User forgot to add delivery costs to purchase order

Got a user that forgot to add delivery costs to a purchase order, now it has been GR and IRd, now they want to add the delivery costs, of course they have to reverse the IR and possibly the GR as well, go to change mode and add this missing condition manually
any other options for doing this?? dont think the invoice has been paid yet
Thanks

Dear Mark Ojo.
Try to think of this missing activity, User/Client can mistake/forget this delivery cost
at anytime. so, you can consider for solving this missing amount as below ;
   - If already this finished the GR and IR procedures, (but invoice has not been paid yet),
     best way is also cancellation of entire posted document, but i think that you just try to
     apply this delivery cost to MIRO (-->  Unplanned delivery costs).
   1) MIRO --> "Unplanned delivery costs" on the Detail Tab Screen.
      If you are using the conventional Invoice Verification component, the system splits up the
      delivery costs entered among the individual items, based on the amounts invoiced so far
      plus those in the invoice being entered.
      If you are using Logistics Invoice Verification, how the unplanned delivery costs are posted
     depends on the Customizing settings. There are two possibilities:
       - Unplanned delivery costs are split up as in conventional Invoice Verification.
       - Unplanned delivery costs are posted in a separate posting line to a G/L account set
         up for this.
     2) MIRO --> "Subsequent Debit" on the first screen.
         Specifies which transaction you can choose "Subsequent Debit" for such as when you
         received an invoice from your vendor for delivered goods.Delivery costs are to be charged.
         on the other hand, if you received a credit memo for delivered goods(previously charged
         delivery costs are to be credited) , you can choose "Subsequent Credit".
Regards,
Jeong, Yeong-Chul

Similar Messages

  • How to enter a specific vendor for  the delivery costs in purchasing order?

    Now I want to create a purchasing order including planned deliver costs such as Freight, Coustoms ect, as the vendor of such planned deliver costs is different from the goods supplier, then How to enter a specific vendor for  the delivery costs in purchasing order? That means the partner for invoice partner will be two vendors at least in one purchasing order. thanks very much.
    <i>
    <b>No one would like to answer this question?</b></i>
    Message was edited by:
            King Qi

    hi, 
    You can have vendor at each condition record level.
    try it out.
    cheers
    Rav

  • User Exit to add line item in Purchase Order

    Hi SAP Gurus,
    Can any body tell me which user exit is used to add the line items in Purchase Order. I want to link the Packaging material (material type - VERP) to the header material (Material type - FERT) in PO for order type NB or UB. Because our requirement is what, when we enter the finished material in PO then packaging material linked with that finished material should automatically comes into PO as a line item.
    Please help me for the same.
    Thanks in Advance.
    Regards,
    Sujay

    Hi,
    You can use Function Module for this requirement.
    BAPI_PO_GETDETAIL1
    Bye,
    Muralidhara

  • Condition type Purchase per delivery and per purchase order??

    Hi Guru's,
    Please advice.
    I have 3 questions:
    1) Who knows a condition type in a purchase order with the goal that I can
    register costs per purchase order item ? Example 10 Euro for a certificate per item?
    2) The same but now per purchase order 10 Euro.
    3) Is there a condiont type where I can use the number of deliveries as basis?
    For example: we get charged 10 Euro per delivery. The total of deliveries are not known during PO creation.
    Thank you very much in advance.
    Eric
    Message was edited by:
            eric van zundert

    Hi,
    1) In this,u r maintain Condition Type,u assign that Condition Type to Pricing Procedure.Pricing Procedure to Accounting view of the Vendor Master Record with the combination of the our Purchasing Organization.
    So here the Condition Type ,will be know the Vendor and Our purc.organization.
    2) This will be from the Info Record.
    3)This one is,u have to use GR-Based-Invoice in the PO.
    Thanks & Regards
    Suresh.
    > Hi Guru's,
    >
    > Please advice.
    >
    > I have 3 questions:
    >
    > 1) Who knows a condition type in a purchase order
    > with the goal that I can
    > register costs per purchase order item ? Example 10
    > Euro for a certificate per item?
    >
    > 2) The same but now per purchase order 10 Euro.
    >
    > 3) Is there a condiont type where I can use the
    > number of deliveries as basis?
    > For example: we get charged 10 Euro per delivery. The
    > total of deliveries are not known during PO
    > creation.
    >
    > Thank you very much in advance.
    >
    > Eric
    >
    > Message was edited by:
    >         eric van zundert

  • Fixed Day in a week as Delivery date in Purchase Order.

