I have come across a strange thing in SAP.
I am creating assessment cycle in the New GL.
1. I am trying to enter Account Number and Profit Centre.
My Sender Account Number ####### (please note that I am entering symbols and not the number) and Profit centre $$$$$$$ (please note that I am entering the symbols mentioned and not the exact profit centre which are created in system)
Now when i try to save this cycle it gets saved.
My question is, why SAP is not checking the master data in the assessment cycle? The cycle is getting saved with the master data which is not at all avaiable in the system.
2. In the New GL Allocation, there is a field called assessment account similar to assessment cost element in CO. Do we need to created a separate assessment account in FI also as we do in CO?
Appreciate your inputs.
Regards,
MG

Hi
My question is, why SAP is not checking the master data in the assessment cycle? The cycle is getting saved with the master data which is not at all avaiable in the system.
Sol: Yes. Default system is behaving like this. System wont check whether master data exisit or not.
System wont check any master record like cost center, cost element, WBS etc

Similar Messages

  • Run PCA Assessment Cycle under New GL

    I'm on ECC6.0, and I'm trying to run PCA assessment cycle using FAGLGA15, I've created the PCA assessment cycle. But I got the warning message saying " no valid sender found", I checked table FAGLFLEXA, the sender profit center has values which I posted through FB50 , anybody has encountered the same issue? 
    please advise.

    Hi,
    In NewGL, all actual data is saved under version '1' by system design. You can see this in FAGLFLEXT-RVERS.
    Kyoko

  • Problem in Actual assessment cycle.

    Hi Team,
    We are using assessment cycle to distribute the cost from utility cost center to production cost center, after cycle execution we found the cost in debit side of the production cost center with assessment cost element. And also we are using the substitution is that the cost which is coming on the assessment cost element will flow to FICO reconciliation GL. We created 5 sets of assessment cost element groups( depreciation secondary cost element group, Admin OH, Store spares, Salary wages & power & Fuel) which  correspond to five 9 series reconciliation accounts.
    The 5 reconciliation GLu2019s are as follows:
    1. Depreciation                90102003
    2. Administrative overheads     90102004
    3. Store spares.                90102005
    4. Salary & wages                   90102006
    5. Power water & fuel.            90102007.
    After assessment cycles when FI team runs the transaction F.01 for the above GLu2019s the cost is appearing. Which is the consolidated cost which is distributed from utility cost centers is there any way to get the primary cost element wise breakup of the above five heads. This is the requirement raised by the FI team kindly advice.
    Regards,
    Ravi.

    Hi Ravi,
    have you come up with any solution?
    I have found, we can use substitution rules in New GL- CO reconciliation to fix assessment issue. In fact, we have to maintain multiple substitution rules or table to get correct P&L by primary cost element. This is pretty much possible.
    My issue is, we are using COPA. COPA dont have distribution option.
    Let me know if anyone has better option than substitution. because I don't want to loose my primary cost element information.

  • How to calculate Tracing Factor in Assessment cycle

    Hi,
    Kindly help me How to Calculate Tracing Factor in Assessment Cycle
    Is it the total of revenue for that division multiplied by the tracing factor (100)?
    Kindly advice me
    Thanks
    Supriya

    Hi Supriya,
    1. If you are using Assessment Cycle for allocation of cost among cost centers, then, the Receiver Tracing Factor selection will by and large depend on your allocation purpose and basis.
    Whether you want to allocate the costs on fixed percentages, OR , on the basis of Variable Proportions ( in which you can allocate the costs on the basis of some Statistical Key Figures data / already existing costs in those cost centers etc).
    2. If you are using Assessment Cycle for the purpose of transferring values to COPA, in that case, the Receiver Tracing Factor can be selected and the basis can be any Value Field (basis on the value which is there in that value field). Pls chk the transaction code KEU1 / KEU2
    Pls try to explain your complete requirement so as to suggest how u have to create cycle.
    Regards
    Srikanth Munnaluri

