Transporting 3 system landscape

Hi,
We have a 3 system landscape configured. Transports created in DEv are moved to QA and then to PRD. Now a transport has been created in QA.  When we release them, datafiles and cofiles are not created.
Please assist me in this issue. How do i get data and cofiles at OS level. I cannot change my transport route
Is there any tp cpmmands that will create data and cofiles at OS level.

In you QA box Change the settings in SCC4 in
"Changes and Tranport for -Client-Specific object."
If changes without automatic recording are allowed in a particular client, you can edit these on a maintenance screen without a request prompt window.
If you have activated automatic recording for a client, whenever you save changed client-specific Customizing settings a Transport Organizer query window appears. Here you can choose Own requests to generate a list of Customizing requests that contain your tasks or, alternatively, Create request to create a new request for the client in question

Similar Messages

  • Is it possible to do portal content transports through System landscape?

    Hello,
    In order to transport content from portal A to portal B I am currently using transport packages: export the content from portal A, download it to the local PC and import it to portal B. The process is working OK but I still have a question:
    SAP are transferring all the control on their systems to the System landscape, for example Java developments. My question is if it is also possible to make these transports through the system landscape so no local PCs are involved in the process?

    Hi Roy,
    You are right in the point that development projects can be transported, using the NWDI, centrally managed through the system landscape.
    Nevertheless, the PCD transports (EPA) have to be touched manually anyhow. Theoretically, you can set up an SDA and put an EPA into it, see http://help.sap.com/saphelp_nw04/helpdata/en/a3/782240da03e569e10000000a155106/frameset.htm for details.
    But this only really makes sense if you want to transport your own application together with the portal configuration (iViews representing your application...).
    So in the end, PCD transports are designated to be transported as you are used to - manually via the export / import function of the portal.
    Hope it helps
    Detlev

  • Transports on system landscape with no test environment

    Hi,
    Please share your experience about transporting from BWD to BWP. I have normally worked with BWD, BWQ, BWP, where we have the chance to test our transports on BWQ before moving the perfect changes to BWP. What precautions should I take when working and dealing with the landscape with no test instance?
    Thanks
    "<i>Public opinion is a weak tyrant compared with our own private opinion. What a man thinks of himself, that is which determines, or rather indicates, his fate.</i>" ~ Henry David Thoreau, US Transcendentalist author (1817 - 1862)

    Hi all,
    Certainly I see and hear that smaller companies don't have enough funds to implement 3- system landscape, but I don't see why they would want to do that - better save money then and just do ABAP R3 reporting if all you will have is just implementing one module. Aren't you suppose to have sufficient funds in order to maintain and have SAP R3 and BW running? When they start wanting to implement more modules, then it will get clumsy and unstructured. They would have to spend more effort in doing the workaround and dealing with an unruly environment.
    Thanks
    "<i>When the character of a man is not clear to you, look at his friends.</i>" ~ Japanese Proverb
    "<i>Nothing is easier than to denounce the evildoer; nothing is more difficult than to understand him.</i>" ~ Fyodor Dostoevsky, Russion Literaturer (1821 - 1881)
    "<i>Be smart and know who you're dealing with...But again who wants to</i>" ~ Anonymous

  • Transport XI System Landscape Directory Contents from Production to Quality

    Hi
    I want to transport SLD contents from my production environment to the quality environment.
    I could see a link in of export in the SLD Administration page, will that help me. I think that link will allow me to transfer whole contents however I want to transfer only the non production systems from SLD.
    Is it possible, if yes then please tell the steps.
    Thanks

    Hi,
    <i>I want to transport SLD contents from my production environment to the quality environment</i>
    Did you see this weblog,
    /people/sap.india5/blog/2005/11/03/xi-software-logistics-1-sld-preparation
    Also there are other using file transport,
    /people/sravya.talanki2/blog/2005/11/02/overview-of-transition-from-dev-to-qa-in-xi
    /people/sap.india5/blog/2005/11/09/xi-software-logistics-ii-overview
    This will get you an overview.
    Hope this helps.
    You can also Use CMS for transport.
    Regards,
    Anirban.

