Two storage location concept in EWM AFS ROD.

Hi Experts,
This post looks very old so opening a new thread.
http://forums.sdn.sap.com/thread.jspa?threadID=1563967
As mentioned I would like to know the working of AFS and ROD storage locations in EWM.
ROD -- F1 Unrestricted in putaway  ,      AFS -- F2  -- Available for sale.
1. I can perform goods receipt for both the storage location using inbound delivery.
              For  ROD  stock will go to stock type F1
              For   AFS stock will go to stock type  F2.
2. As per the information I can not perform goods issue from ROD ie I can not create a Outbound delivery to issue the goods from ROD storage location.
3. If any goods issue is needed I should transfer the goods from ROD storage location Stock type F1 to AFS storage location in EWM, may be by transfer posting.
Does these points make sense ?
Regards
Shashank
Edited by: Shashank Balooni on Aug 11, 2011 2:47 AM

Self:
In EWM we have to use two storage locations : 0001 (ready on dock ) and 0002 (available for sale )...
In configuration ewm : availibility group 001 + 0001 and  availibility group 002 + 0002
                                 availibility group 001 + F1 and  availibility group 002 + F2
Create delivery and confirm the warehouse task : stock moves to 001  F1 , Storage type maintained in Warehouse process type  > and this will trigger receipt in 0001 at IM
Later when the goods receipt is posted in EWM from delivery the stock will move from 001 / F1 to 002/ F2 in 0002 store in IM
Hope this helps !
shashank

Similar Messages

  • Transfer of stock between two storage locations within a plant in two steps

    Hi,
    We have a plant 6400 & we have two storage locations 6401 & 6402. Each storage location belongs to a department which are located at some distance from one another.
    The material to be moved from one storage location to another using a truck.
    For the above mentioned process can we have the following process
    (1) In first posting the material is issue from the storage location to a transit
    (2) In second posting the material from the transit is received into the storage location
    I am looking for a feature that is possible between two plants, can we have a similar feature available within a plant.
    Warm regards,
    Umesh

    Hi Umesh,
    It would be a business decision i suppose. If those 5 nos. are lost / damaged in transit & needs to be scrapped, then the ownership needs to be decided first. If it lies with the sender, then reverse the 5 nos. (MB1B mvt is 314) & then proceed with your scrapping or if it lies with the receiver then receive the 5 nos & then proceed with the scrapping.
    Posting in system is one aspect, but a clear business rule is the key factor. So discuss with your materials mgmt personnel to define the process flow.
    Hope the above helps.
    Regards,
    Vivek

  • Stock transfer order between two storage locations in IS Retail

    Hi,
    I want to have a Stock transfer order between two storage locations in the plant.
    I have activated the "Activate Stock Transfer Between Storage Locations", now i can create a STO and have the "Issuing SLoc" tab.
    Having that i get an error message "Not possible to determine shipping data for material XXX" Message no. 06280.
    I am trying to have the shipping data in customizing for set stock transfer - "Define Shipping Data for Plants", but my site is not listed due to the use of IS Retail. Is there a way to configure it?
    Tnx
    Lior

    Hola.
    Voy a contestar tu pregunta en espanol. Debes crear al centro  emisor  como  deudor  en la transaccion WB02  y ampliar a la organizacion  de compra.
    Posterior, debes crear al centro  receptor como  acreedor en la transaccion  wb02.
    Cesar Moreno. Funcional MM Retail.

  • While doing delivery batch is showing in two storage location

    Dear All,
    I have following senario in WM:
    First I will create Packing order for my End product, here batch will generate.
    For this Material Quality is active that is Insp type 04.
    Here i will do LT10- I will transfer to Final Bin that is Finish Goods storage location say SL01.
    After this i will go for QA32 and here I will cleare the quality and transfer to FG storage location SL02.
    Now i will check the stock for the batch. but here i am observing the stock for the batch one is with stock indicator with 'Q' and one more stock without 'Q'
    Now I want to delivery the material how i can delivery? here i am getting that material in two starage locations SL01 and SL02.
    here which one i should consider for delivery.
    Please guide.
    Thanks in advance.