    Dear All
    I have the below requirement
    For a material/ vendor combination users would like see  always a fixed day as delivery date in Purchase Order.
    For  example for a Material X and Vendor Y always Wednesday of the week should be delivery date.
    Whether this can be achieved ?
    Can you please let me know your thoughts on this
    Regards
    Shyam

    Dear Jurgen
    Thanks for referring to the post.
    But actually my requirement is bit more specific. For material-vendor combination the deleivery date should be a particular day in a week
    Ex : Material X and Vendor X1 = Monday
    Material Y and Vendor Y1=Tuesday
    This requirement I believe is quite difficult in achieving  for a PR from MRP. That's why I put the question as whether we can achieve this when we convert the MPR PRs to PO s ?
    Please let me know your thoughts on this
    Regards
    Shyam

  • How to execute availability check against delivery date in purchase order

    Hi all
    In MD04, I know that "available date = delivery date in purchase order + GR processing time" & "GR date = delivery date in purchase order". When I execute availability check in production order, I will get material's committed date = available date. But I hope to get material's committed date = GR date in purchase order.
    For example. delivery date in purchase order is 2012/02/06 and GR processing time is 2 days. After ATP in production order, I will get committed date 2012/02/08. But I hope it show 2012/02/06. How to customize it.
    (The GR processing time must be set 2 days for MRP calculation. it can be changed to 0.) Thanks!!

    Hi Rita,
    One Doubt, If you say that material commited has to be the GR date and you do not wish to wait for GR processing time, then why do you have the GR processing time in first place.
    For ex. My client, we get the stock as per GR in Quality inspection and so we have GR processing time considered for available time in MD04. But since the business considers the Inspection stock as avialble, The stock gets reflected in avialibility check the moment GR is done.
    So please explain your requirement in detail. There could some way to do so. If not the raise an issue with SAP.

  • Delivery date in Purchase Order Header

    Hi all,
    In which table is Delivery date in Purchase Order Header stored.
    the screen field name is eeind.
    Thanks

    Table EKET, Field EINDT or LPEIN try to look from se11 or se16n
    reward point if correct

  • Delivery date in Purchase Order in the item overview

    Hi all,
    In which table is Delivery date in Purchase Order in the item overview stored.
    the screen field name is eeind.
    Thanks

    In table EKET in field EINDT the delivery date is stored, based on the Schedule lines in the PO Item

  • Source inspection before 365 days of delivery date of purchase order

    Hi Experts,
    Business wants to create source inspection lot well in advance before 365 days of delivery date of purchase order. this lot is required to record results.
    In SAP, transaction code QA51 allows only two digit characters for 'number of days for opening period' so system is not creating inspection lot for more than 99 days delivery date from current date.
    Please advise.

    Hi Patel, I really got interested on this particular issue because we have been using source inspection in our company for a while. After some investigation on ABAP code of report I will share with you my fact findings:
    1) System calculates the start date of source inspection (delivery date from PO - Leadtime from q-info record). For example, in my test case it was 14.08.2015 - 0 days. So field g_datum below will be 14.08.2015:
    2) System then checks if you are running the report in background (highlighted in yellow above). If so then it will check if the start date of inspection (g_datum) falls on opening horizon (g_datum_eroff). The opening horizon is calculated as per formula below (system login date + opening period). As an example: 14.08.2014 + 30 days = 13.09.2014.
    Default opening period (p_eroff) is 30 days:
    3) So all-in-all, when you are running QI07 online you´ll get a yellow traffic light on the long leadtime PO but you will be able to process it (on-line). However if you run the report in background (job scheduling) system will only create inspection lot to the relevant POs if the PO's delivery date falls on the 30 days window based upon the current date.

  • Delivery document from Purchase Order

    Hi Experts,
    How can I create a delivery document from Purchase order type NB?
    I have created a delivery from po type UB, and there is a shipping tab at the item. Do I need also a shipping tab in NB to create a delivery? If yes, how can I customize it?
    Thanks.

    Hi
    I think you are talking about NB for intercompnay stock transport order. For that you need to customization in below link
    spro>MM>purchasing>Purchase order>setup stock transport order
    Apart from STO there is no ther delivery for PO. Because for PO you can do only inbound delivery. For that you need to have confirmation control key defined in customization and then you need to give it in PO. Then you can create a inbound delivery for PO and gainst inbound delivery you can make GR.
    Regards
    Antony

  • Delivery Address in Purchase order

    Hello Expert
    Delivery address on purchase order.
    I am trying to make changes in Delivery address tab at item level  for Intercompany purchase order but the changes are not reflected in print preiview.
    But the same changes I am trying to make in delivery address for standard purchase order and Servie order
    Changes are refelect in print preiview.
    Can you please guide us what must the settings which are not affecting changes in Intercompany purchase order.
    Thanks in advance
    Abhi

    The print preview (or the print itself) is generated via a program assigned to an output type. If you have a custom format, it is possible that the program does not pick up the delivery address from the PO item, but from somewhere else (probably plant address).
    You will have to check the smartform and its driver program for this purpose.
    You can get the program name / smartform name from the output type configuration (check the output type that gets triggered by clicking the messages tab).
    IMG > Materials Management > Purchasing > Messages > Output Control > Message Types > Define Message Types for Purchase Order
    Regards,
    Aroop

  • Creating inbound delivery for the purchase order line items

    Hi Experts,
    Please let me know how can I create inbound delivery for the purchase order line items?  Say, I have a purchase order with 5 line items in it.  I wanted to create an inbound delivery for only 2 line items at this point of time.  Which SAP Standard transaction I have to use and what all  data I need to populate?  I would appreciate any help on this and will reward the right answer.  Please let me know.
    Thank you in advance.
    with regards,
    Muthu Ganapathy.

