User Status automatically checked when a order is scheduled twice or more

Hello Friends
We created a User Status called "Rescheduled" for Work Orders
We want that the system flag this status automatically when a order is scheduled twice or more in CM33
Is that possible?
Edited by: Davison Tadeu Avigo on Jul 14, 2011 4:23 PM

Davison Tadeu Avigo
Yes it would be possible, but you would need to develop a solution for this..
PeteA

Similar Messages

  • Need help on to set User status for Operations in Maintenance order

    Hi experts,
    i am new to PM module.
    i need to do BDC for IW31. i want to know some inforamtion
    on user status for each opertaion.
    my problem is ,, what is user status.
    why it is saying order is not yet released when saving and status can not set.
    in this cases how can i do BDC.

    User status are something set in the configuration and specific to the company which SAP hasn't given in the system status.
    May be in your system user status are configured to set only  after the release of the order.
    For doing the userstatus you may need to release the order, you can release the order thru bdc and then do bdc for user status. Also see below link
    http://www.sap-img.com/plant/user-status-set-date-in-maintenance-order.htm

  • Reopen windows box is automatically checked when shutting down

    Since I've installed LIon, "reopen windows" box is automatically checked when shutting down.
    how do i change this preference?
    thanks!
    ellen

    ellenfromblue bell wrote:
    Since I've installed LIon, "reopen windows" box is automatically checked when shutting down.
    how do i change this preference?
    To prevent application windows (not Finder windows) from reopening on restart, simply close all open applications, then use the Get Info dialog "Locked" checkbox to lock this plist (not the lockfile by the same name),
    ~/Library/Preferences/ByHost/com.apple.loginwindow.*.plist
    where "~" is your home folder, and "*" is a string of characters (12 in my case). This plist is where the System stores "reopen windows" info, so the System can't change/delete it if it is locked. Works fine for me and others.

  • Prevention of delivery when using "user status profile" for a sales order?

    Hi,
    I have used "user profile status" in the sales order "as a work flow" for releasing the sales order.
    The user profile are as follows
    a) 10: created
    b) 20: Released
    But I believe I am still able to create the delivery when the order status is still "10" created.
    Any advise, user exit or workaround or should this happen.
    Usefull answers will be rewarded.
    Thanks

    Dear Rajiv,
    Please go through this SAP help link it will help you about Status Management in the sales order processing.
    http://help.sap.com/saphelp_47x200/helpdata/en/dd/560629545a11d1a7020000e829fd11/frameset.htm
    I hope htis will help you,
    Regards,
    Murali.

  • Upadation of user status and text for perticular order line item.

    Hi Frens,
    I got stuck while updating the status field.
    After Posting IDOCs,
    I am getting the order response data in ' XML ' file format from OSS through XI.
    Here we have to check the rejacted and commited records.
    For that,We have created two new status fields for the sales order type ZTA0 and Item category ZTA4.
    OSSM (send with error)
    OSSU (send without error)
    Depending of the status from OSS the either OSSM or OSSU should be automatically updated.
    Further we have created a new text type ZOSS (error message from OSS). This is also to  be updated with a relevant text if status OSSM is trigged.
    If status is OSSM is trigged an e-mail to the responsible person.
    I am posting 4 idocs.(ZOSS_CREATE ,ZOSS_Change,ZOSS_Cancel,ZOSS_Complete ).
    Depending upon which idoc is giving errors , mail should be triggered to corresponding person who created or changed the Sales order.
    Need Help on this.

    Hi Amitav,
    I think you need to develope a simple workflow for this.
    After IDOC processing, in case of any error, IDOCAPPL.inputErrorOccurred or somthing similar event gets triggerd.
    You need to develope a workflow which will have above mentioned event as triggering event and will check for your IDOC types.
    Further, the user name, who changed the order must be there in one of the field of IDOC data.
    This workflow will have  one step to send a mail to the above user name.
    You can call another background task, which will further call a method ( you need to check which object you are trying to update and see if a mehtod is available on that for updating the status or else create one ) to update the status.
    Thanks,
    Ram
    Message was edited by: Ram Manohar Tiwari

