I have created a requisition for 80,000 KG of a tolling material. When converting the requisition into a purchase order, one of the components of the material goes from 45,881.875 KG to 45,881.874 KG, resulting in an overall amount of 79,999.999 KG and a mismatch between my requisition and purchase order.
I have checked the rounding profiles in the MRP 1 view for all the materials, and each is set to 1.000 KG. Why is this material component rounding down?
Thanks.

so the reduced order quantity is not caused by an component that goes down. it is actually the other way around.
SAP converts the Kg from the requisition into LB in the PO.
And rounds the decimals.
Using this as basis then for the components.
The leading unit is now the order unit, which is LB. whenever you look at a oder  quantity in KG, then SAP converts the LB quantity back into KG, which causes again a rounding issue.
That is one of the problems when the base unit is not the smallest unit.

Similar Messages

  • Update Material Availability dates during order creation

    Hi,
    We have a requirement to update the material availability in the schedule lines of the order when the order is being created.
    We want the update to happen after the sales order is in the Data base. We tried calling a Function module in Update task. The function module is written in the EXIT_SAVE_DOCUMENT form of sales order user exit.
    The FM is getting called on the commit work , but not updating the sales order. We are getting an error " Material availability date should be less than load date". On debugging we noted that the SD_SALES_SCHEDULE_MAINTAIN is called with a load date of 00/00/0000 since the sales order is not in DB.
    Is there a way to call the FM after the sales order is in the database.
    Regards,
    Prabaharan G

    Worked using the enhancement framework development

  • COR2- Process order material  quantity change

    Hi, I want to change the material quantity of process order with COR2 transaction, could you plese help me out in finding the bapi or function module which will be relevent.

    I have done it through BDC recording, change on first line, then upload using bdc from 2nd line.

  • Sub-Contracting material Issued to Vendor and balance to be Issud

    Hi,
    Sub-Contracting material Issued to Vendor and balance to be issued against the Sub-contracting Purchase Order.
    Please suggest T.Code for the same.  (Same Like ME2O, but PO number should be an input parameter)
    For example I have Created PO with header Material for 1 quantity which having one child item and qty say 20 numbers, and issued child material to vendor 10 numbers (541) and balance is to be issued to vendor is 10 numbers, now I want a report which gives PO number, Header item with qty, total requirement of qty for the child item with line item number, issued child item with qty and balance to be issued child item with qty.
    Thanks
    Ramesh.G

    Report MB51 is there. Here you have to input your Purchase order number and execute but, it will show only material issued to subcontractor through 541. It will not show the balance quantities.
    And there is no such standard report which will show information how much issued to subcontractor and how much is balance based on Purchase order.
    You can develop a z report with the help of abaper.

  • Capture re pricing during order creation/change

    Hi,
    I have to differentiate between standard pricing and re-pricing ( when user has pressed update button on the conditions tab ) in a sales order.
    How and where can i get this information during order creation / change.
    Thanks for your replies.
    Abhishek

    hi,
    KALSM is the pricing procedure and it will be same for the document during creation and re-pricing, how dose it help in determining if user pressed update button.
    Thanks,
    Abhishek

  • Manual selection production version during order creation

    hello!
    i have setup production orders that during order creation the production version has to be selected manually. this works fine in CO01 and CO40. but in CO41 the production version is determined automatically - where would i change that setting?
    best regards,
    matthias

    Dear Matthias,
    In my understanding it is not possible in standard SAP.
    If you have manual selection of production version and if you have set the BOM selection method as 2 in
    MRP 4 view of the material master then,
    1.If you create a production order manually then the system displays the pop up to select a production
    version.
    2.If you are converting the planned order into a production order then it picks up the one which is
    present in the planned order.So obviously if 2 production versions are there with same lot size and
    validity dates,then the system picksup the first one only during MRP run.
    Even if it picks up the first prod.version in planned order,but while converting click on master data and
    change the production version if required.
    3.Otherwise what you can do is set the production version in MD61 itself ,so that its going to be
    considered during MRP run and same will be included in the planned order.
    Check and revert back.
    Regards
    Mangalraj.S

  • How to restrict changes of material quantity in Maintenance Order

    Hi Expert,
    How can i restrict the user to change the material and quantity in the Order's components tab.(IW32) Eg, not allow changes after RELEASE.
    Can the system keep track on all the changes for material number and quantity in the Orders?
    Please Advise
    Thank You
    Best Regards

    Hi,
        Better way is grey that tab after releasing the MO .. try BADI ;-IWO1_SCREEN_MODIFY Field Content and Display Modification
    You can also explore User exit ;-PPCO0023 : Check Changes to Order Components
    FM ;- STATUS_READ
    regards
    pushpa

  • Report For Sub Contract Material

    Dear Experts,
    Is there any standard report for finding the details of the subcontract.
    I tried through ME2O, MBLB where I am not getting the report I wanted.
    I want to take a montly report for all the subcontract work given to the vendor. (The work is completed )
    Please help. Thanks

    Thanks,
    In ME2L I am able to get the details, but the problem is;
    I want to get a report which will give me the full details of the Sub COntract PO.
    Example. I created a Sub COntract PO for Fineshed Material A. For makng Material A I need to supply Material B, Material C to the Sub Contract Vendor.
    I want to know by the end of the month
    1) The Subcontract PO
    2) Final Material (Material A)
    3) Raw materials Supplied to vendor (Material B & Material C)
    4) Status of the order
    5) Material A given back to me
    6) remaining Material (Material A)
    Please help.