    Are you talking aobut storage locations or storage bins?
    First I will create Packing order for my End product, here batch will generate.
    For this Material Quality is active that is Insp type 04.
    I guess this posts the receipt into Q status in storage type 901 with dynamic bin of the packing order.
    Here i will do LT10- I will transfer to Final Bin that is Finish Goods storage location say SL01.
    So you move your goods while they are in Q-status.
    After this i will go for QA32 and here I will cleare the quality and transfer to FG storage location SL02.
    Now i will check the stock for the batch. but here i am observing the stock for the batch one is with stock indicator with 'Q' and one more stock without 'Q'
    QA32 resets the Q-status at IM level.
    If you have not yet changed the status in WM too, then you transfer just unrestricted use stock to your final bin, hence you have your batch in to different bins, one with with q status and one with unrestricted use status.
    You have to execute LU04 to process the status transfer as well in WM.  This will then clear the situation. Best is to o this before you move stocks.
    Now I want to delivery the material how i can delivery? here i am getting that material in two starage locations SL01 and SL02.
    here which one i should consider for delivery.
    you can only consider unrestricted use stock in the bin where the material physically resides.

  • Inspection lot for Mvt type 311 between two storage location only

    Hello all,
    I want to create an inspection lot only whenever my material transfer between two particulars storage locations. e.g if i have multiple storage locations, then i need an inspection lot to be created whenever my material transferred from say X S.Loc to Y S.loc only. For other transfers i don't need to create an inspection lot even from Y to X.
    For more clarity, suppose i have ten storage locations. i have also created one storage location for my Lab. So I want an inspection lot to be created only when my material transfer to my Lab storage location from any other storage location, not when i transfer from my LAB to any other S.Loc or between two S.Loc other than LAB.
    I have activated inspection type 08 but it does not have a restricition on S.Loc.
    So please suggest some solution for the same.

    Dear Amit
    In this case what you can do is make a copy of 311 movement type, say Z11. Deactivate QM for 311 and activate QM for Z11
    So whenever you want inspection lot to be created use Z11.
    You can activate and deactivate QM in QCCO > Quality inspection > Inspection lot creation > inspection for goods movement
    Regards
    Gajesh

  • Link material to profit center at storage location level

    Hello,
    I have one plant 0001,  two storage location assigned to this plant (MAG1, MAG2).
    In " MAG1", I am keeping the consignment stock (stock blongs to my vendor), hence when I create the material at the storage location I need that profit center be set to PF1
    "MAG2" is my own stock location, so when I create material at MAG2 level, I need that profit center be set as PF2.
    Does standard SAP allows such scenario.
    Is there any possibility to map this scenario
    Many thanks for your help
    Meher Souayeh

    Dear,
    Basically GUIXT script work mainly from Technical point of view..
    Here they can write codes accordinly so that if you want to make any sort of changes in the application or if you want to put some restriction parameters then by writing codes, it is very much possible to get the desired output.
    Hope this clears your doubt.
    Utsav

  • Availablity check at storage location level in STO

    Hi,
      There is an unique requirement from my client with respect to the Availability check at storage location level in STO
    Process:
      Based  on the inputs from APO we are creating STR for moving the material from one plant to another plant. These STR’s will be converted into STO through ME59N batch job. During STO creation process system will do the availability check and only if stock is available in the issuing plant then only STO will be generated.
    During this availability check the stock will be considered at plant level and not at storage location level.
    Requirement/Scenario:
    Issuing plant contains two storage location ( location A & B).FG stock exists in both the locations.
    Our requirement is system should create separate line items in the STO based on the availability of the stock in the respective storage locations.
    Example
    Total required qty: 1000  of material X
    material X - Stock in Storage location A  : 600
    material X - Stock in Storage location B : 400
    Two separate line item needs to be created in the STO
    Sl no
    Material
    qty
    Issuing storage location
    1
    X
    600
    A
    2
    X
    400
    B
    Is there any function module available for doing Availability check at storage location level so that it can be called in ME59N with the enhancement.
    Please suggest how to achieve this. If any enhancements needs to be done we will do it.
    Thanks & regards,
    Prashanth

    Hi Nilesh,
    in SAP standard the system is always checking on plant level first and then on the storage location level, there is no possibility to change this behaviour.
    I'm also not sure if the process is correct, because if you have also requirements on plant level only then you would create negative ATP if you confirm on storage location level even though there is no ATP on plant level.
    I'm also not aware of a user-exit that would suite your requirement, additionally according to the IMG documentation the user-exits in the availability check area should only be carried out in agreement with SAP.
    Regards,
    Markus