  • Virtual systems within Transport system landscape

    Hi!
    I should map the existing transport management system landscape into ChaRM approach within SOLMAN.
    The existing transport management system landscape has a lot of virtual systems with virtual transport routes.
    Can some one of you explain the usage of such virtual systems with their virtual transport routes?
    Thank you very much!
    regards
    Thom

    read,
    http://help.sap.com/saphelp_nw04s/helpdata/en/44/b4a0db7acc11d1899e0000e829fbbd/frameset.htm
    Regards
    Juan

  • Transport target for business system not found in System Landscape Director

    Folks,
    We have new installed new PI 7.1 system and importing interfaces from the OLD XI 3.0 system in to new PID 7.1 system.
    We are getting following error when we try to import an interfaces in to new PID system:
    Import failed because of business system transfer object
    Communication component XID_FileSystem: Obligatory
    transport target for business system XID_FileSystem not found in
    System Landscape Directory
    We are yet to install PIQ system.
    All the interfaces in the old XID system have transport target of XIQ system.  I removed the  transport taget for the interface, but transport target is still showing in the Business system under transport target head.
    How can we overcome this issue as we will not have PIQ system atleast for two weeks.
    Thanks in advance,
    Regards
    Chandu

    Hi,
    You need to maintain Transport Groups and target for business systems while SLD transports between your XI system and PI 7.1
    Illustrated with DEv & PRD here.
    Procedure:
    1) Call Integration Builder screen on DEV Server with http://hostname:J2ee Port/rep
    2) Call SLD (System Landscape Directory) Component from the Integration builder
    Save all the Following .zip files on the Local Desktop
    3) Select the Software Component & say Export that you want to Export from DEV
    Server to Production server and which is going to use in the IR of XI
    4) Also Select the Product of the above SWC and say Export
    5) Select the Technical Systems (TS of XI & TS of the SAP R/3) and say Export
    6) Select the Business System(s) & say Export; those are associated with above Exported
    Technical systems.
    In Production Server
    1) Logon to the SLD of the Production Server.
    2) Create a Technical System and Business system which points to the Production SAP R/3
    3) Go to Administration TAB in the main page of SLD
    4) Select the Import option to Import the SWC , PRD, TS,& BS which we Exported Earlier in DEV Server
    5) Click on Browse and select the .zip files that is to Import into Production Server,
    Which were stored on the local desktop at the time of DEV Server Export
    And say Import Selected File Option
    By this we exported and imported the SLD Objects
    Now we have to create transport groups and transport targets in the Production server of SLD
    Creation of Transport Groups
    Edit GroupsGroup1) Select the Business systems 
    2) Click on New Group and give the name of the group as DEV_group & select the
    Corresponding Development serveru2019s integration Server
    3) Similar way create another group for Production serveru2019s business system as
    PRD_group and select the Production serveru2019s integration Server
    Creation of transport targets
    This is to Define which business systems in two different groups correspond to each other
    1) Select each Business system in the SLD and select transport TAB---click on
    Add/Change Target and select its corresponding target business system.
    For Example:
    If you select the business system of Production XI server means
    In the target you have to select group as DEVGROUP and the business system of Development XI server.
    Like this do the same for other business systems also
    Ex:
    BS_PRD_Integration Server----
    BS_DEV_Inetration Server
    How to create Transport Groups & transport Targets
    http://help.sap.com/saphelp_nw04/helpdata/en/ef/a21e3e0987760be10000000a114084/content.htm
    Regards
    Seshagiri

  • Transport target group and routes setting for 2 system landscape

    Hi!
    I have 2 system landscape (DEV with 2 Clients, 100 CUST and 200 TEST and PRD with productvie client 100).
    Currently I have the standard TMS configuration for 2 systems (with tranport layers/routes ZDEV and SAP) .
    Now I  have to set up my TMS settings client specific
    (Development in DEV 100 and transport to the DE 200 TEST and PRD 100).
    I have created tranport target group /B-DEV/ with both target goals:
    DEV 200 and PRD 100.
    <b>What are the further settings for transport routes?
    I assume, I have to delete the existing routes ZDEV and SAP?
    what are the next steps? </b>
    Thank you very much
    regards

