Where to assign setup matrix ?

Hello to all SAP Expert,
    I have one problem regarding setup matrix assignment. I have created setup matrix, but where to assign this so that I can reduce my setup time required.
Thanks in Advance.
Regards,
Yogesh

Dear,
Set up group and transition matrix :- Setup group key is defined in the operation in the routing and then the transition times between setup keys is maintained in configuration. in work center CR02  default value tap you will get field for Setup Type Key.
Regards,
R.brahmankar

Similar Messages

  • Assign a matrix to a JTable?  Possible?

    OK. I will not know the incomming data matrix untill it is assigned. Is there anyway to put the following matrix into a JTable without a headache? All I see are examples of Object class variables assigned to JTables. If anyone knows how to make this work I will appreciate it very much. Here is what I have come up with as an idea:
            String[][] originalDMatrix;
            // Assigned String Matrix.
            if(Program.printDataMatrix.isSelected()) {
                originalDMatrix = new String[Program.matrix.length][];
                for(int i = 0; i < Program.matrix.length; i++) {
                    originalDMatrix[i] = new String[Program.matrix.length];
    for (int j = 0; j < Program.matrix[i].length; j++) {
    originalDMatrix[i][j] = Program.matrix[i][j];
    // Create the table and give it the matrix THIS IS WHERE IT WONT WORK.
    final JTable originalDMatrixT = new JTable(originalDMatrix);
    [/code[
    ERROR OUTPUT:
    cannot resolve symbol
    symbol : constructor JTable (java.lang.String[][])
    location: class javax.swing.JTable
    final JTable originalDMatrixT = new JTable(originalDMatrix);
    ^
    1 error
    Errors compiling Results.

    Changing to strings gave same result but with Object:
    symbol  : constructor JTable (java.lang.Object[][])
    location: class javax.swing.JTable
            final JTable originalDMatrixT = new JTable(originalDMatrix);
                                            ^
    1 error

  • Using the PPDS setup matrix

    Hello All -
    I have 3 products A,B and C which  are run on a single line during a particular week(day). We have certain set-up times when we move from one product to another. Here are the set-up times:
    The sequence in which these products run on the line is decided by the plant scheduler during production planning. The production planners run heuristics and peform manual changes to the planned orders. They know which product runs in which shift but they do not necessarily adjust the planned orders to the hourly level.
    What we would like the system to do is somehow incorporate the set-up times when we move from one product to another.  We would like to see the the resource being consumed during the set-up time.
    Also, we are not in a position to use the optimizer. So any solutions involving the Optimizer are out of scope. Just want to achieve this using heuristics.
    To achieve this, I have created the following master data:
    1) Created 3 setup groups SG1(A), SG2(B), SG3(C).
    2) Created a setup matrix SM1 and set up the transitions for   all the above combinations.
    3) Assign the setup group to operations in a ppm
    4) Assign the setup matrix to the resource
    I then created 3 planned orders in production planning for the SAME day. All 3 have the same availability time 23:59:59 and based on run-rates we have different start times.
    I have the following questions:
    1) Which DS heuristic should I use to adjust the start times and the end times of these orders by considering the set-up times in the setup matrix?
    The resource should basically be consumed during these setup times. I have looked at "Reschedule" function in the DS planning board but I get an error when I run this. Please see end of this post for the error. The message says I may not have free capacity, but I do. I am using backward scheduling and infinite.
    2) Is there anyway the set-up times/matrix can be considered during production planning itself and not during detailed scheduling?
    3) Can the option of "Schedule Sequence" work for my scenario.
    Appreciate all your help.
    Varun
    Error during scheduling
    Message no. /SAPAPO/OM043
    Diagnosis
    The system could not schedule an order, operation or activity.
    This could have the following causes:
    The resource does not have any free working time or capacity.
    If you have set planning direction backwards in the strategy profile:
    There is not enough working time or capacity available for scheduling between now and the scheduling date.
    If you have set planning direction forwards in the strategy profile:
    There is not enough working time or capacity available for scheduling between the scheduling date and the end of the planning area.
    If you plan characteristics-dependently:
    You have assigned characteristics to operations of the order that do not agree with characteristics of the resources on which the operations are to be processed.
    The system cannot find any suitable characteristics on the resources and so it cannot schedule.
    Procedure
    Depending on which of the above reasons is the cause, change the following settings:
    Change the working times and capacities of the resources.
    Set the planning mode "infinite planning" in the strategy profile.
    Activate the planning direction forwards or backwards and reverse in the strategy profile.
    Change the characteristics that you have assigned to the resource.