  • COPA Assessment Cycle using KEU5 for multiple controlling areas

    Hello All,
    There is an organization with operations in several countries. There is a separate controlling area for each country. There is one controlling area, for instance, for Germany and another for Netherlands.
    A problem is encountered while executing transaction KEU5 for multiple controlling areas in parallel. For instance, when one user from Germany executes KEU5 for an assessment cycle for Germany controlling area and at the same time another user from Netherlands tries to execute KEU5 for a cycle for NL controlling area, the user from Netherlands encounters an error message u201C'Cycle XXXX 01.02.2008 cannot be started because run group 0000 is locked'.
    Apparently SAP allows assessment cycles for exactly one controlling area to be executed together. This poses a problem since the organization plans to implement SAP in several other countries (There will be one separate controlling area for each country as per the organization structure adopted by the company).
    Any ideas, views or suggestions on the aforesaid issue would be highly appreciated.
    Regards,
    Soumya

    Hi Soumya,
    Did you find any text in SAP Documentation saying that "SAP does not allow cycles belonging to different controlling areas to be executed at the same time"...?
    Pls find the following text from SAP Help...
    Parallel Processing of Cycles of an Allocation Type
    Use
    Parallel processing of cycles results in considerable time savings. To process cycles of one allocation type in parallel, they must be assigned to different cycle run groups.
    You define the cycle run groups in the cycle header data. You also assign cycles to the cycle run groups in the header data.
    To process the cycles of a cycle run group in parallel, start the cycles one after the other, if required, in different sessions.
    You are carrying out a cross-company code cost accounting and want to perform the actual assessment in the individual company codes in parallel. Create a cycle run group for each company code and assign the appropriate cycles to these groups. You can then carry out the actual assessment in the individual company codes in parallel.
    When you execute a cycle, you can start a consistency check. The system checks whether you are allowed to execute the selected cycles in parallel.
    Though I didn't come across such requirement, I feel, my earlier suggestion will work out...
    Srikanth Munnaluri

  • Actual use of assessment cycle group

    Hi All,
    I want to understand the actual purpose of a cycle group. Is it used to group cycles so that we can execute all the cycles under the group at once in the KSU5 t.code? If yes then how can i execute the cycle group in KSU5 because i cannot find an option to execute the cycle group?
    Thanks in advance.

    hi..
       Your understanding on "Cycle run Group" is not correct. You can't run any group in KSU5 as by default it is defined under "No parallel group". You can select individual cycle as multimple selection line and execute at a time.
      Now What is "Cycle run Group" : As per SAP standard "0000" is defaulted for "No parallel run" that means You can not use this cycle for other company.
      You can creat "Cycle run Group" at the time of creating cycle and  youu can use cycle run groups to allow the cycles for an allocation type to run parallel. But SAP does not recomend this at all.
    I think you are clear on this issue.
    kkumar

  • COPA Assessment Cycles

    Hi Guru,
    I really need some help with setting up COPA assessment cycles in 6.0.  I have used the best practice guides but unfortunately they were to lazy to be thorough.  I am using transaction code KEU7 to create the cycle.  I have attached a few segments to the cycle and added the sender/receiver (cost centers, companycode) details aswell. I checked it before saving the cycle and i got no error messages.  Now when i execute the cycle through tcode KEUB i get errorr/warning messages saying that "no valid sender entries found" and "this segment does not contain any senders".  I am not sure what i am missing and what i may be doing incorrectly.  Can someone please help me understand how to rectify this issue.  I am extremely generous with rewarding points!!!
    Thanks in advance,
    Shaun

    Hi Smith,
    Basically we created copa cycles in KEU1 and execute through KEU5.Find that recivers are product hi-erarachies, In our orgainisation  Corporate oh are be charge to products through copa cycles.
    Coming to your problem,When ever you define new copa cyle you find the error in differet ways.
    1) NO VALID SENDER FOUND  for segment means, Go to the segment there is an button ie consistancy chek box.Click on the check box System returns relavant segment.Observe that segment contains valid senders and revicers are produtc hierarachies or not.
    2) Other wise go to the segment and clik on find button, give the cost center, cost elements.Observe secondary cost elements and rules.
    3) other wise you can directly execute the co-pa cycle and click on segments.Here you can easily find that sender contains valid recivers or not.Basically these kind of error message will appears still now there is no Transaction passed to that products..
    I hope you understood.
    Regards
    Maruthi