  • Pricing Error in Sub Contracting Material

    Dear Experts,
    We are executing monthly costing run on plant level. There are some sub contracting materials system issues a message that '' No Price found'' while there is standard price maintained in materials master. what could be possible reason...Please suggest.....
    Regards,
    waqas

    Dear Umar,
    Thanks for your support,
    I went through this post before posting my question. I know  SCN Rules not new to SCN . The solutions suggested in the post are not feasible for my problem. I already tested this. All Master Data exists in my case on CO PP and MM side.
    Please suggest the solution if u know!
    Thanks...........

  • Quantity change in Order related Billing

    Dear All,
    I have a scenario where i am crating a invoice and partially invoiceing the customer.
    Following can be example
    Order quantity : 10 unit
    Invoice1 quantity : 3 unit
    Invoice2 quantity : 5 unit
    Invoice3 quantity : 2 unit
    I have created order for 10 unit and after few days i have invoice1 for 3 unit.
    But when i am invoicing2 for the 5 units, the system does not allow me to invoice. It comes with the massage as follow:
    " Document 123 does not contains any open quantitys"
    But the fact is that i have invoiced only 3 unit of the ordered 10 units.
    Following are the configuration that i am using
    Billing relevence 'C' status according to target quantity.
    In copying control from OR to F1 I am using billing quantity as A Order quantity less invoice quantity.
    In copying control Data VBRK/VBRP as 007 Inv split (rec and del).
    I have checked in the forum and dose not found any relevent answer.
    Please help me in this scenario.
    Ram
    Edited by: suhas.ram on Nov 30, 2011 7:47 AM

    Dear All,
    I got the answer, the setting should be as follows
    Billing relevence B
    Completion rule B
    relevent for pricing
    and other configuration talked in question.
    Thanks to all who try to answer the query.
    Ram

  • How to update condition value using e1edp05 segment during order creation

    Hi,
    I have a requirement where I need to update the item level condition value (komv-kbeter)  to the condition type (komv-kschl) from the incoming idocs (orders05).
    But  the same is configured  in such a way to populate automatically with the default condition value zero during the order creation level using VA01 at condition tab.
    I am able to populate condition values from incoming idoc using segment E1EDP05 which is good, but it was getting created as new entry with the same condition type  instead of updating the condition value to the existing condition type(which got populated from automatically from configuration) .
    So I want to restrict to one entry instead of two with same condition type. Is there any userexit/gap to restrict automatic population of condition type thru programming or to update with idoc (orders05) value rather than inserting as new row?
    My client doesn’t want to restrict the pricing automation from configuration. So I have to handle through programming level.
    Your  inputs are appreciated

    It doesn't really matter if it's a credit/debit memo, it's the same transaction anyway and pretty much the same functionality. What is your requirement exactly? Do you always have to override the price from Siebel or, let's say, some price is automatically proposed and you might or might not need to override it?
    We use a custom (Z..) condition for price override. When a material is entered in VA01, some price (condition PR00, for example) is assigned automatically. Then, let's say, a special price has been negotiated with this customer just for this purchase. So the user goes into Conditions, types in condition code Z... and types in the new price. This basically annuls the previous PR00 condition. I'm not a functional consultant and can't give you all the config details, but your SD person should be able to help.
    I'm still positive that conditions cannot be removed or changed by IDoc. One thing I would suggest for your situation: do not create ZCD2 condition initially and then just add ZCD2 condition when you receive the data from Siebel. Otherwise it seems that you would have to write a user exit or a requirement to deal with the duplicate conditions.