    Thank you all -
    It was a mistake on my part. I was supposed to create a new "set up" activity before processing activity and make that relevant to set-up. I had the processing step checked for setp all this while. Now its working.
    Thanks
    Varun

  • Document for PPDS Optimizer Setup Matrix

    Dear All,
           Can I have a document or an implementation guide for PPDS Optimizer Setup Matrix?
    I have already checked the SAP help and Certification Material about this topic. But there is no more information on this topic. It will be great if you provide a document where I can learn from the scratch.
    Thanks a lot.
    Regards,
    Ram.

    Hi Ram,
    See wiki page:
    General PPDS wiki page
    http://wiki.sdn.sap.com/wiki/display/SCM/APO-PPDS
    Setup Matrix Generation in a Complex Manufacturing Evironment
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/00a618c4-8aad-2b10-6ebb-f70cb4470195
    Oficial doc
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/00a618c4-8aad-2b10-6ebb-f70cb4470195?quicklink=index&overridelayout=true
    Hope this help.
    Luiz Giani

  • Scheduling using  Setup Matrix in PPDS

    Hi Gurus,
    We are using PPDS Steup Matrix for scheduling orders. We have scenario that from product A to B, there is a changeover. And after producing A or B for certain hours, there is a cleanout of certain hours.
    Ex- Orders A for 5 hrs, B for 5 Hrs. Setup Matrix: A-B=1 hr and Max order ( A or B)=7 hrs after which cleanout should happen.
    While scheduling , A(5hrs) (Setup) B( 5 hrs), this is acheived.
    But result should be A(5hrs)(Setup)B(2hrs)(Cleanout)(B 3hrs)
    Please give your valuable inputs. How to map extra Cleanout ??/ Should we ceate another setup matrix for cleanout?? Can system take multiple setup matrix???
    thanks,
    Priya

    Hi Priya,
    I think Your case can be achieved through campaigm planning.
    Create a setup group 'PROD' in ECC.
    Under setup group 'PROD' maintain setup keys as 'A' & 'B'
    Assign these setup group and setup keys in master recipe.
    Maintain the same setup group & keys in APO also and than CIF PPM.
    Maintain the setup matrix and assign it to resources
    Create a campaign profile for 'PROD' with no of chargers(Orders) as 7.
    Now schedule orders by using optimization.
    After that create campaigns by using campaign heuristics on the resources.Campaigns will be created for every 7 hours.
    And then create cleanout order by using cleanout heuristics between campaigns.
    By this you will achiece setup between products and change over after your max run length also achieved by cleanout order between campaigns.
    Hope this is clear.
    Regards
    Sravan

  • Extending the setup matrix use

    Hi
    we would like to extend the setup matrix use for the halb products now, currently we use the setup matrix for the fert products and it works fine. our fert = halb+packing, when extending the setup matrix use to the halb products what changes need to be done.
    do we have to create a new setup matrix for the halbs or..can you pls share your ideas..