  • Implementing registration check when an order comes

    Hi all,
    My requirement is as follows:
    Brief: We need a mechanism in SAP which will allow us to block the release of a catalog number at the country level to ensure product is not released into the country before our product gets regulatory clearance from that country.
    In detail:
    When we enter customer order in SAP, then the catalog number looks at the customer account ID which has the country of sale.
    If our product is not approved in that country then that order should not process and a notification should be given.  Once we recieve the approval from the country we need to remove the block and the order should be processed.
    The idea i have is:
    to create a ztable with country id, product(material no) and approval status.
    while checking an order read the ztable to cehck the status and process accordingly.
    I think it is similar to credit realease for a customer.
    Note: Blocking is not at organisation level. It is at country level.
    Can any one please help me how to implement that in SAP.
    Thanks,
    Aravind.
    Edited by: Aravind Kanaparthi on Aug 21, 2009 7:56 AM

    Hi Raymond,
    Thanks for your reply. I have used the user exit suggested by you. Its working. But client came back suggesting to maintain class type for materials since there are lakhs of products and maintaining them  in ztable and changing as we get approval is difficult.
    He suggested to use classification on material master.For a material no. we could have a series of checkboxes for all the countries we could possibly sell the product in. We build out the classification with all possible countries once. Then assign to the material master for material numbers. Then users can go in and update as regulatory approval is gained on a country by country basis.
    Can you please tell me how to resolve this issue?

  • User Status change problem in Process Order

    Hi,
    We are in process of upgrading our system from 4.6C to ECC 6.0. I have a problem with User status change for process Orders.
    In 4.6C we are using the profile x with settings:
    10     ZNEW     Created process order     10     90     1     1     ZSTA
    20     ZLCK     Locked process order     20     90     1     1     ZREV
    30     ZOPN     Reopened process order     20     90     1     1     ZOPN
    40     ZMST     MES order started     20     90     1     1     ZMST
    50     ZMCL     MES order closed     20     90     1     1     ZMCL
    90     ZTEC     Technically completed      20     90     1     1     ZTEC
    In ECC 6.0 we also use the same profile settings as above.
    The problem is in ECC 6.0 when I do a goods receipt the User status changes to ZTEC . The process followed is ..Create process order, Release Order, Goods issue, Phase partuial confirmations, Goods receipt and then Finla confirmations of phases. Now in 4.6C if i do the above process the User status remains at ZMST and it only changes to ZTEC when i technically complete the order but in ECC 6.0 when I do a goods recipt from above steps the User status changes to ZTEC. THis should not happen.
    Any pointers will be very helpful.

    Hi,
    The log for production order preliminiary costing is not saved. Therefore, once the order is saved, there is no log available anymore (this is by the way a question of PP; none of the logs is saved).
    Hope that helps...
    Regards,
    Declan

  • User status for Notification and Work order

    We generate Service Notification IW26. I have already configured user status like PMND (Planning order not done), AWOP (Awaiting ordered parts) etc. in the Work order a while ago. Now the user wants same User status to the Notification as well. I like to know from experts what is the value added to have the same user status for both Notification and Work Order?
    Do you have any suggestions?

    Hey Chandra,
    The customer intent behind this requirement must be to check in reporting / List Display Transaction about the Order Status. If they want to know looking at a Pending Notification List about the Order Status, you can always provide similar report using SAP Query Builder or with help of your Developer.
    Apart from that If the Requirement is to have these User Statuses in Notification itself, Please advice them that it will be extra activity while performing transaction.
    I dont see any other benefit of having User Statuses added to Notification as well.
    Do let me know if you have some more info on Why Customer is requesting this....
    Regards,
    Avi

  • User statuses for equipment,functional location,order,notification

    Kindly suggest me which user statuses should be assigned to equipment,func. location,notification & order.
    Regards,
    Vivek

    Vivek,
    There is no rule or std instruction which user status to be assinged to equipment,FL, Notification or order. In std you may get some user status for equipment. notification etc. It doesnt mean that you should use it. User status are define /created base on the  business requirement . a user status can be assigned to multiple object type such as equipment, notification ,order etc.
    You can refer the std user status profile when you create your own. In order to know the detail of it object type. You can select the status profile >> click on the detail>> click on the object types.
    Hope it is helpful to you.
    if you want further detail please revert.
    DP

  • System Status & User Status Fields/Tables for PM Order

    Hi All,
    May I know the PM Order System Status & User Status Field Names & Tables??
    Sundar

    Dear,
    Table- JEST  to get the status of the order &
    Table- TJ02T to get the text for the internal status & TJ30 to get the text of external status.
    regards
    sunil

  • User Exit IDOC creation - When purchase order gets created

    Hi All,
    The requirement is whenever user creates a Purchase Order in the current SAP system an IDOC needs to get created and be sent to another SAP system where a Sales Order will be created.
    Can anybody suggest the correct User exit/enhancement at the time of Purchase order creation which could be used ?
    Also the function modules for creating the IDOCs within the user-exit.
    Thanks for your help.