  • Sales order same plant different storage location

    Hi
         We are doing a sale order for a material that is storage in two storage location.
    Storage location A:
    2 units
    Storage location B:
    3 units
    We did a sale order for 5 material. Stock availability asigned 5 unit in one position of the purchase order. Then the system create just one delivery for 2 units.
    Which procedure or customizing we have to do to get two deliveries, one for each storage location.
    Thanks in advance for the help
    Regards
    Enzo

    thanks SAJU SOM
    We need to create two deliveries from one sales order, that have quantities for differents storage locations.
    Example:
    Sales order A: 5 units
    We have, 2 in storage location C and 3 in storage location D under same plant. The storages locations are in differents places, so we need two deliveries, one from C and the other one from D.
    I suppose that this situation is normal and occurs in many companies.
    So, we have to create a sales order with 2 positions, or the system split the deliveries during deliveries creation?
    I think the system should split the positions automatically in the sales order creation.
    Thanks for your help
    Regards
    Enzo

  • MRP Run in an excluded Storage Location

    Hello all. I have this situation.
    I have material X with two storage locations: SL01 and SL02. Storage location SL01 has 15 pieces and SL02 has 5 pieces. In MD04, I can see a total of 20 pieces under the "Stock" MRP Element.
    Material X also has five Order Reservations (OrdRes), for 5 pieces each. These Order Reservations are assigned to Storage Location SL02, because stock is procured from there.
    What I want is to have the "Stock" line only show me the stock of SL01 (Stock = 15 pieces). I want SAP to "ignore" whatever it has in SL02 and only consider the stock in SL01, so MRP Run would give a proposal of 5 pieces.
    I tried deactivating SL02 in Material Master MRP4 for material X, but then the MRP Run doesn't generate any proposals because my reservations are in SL02, and it's deactivated. Even if my Availability Check is set not to look at "storage location", if I the requirement is in SL02, it won't propose anything.
    Is there any other solution to my problem? How can I have the system ignore the stock in SL02, but still propose those 5 pieces I'm missing in SL01?

    I have material X with two storage locations: SL01 and SL02. Storage location SL01 has 15 pieces and SL02 has 5 pieces. In MD04, I can see a total of 20 pieces under the "Stock" MRP Element.
    Material X also has five Order Reservations (OrdRes), for 5 pieces each. These Order Reservations are assigned to Storage Location SL02, because stock is procured from there.
    What I want is to have the "Stock" line only show me the stock of SL01 (Stock = 15 pieces). I want SAP to "ignore" whatever it has in SL02 and only consider the stock in SL01, so MRP Run would give a proposal of 5 pieces.
    Sorry, but your logic is not clear to me...
    your stock:
    5 pcs (SL02) + 15 (SL01) = 20 pcs
    your requirements
    5 x 5 pcs (SL02) = 25 pcs
    Procurment proposal (w/o excluding SLoc):
    20 pcs (stock) - 25 pcs (requirements) = -5 pcs > procurement proposal 5 pcs
    You are saying:
    What I want is to have the "Stock" line only show me the stock of SL01 (Stock = 15 pieces). I want SAP to "ignore" whatever it has in SL02 and only consider the stock in SL01, so MRP Run would give a proposal of 5 pieces.
    So, you can see MRP will give a procurement proposal of 5 pcs without any SLoc exclusion...
    Please clarify your requirement / business process. Why don't you want to consider the stock in Sloc2? What is your process?
    You can see that you cannot exclude a SLoc with Sloc MRP and still consider the requirements relevant to that SLoc (unless you use reorder point planning in that SLoc).
    Thanks,
    Csaba

  • Stock valuation different for different storage location in same plant

    Hi SAP Gurus,
    Please provide me a detailed idea and solution for this.
    My client has simulated several transactions in MM.
    Say it has two storage location 1110 and 1120 under plant 1100
    Now in 1120 there are stock movements pertaing to a project (includes stock transafers from 1110 and issues made to project)
    Finally, the MB52 report is showing valuation of stock (unrestricted) at different rates for 1110 and 1120.
    My client is raising issue, saying the value should be same for stock under a single plant as valuation is done at plant level.
    Also, both the stock is under unrestricted category, so valuation should be same.
    What could be the issue?
    Any solution?
    The auditors will raise issue over this.
    Please help ASAP.
    Regards,
    Sumit