    Hi, its advisable to create a new setup matrix for the halb product.
    Ensure all the w.c on which setup sequencing is to be done are single mixed resource.
    Assign the newly created setup matrix to single mixed resource
    In the routing assign the setup group
    Re transfer your PDS
    create a test planned order in APO rrp3 and test if the setup group is arriving or not
    You ca use the existing sequencing heuristics
    Regards
    Amlan

  • Setup group and setup matrix

    Hi Gurus,
    Please brief me on the significance of setup group and setup matrix in APO and the effect of the same in planning?
    Thanks,
    Prasanth

    Hi Prashanth,
    Setup group tries to group products with similar characteristics.
    Setup matrix provides the sequence in which the set up groups
    can be executed.
    Setup sceanrio is used in cases where in the time taken for switching
    over from one product or group of products or category of products or
    charactersitics of products which is called as predecessor to another
    product or group of products or category of products or characteritiss of
    products which is called as successor.
    Say for eg, if you are having a scenario wherein
    you need to manufacture products with low weight,
    medium weight and heavy weight products.
    You can define in the set up matrix that for switch
    over from low weight to medium weight products for
    manufacturing, the set up time involved in 2 hours and
    the setup cost involved is Rs.100,
    Similarly, for switching over from heavy weight products
    to medium weight products, the set up time involved
    is 3 hours and the set up cost involved is Rs.50.
    Based on this information, system will frame a matrix
    of information and use during planning.
    Hope this information is clear to you.
    Please confirm whether your issue is resolved.
    Regards
    R. Senthil Mareeswaran.

  • Setup Matrix volume Doubts

    Hi experts,
    I have a couple of questions concerning the setup matrix volume.
    1-a)What setup matrix combination volume is considered  as acceptable?
       b)Which is the break point from where performance issues take place?
    3-What happens if the optimizer is optimizing orders and within those orders , there are features which are not included in the matrix.If this eventuality occurs, how the optimizer reacts?
    Regards,
    Analí

    Thanks a lot for your advise Frank!!
    Question Still pending review:
    3-What happens if the optimizer is optimizing orders and within those orders , there are features which are not included in the matrix.If this eventuality occurs, how the optimizer reacts?
    regards,
    Analí

  • Where we assign Exchange rate type at company code level,

    Dear All,
    Where we assign Exchange rate type at company code level, In 0BA7 we assign by Document type wise and OB22 will assign by controlling area wise , but we are not maintain Controlling area, exactly where we assign , and how it will pick at the time of PO creation ,
    Thanks in advance
    Vijay

    Hi,
    In OB22 we assign Exchange rate type against company code and not against controlling area .
    Regards,
    Shayam

  • Where to assign GL Account to cost center?

    Hello Friends,
    Actually in MIGO T.C , I  am issuing the material against the cost center.Now in MIGO T.C ,  in Account Assignment tab i give the cost center and other requied data and save.And in display mode when i check that document than by default system takes the GL Account.Now my question is where we assign the G/L Account to cost center?In FS00 T.C i checked in Edit cost element for that account, there in Default account assignment , no cost center is maintained.So from where system is picking this G/L Account?
    Thanks and Regards,
    Jitendra Dilip Chauhan

    Hi Jitendra,
    This setting is made in OBYC. This actually MM & FI integration.
    You check this in OBYC.
    1.First check your valuation class in material master.
    2.Then goto OBYC.
    3. Double click on GBB transaction key
    4.This will pop up chart of account.Maintain chart of account & enter.
    5.Here you will see that GL account for combination of Genral modification VBR & Valuation class.
    VBR: for internal goods issues (for example, for cost center)
    That means whenever you do Goods issue of material  for cost center which having same valuation class,this GL account will be automatically assigned.
    Hope this clear you.
    Regards,
    Raja.
    Edited by: Raja on May 8, 2009 9:46 AM

  • PPDS: I have a setup matrix in SAP ECC 6.0, and want to transfer the same to APO using Core Interface.

    PPDS: I have a setup matrix in SAP ECC 6.0, and want to transfer the same to APO using Core Interface. Has anyone done it before?