    Ok, I have in DEV system:
    Client 100 (Customizing)
    Client 200 (Test) (it can be considered as replacement of QAS-system, because we only have 2 systems)
    PRD system
    Client 100 (Productive client)
    So we would like to set up the transport management system client specific, in order to develop in DEV 100 to test in DEV 200 and to use the transports in PRD 100.
    Thank you very for your help
    regards

  • Transporting a request in single system landscape

    Hi,
    I our single system landscape, we are using the scc1 t-code to transport a request from dev client to prd client,then it showing a message like target client is productive and protected against client copy for this reason every time we are changing the production client settings. please give me suggestions how to transport a request in single system landscape  with out using scc1 t-code.
    Regards,
    Reddy

    Olivier,
    Are you sure SCC1 is just for client copy? I dont think so.
    Client Copy transaction is SCCL for a local copy and SCC9 for remote client copy.
    SCC1 allows to transport local requests within different clients, of course depending of what the transport request contains you can copy something simple or a lot of data (yes, I know, the title says something, but see the functionality).
    I'm agree is not a good practice to have DEV and PRD in one server, but maybe he is using it for testing purposes? I saw different cases in the past and sometimes they had DEV and QA in one server, maybe this is the case.
    Anyways, lets help him on his question.
    Reddy, if you have any question, just post it.
    Good luck,

  • Transport request in single system landscape

    Hi,
    In single system landscape we are having only two clients (dev & prd), we are using T-code scc1 to transport a request from dev client to prd client.for this every time we are changing the production client settings.could anyone suggest me how to transport a request with out using scc1.
    Thanks & Regards,
    Reddy v

    Hi,
    you have only one system and two clients? Then you simply cannot use CMS functionality. Maybe it is possible to create transport target group and set up a client dependent transport control, but I've never tried it on one system landscape. Read more: http://help.sap.com/saphelp_nw04/helpdata/en/44/b4a0137acc11d1899e0000e829fbbd/frameset.htm
    If I where you I'd use virtualization and install two SAP systems on virtual machines, then use standard 2 system landscape. It's much safer for your repository!!!
    Regs,
    FS

  • No system in the system landscape exports transport requests

    Hi gurus,
    We are trying to implement the Change Request Management scenario in
    Solution Manager 4.0 SP12 in a POC.
    The TMS are created with Solution Manager as Controller and with the settings are correct.
    We have created a Maintenance Project with the following landscape :
    system1 - Client 100 as Development System - Type of Rol "Source System"
    system2 - Client 200 as Quality System - Type of Rol "Target System"
    system2 - Client 100 as Production System - Type of Rol "Production System"
    In the Change Request tab, when we check "Activate Change Request Management" checkbox, the following error is shown:
    "System system2-100 is to be changed in a Solution Manager project, but no
    system in the system landscape exports transport requests which are
    imported into this system."
    What is happening? Any idea??
    Thanks

    The reason may be, that your "POC" is not valid due to the fact, that you use "clients" and not "systems" to transport
    What you can try to verify that is - take out the QA client/system out of the transport route and try then to activate just with DEV --> PRD.
    We wanted to setup something similar in the past and TMS failed to get configured properly - due to exact that reason.
    Markus

  • Doubts in System Landscape Directory

    Hello All,
    I got some basic doubts in SLD.
    Why do we need to store the information about the installed products and to be installed products in software catalog?
    And, what is this techncal system?
    After reading few help sites, what I understand is the following:
    For example SAP is a product and  CRM etc are the software components. We create the technical system for this product like for client 100 we create a technical system and for client 200 we create another technical system. And we give some logical names, called business sytems, to these technical systems.
    My second question is, why do we need to create all these information(the information in SLD)? Why cant we directly create messages types, message interfaces etc and configure them in Integration directory without using the information in SLD like business system?
    In Integration Directory, we say that the sender is one Business System and receiver is another business system. These business system are created based on some technical systems. These technical systems are based on some software components and product. This product and the software component might be a installed or non installed product. Then how do we can get the connection between the sender and the business system? Can you please explain me the idea behind considering the sender and reciever as business systems.
    Can anybody please clear the above doubts?
    Priya

