Third party scenerio
Hello,
My client is using ECC 6.0, were in there is a thirdparty scenerio for which once a sales order is created the generation of PR is done automatically by the system. With respect to this PR a PO is created for the same.
Now the query is
Suppose a sales order is created with a line item having 100 quantity, for which a PR of 100 quantity is created automatically. Once the PR is created with respect to that PR a PO is created for the same 100 quantity. Now once that is done is there any standard setting available is SAP were the order quantity cannot be changes once a PO is generated
Awating your reply
Thanks & Regards,
Nitesh Joshi
Hi Nitesh,
Once PO generated and done subsequent activities system will not allow you to change the qty in sales document. If you try to increase standard error message displays as " Schedule line is already ordered - you need to create a new schedule line".
Not required to make any changes.
regards
Jagan
Edited by: Jagan Mohan on Mar 17, 2011 1:02 PM
Edited by: Jagan Mohan on Mar 17, 2011 1:05 PM
Similar Messages
-
Billing in Third Party Scenerio
Hi All,
I completed the complete cycle for third party process.While i am trying to do billing for Third Party Scenerio, i getting a warning message "No Billing quantity has been determined".If i ignore it, i am able to create the billing.But the issue is that we are using a user-exit in billing.Because of the above message, User-exit fails.I want to aviod the error. Please guide me.
With Regards
Vinu.NThis error occur b'coz of two possibilities:
1) Check your billing relevance in Item Cat (VOV7) in your THIRD PARTY process or sales order. It should be F.
2) IR - Invoice receipt (MIRO) should have been completed before you raise a sales invoice.
+If you don't want IR to happen before raising sales invoice, select a relevant Billing relevance for your process Item Cat. +
Hope this can assist you.
Thanks & Regards
JP -
Third Party Scenerio - No Invoice - Only proforma Invoice
Hi,
We have a scenerio where we will create a order for Free of cost with third party scenerio.Then we want to create only proforma Invoice with reference to Order.Invoice is not needed.
Please let me know how to achieve this using standard SAP.
With Regards
Vinu Nanjan.If you follow standard.
- Maintain ZTNN (TP Free of cost) - with reference to std I Cat TANN, where maintain Billing Relevance as F.
- Determine (VOV5) sch line CS for I Cat ZTNN.
- According maintain/check copying control for ZTNN for your doc (VTFA)
Rest as same as normal & std Third Party [Config & Process|http://wiki.sdn.sap.com/wiki/display/ERPLO/PROCEDURETOCREATETHIRDPARTY+SALES|Guide to Config & Process in Third Party Sales].
If require or based on your client make necessary modification/alteration in your business process flow.
Hope this can assist you.
Thanks & Regards
JP -
HI SD Gurus,
I would like to know the process (mainly the list of documents), how is followed for Third party order processing in Indian scenerio.
When the vendor is supplying the goods to the customer, what are all the documents needs to be carried along with the consignment?
When the Business raising Invoice to customer, what are all the documents needs to be sent to customer?
In particularly, who will pay excise duty and sales tax etc,.
Expecting your valuable response.
In case, if you need more clarity, please feel free to ask me...
Regards,
ManiHi Swamy & SD Gurus,
Let me explain more on my question.
In Third party order processing, Vendor is supplying the goods to Customer on behalf of Business. Here is my doubts :-
1) What are all the documents to be sent to Customer by the Vendor?
2) Who will pay the excise duty (Whether the Vendor or Business)? (as per my knowledge, Excise duty is on Manufacuruing)
3) Who will pay the Sales Tax? (to my knowledge Sales Tax is only at the time of Sales) - In this case, whether the sales tax is applicable or not
When the Business sends the Invocie to cutomer -
1) What are all the document will be sent to customer by Business?
2) When Business raises the Invoice to customer, how is Pricing , Excise duty, Sales Tax are calculated?
Here I don't like to know the setting in SAP (however this is later stage), at least, would like to know the business process...
Hope you understand the questions......
Thank you
Regards,
Mani -
How to integrate single sign on with third party system
we are in the process of implementing istore application. we already have home grown isupport application to contact support personnal for any issues. Now we are wondering how do we integrate oracle applications single sign on with our third pary system. Is there any recommendation provided by oracle to achieve the same.
We too are in the process of implementing iStore with SSO features.