    Hi Subhash,
    Please open this link to see the details:
    http://help.sap.com/saphelp_scm70/helpdata/EN/89/bd3e42ce98033be10000000a1550b0/frameset.htm
    You perform the data transfer in the following sequence:
    Plant
    Setup groups
    Work centers
    Routings
    You check the setup groups in SAP APO.
    You create the setup matrixes in SAP SCM.
    Thanks, Marius

  • I have microsoft outlook installed on my Mac book pro, I can only use the outlook with the office server where it was setup, I can't use outlook else where, is there any way I can reset the settings in order to be able to use outlook every where?

    I have microsoft outlook installed on my Mac book pro, I can only use the outlook with the office server where it was setup, outlook won't work out of office, is there any way I can reset the settings in order to be able to use outlook every where?

    I can see my folders by clicking the X next to my name on the Inbox Folder.  So I have my folders now, just cannot see them in the left colum or see multiple windows on Outlook.  At this point, I can use the folders, just with limited functionality.  Thanks -Gina

  • Where to assign cost cnetre and actvity type

    hi
    all
    can any body tai lme
    where to assign cost cnetre and actvity type
    i assgn this actvity type in work center
    so than when ia ssign ctr to work cnetre
    actvity type automatically seen there

    i got some thing
    whats about teh date teh date mentioned in
    ctr-01.04.2007 to 31.12.2999
    kl01-01.04.2007 to 31.12.299
    now iam going to craet work cnterin costing tab the validy date i also mention the same 01.04.2007 to 31.12.2099
    what should imaintain in kp26
    should i maintain the version 0 and what to writte in from to to period
    any idea

  • Where we assign operational chart of accounts to country chart of account

    Hi Expert,
    where we assign operational chart of accounts to country chart of account.
    thnx,

    Hello,
    Use T.code OB62.
    SPRO --> Fin. Acc (New) --> Gen Led. --> Master data --> GL --> Prep --> Assing Co. Code to Chart of Accounts.
    Regards,
    Jaymin R. Bhatt

  • Where to assign HU in Ware house management

    I am trying to create tranfer order from inbound delivery  with Handling unit.
    I am getting error message PUTWAY FOR HANDLING UNIT FOR STORAGE TYPE 001 IS NOT POSSIBLE.
    i have tried  to enable the storage unit managemet SUM for storage type 001.  System is not accepting the switch on of SUM.
    Can any body know how to solve this problem.  where to assign the HU in warehouse.

    Hi ,
    Is your storage location an HU managed storage location, you create Handling units only in HU managed storage locations.
    For linking Storage location to HU please find the path below
    Spro --> logistics general -->Handling Unit Management --> Basics --> Material Management -->Inventory Management --> HU requirement for storage location
    Regards
    Krishna

Maybe you are looking for

  • ITunes Media on external drive and moved to new PC laptop

    Environment: Dell PC laptop, Window 7 32-bit, iTunes 12.1.1.4 I have all of my iTunes Media on an external hard-disk drive. I want to keep it on that drive. I have a new laptop and have connected the external drive to it. I have installed iTunes on t

  • I can't shut my iPod off!

    Yesterday, I was cleaning and accidentally dropped my iPod in a basin of water. It was probably only in there for fifteen or so seconds, and when I took it out, I patted it with a towel and shook it. Everything seems to work perfectly fine, except it

  • Hi there, I have a problem with my iphone3g. The '*', '0' and '

    Hi there, I have a problem with my iphone3g. The '*', '0' and '#' dont work on the keypad when i try to umlock my phone? When I swipe across the screen its fine, but when I try to enter passcode, it wont let me as the passcode has a '0' in it =/ this

  • "Unable to connect to server" when trying to accept the new terms and conditions for iCloud.

    I keep getting "Unable to connect to server" when trying to accept the new terms and conditions for iCloud.  What can I do?  I can access the internet, but my clash of the clans applications is failing.  The problem started January 1, 2014

  • Best practice GeoRaster and MapViewer?

    Hi, I want to see rasterfiles with using Oracle GeoRaster and MapViewer. I've bineary rasterfiles and aerial photographs(24 BIT). Until now I put the data with following parameters into the database: -     Oracle_inverleaving_type: BSQ -     Oracle_r