    Hi Priya,
    <u><b>SLD:</b></u>
    The System Landscape Directory of SAP NetWeaver (SLD) serves as a central information repository for your system landscape. A system landscape consists of a number of hardware and software components that depend on each other with regard to installation, software updates, and demands on interfaces.
    - so talking about the working of an SLD, here if any information is required for the integration server regarding the systems(logical or physical) and the software (installed products) it refers to the SLD.
    - to tell you about the other features it has....it captures the dimensions of the system landscape like solution dimension, transport dimension and technical dimension.
    - putting it in short XI IS A CLIENT OF SLD
    Also go thru this link and understand more about SLD <a href="http://help.sap.com/saphelp_nw2004s/helpdata/en/31/f0ff69551e4f259fdad799a229363e/frameset.htm">System Landscape Directory</a>
    <u>
    <b>SOFTWARE CATALOG:</b></u>
    The SLD contains a Software Catalog of all installable SAP products and software components. The Software Catalog includes information about support packages and dependencies between the products and software components. This information is the basis for the description of the system landscape.
    Also go thru this link and understand more about Software Catalog <a href="http://help.sap.com/saphelp_nw2004s/helpdata/en/a2/2999ef97ea2b4790165f9ca5c05c41/content.htm">Software Catalog</a>
    <u><b>TECHNICAL SYSTEM, BUSINESS SYSTEMS, SOFTWARE PRODUCTS:</b></u>
    Technical system correlates the software to the physical host on which it is installed
    Or in other words Technical systems are application systems that are installed in your system landscape.
    - they are actually the basis for defining the business systems.
    - we assign a technical system to a business system to help the SLD make the appropriate association.
    - the software products used by the business system are got from the technical system definition.
    - to note 1 technical system can have more than one business system assigned to it....and as told the SLD make the appropriate association between them.
    Also go thru this link and understand more about each of it:
    <a href="http://help.sap.com/saphelp_nw2004s/helpdata/en/24/8fa93e08503614e10000000a114084/content.htm">Technical Systems</a>
    <a href="http://help.sap.com/saphelp_nw2004s/helpdata/en/42/c817d9d2296bb2e10000000a1553f6/content.htm">Business Systems</a>
    <a href="/people/sap.india5/blog/2005/11/03/xi-software-logistics-1-sld-preparation Preparation</a>
    Regards,
    Abhy

  • ChaRM: 4-System-Landscape possible?

    Hello,
    regarding our system landscape we have no clue how ChaRM will handle following situation
    DEV-System: Development-System were the developments should be done.
    QAS-System: Test-System were the tests should be done.
    FNC-System: nothing to do here, just for functional tests
    PRD-System: Production System
    Transport routes are DEV -> transport group which deliveres QAS and FNC, and from QAS -> PRD.
    What needs to be done to set this up correctly for ChaRM (e.g.: SMSY-logical components)?
    Thanks in advance.

    Hi
    You have two options:
    1) assign FNC to task list: you can start the import to this system in the task list manually
    2) or task list without FNC: you can schedule a job 'import all' at FNC or import manually via STMS
    Confiiguration:
    1) One log. component with D-Q-FNC-P (Q and FNC are of role target systems)
    2) One log. component with D-Q-P
    regards
    Andy

  • URGENT: Changing System Landscape in ChaRM

    Ok...here is our situation:
    We use ChaRM with a 3 tier system landscape (DEV > USER  >  PROD).
    Out USER system has been down for a month (maintenance) so we went live with ChaRM as follows:
    DEV > PREPROD >PROD
    Our USER system is now back up and running so we have replaced the Logical Component on the project to reflect this.  This has worked ok but the task list is still showing the old system landscape.  i.e. its showing PREPROD still instead of USER.  How do I resolve this?
    Do I have to complete the existing cycle and then create a new one?  This would be fine except I would lose all the jobs I have scheduled in the task list (schedule every 15min EVERY day....took me ages).
    Any suggestions?
    Thanks!!!!!!!!!!!!