And if you believe me it seems to me as nightmare.
In our scenerio we are intgrating this SSO with Third party access control too (AD and Siteminder). I would request you to please respond me on the following mail id , so we can share our experince which will help us in our implementation
[email protected]
regards and thanks in advance
Vikas Deep -
Diff b/w standard PO and third party PO
hi can anyone explain me the differences between standard PO and third party PO? how does the screen shots vary b/w each other.
tks in advance..under stand the scenerio
sd pepole has recived a sales order for material x
but in the sales order they have mentined the item category as TAS so by doing this the moment they save the sales order system will genrate a requisiton automatically with the account assignement category as third party so now it is th ejob of the mm pepole to convert that pr into po and that po is know as the third party po and when u do the dummy gr for this po then system will nto ask for the sloc as there is no stock updation for the po -
Account Postings in Third Party Purchase Orders
Hi All
Please explain the Accounting Docs generation in Third Party
Purchase Orders in the following scenerios.
1. Purchase Order created against Sales Order and goods to be delivered to Customer.
2. Goods to be To be delivered to another vendor
3. Goods to be delivered to the another address(diferent from plant address).
Thanks ,
TausifHi,
For 1. Previous answer is correct.
For 2. Goods to be To be delivered to another vendor
So vendor become customer, so the postings as in Case .1
(I think you the diff.between vendor & customer).
For 3. Goods to be delivered to the another address(diferent from plant address).
Whatever the address, the FI documents generated are same, The bill/Invoice from the Company send to the Billing address as mentioned by customer.
I think you get clear idea.
Regards -
Dear QM Gurus,
Here is a scenerio in Quality inspection.
during the manufacturing at some stages inspection is required but this inspection is not performed by my client...they consult with third party and third party do this inspection and submits the report.for this type of inspection they manage the cost incurred also (b/c third party charge price for inspection).
how to map this scenario in SAP? does any can give any idea?
RegardsHi'
This is possible by customizing a Notification called "Customer Inspection".
You can trigger this inspection manually & Process the same by customers feedback.All the document related to inspection you can maintain here.
Also other option is that you can do Inspection by Inspection type 89.
You will have to manually create the inspection lot.
This will give you list of all lots for customer inspection in QA32.
Regards
Sujit -
Dear SAP Guru's,
The Situation is for Third party order item : Cat TAS
When I am doing the order saving due to credit check the system is not allowing to create the PR and the order cannot be saved before the releasing of the credit check.
I want the credit check to happen but at the same time it should not block from the PR to be created.
Let the delivery get blocked for the failed credit ckeck but the PR creation should not Stop.
How can I configure the same scenerio.
regards,
SAP SDHi,
What I meant was, the PR would have been created when the sales order was saved. There is no need to create PR manually as this does not come under standard third party order processing.
In one of my previous projects, while working in a similar scenario, I got a popup upon saving the sales order which states that the order may be edited or saved. There was also an information that the order was under credit check. Then we saved the order and try to late the PR # through the path - Item - Schedule lines - Procurement; but we were unable to find the same.
Subsequently after releasing the credit thru VKM3 for that sale order, we followed the same above specified menupath and were able to locate the PR#.
Please check now and confirm.
Regards,
Zahid -
Hello,
Could any one give me a pdf document which has detailed information about consignments and third party processing, I tried in help.sap, but did not have any luck, it would be great if someone can provide me pdf files..
ThanksHello Raj,
In third-party order processing, your company does not deliver the items requested by a customer. Instead, you pass the order along to a third-party vendor who then ships the goods directly to the customer and bills you.
In this scenario, the shipping notification received is entered as a dummy goods receipt in consumption. This allows you to create the customer invoice before the incoming invoice is received from the vendor.
Check this link: <a href="http://help.sap.com/bp_blv1470/BL_US/index.htm">Best Practices</a> and navigate to Building block library-baseline package-third party w/wo Shipping notification for scenerios and building blocks to set-up the same in SAP.
Also, check these links:
http://help.sap.com/bestpractices/BBLibrary/Documentation/J54_BPP_EN_US.doc
http://help.sap.com/bestpractices/BBLibrary/Documentation/J54_BB_ConfigGuide_EN_US.doc
http://help.sap.com/bestpractices/BBLibrary/Documentation/J54_Scen_Overview_EN_US.ppt
Regards
Gauravjit.
