Validility period of cost centre

hi,
can anybody tell me how can i change the validity period of cost centre and cost element ???
ankur

cost centre and cost element validity can be changed In KS02 AND KA02 we can click on Edit Tab - analysis period - other analysis period at the bottom.
or for the cost centre we can also change in -  spro - controlling- cost centre accounting- master data- cost centres- define standard hierarchy-   u will find the cost centre basic screen at the bottom
Beside the analysis time frame u will find small icon set analysis time frame where we can change.
thanks

Similar Messages

  • How to change validity period of cost centre or activity type

    Hi
    How to change validity period for an Activity type or Cost centre?
    Can we change the validity period once created?
    regards
    Prakash

    Please note this can be done.
    Go to Edit Cost Center
    Goto Edit, Analysis Period.
    Create a new validity period say today until 3112999
    Change the data you want and save.
    When you go into the CC again it will show two validity periods.

  • Cost centre wise expenses comperative with period to period

    hi all,
                     pls tell me is there any standard report for cost centre wise expenses comperative with period to period.
                  if not pls help me how i can prepare it and also tell me table name.
    regards
    vikas

    Hi,
    check tcode KSBT
    KSBL
    S_ALR_87013611
    S_ALR_87013612
    S_ALR_87013613
    S_ALR_87013614
    S_ALR_87013623
    S_ALR_87013624
    S_ALR_87013625
    S_ALR_87013626
    Regards,
    V.Balaji
    Reward if Usefull...
    Edited by: Balaji V on Apr 1, 2008 6:40 AM

  • Automatic settlement to particular combination of cost centres and gl codes

    HI,
    A company uses Plant Maintenance for Engineering overhauls. MM is used for Engineering spares only (i.e. not for goods for resale etc).
    The requirement is to set up ongoing Plant Maintenance Orders, one for each item of plant (only 600). The plan is just to leave them open, as they are only used at a simple level.
    Anyway, for each PM order, the requirement will be to settle automatically, and to a particular GL code and a particular cost centre.
    So, for three different works orders:-
    Cost Centre -
    >   333     334     335
    GL code
    1234----
    >(X)
    1235----
    >(Y)
    1236----
    >(Z)
    1) What is the best way to achieve this? I am thinking that GL code will be specified by order type (therefore I will need about 10, corresponding to the GL codes) and cost centre will be specified by Work Centre in each order.
    2) How do I set up automatic settlement? Can this be at period end only or instantly when good are booked to the order by the stores.

    Hi ,
    For Plant Maintenance with FICO , you need Settlement rule & settlement profile. 
    The settlement rule determines what portions of a sender's costs are to be settled to which receiver(s).
    In thesettlement profile you determine to which objects orders of this order type can settle to. You can also assign an order type to a settlement profile at a later date. You can change the settlement profile in the order.
    After you create the settlement profile , you need to save the profile to particular order type.
    Inside the settlement profile , you will define the control parameter of how is the way to settle included which cost center to post.
    For automatic settlement , i think you need user exist - Please refer to userexit IWO10027 or COOM0003 with your abaper.
    Thank you.

  • COST CENTRE EXPENSES WITH THE HELP OF COSP

    hi all,
        i have to make a report on cost centre expenses with the help table COSP.I have to put cost centre  from OBJNR in which last five haraters are cost centre and period like month  and year.After that in report display i want KSTAR i.e. in down the line and cost centres of selection in vertical it may increase or decrease depending on selection.After that i have to add all the WTG001-WTG016.if in seletion period is 1 to 2 then i have to add WTG001 and WTG002 in corresponding in KSTAR and so on in desired cost centre column below that facing respective KSTAR.If anyone can send any report relating that i will be thankful.
    Regards,
    Praveen

    Answered

  • Cost centre report with all GL expense accounts

    Hi Gurus;
    Can you please give a cost centre report that gives all GL expense accounts with the correponding Cost centres or functional areas ni the next column?
    Example:
    Column A                        B                C                          D
    GL 12005                Cc 52001        Amount 100          function area 1000
    That is without expanding the report gives you in total amount per requested period in the format shown.
    The report should tally with Trial balance for all expense accounts.
    Thanks
    Lameck

    Hi
    Did you check the available reports in cost center accounting ?
    Also check the report layout and check the desired fields.
    Now you could see whether they match or not your requirement.
    If not also, you could add fields from the options.
    If nothing works, create a Z Report.
    reg
    suresh

  • Change the profit centre in the cost centre master after a year

    Hi All,
    Could you'll please let me know whether it was possible to change the profit centre in the cost centre master and if i did what will be the implications.
    Thanks and Regards,
    Vandana