    Hi,
    About this issue, there is a detail information about this in blog point 6  u201CChanges in the logical components of a project where Charm is already activatedu201D.
    This is the link:  http://www.sdn.sap.com/irj/scn/weblogs?blog=/pub/wlg/15116
    So, you have to change the transport route accordingly and then close current maintenance cycle and generate a new one.
    Following is the steps.
    1: please import all the transport requests which were associated in the current maintenance cycle task list by STMS manually import.
    1: change transport route from DEV > PREPROD >PROD to DEV > USER > PROD on the domain controller system.
    2: close current maintenance cycle.
    3: change the system landscape to DEV > USER > PROD in solar_project_admin.
    4: generate a new maintenance cycle.
    Thanks
    Regards,
    Vikram

  • How to Configure Transport MAnagement system in CHARM

    Hi
    How to Configure Transport MAnagement system in CHARM? Here our requirement is when ever a change request approved in the background Transport request should be created automatically. We have configured all the Transport Routes in our lanscape.
    Can any one tell me the detailed process? If you have any Configuration document please share it to me
    Points will awarded for helpful answer
    Thanks
    Bhaskar

    In a two system landscape is it necessary to make development the domain controller always?
    No such compulsion as such exist(correct me if wrong),however why you want to make production your domain controller?
    This is not recommended.
    Regards,
    Ashutosh

  • SAP Three-System Landscape

    Hi All,
    I have a very basic doubt - I have read umpteen times that the SAP recommendation is to use a 3-system landscape for performance reasons. One system for the developement, one for quality assurance and one for the production environment.
    However, I want more clarity on what a 'system' is. Does it mean I purchase 3 mySAP ERP licenses for my implementation and then implement DEV, QAS and PRD in each of them? But would that not multiple my costs 3 times if I decide to move from legacy system to an SAP implementation?
    Thanks and Regards,
    Vidya.

    Srividya D. wrote:>
    > Yes, all clients in a single SAP software get affected if any client-independent customizing. So do you mean by having different hardware systems for the different logical systems (DEV, QAS, PRD) client-independent customizing in one client in one hardware system does not affect another client in another hardware system? But I don't quite understand this since the concept of a client is per SAP system and not hardware system.
    Yes. exactly if the system are different then any config/changes will not going to affect another system until unless you move any transport. Client is a buisness unit to identify the Buisness data, It is system specific.
    > By an instance if you mean an SAP Application Server, though there are multiple application servers on multiple hardware systems, the underlying Repository (nothing but database) and client-independent data should still be common right? Or do you mean that if I implement 3 instances of the SAP ERP system over 3 hardware systems, each instance or application server then has its own client space which do not interfere with the clients in the other hardware system?
    I mean to say you required 3 Hardware, for 3 Database, and 3 SAP instance, 1:1 concept. everything will be seperate and will not interfare with any other system.
    Regards,
    Subhash

Maybe you are looking for

  • Trouble getting internet through Airport Express

    I am trying to set up the most basic wireless network with a cable modem, Airport Express and G4 Powerbook running 10.4.6. I have went through all the steps of setting up the modem then the Airport Express and configuring it with Airport Admin. and a

  • How can connect to oracle8 server(install in RedHat6.0)

    I have installed Oracle Standard Edition 8.0.5.1 in RedHat6.0 . Now I can't connect to it with Windows95 client. get an ORA-12500 error. 1. successful start Oracle use "dbstart" 2. successful start the LISTENER use "lsnrctl" -- 'start' to /home/oracl

  • HT1766 Backed up files and iMessages/SMS messages missing from current backup when restored

    My backed up photos and sms messages are not showing up when restoring from latest backup but if I look at backup with third-party restore tools I can see the missing files - How do I fix this without these tools??

  • Process chain stops - previous processes are green

    Hi All, We have a process chain that loads our master data each night.  It chain is mostly made up of infopackages (mostly full loads) and the change run for those objects.  We recently upgraded from 3.5 to BI7, SP16.  Since the upgrade, this chain,

  • Mini updates only a few songs and quits

    New computer... I tried to put the songs from my mini onto the pc but messed up. This cleared all the songs. I then put the songs on the pc through the network. Now I can't get all the songs back on the mini. It starts the update then stops after 2 o