Reward points if the documents are helpful -
Logical GR in Third Party Process
Hi Friends
There is logical GR involved in third party process. What if we do not want to trigger it?very useful thraed for your Qn-
[stock not updating after doing MIGO (gr) for third party sales |stock not updating after doing MIGO (gr) for third party sales;
BR
Raj -
Hi..
Please send me configuration steps of Free Goods in Third Party..
Thanks in Advance
ShriniwasFree goods cannot be used in make-to-order production, third-party order processing and scheduling agreements.
This is the Limitation of setting up free goods
Cheers -
Automatic po creation third party order
Hello Gurus,
In case of automatic po creation from third party order we have attach purchase organization and vendor to sales organization. This restrict only one vendor against sales organization.
Is any BADI available which we can use which to change vedor dynamically ?
Best Regards,
VasantDear Vasant,
For automatic PO at the time of GR following are the prerequisites:
1) In Customizing
a) Auto PO generation must be activated in Mov. Type 101 & 161
b) the plant for which GR is entered must be assigned to standard Pur. Org.
c) Default Document type for PO must be specified in GR ( MB 01)
2) Application - Front end side
a) material must be valuated material
b) Purchasing Info record must exist for vendor , material & standard Pur Org.
c) Conditions in Info Records must be valid.
d) Applicable for stock items & not consumable items
e) you cannot enter any movement in GR block stock
f) Material Master & vendor master records must.
If you ensure all above settings then it is possible to have auto PO during GR.
Please try,
Vivek -
Stock is increased and FI entry is posted in statistical GR for third party
Hello
I was trying to activate the functionalty for statistical GR in third party but STUCK due to following issues. For enabling this functionaltity I have checked "Goods Reciept" and "GR Non-Valuated" check in "Delivery tab" of PO.
1. After creating Statistical GR through MIGO (101), stock has been posted in plant. I was expecting no movement in Stock .
2. I was hoping there should not be in FI posting but FI entry is posted through statistical GR .
We are using third party process from many years but without statistical GR. Requirement from client is to post statistical GR without FI entry and no stock should be updated. Please advise if anyone has idea on this.
FYI--We have item category TAS and schedule line category CS in customisation. Also advise if above two settings in PO are enought to turn ON the statistical GR functionality.
Thanks for your help.
Regards
ArvindThanks AKPT for reply
As advised , pleae find enclosed screens for OMS2, PO and FI entry. FI entry might be wrong as while posting MIGO ..I was getting error "WE etnry is missing in table YFTFI_SUBST236 and I maintained some dummy GL accounts.
Regards
Arvind -
Goods return from customer in third party business process
hi all sd gurus
here I ve adoubt regarding returns in third party business process query is how a customer send his foulty goods n how he gets his credit note plz explain eleborately plz help me out
thankx in advance
santoshIt has not been addressed in standard SAP. For further detais, go through Note 751609 - Returns for third-party process (cancellation)
thanks
G. Lakshmipathi
Maybe you are looking for
-
i have usb 2.0 but not a high power usb 2.0. can i use the new ipod 5th generation on it to transfer songs music and videos.
-
New G510 with Win 8.1 - no bluetooth
I just bought a Lenovo G510 with Windows 8.1 pre-installed. I couldn't find the bluetooth device and looked in Device Manager - no bluetooth device is in there. The Network card Hardware ID indicates a Broadcom BCM4313, which supposedly has Bluetooth
-
Exits in the function module - SO_OBJECT_SEND
Hi, As per my requirement, I need to add a common line to the body of the E-mail that is sent via the function module SO_OBJECT_SEND. So please let me know if any Exit/BADI exists that I can use to modify the body of the E-mail. Thanks & Regargs, Mad
-
Communication Channel Monitoring not showing up Communication Channels
Hi All, PI 7.1 : I have created Communication Channel using File Adapter in ID and activated it. Adapter engine is Central Adapter Engine. But in Runtime Workbench I am not able to see communication channels created under Component Monitoring -> Ada
-
Hi I import one ParProject zip to NWDS n Wher can i change for Costamized for myself. this is first time i used Par files i dont know nothing about implementing par files so send me any details for implementing par files. thanks & Regards Narayan