  • Storage bin Type Change during TO creation

    Hi friends
    Is it possible to change Storage Bin type (Not Storage bin no)during Transfer Order (TO) creation in LT06 / LT04 ? If so please let em know the procedure to bring storage bin type during TO creation.
    Please confirm
    Rgds
    Madhavan

    Hi,
    Please check and try to define Storage Bin Type (SPRO->LE->master data->storage bins), then activate  Storage Bin type search strategy in OMM1.as appropriate. (in my past experience system given priority to Storage type search and then to Storage BIn type search during picking- I am not sure whether this is the SAP logic or priority).
    Once you define and assing the Storage bin type to Bins this will be available during creation of TO.
    Hope this helps.
    Thx
    MJ

  • Production Order Number and Batch Number same during order creation

    Hi All,
    I wanted to keep the Production Order number and Batch Number same during creation.
    How I can do that during creation of order only. So during creation same number to be get assigned automatically in the background.
    One thing I can maintain ; the same number range for both.
    But how to activate other functionality.
    Regards,
    Amit

    Hi SAP2511,
    For Production order-
    1.You can define a Order type  and  Mantain the number range same as batch number range (in  OPJH transction)
    For Batch
    1.Activate Automatic internal batch assignment - (OMCZ)
    2.Number range for batch - for object - BATCH_CLT - (OMAD)
    For batch creation at time of Order creation -
    You can create Automatic batch at the time of order creation or order release
    1 Create Production scheduler Profile(OPKP) and assign in Work scheduling view of material master for which you want to create batch at the time of order creation or release.(Select automatic batch creation at the time of release or creation in OPKP)
    Things to be taken care -
    1 . What if you set deleation flag for order?
    Regards
    Girish
    Edited by: girish khobare on Aug 20, 2010 9:31 AM

  • Delivery Quantity change during creation of Delivery Document

    Hi Friends,
       I have a requirement of creating a Partial delivery when not much stock is available.
       For this I am using a BADI 'LE_SHP_DELIVERY_PROC' method Save_Document_Prepare.
       I am changing the contents of CT_XLIPS-lfimg in the method and also keeping UPDKZ as 'I', but still
       the quantity is not changing.
    Pls Suggest.
    Arpit

    Check, "Outline agreement message" in Document type details in VOV8- (eg: CQ- Quantity Contract) under Transaction flow view.
    Use Indicator:A- Check at Header level.
    Then system pop ups the message saying " Already Contract is open for this Customer" - ( Assume, SOld to party already have Open Contract)
    similarly, for Material, for this you should use  Indicator" B- Check at Item Level.
    Hope it helps

  • Sub contracting material is returned without the activity carried out

    Dear Friends,
    I have a one doubt which I need to clarify.
    I have supplied some material to subcontracting vendor. The vendor processes some of them & sends back the finished product. Some of the material is returned back without being processed.
    Step1- S/C PO created (Finished Product X, Component-Y)
    To produce 10 X , Y required is 100
    Step2- MB1B(541) for 100 of Y
    Step3- J1IF01 created with reference to MB1B document for 100
    Step3- But vendor supplies 5 quantities & 60 components are consumed. So GR done for 5 nos. 40 components are returned back without being processed.
    Step4-  J1IFQ
    Then reconciliation  is being done with respect to the GR document for 60 components. Still the challan is open.
    Step5- Then in MB1B I did 542 for the 40 quantities.
               Then in J1IFQ I reconciled 40 quantities with 
                reference to 542 material document.
    I want to know wheather this method is correct or not.
    The problem I am facing is,
    1) During reconciling the 40 quantities with reference to 542 material doc it is showing 2 line items each with 40 quantities in J1IFQ. But the open quantity is showing 40 only.
    2) While completing the challan in J1IF13 , It is giving run time error(Dump).
    R Panda

    Hi,
    The method you are following is correct as the Standard SAP process.
    Once you reconcile the 40 qty with respect to the 542 mvt type
    Then goto J1IFR check the quantity pending it should be 0 only and will display 2 material documents there
    Then goto J1IF12 check the Challen status -- It should be fully reconcilled
    Then goto J1IF13 - Complete/ Reverse/ Recredit  there select the posting tab & mark as Complete challen
    Then check in Overview tab as Completed
    rgds
    gsc

Maybe you are looking for

  • High CPU Usage with one client

    I work as a desktop support engineer. I've got a call that has been back and forth between departments that I believe to be an SCCM problem but I'm not involved in the back end of that, just desktop onsite type stuff, hardware, rebuilds etc... So I'm

  • My shutter noise doesn't work any more!

    When I take pictures in Photobooth the shutter noise no longer goes off, this also disappeared for when I take screenshots. I don't know how this happened but it's something that I just noticed recently. What can I do about this?

  • Space after paragraph

    The new version of Pages is missing a few things, or at least I can't find them (flow between text boxes being foremost). Where is the tool to add space after and/or  before a paragraph?

  • Family Share - Kids still have to login when picking app??

    I'm in the process of changing the iPads for my children by enabling the Family Sharing option.  I've successfully setup two icloud accounts for them, and associated their appstore/itunes account with the new iCloud account.  They both show up under

  • Install error message to close RSo3Server.exe

    When installing Photoshop from the creative cloud, I get a message after the install is 42% complete. "please close the following applications to continue:- RSo3Server.exe.  When I search Task Manager for open processes or Apps this is not listed.  I