    Refer transaction code OKEG.
    You can maintain master data for cost centers, cost elements, activity    
    types, and business processes with time dependencies. You can make        
    changes at any time for any given time interval. Data storage also takes  
    place with a time reference. In this way, a master data record can have   
    multiple database records storing different information.                                                                               
    The smallest interval is one day. To ensure data consistency, you cannot  
    change each field daily. The timeframes in which you can change a field   
    depend on the field functions, which are fixed by the system and cannot   
    be changed. Master data maintenance includes an automatic check for each  
    field's time-based consistency, resulting in individual time-based        
    maintenance for each field.                                                                               
    The following dependencies are supported:                                                                               
    o   Not time-based                                                                               
    o   Day-based                                                                               
    o   Period-based                                                                               
    o   (Fiscal) year-based                                                                               
    This function provides an overview of the time dependencies of           
    individual master data fields during master data maintenance, along with 
    checks and storage of consistency timeframes. You find this information  
    in the "Time dependency" column.                                                                               
    If you use fields requiring characteristics greater than one day and     
    which are changed for the system lifetime of the object, the system      
    automatically creates a new database record for this processing          
    interval, and changes the time-based validity of existing records. The   
    change is logged in the master data record with the time reference.      
    However, a great number of changes in multiple timeframes will result in 
    a correspondingly great number of data records.                                                                               
    Fields which you can change freely (indicated in the DAY column) can     
    possess different time dependencies only if you mark them additionally   
    as historically relevant. This activates the time-based updating for the 
    records.
    Object 1000 has one master data record created with a fiscal year of 12 
    periods and the cost center name AAAAAAAAAA. During master data         
    maintenance, you change the cost center name in period 5 to BBBBBBBBBB. 
    The system reacts with one of two options.                                                                               
    o   "Name" is marked as historically relevant. The existing master data 
         record for periods 1 - 12 must now become three records:            
         1000   01-04   AAAAAAAAAA                                           
         1000   05      BBBBBBBBBB                                           
         1000   06-12   AAAAAAAAAA                                                                               
    o   "Name" is not marked as historically relevant. The existing master  
         data record remains intact, with the name changed for the entire    
         existence of the record:                                            
         1000   01-12   BBBBBBBBBB
    Edited by: Ravi Sankar Venna on May 19, 2009 4:03 PM

  • Bad Debt By Cost Centre

    Is there any business content (or combination of inforproviders) that shows me outstanding debts by customer and the cost centre that the revenue has been credited to?

    Hi
    Usually revenue does not get credited to a cost center in R/3 but to profitability segments, internal orders, sales orders or WBS elements. However, it may be possible to derive the cost center from the master data.
    To link the outstanding value of a customer, which is a balance sheet item (and not appearing in the controlling module) to the revenue (income statement item) will prove a bit difficult. There is no standard content to link this specific scenario.
    Also remember that the outstanding balance is reflected at a specific point in time and may relate to a variety of invoices, while revenue is accumulated over a period as well.
    L.

  • Cost centre assemment cycle

    Dear all,
    Question on Cost Center Assessment Cycle:
    Controlling environment: only one controlling area with several company codes.
    In my standard hierarchy we've got some nodes with cost centre from different company codes in the same node.
    I would like to transfer cost from one node to another node via an assessment cycle.
    So I activated “company code” in header data as selection criteria for cost center assessment cycle via Tcode KCIU.
    This selection criteria will allow SAP to sort cost centre and only takes the one which will correspond to company code selected.
    The sender rule is the "posted amount" and the receiver rule is the "percentage".
    Once cycle has been created, I click on the check icon and the check was successful.
    When I execute it, SAP warns me that "no valid sender entries were found". The message errors numbers are GA749 and GA710. And those messages correspond to FI message and not CO.
    I do not understand because there are posted amounts and all cost centers exist with the good period of validity.
    Do you know why? Do you have an explanation?
    Is it really possible to activate some news criteria selection for cost centre assessment cycle? Or definitively not possible.
    Did I forget any else customizings?
    Best regards
    Sovann leng

    You have two directions to resolve this issue:
    1- check TCODE GCA8 and check whether the new GL tables are listed or added specially the FAGLFLEXT
    2- You probably need to change the From To periods in the selection parameters. Don't make the From To the same period.
    Make sure the Settlement profile is configured appropriately. With a bit of trial and error concerning the GCA8 including defining a new Cycle with another segment, and it'll work.

  • Cost Centre Currency

    Hi
    We have got number of cost centres with wrong currency as part of the cost centre master data. All of them have got postings against them. Can you please tell me !
    - Can I change the currency to correct currency ( I suppose, we can create another analysis period ?)
    - Is it true that Company code (Controlling) currency (which is correct in this case) takes the precedent over whatever currency maintained as part of the master data?
    - What impact would this error will have on the existing entries, I have checked the entries in GD13 and KSB1 reports and they all are in company code currency and seem to be ok? Am I missing something to check ??
    Much appreciated.
    SA
    PS: I will award points irrespective of answer helps me or not as I do appreciate the effort behind any reply.