    Hi Sumit,
    In valuation using the moving average price (price control u201CVu201D), the system valuates goods receipts with the purchase order price and goods issues with the current moving average price.
    So, for Plant 1110 the rate could be the PO price used for procuring the material whereas for Plant 1120, it is the moving average price and hence the difference in rates.
    However the auditors would look after the Material Valuation at the Valuation Area level which is the Plant.
    Thanks,
    Ankur

  • Help required -for MRP Run at storage location level

    Hi ,
    we need to have separate MRP fro two storage locations with direct procurement from Storage locations. Right now we have MRP run at Plant level for all the storage locations. we donot want the materials in these two storage locations to be planned at Plant level only with Separate storage locations. Plant level MRP will run for the other storage locations .
    I have created separate MRP areas for the storage locations & activated MRP for MRP Areas client level. material masters for the two storage locations have been asigned the MRP areas & maintained the MRP area data in material master .
    When we run the MD01, the Planned orders are getting created at both MRP areas plus at the Plant level.we donot want the planned orders creation at Plant MRP area level-only at the storage location level for those two storage locations MRP areas.
    Can anybody guide me -how to achieve that ? Did we miss any configuration?
      I tried to maintain scope of planning & getting error for parallel processing .
    Do i need to maintain parallel procesing with servers ?
      Pls need your input on this. Any help will be highly appreciated .
       Thank you in advance.
        Regards,
        Krish.

    Hi,
         Go to IMG settings 'Materials Management + Consumption-Based Planning + Planning + Define Storage Location MRP per Plant' Enter your Plant, It will show list of storage location in that Plant, then select 2 in 'MRP Indicator' field for storage location for which u want to plan seperately.
    Hope It will clear Your Problem
    Regards
    Sunil Kumar

  • Help required !! For MRP at Storage location level

    Hi ,
    we need to have separate MRP fro two storage locations with direct procurement from Storage locations. Right now we have MRP run at Plant level for all the storage locations. we donot want the materials in these two storage locations to be planned at Plant level only with Separate storage locations. Plant level MRP will run for the other storage locations .
    I have created separate MRP areas for the storage locations & activated MRP for MRP Areas client level. material masters for the two storage locations have been asigned the MRP areas & maintained the MRP area data in material master .
    When we run the MD01, the Planned orders are getting created at both MRP areas plus at the Plant level.we donot want the planned orders creation at Plant MRP area level-only at the storage location level for those two storage locations MRP areas.
    Can anybody guide me -how to achieve that ? Did we miss any configuration?
    I tried to maintain scope of planning & getting error for parallel processing .
    Do i need to maintain parallel procesing with servers ?
    Pls need your input on this. Any help will be highly appreciated .
    Thank you in advance.
    Regards,
    Krish.

    Hi Krish,
    Go to following IMG path and check out your settings -
    IMG>>>Production>>>MRP>>>Master Data>>>>MRP Areas>>>
    (1) Activate MRP for MRP Areas    -
      Is that activated?
    (2)Define MRP areas>>>> Do setting s as per Storage Location
    Then run MRP.
    MRP Areas
    In this IMG activity you define whether MRP is to be carried out with MRP areas. In addition, you define the MRP areas for each plant in which you would like to carry out this type of materials requirements planning.
    The MRP area represents an organizational unit which carries out materials requirements planning independently. The results of the planning run are displayed specifically for each MRP area. An MRP area can include one or several storage locations of a plant or stock with a subcontractor.
    You can assign a material to various MRP areas.
    Basically, there are three types of MRP areas:
    Plant MRP Area
    Initially, the plant MRP area includes the plant with all its storage locations and stock with subcontractors. When you have defined MRP areas for storage locations and for subcontractors and you have assigned the materials, the plant MRP area is reduced by exactly this number of subcontractors and storage locations, as they are now to be planned separately.
    MRP Areas for Storage Locations
    You can define an MRP area that consists of a particular storage location by creating an MRP area and assigning the storage location to it. Material requirements for this storage location are then planned separately from the rest of the plant. You can also group several storage locations into one MRP area by creating an MRP area and assigning the storage locations. These storage locations are then planned together.
    MRP Areas for Subcontractors
    You can also define an MRP area for each subcontractor. Using an MRP area, it is possible to plan the components to be provided in subcontracting, by defining an MRP area for each subcontractor and assigning the components to be provided. You can therefore plan the requirements to be provided for these components for one subcontractor separately from the usual requirements.
    Up to now, MRP at plant level had been carried out. The various requirements were combined in the planning run and procurement elements were created for these pegged requirements with unknown sources.
    The introduction of MRP areas enables you to carry out material requirements planning and know the source of the pegged requirements and to be able to distinguish between them. The source of the pegged requirements can be, for example, production on a particular assembly line or a subcontract order.
    Material requirements planning for each MRP area allows you to have specific control over the staging and procurement of important in-house production parts and purchased parts for each shop floor and assembly area.
    Hope this will give you more idea about the same.
    Satish

