type 300 (variant) & assign the characteristic to the class
    4 Assign this class in the Classification view of the material master & save the material.
    5 Create a configurable profile (CU41) for the material
    6.Basic data 1: Gen Itm cat grp (0002) configuration
    7Now while creating the super BOM, use the same Tcode CS01, in the item categary enter 200 and the item details assign it to the KMAT.
    If you can send yr mail ID I can send you the file on CAMSHOW.
    Regds,
    Umesh

  • Super BOM creation

    hi can someone tell me how to create and utilize super BOM(step by step process in img and easy access) its very urgent for me.

    hi
    check this link
    <a href="http://help.sap.com/saphelp_erp2005/helpdata/en/92/58c0fb417011d189ec0000e81ddfac/frameset.htm">SUPER BOM</a>
    BILL OF MATERIAL
    The Material Ordered, Delivered and Billed consists of one or Several Components.
    These components are called as Bill Of Materials
    The Material Ordered by the Customer is referred as Main Item or Higher Level item. The Components are referred as Sub-items.
    When we enter the Main-item in the Sales documents, the Components are automatically determined and this is called as expansion of Bill Of Materials.
    In SD, we treat the processing of Boms in two ways.
    Processing at Main-item.
    Processing at the Sub-item
    The Processing in both cases is controlled by the Item Categories and Schedule line Categories.
    Step: 1
    Prepare the Martial Master for all the Materials, which is main-item and Sub-item.
    In the Material Master, the Item Category group of the Main-item is important.
    We need to Maintain the item category group for the Main-items and sub-items as follows.
    Scenario Main-Item Sub-Item
    Processing at ERLA NORM
    Main-item level
    Processing at LUMF NORM
    Sub-items
    Item Category TAQ TAE
    Schedule line CP CT
    Category
    Step: 2
    Let us take Computer as a Bom. It has Varies parts like Mouse, keyboard, Motherboard, Ram, CPU.
    Let us take Computer has the main-item, and sub-item as the rest.
    Prepare Material Master. We have to Prepare Material Master for Main-item and Sub-items.
    T-Code: MM01
    First Prepare for Computer which is the Main-item.
    In Sales: General/Plant. Maintain ERLA in the Item Category Group
    Then Create and Save the Material Master
    Step: 3
    Create Material Master for the Sub-item. That is for Keyboard, Mouse,
    Motherboard, Ram & CPU.
    In Sales: General/Plant. Maintain NORM in the Item Category Group
    Similarly Create Material Master for the rest of the Sub-item and SAVE.
    Step: 4
    Create Material Bom.
    T-Code: CS01
    Enter the Details
    Material no: xxxxxx
    Plant: xxxxxx
    Bom Usage: 5
    Then Enter
    Step: 4A
    A screen will pop-up. Enter the details of Components such as:
    Mouse , keyboard, Motherboard, Ram etc, in the screen
    Then SAVE
    Step: 5
    Create Condition Record.
    T-Code: VK11
    Maintain Pricing for only the Main-item.
    Maintain Pricing only for Main-item.
    Thas is Computer.
    Then SAVE
    Step: 6
    Create Sales Order
    T-Code: VA01
    Enter only the Main-item.
    Then ENTER
    Step: 7
    The Bom Explodes
    Bom Explodes with the Sub-item.
    Pricing is done only for the Main-item.
    Then SAVE
    Step: 8
    Create Delivery
    T-Code: VL01N
    Picking is happening only for the Main-item and not the sub-item
    Then SAVE
    Then do billing.

  • How to set up the inspection plan for the material in super BOM

    Hello,
    how to get the accurate inspection plan of the IQC for the material which was class item in a super BOM?
    I've gotten the characteristic value from the sales order, and get the PO after MPR. The problem is how to specify the target value and the range of inspection characteristic in inspection plan, because the value is temporary?
    Thanks!
    Lin

    Hello,
    I think you need to create MIC which linked with the configuration characteristic, and specify "inspection by configuration" for the inspection type.
    then the configuration value in the sales order can be transfered to the inspection lot when production released or goods receipts if you use inspection type 03 or 04. that means the value range for the MIC will be determined dynamically for each sales order.
    Regards, Winnie

  • Create a Super BOM

    Hi,
    we require to create a super Bom in Varient Configuration scenario.
    i just want to know how to create a super bom? ( t. code )
    i have not tried by cs01, please answer.
    thanks in advance,
    Rasika

    Dear,
    Super BOM is nothing but a collection of all the possible components which can make a particular material. You can can simply use transaction CS01 to make Super BOM here you need to assign your object dependency.
    Please refer  this thread for details,
    super bom.
    Regards,
    R.Brahmankar

  • Difference between varient configuration and super bom

    hi gurus
    i want to know the difference between varient configuration and super bom??
    i think as per my knowledge it is same.
    but my friend says  both are different.
    award points
    enjoy

    hi,
    Variant Configuration : You do not need to create a separate material for each variant of a product in your company. You can use one configurable material to cover all variants. You create a super BOM and a super routing for this material, containing all the components and operations for producing all variants of the product.
    Super BOM : The bill of material (BOM) of a configurable material contains all the components that are required to manufacture the material. The BOM contains components that are only used in specific variants (variant parts), as well as components that are used in all variants (non-variable parts).
    <b>This is why BOMs for configurable materials are known as super BOMs.</b>
    Thanks
    Sadhu Kishore