  • Reserval of Assessment Cycles for closed periods - FAGLGA15

    Hello,
    We have assessment cycles in closed periods which we want to reverse / repost in current period.  We are using ECC New GL functionality.  Tcode KISR does not seem to recognize Assessment cycles created with FAGLGA1* .
    Suggestions / options to achieve the end result, please.
    Regards
    Jayesh.

    Hi:
    If your CO allocation has some external postings (like GL or fixed assets) or generating some intercompany documents, then it needs FI to be open also. It happens sometimes if the allocation goes external so it would need fI period to be open also. If FI is close but CO is open, it would only work for CO specific allocations and others would error out.
    Please check the cycle/segment which is in error. If it is suppose to hit FI, then FI (OB52) and CO (OKP1) periods should be in sync.
    Thanks.
    Rahul

  • Is the Division(  i. e A/B = C ) is possible in SAP? thrw Assessment cycle?

    Plant Name     Qty Produced (in Kgs)   Total Cost              Per Kg     Cost          
    A             1000                      100000                         100               
    B               200                        20000                         100               
    C               500                       100000                         200               
    D            1500                       450000                         300               
    Requirement                              
    *     I need to get the cost per kg forr each plant is required in SAP                         
         i.e Last Column results shoulh come in SAP                         
    *     Is there any possibility to maintain any Assessment Cycle to achieve this?                         
    *     Suggest me how to get those results in SAP
    If possible What are the senders and receivers and Skfs/ Activity Types to be maintained..............?

    Hi
      Assessment  cycles are used to transfer costs from one cost center to multiple cost centers (KSU5) or from a cost center to multiple PA segments (KEU5). You cannot use plants in an assessment cycle.
      Maybe if the data you have given is available in COPA then you get get the required info using a formula in a KE30 report
    regards
    Waman

  • Assessment cycles, gr55 and ke30

    hi there,
    we have many assessment cycles, cost objets, report painter, Z and COPA reports. I am sure we cant transport master data but can have transport requests for config in IMG. Can we transport the sets/ reports from DEV-QA- Prodn? I am referring to gr31/gr51 and COPA reports?
    Also can we transport the assessment cycles along with their segments?
    Thanks.

    Hi,
    Report Groups and reports in report painter can be transported from DEV-QA-PRD. You can do this using T.code GCTR.
    You can also transport sets from DEV-QA-PRD. Go to GS02 Change sets. Mention the set you want to transport and then go to utilities in menu bar. Under utilities you will have the option of transport which have transport request has sub node.
    Please assign points if useful.
    Regards,

  • Assessment cycle

    Hi guys. I need help on how to create gl assessment cycle step by step.  I created a cycle using FAGLGA11 but i keep getting an error message that the sender and receiver doesn't exist. Is there something that I am missing. My goal is to do profit center assessment to transfer costs from one cost center(service)  to 8 cost centers (production) and post the costs into one GL account. Please help , its urgent.Thanks for your help.
    Moderator: Please, read and respect the rules of SDN

    Hi Sridhar,
    You have defined is ok, further you have to give the selections in the Receiver Tracing Factor - Reveiver Rule / Var portion type.
    You have the following options:
    1. Receiver Rule - You want to transfer the variable portions / fixed amounts / fixed % etc.,
    2. Var. Portion type - On what basis you want to split the sender amount from 201 to receiver cost center group Actual costs / plan costs / actual Statistical key figures / plan Statistical key figures.
    Unless you dont do the selections it would not be able to identify the sender and receiver.
    Regards,
    Suraj