  • User Authorisation - storage location

    Hi,
    we have three storeage location under one plant, can we restrict user to access only on UM1 storage location not to access balance two storage location.
    Plant :    X70
    Storage Location  :  UM1
                                    UN1
                                    UN2
    Is it possibile to create a role only on storage location, please advice.
    Regards,
    Muthu

    You will need to activate " Authorization Check for Storage Locations "
    Storage location authorization means that a user has to have authorization for authorization object M_MSEG_LGO in order to enter a goods movement in the storage location, using a particular movement type. In the list of material documents, only the document items for which the user has a display authorization are displayed
    Go to  SPRO->Materials management ->Inventory management ->Authorisation management->Authorisation check for storage locations,

  • Different storage location automatically pick for same material code

    Hi,
    As per my requirement,
    We have two storage locations i.e Return Location and Finished Location and single plant and single shipping point.
    At the time of Normal delivery system should be automatic picked Finished Location and return delivery system have to pick Return Location only.
    I tried to do Storage location determination but system is not picking correct location. Kindly guide me.
    Thank You!
    Chakradhara

    Check this thread
    Creation of return order with ref to an Invoice
    G. Lakshmipathi

  • Availability check with storage location

    Hi experts,
    I have one problem in availability check.I will explain in steps.
    There are two storage locations
    RMMU: main storage location where GR will happen from vendor.
    WPMU:WIP storage location from where material will be issued to production order.
    A is fert material.
    B is bom item (raw material) and in material master maintained WPMU production storage location.
    Now after sales order(100 nos) and after mrp run we will get the Planned order for 100 nos and Purchase requisition for 100 nos for material B.Now we will do the GR for "B" in Storage location RMMU.
    Now we will create the Production order for ''A''.After availability check in production order ,it will show the material availability.
    The problem is that we maintained the prod.storage location as "WPMU''and in that no stock is there.It is in RMMU.Still it is giving availability of material.
    Requirement is it check the stock in  prod.storage location i.e. WPMU
    Please throw some light on it.
    Thanks in advance.
    Regards
    VILAS

    Find out your checking rule maintained  in Order Control OPJK for your order type and plant combination for both
    Create(1) and Release purpose.
    Then in t.code OPJJ and for that Checking rule and Checking group combination(Maintain in material Master) go to detail screen and don't activate check box for No Storage location inspection.
    In this case system will check the available stock in Production storage location only.If it is not maintain then system will check at plant level in all storage locations.
    If production storage location is not maintained either in material master or in BOM then maintain it.
    karthick

Maybe you are looking for

  • [SOLVED] urxvt not using locale

    Help! I am stuck here. For the life of me I cannot find a reason why urxvt won't use my locale. Output of locale LANG=en_DK.utf8 LC_CTYPE="en_DK.utf8" LC_NUMERIC="en_DK.utf8" LC_TIME="en_DK.utf8" LC_COLLATE=C LC_MONETARY="en_DK.utf8" LC_MESSAGES="en_

  • JDBC from jsp (performance)

    Hello everybody. I am developing a web application with jsp and beans, i have a connector bean that opens a connection with a database, then this connection is setted in the session, so the other classes can use it to create preparedStatements. First

  • Spectral histogram of adc output

    G'day all I have a LabVIEW task that I'm confident would have been dealt with before (many times). However, not for the life of me can I find a documented solution. It involves the display of a spectrum of channel hits from an ADC on a histogram (no,

  • Closing video window brings up last minimized window..any way to stop this?

    When I have multiple videos open and I minimize a few of them when ever i close the current one I'm watching it brings up the last minimized video window. Is there any way to stop this? It didn't do it before. I don't like the minimized videos to pop

  • Help before I throw this printer out of the window!!!!!!!!!!!!!!!!!

    I have just purchased a Deskjet 2540 all in one printer - I will only ever need to print boarding passes etc. - this looked so good on Amazon ideal for my iPad and said how easy to set up!!! In my dreams - I have now spent 10 hours Trying to set this