    Thank you folks
    Eric - Maximum awarded
    Sridhar - very helpful answer
    Last thing,
    Does this constitute some kind of mis-statement for financial reporting, as far as I understood, as controlling are currency is correct, the object currency error wouldn't affect the reporting as my assumption is controlling will take precedent. Please do correct me if I am wrong.
    Would you still advise to correct them to correct currency, by creating another analysis period or would advise to create new cost centre itself (which will be very painful)
    Cheers
    SA

  • Cost Centre Repostiongs

    Can we make repostings in CO with FI periods being closed.
    Actually we are reveiwing our Cost Centre postings of the previous six months and in this process we need to make some repostings. We are currently using T code KB11n and KB61 for the same, however each time the system gives an error for the same stating that the posting periods are closed.
    can we repost within Cost Centre without opening the prvious periods in FI.
    The CO period for the Co Code Area are already open.
    regards,
    Fareed
    Edited by: Fareed  Dhiyan on Dec 29, 2008 12:32 PM

    Dear Mr. Sreekanth
    I have checked the transaction code OKP1 the posting periods for reposting costs within cost centres aer open, still it asks for opening the FI periods to post the cost centre repostings.
    Do we need to check any configuration related things in the same.
    regards,
    fareed

  • Cost Centre Report - Report Painter

    Dears
    I am trying to create a Cost Centre report to show the Cost element posting period wise in vertical columns.
    I am not able to get the required output. I am not sure whether I am mistaken anywhere.
    General Data selection : Controlling area, Cost Centre
    In the GL Code : Cost element
    Period 14-Jan : Version, Actual Cost, Fiscal year, Period from (001), period to (001)
    Period 14-Feb : Version, ACtual Cost, Fiscal year, period from (002) , period to (002)
    etc. etc.
    still I am not able to execute the report.
    Please advise whether I am doing right ?

    HI ,
    please see below .
    Your form should look like as below ( Please ignore Plan cloumn )
    General data selection
    NOw as left and side you see I have debit and credit as lead column .
    Now click double click on lead column .for debitand define as per below screen shot
    After this double click on next line and define credit elements I have included A creditas well coz we have settlements as well.
    NOw you need to define the Actual Periods as per my First screenshot
    I have Plan periods as well Please ignore them . YOu can just define 12 Actual mnths only as below
    NOw you  this exercide for 12 time for each periods . Just change Period filed like  from2 to 2 , from3 to 3 etc.....
    Please let me know if you need more help.
    Many Thanks

  • Retro payroll processing for org unit cost centre changes

    Dear All,
    We have created some new cost centres and assigned  it to relevant org units . when we run payroll , retro run is happening from the period we changed the cost center and assigned the new cost centre to the org units . please suggest a solution
    regards
    Tressya

    Hi Tressya,
    changes in IT0003 won't affect retro calculation, since you have already created result periods for retro calculation. The payroll programm will detect this and allways will repeat the retro unless you delete those results first.
    Try TR PU01 during correction - then clear Earl.pers. RA date  by PU03 (PA30 won't work here)
    After that you hou'll have to repeat payroll run for effected employees to get new results for actual period only.
    regards
    J.

  • Blocking of Cost centre and activity type

    Dear all,
    Please tell me how to block cost centres and activity types which will no longer be used
    best rgds,
    Manoj

    Hi,
    There are two ways .
    If you wish to use the cost center number for any other cost center , then you need to delete the cost center by KS04 & you need to mention the future period for which the same should deleted, normally, starting would be 1st day of next year to 31.12.9999
    Keep in mind, cost center can only be deleted , if no data (Actual/Plan/reversal) is posted in it. You may do it , before starting next year's budget processing.
    If you wish to just block the same , lock Actual primary/Secondary & Plan primary/Secondary in the control tab.
    Regards,
    Deepak Kolwankar

  • Cost Centre Splitting

    Dears
    I am not very much conversant with Controlling.
    Still I am supposed to do the period opening activities in Controlling.
    I need a clarification on the Cost Centre Splitting.
    Cost Centre 300001 is having 3 activity types : MACH001, LAB001, FIN001
    In our case, there is a Split structure Z1 and there are 35 assignments to this structure.
    When I go into the individual assignment, say, first assignment (defined as 10),
    I see that the selection criteria is Cost element group : AB0001 (5 cost elements) & ActivityType : MACH001.
    What does this imply ?
    I understand that the total plan cost for the cost element group AB0001 will be allocated to the Activity type MACH001 for this Cost Centre 300001.
    This cost will not be available to any other activity type in the same cost centre.
    Is my understanding correct ?