    Hi Meghna,
    Your requirement is SAP standard function which means you don't have to use any user exit.
    What you need to do is configure output control, then when a PO saved, a idoc will send to vendor automaticly.
    Here is a step brief
    1. configure output type in NACE
    2. Add condition record in NACE
    3. Setup partner profile in WE20
    if you need detailed doc, give me your email, I can send you.
    Regards,
    Brown

  • BADI or USER EXIT for MIGO when changing order number

    Hi experts, I'm looking for a BADI or USER EXIT in Tx. MIGO that is triggered after pushing ENTER when you change the order number. What I need to do is to propose the movement type depending on the order data. Thanks.

    Not sure but you can try in BADi MB_DOCUMENT_BADI menthod:
    MB_DOCUMENT_UPDATE

  • GR-Non valuated flag is checked when using Order as account assignment Cat

    Hi,
    We are creating a Purchase Req using a Work order, but under the valutaion tab GR-non Valuated is checked and greyed out so the user can't uncheck it. I want user to select just the Goods Receipt Check but not GR-Non Val.
    I already chekced the configuration in OME9 and both are not checked . Also we are not using multiple accout assignment there is only one account assignment element which is that Work order number.
    please advice...
    thank you!

    what is the account assignment category in your PR? if it is coming as checked by default then somebody must have ticked it in SPRO-MM-Pur-account assignment-Maintain Account assignment categories---there select your relevant account assignment category and you will see GR Non Val indicator TICKED, if you don't want it to be dafult in PR , remove it.
    But first check why it has been ticked there , it is possible that based on business need all servies / stock purchase under that acnt *** cat need not to be valuated.
    Yogesh

  • How can I get a check box automatically checked when other check boxes are checked?

    A little tongue twister there, but the attached image should clarify.
    I'm trying to create a form to measure achievements. When all achievements are met/checked I want the green check box with a star to auto-check.
    If not all achievements are checked, I want the orange check box to auto check...
    Can I get this working by using export values?
    Thanks!

    I would use a custom JavaScript to count the number of check boxes whose value is not "Off" and set the final box on the result of the count.

  • Status is failed when a batch is scheduled when the destination is PDF

    Hi,
    I have couple of batched which need's to be scheduled among those one of the batch which are ll running with PDF destination is getting the status as error so what would be the error for  this.
    It's an urgent task please let me know any suggestions
    Thanks

    check FrConfig.cmd file it will point to Setenv.bat file... make sure you have correct path there. when i made changes in there it is now accepting the folders
    OR
    There is a related Bug (known issue) for this. You'll have to use the hyperion service user(the user account which was used to install) to burst to a shared directory.
    How about creating a hard link and adding that as an ExportFolder. (I've never tried it). It may work because FR might think that as a local folder.
    When i said hard link was a referring to a link created using MKLINK command Mklink not a local folder.
    let me know if more inputs required.
    Thanks,
    ~KKT~

Maybe you are looking for

  • If you format on a Mac can you still use on a PC?

    I know it used to be if you formated you iPod to a pc you could use it on both pc and Mac. But if you formated to a Mac you cant ever use it on a PC. Is that still true?

  • Install photoshop cc on second drive

    I read an article saying Photoshop will run more efficiently if it is installed on a second drive and a third drive for scratch files. When I go to install Photoshop CC it does not give me an option to change drive install location? Does anyone have

  • Raise an Event in Redwood after a Commit to an External Oracle DB?

    Hello Netweaver Community / Redwood specific, I am at customer site and have been presented with the following scenario and subsequent question... The scenario is that there is a 3rd party product (powerBuilder program / windows executable) that is u

  • Duplicates in my music library

    I have a playlist for my songs in the I-Phone 4. My problem is that i have duplicates of the songs. But my playlist and i-tunes are syncing, just that when i browse the songs through the phone's library i have 3 copies of each songs. When i checked t

  • Dedicated or shared  server configuration

    Hi all, Good day...We have a 10204 rac db running on a linux server. Our concurrent connection are more than 1000..Is that good to have a shared server configuration or we can continue with dedicated server configuration... thanks, baskar.l