  • Super BOM, Multi BOM configurations

    Sir,
    how configure Super BOM, and Multi BOM please provide me the configuration settings to do practise in my home PC.
    Thank u

    Hi Supraja Bolli
    BILL OF MATERIAL
    The Material Ordered, Delivered and Billed consists of one or Several Components.
    These components are called as Bill Of Materials
    The Material Ordered by the Customer is referred as Main Item or Higher Level item. The Components are referred as Sub-items.
    When we enter the Main-item in the Sales documents, the Components are automatically determined and this is called as expansion of Bill Of Materials.
    In SD, we treat the processing of Boms in two ways.
         Processing at Main-item.
         Processing at the Sub-item
    The Processing in both cases is controlled by the Item Categories and Schedule line Categories.
    Step: 1
       Prepare the Martial Master for all the Materials, which is main-item and Sub-item.
    In the Material Master, the Item Category group of the Main-item is important.
    We need to Maintain the item category group for the Main-items and sub-items as follows.
    Scenario               Main-Item                    Sub-Item
    Processing at               ERLA                         NORM
    Main-item level
    Processing at               LUMF                         NORM
    Sub-items
    Item Category               TAQ                         TAE
    Schedule line               CP                         CT
    Category
    Step: 2
    Let us take Computer as a Bom. It has Varies parts like Mouse, keyboard, Motherboard, Ram, CPU.
    Let us take Computer has the main-item, and sub-item as the rest.
    Prepare Material Master. We have to Prepare Material Master for Main-item and Sub-items.
    T-Code: MM01
    First Prepare for Computer which is the Main-item.
    In Sales: General/Plant. Maintain ERLA in the Item Category Group
    Then Create and Save the Material Master
    Step: 3
    Create Material Master for the Sub-item. That is for Keyboard, Mouse,
    Motherboard, Ram & CPU.
    In Sales: General/Plant. Maintain NORM in the Item Category Group
    Similarly Create Material Master for the rest of the Sub-item and SAVE.
    Step: 4
      Create Material Bom.
    T-Code: CS01
    Enter the Details
    Material no: xxxxxx
    Plant: xxxxxx
    Bom Usage: 5
    Then Enter
    Step: 4A
    A screen will pop-up. Enter the details of Components such as:
    Mouse , keyboard, Motherboard, Ram etc, in the screen
    Then SAVE
    Step: 5
    Create Condition Record.
    T-Code: VK11
    Maintain Pricing for only the Main-item.
    Maintain Pricing only for Main-item.
    Thas is Computer.
    Then SAVE
    Step: 6
      Create Sales Order
    T-Code: VA01
    Enter only the Main-item.
    Then ENTER
    Step: 7
    The Bom Explodes
    Bom Explodes with the Sub-item.
    Pricing is done only for the Main-item.
    Then SAVE
    Step: 8
    Create Delivery
    T-Code: VL01N
    Picking is happening only for the Main-item and not the sub-item
    Then SAVE
    Then do billing.
    Reward if helpful to u

  • What is super BOM

    Why bill of material for configurable material is called super BOM, Please give a example.

    Hi,
    The bill of material (BOM) of a configurable material contains all the components that are required to manufacture the material. The BOM contains components that are only used in specific variants (variant parts), as well as components that are used in all variants (non-variable parts).
    This is why BOMs for configurable materials are known as super BOMs.
    Features
    When you maintain BOMs for configurable materials, there are additional functions:
    You can assign object dependencies to the BOM items for a configurable material.
    You can assign the following dependency types to BOM items:
    Selection conditions
    To ensure that variant parts are selected when they are needed in a variant, you assign selection conditions to the variant parts.
    See Selection Conditions and Selection Conditions for a BOM Item and Operation
    Procedures (actions)
    You can use procedures and actions to change field values in a BOM item, such as the component quantity.
    See Reference Characteristics in Dependencies and Master Data References in Bills of Material
    You can use classes as BOM items for configurable materials, as well as the other types of component. When you configure the material, the characteristic values you assign can trigger the replacement of the class by a material or a document that is classified in the class. You can use a class item instead of using several BOM items with selection conditions.
    You can use the classification data of a material or document as a selection condition.
    The BOM can contain components that are configurable materials. These configurable materials have item category N (non-stock material).
    Please reward if helpful.
    Thanks & Regards
    Sadhu Kishore

Maybe you are looking for

  • Doom 3 universal patch on MBP

    after i got my MBP i installed doom 3. to my stupidity, i opened to play it and it was laggy, forgetting it needed a universal patch. i went and downloaded the patch and when i open it to install it everything locks up except the mouse. meaning if i

  • Photoshop Elements 11 won't open

    Just downloaded PSE11; can't get it to open. Desktop icon does nothing; starting it from the .exe file gets things going, but when it reaches the 'initializing' phase, up pops an error message: "Adobe Photoshop Elements 11 has stopped working. A prob

  • How can I get new tabs to appear blank instead of with a Yahoo search page?

    Previously when I would open a new tab on Firefox, I would get a blank page, which loaded fast. Then I could go to whatever page I wanted. It was great. Now when I open a new tab, I get a Yahoo search page. It loads slowly, and I never use Yahoo. I p

  • How do I get out of "full screen" view?

    How do I get iTunes out of the "full screen" view?

  • Creating HELP in application

    I have a form where certain fields are required. These fields appear as links. When I place the mouse over the name of the required field, a question mark appears. When I click on the label, another window opens and says there is no help for this fie