    Hi,
    While creating the inbound delivery (VL31N), intially all the items will be shown, see the advance shipping notfication - from the vendor for which he has send confirmation & rest items you can delete simply & save. & next time when the vendor sends rest advance shipping notifcation (confirmation), you can receive them.
    Hope this answers your query.
    Regards
    Irfan.

  • Selection of a price list based on the delivery date of purchase orders

    Description of requirement:
    One of our customers would like to have the price list selected on the basis of the delivery date of purchase orders rather than on the posting date.
    The customer wants to have this feature available by the date scheduled for their go-live, that is January 2nd 2008.
    Best regards,
    Emmanuel Ruellan

    Dear development team,
    Is it possible to have the above functionality in a future version?
    Best regards,
    Emmanuel Ruellan

  • Issue During Outbound Delivery for STO Purchase order

    Hi,
    Delivery Quantity is not picking automatically in VL10B, while creating outbound delivery with STO purchase order with account assignment ''Q'' Project (with WBS element). Stock also available in the supplying plant as shown the below screen shot.
    MMBE:
    Please do the needful.
    Thanks,
    Ashok

    Hi Pardhu,
    Thanks for your response.
    We don't have any open reservations and safety stock available for the material. Kindly go through below screen shot for your reference:
    Thanks,
    Ashok

  • Shipment costs to appear as delivery costs in Purchase

    Hi,
    we want the shipment costs to appear on the purchase order.
    I have followed the sequence as below
    Created a purchase order
    Created a delivery VL31N
    Created a shipment VT01N
    Created a shipment cost document VI01
    I have goods receipt using VL32N, but the shipment cost did not appear in Purchase Order.
    in configuration i have created a new condition in Purchasing ZFRB which has copy shipment cost slected, and added this to the purchasing schema.
    for the shipment cost item category, i configured the settement to delivery costs and left the generate PO blank.
    i would be grateful if someone could help me with configuration that i've missed,
    thanks in advance
    Shadaab

    Please read OSS note 427944 and check SAP online help:
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/83/218ad1068a11d2bf5d0000e8a7386f/frameset.htm
    Prerequisites
    To add shipment costs to delivery costs in the incoming shipments, you need the following settings in Customizing:
    Shipment cost item categories
    Under the Shipment cost types and item categories activity, set the Relevant for costing field to A = Relevant for calculating delivery costs (Delivery costs). This results in the shipment costs not being transferred directly into accounting. The accounting is done via the purchasing functionality for delivery costs.
    Conditions in the purchase order
    Under the Define condition types activity, set the Condition type field to B = Delivery costs. In addition, select the Transfer shipment costs field. The system only shows this field, if you have chosen delivery costs as condition type. In the purchase order, you have to enter the condition type in the item category section. However, you do not enter a value since this value will be determined by the shipment cost document and will then be automatically transferred to the goods receipt document.
    Goods receipt
    To find the relevant shipment cost documents, you must know the corresponding inbound deliveries. Therefore for incoming goods this must relate to confirmation-related goods receipts. Under the Set up confirmation control activity, select the GR-relevant and GR assignment fields for the appropriate confirmation control key (which is then entered in the purchase order).
    Regards,
    Csaba

Maybe you are looking for

  • How to know if commit_form is successful

    Hi I am new with Oracle Forms. I am developing an application using Oracle 10g express and forms 6i. Can somebody please guide me regarding code under SAVE button(I have placed some push buttons on form for add_new, Save, Reset ect). I am trying to h

  • Completely Frozen iTouch after 3.1.2 Upgrade

    Yeah, I'm not too happy about this. Besides the fact that it wiped everything clean off my iTouch in order to upgrade, it's now frozen. All the screen simply shows is the Apple Symbol and then a loading bar underneath, which is frozen as well. When c

  • Import problems

    When I open up iPhoto, I get two messages:  " 57 photos have been found in the iphoto library. Would you like to import them? "  If I respond yes or no, it doesn't matter and repeats itself.    Then I get a message: "the photos have been placed in fo

  • Standby setup - error in shipping logs

    Hello all, I have configured a physical standby database at the DR site which is connected by a 2mbps line to the primary database at Mumbai. A log file 20 MB in size takes 90 seconds to traverse this line (through manual ftp). When I put the databas

  • UWL Customisation for MSS

    Hi, We are using ESS/MSS mySAP ERP 2005 on EP7.0, ECC6.0. I ma running into some issues. 1) By default the tabs displayed in the Portal UWL are Alerts, Tasks,Notifications, Tracking. I want the Tasks to come up before Alerts. For this I tried Navigat