  • Error with assessment Cycle

    Hi all
    When I run Assessment cycle its giving this error .Test run is successful, but normal run its giving the error
    "No account was specified for account type "S" in item "0000000001" of the FI/CO document"
    trying to find out whats happenning.
    Is it some thing with the recon account
    Thanks in advance

    It seems that FI/CO reconciliation is active for CO postings. During assesment it is trying to create a FI document and unable to find GL account. Plz maintain account determination for CO postings.
    If your SAP is 4.7 or below, check the following settings -
    SPRo - Controlling - Cost Element Accounting - Reconciliation Ledger
    If you are on ECC, check out the following settings -
    Financial Accounting Global Settings (New) Ledgers - Real Time Integration of Controlling with Financial Accounting.

  • Reciever tracing factor in COPA assessment cycle

    Hi All,
    I have account-based COPA and am trying to create COPA cost center assessment cycle in Tcode KEU2. While filling the reciever tracing factors, i can see the following values
    RCMEGI     Total Quantity
    RCWKFI     Fixed Costs
    RCWKGI     Total Costs
    However i need to define another key figure based on headcount
    Can anyone help me with how to create additional Amount/Qty Field for the assessment cycle. Where would be above be defined?
    Thanks & Regards
    Pooja Saxena

    Hi Christian
    Are you suggesting that the costs from cost center be allocated upon, say, some IOs based on SKF and then settling the IOs to COPA?
    This would be very cumbersome to create as many IOs as the possible combinations of Customer/ product / Other receiver chars
    Or are you suggesting some thing else which I could not catch?
    Also, new qty field can be created in KEA6... Values updated for this thru KE21N will work for acct based COPA?
    Regards
    Ajay M

  • Distribution criteria list in Assessment cycle takes time

    Dear Peers,
    When I click the tab 'Receiver Tracing factors' of the COPA Cost Center cycles, a dialog 'Distribution criteria list' which asks for one more selection for confirming the receiver parameters. After selecting all of them, it takes very long time but in vain.
    In my case, I want to allocate the selling overheads on the basis for those products with particular batch, say, which starts with say '1' by giving the range as 1AAAAAA TO 1ZZZZZZZ. This '1' denotes one of the manufacturing plants. Hence, I want to pick up the batches which have been sold across the company code in other plants as well as in depots numbering 100+. I had already created  the summarization levels and now I had refreshed it but it has no effect on it. Do we need to create seperate summarization level manually for this and how? Is there any thing other than summarization, we need to do?
    Regards,
    Ashok singh

    Hi Ashok
    Summ levels can be used in Assessment cycles... Your "Distribution List" tab might take time to finish...
    However, I would ask you to assess your req once again... This level of allocation is more likely to cause performance issues
    however, if no of docs in COPA is not much, then you need not worry
    What worries me is that you cant use non-segment level chars as receivers in COPA assessment cycle.. have you specified BATCH No as segment level char in KEQ3? If yes, please undo it.. Else, you are going to face a nightmare situation
    Regards
    Ajay M
    Edited by: Ajay Maheshwari on Jan 10, 2011 3:04 PM

  • Embeding pdf in aspx page and transfer its contents to server using live cycle

    Hi,
         I am new in designing live cycle forms , My requirement is I want to send a pdf content data from client to server, i am using visualstudio 2005 ,
    pls give me a solution for sending using live cycle designer , Is it possible to call a webservice using live cycle if so then how? please provide a sample application , I am waiting for reply

    1) submitting form content from an interactive PDF to a server-side solution
    Designer ES enables the submission of PDF, XDP+XML, XML, and form data via an an HTTP POST. The fact that a PDF is hosted in a HTML container produced by ASPX does not change the submission options. Could you be more specific about what you are looking for in the context of VS 2005?
    2) calling a Web Service
    Yes it is possible to call a Web Service from a client-side interactive PDF. You need to define a data connection to a SOAP endpoint and bind the input and output parameters to form fields. See LiveCycle Designer ES help http://livedocs.adobe.com/livecycle/8.2/acrobat_designer/000498.html.
    Steve

Maybe you are looking for