    Hi,
    Please look into the following to know the concept of splitting:
    Here I am providing the necessity and importance of splitting structure,
                        Expense Analysis and Splitting in Manufacturing Cost Centers
    Introduction In SAP Cost center work as a cost responsibility center, where all the expenses and cost are stored and analyzed for the purpose of management decision making.
    The cost could be fixed or variable in nature. The difference between variable and fixed costs can be made in various ways in product costing in CO module.
    Fixed costs represent the static costs incurred by the organization, which doesn’t change on the basis on manufacturing activities, which remain constant irrespective of production activities like rent for the premises, salaries of office staff etc.
    On the other hand, variable cost varies based on the level of production activities; if production activities increase then variable cost also increased like electricity consumes raw material charges etc.
    However all the variable cost doesn’t vary in direct proportion by quantity of goods produced.
    In this document will try to define; how the Expenses analysis and splitting of cost done in manufacturing cost centers.
    From controlling prospective, fixed cost remain constant regardless of operating activities, but if these factor changes, variable cost will fluctuate.
    Basically raw material costs represent variable cost, but in this document main focused will be given to distinguish fixed and variable activity cost.
    The segregation between fixed and variable cost is optional and is derived from the configuration and master data configured in cost center accounting and overhead accounting.
    Activity Price:
    There are different methods that could be used in cost center accounting to determine the activity price. The simple way is the manually enter “Fixed” and “Variable” Activity cost (KP26).
    However there are other methods used in Cost center Planning and Budgeting that automatically calculate the fixed and variable activity price.
    Here the focused will be given on Planning and Budgeting activity and automatic calculation of plan activity rate in cost center.
    This method aggregate planned costs by cost element and capacity by plan unit to calculate the activity price.
    Activity independent costs are segregated among different activities based on Splitting Structure, while activity dependent cost directly used for the purpose of variable activity rate calculation.  
    Fixed Activity Cost:
    In product costing all those cost, which doesn’t vary based on the activities in manufacturing cost will represent fixed cost.
    In a manufacturing cost centers there may be two or more activities performed.
    To calculate the activities rate, the fixed costs are distributed to various activities on the basis of Splitting Structure defined for cost center. 
    Variable Activity Cost:
    Variable activity cost, which directly depend upon the activity type and fluctuate based on increase or decrease in manufacturing activities. In SAP variable activity cost are directly linked to the respective activity.
    Activity Prices: Fixed and Variable Split
    In Cost Center Accounting dividing the cost between Fixed and Variable requires appropriate split to be made in the cost entered for the activity. The process is described below:
    i.  Variable cost would be planned at activity level and expenses should be maintained at cost element in the manufacturing cost center by assigning activity and cost element combination.
    In other word, the expenses should be planned on Activity type at the time of primary cost planning (KP06).
    Then the variable activity rates are calculated on Total cost planned at Activity divided by Total number of activity planned at that cost center (i.e. capacity in KP26)
    ii. Fixed cost would be planned at independent of activity type. These costs are maintained in KP06 at cost element level on manufacturing cost center.
    Then the fixed costs are distributed on various activity types on the basis of Splitting structure defined at OKEW.
    In Splitting Structure we define the rules, how the fixed cost will be distributed to Activities. For the purpose of this document, considering split of fixed cost on the basis of Capacity maintained in KP26.
    Regards,
    Pavan kumar Arvapally

Maybe you are looking for

  • Help! How do you adapt an InDesign document in various languages?

    Hi everyone...we are presently working on a user manual which we designed in English. We need to adapt this manual in 4 other languages. Is there anya feature in InDesign that changes the language in the doucument without going through the process of

  • Is Multiple Http handlers are re-commended

    Dear All, We have created an Http handler service using sicf and this will be used by the mobile application for online queries. Now i would like to know what is the best method of implementation. Please adress the following queries. 1. Is it better

  • Error during email account validation

    I'm trying to activate my email account, and keep getting the message "An error occurred during email account validation. Please check your information and try again." Any advice?

  • Installing Elements 12

    The last year launched by downloading Elements 12   I try to install on my new Windows 7 64bits system. By clicking on my product the process isn't starting. Akamai Download Manager should start the download. What can I do? William Heres, Holland

  • Why is a 4MB Pages document converting into a 20.7MB epub file?  How can I reduce the size?

    I'm using Pages 4.3 to create epub files.  It converted a 112-page, 4 MB Pages document to a 20.7 MB epub file.  Yet when I converted the Pages document to a mobi file (for Amazon ebooks), it's only 3.6 MB.  Obviously I can't use a 20.7 MB file.  Why